| Owner | Filings | Most Recent |
|---|---|---|
| Jamestown 47th Ave | 221 | 03/21/2026 |
| 3100 47 Avenue Property Investment | 184 | 07/08/2026 |
| Savanna Partners | 61 | 03/22/2026 |
| CF 3100 Falchi | 47 | 03/21/2026 |
| Ianvil Holdings | 21 | 03/21/2026 |
| CF3100 Falchi Ianvil Holding | 13 | 03/21/2026 |
| Tourneau | 7 | 03/21/2026 |
| 31-00 Holdings LLC CF-31-00-LLC | 6 | 03/21/2026 |
| CF 31-00 LLC 3100 Holdings | 6 | 03/21/2026 |
| 31-02 47th Ave Associates | 4 | 03/21/2026 |
| 31-02_47 AV | 4 | 03/21/2026 |
| Dano's | 3 | 03/21/2026 |
| Danos | 3 | 03/21/2026 |
| Associates by Sig | 3 | 03/21/2026 |
| 183 Madison | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/22/2016 | $257.5M | — | JAMESTOWN 47TH AVENUE, L.P. → 3100 47TH AVENUE PROPERTY INVESTORS III, LLC | $449/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Scott Segal | 1 | 10/08/2026 |
| GKV Architects | 2 | 09/16/2026 |
| Akfengineers | 18 | 05/13/2026 |
| MG Engineering | 6 | 04/28/2026 |
| DJ Associates Architect | 4 | 04/24/2026 |
| Meyers+ Engineers | 6 | 03/05/2026 |
| SSM Design LLP D/B/A Spector Group | 10 | 02/03/2026 |
| Imc Architecture | 2 | 03/17/2025 |
| Desimone Consulting Engineering | 6 | 01/08/2025 |
| Cany Architecture & Engineering | 1 | 01/06/2025 |
| HLW International | 1 | 07/11/2024 |
| Syska Hennessy Group | 1 | 07/11/2024 |
| Wellworth Consulting | 2 | 09/29/2023 |
| Richard Wainer Architect | 1 | 07/31/2023 |
| Startech Engineering | 1 | 04/07/2023 |
| Tan Engineering | 4 | 01/27/2023 |
| Twig Consulting Engineers | 3 | 09/13/2022 |
| KZ Engineering | 1 | 08/25/2022 |
| Gace | 1 | 08/16/2022 |
| Cherico King Architect | 1 | 05/03/2022 |
| Grant | 1 | 09/03/2021 |
| Kevin Gallen PE | 1 | 05/13/2021 |
| Ryan Soames Engineering | 4 | 09/22/2020 |
| Fiskaa Engineering | 3 | 03/05/2020 |
| New York & Company | 1 | 09/30/2019 |
| Joel Phagoo P.E | 1 | 12/01/2017 |
| Arra Architecture | 1 | 11/09/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| Metropolis Group | 100 | 03/21/2026 |
| DJ Associates Architect | 18 | 03/21/2026 |
| Core Consultants NYC | 8 | 03/21/2026 |
| A1 Expediting Service | 2 | 03/21/2026 |
| Codegreen | 2 | 03/21/2026 |
| Preemptive Solutions & Consulting | 2 | 03/21/2026 |
| Synergy Building Consultants | 1 | 03/21/2026 |
| D R Brown | 2 | 03/21/2026 |
| United Safety Consultants | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Savcon Construction | General Contractor | 36 | 07/08/2026 |
| Savcon | General Contractor | 33 | 07/08/2026 |
| Prime Mechanical Contracting | General Contractor | 7 | 07/08/2026 |
| Solid Development Group I | Scaffold | 6 | 03/21/2026 |
| Cooper Works | General Contractor | 5 | 07/08/2026 |
| Universal Superior Group* | General Contractor | 5 | 10/16/2026 |
| Advanced Plumbing Mechanical | Plumbing | 4 | 07/08/2026 |
| FC Newland General Contracting | General Contractor | 4 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 4 | 07/08/2026 |
| Advanced Plumbing, Mechanical & Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Five Boro Associates | Fire Protection | 4 | 07/08/2026 |
| JRM Construction Management | General Contractor | 3 | 04/09/2026 |
| Summit Interiors | General Contractor | 3 | 07/08/2026 |
| Marcos General Contractor | General Contractor | 3 | 03/21/2026 |
| Dynamic Plumbing & Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Republic Scaffold & Hoist | Scaffold | 2 | 07/08/2026 |
| Solution Mechanical Contng | Plumbing | 2 | 07/08/2026 |
| M&T Plumbing and Heating Co | Plumbing | 2 | 07/08/2026 |
| J.calnan & Associates | General Contractor | 2 | 03/21/2026 |
| The Sweet Construction GR | Scaffold | 2 | 03/21/2026 |
| Accurate Mechanical | Plumbing | 2 | 07/08/2026 |
| L.e.c.inc | General Contractor | 2 | 03/21/2026 |
| Accurate Mechanical | Fire Protection | 2 | 07/08/2026 |
| Vanquish Group | General Contractor | 2 | 03/21/2026 |
| Downtown Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Standard Plumbing Services | Plumbing | 1 | 07/08/2026 |
| Aero Electric | Electrical | 1 | 03/21/2026 |
| A + Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Boca Fire Products | Fire Protection | 1 | 07/08/2026 |
| Express Plumbing & Heating & Gas Leak | Plumbing | 1 | 07/08/2026 |
| TFP10 | Fire Protection | 1 | 10/16/2026 |
| M&T Plumbing and Heating Co | Fire Protection | 1 | 07/08/2026 |
| Samson Electric | Electrical | 1 | 03/21/2026 |
| Leader Electric Co | Electrical | 1 | 03/22/2026 |
| Maven Electric | Electrical | 1 | 03/22/2026 |
| Team Electric | Electrical | 1 | 03/22/2026 |
| Michael Mazzeo Electric | Electrical | 1 | 03/21/2026 |
| Vitale Eric | Electrical | 1 | 03/21/2026 |
| Alba Services | General Contractor | 1 | 07/08/2026 |
| A.W. & S. Construction Co | General Contractor | 1 | 07/08/2026 |
| Cogen Electrical Services | Electrical | 1 | 03/21/2026 |
| EG Munoz Construction | General Contractor | 1 | 07/08/2026 |
| NYC Renovation | General Contractor | 1 | 07/08/2026 |
| Interphase Electric | Electrical | 1 | 03/21/2026 |
| Call Metro Electrical Associates I | Electrical | 1 | 03/22/2026 |
| New Grand Electric | Electrical | 1 | 03/21/2026 |
| Bigman Brothers | Electrical | 1 | 03/21/2026 |
| Kwong Ming Electric | Electrical | 1 | 03/21/2026 |
| Standard Fire Protection | Fire Protection | 1 | 07/08/2026 |
| L.S. Sign Co | Sign hanger | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK Engineering | 678 | 12 | 10/08/2026 |
| Socotec Engineering | 4983 | 19 | 05/13/2026 |
| DJ Associates Architect | 2852 | 6 | 01/10/2025 |
| Sag Engineering & Consulting | 608 | 1 | 07/11/2024 |
| Startech Engineering | 1041 | 1 | 04/07/2023 |
| DNA Controlled Inspection | 554 | 18 | 02/17/2023 |
| Tan Engineering | 1291 | 3 | 01/27/2023 |
| Twig Special Inspections | 885 | 3 | 09/13/2022 |
| Gace Consulting Engineers | 1545 | 1 | 08/16/2022 |
| Metrospec Sia | 6420 | 1 | 05/03/2022 |
| Architectural Engineering | 6111 | 4 | 09/22/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Universal Superior Group* | 10/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dual Fuel Company | 10/15/2026 |
| DOB NOW | General Construction | Permit Issued | Universal Superior Group* | 09/09/2026 |
| DOB NOW | General Construction | Permit Issued | Universal Superior Group* | 08/28/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Universal Superior Group* | 05/07/2026 |
| DOB NOW | General Construction | Signed-off | Universal Superior Group* | 05/07/2026 |
| DOB NOW | Standpipe | Permit Issued | Advanced Plumbing, Mechanical & Sprinkler | 02/10/2026 |
| DOB NOW | Plumbing | Signed-off | Solution Mechanical Contng | 06/17/2025 |
| DOB NOW | Sprinklers | Signed-off | Advanced Plumbing, Mechanical & Sprinkler | 06/17/2025 |
| DOB NOW | Structural | Signed-off | Savcon Construction | 05/14/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 05/14/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 05/14/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 05/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Savcon Construction | 05/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Savcon Construction | 04/24/2025 |
| DOB NOW | Sprinklers | Signed-off | A + Sprinkler | 03/11/2025 |
| DOB NOW | Plumbing | Signed-off | A&H Plumbing | 02/21/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 02/21/2025 |
| DOB NOW | Sprinklers | Permit Issued | Standard Fire Supp | 02/21/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 02/21/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 02/21/2025 |
| DOB NOW | General Construction | Signed-off | Lorich Construction Management | 02/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Prime Mechanical Contracting | 01/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 01/30/2025 |
| DOB NOW | General Construction | Signed-off | JRM Construction Management | 01/30/2025 |
| DOB NOW | Structural | Signed-off | Savcon Construction | 01/13/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 01/10/2025 |
| DOB NOW | Plumbing | Permit Issued | Advanced Plumbing Mechanical | 09/09/2024 |
| DOB NOW | Plumbing | Signed-off | Advanced Plumbing Mechanical | 09/06/2024 |
| DOB NOW | General Construction | Signed-off | A.W. & S. Construction Co | 08/16/2024 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 02/26/2024 |
| DOB NOW | Plumbing | Signed-off | M&T Plumbing and Heating Co | 02/05/2024 |
| DOB NOW | General Construction | Signed-off | Summit Interiors | 02/05/2024 |
| DOB NOW | General Construction | Signed-off | Alba Services | 01/31/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Prime Mechanical Contracting | 01/31/2024 |
| DOB NOW | Sprinklers | Signed-off | M&T Plumbing and Heating Co | 01/09/2024 |
| DOB NOW | Plumbing | Signed-off | M&T Plumbing and Heating Co | 01/09/2024 |
| DOB NOW | Standpipe | Signed-off | Five Boro Associates | 01/04/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 01/03/2024 |
| DOB NOW | General Construction | Signed-off | Summit Interiors | 12/20/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/13/2026 | Signed-off | Savcon Construction | Air Conditioning Systems, Heating Systems | |
| 03/05/2026 | Signed-off | JRM Construction Management | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric PEFY-P96NMHSU-E 94,600 BTU · Vrf Indoor ×4 PEFY-P24NMAU-E4 23,700 BTU · Vrf Indoor ×1 PEFY-P27NMAU-E4 26,300 BTU · Vrf Indoor ×1 PEFY-P48NMAU-E4 47,300 BTU · Vrf Indoor ×1 TPEFY-P024MA144A 23,700 BTU · Vrf Indoor ×1 TPEFY-P027MA144A 26,300 BTU · Vrf Indoor ×1 TPEFY-P048MA144A 47,300 BTU · Vrf Indoor ×1 Heating Zehnder RH-18 13,000 BTU · Unit Heater ×2 RH-24 17,300 BTU · Unit Heater ×2 RH-340 273,000 BTU · Unit Heater ×2 Ventilation Greenheck CSP-A3300-VG 1,645 CFM · Exhaust Fan ×2 CSP-B110 75 CFM · Exhaust Fan ×1 GREENHECK SP-L80 75 CFM · Exhaust Fan ×1 |
| 09/22/2020 | Permit Issued | EG Munoz Construction | Air Conditioning Systems | Cooling United Cool Air C3G3ASHA15VX 3 tons · Split System ×2 |
| 09/30/2019 | Permit Issued | NYC Renovation | Ventilation Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | Sprinkler System |
| 04/28/2026 | — | — | Sprinkler System |
| 03/05/2026 | Permit Issued | Standard Fire Protection | Sprinkler System |
| 04/14/2025 | Permit Issued | Advanced Plumbing, Mechanical & Sprinkler | 405 heads, 1 outlets |
| 09/13/2022 | Permit Issued | Boca Fire Products | 13 heads |
| 09/22/2020 | Permit Issued | Dynamic Plumbing & Sprinkler | 35 heads |
| 03/05/2020 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | Water/Sanitary |
| 03/05/2026 | Signed-off | Standard Plumbing Services | Water/Sanitary |
| 07/11/2024 | Signed-off | Advanced Plumbing Mechanical | Water/Sanitary |
| 02/01/2024 | Signed-off | M&T Plumbing and Heating Co | Water/Sanitary |
| 09/22/2020 | Signed-off | Downtown Plumbing & Heating | Water/Sanitary |
| 03/05/2020 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/18/2026 | Permit Issued | Nova Electric | — |
| 05/18/2026 | Complete | Nova Electric | General Wiring |
| 06/24/2025 | Permit Issued | Leader Electric Co | General Wiring |
| 02/07/2025 | Complete | Metropolis Electric | General Wiring |
| 02/06/2025 | Complete | I&E Electric | General Wiring |
| 05/17/2024 | Complete | Metropolis Electric | General Wiring |
| 02/12/2024 | Complete | Northeast Electric | General Wiring |
| 10/03/2023 | Complete | Top Shelf Electric | — |
| 08/14/2023 | Permit Issued | AUR0RA Electrical Contg | — |
| 09/06/2022 | Permit Issued | Akay Electric | General Wiring |
| 08/05/2022 | Permit Issued | Team Electric | General Wiring |
| 04/09/2022 | Complete | Matros Automated Electrical | — |
| 03/18/2021 | Permit Issued | Update Systems Electrical | General Wiring |
| 07/29/2020 | Complete | MLB Electrical | General Wiring |
| 06/16/2020 | Complete | Right Away Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/01/2017 | Permit Issued | Republic Scaffold & Hoist | Scaffold |
| 11/09/2017 | Permit Issued | The Sweet Construction GR | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 03/31/2026 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 03/27/2026 | Fail-Final SP - Up to 3 Requested Floors | Fail | View ↗ |
| 03/25/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/27/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/21/2025 | Fail-Final PL - Underground | Fail | View ↗ |
| 03/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/05/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/22/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/16/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/15/2024 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 05/07/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 05/02/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/02/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/02/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/24/2026 | Electrical motors and elevators | — | energy_progress |
| 08/10/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 08/10/2026 | Vestibules | — | energy_progress |
| 08/10/2026 | Masonry | Ari Kamo | special |
| 08/10/2026 | Luminous Exit Path Markings | Ari Kamo | special |
| 08/10/2026 | Air barrier - visual inspection | — | energy_progress |
| 08/10/2026 | Fenestration air leakage | — | energy_progress |
| 08/10/2026 | Fenestration areas | — | energy_progress |
| 08/10/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/10/2026 | Insulation placement and R values | — | energy_progress |
| 05/13/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 05/13/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | Lighting controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | Electrical motors and elevators | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 05/13/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 05/13/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/13/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 05/13/2026 | Interior lighting power | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/13/2026 | Duct leakage testing, insulation and design | ALEXIS SCHLESSINGERMAN | energy_progress |
| 04/17/2026 | Metering | Ari Kamo | energy_progress |
| 04/17/2026 | Interior lighting power | Ari Kamo | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| NYC Hra | Government / Civic | Cellar, Floors 1–4 | Project Q01376268 Project Q01391423 |
| U.S. Citizenship and Immigration Services | Government / Civic | Floor 5 | Project Q01352502 |
| Savanna | Office | Cellar, Floors 1–5, Roof | Project Q01100685 Project Q01100962 Project Q01101607 Project Q01101841 Project Q01105125 Project Q00818893 Project Q00787769 Project Q00787619 Project Q00787680 Project Q00204429 |
| Future Storage of Archives | Office | Floors 3, 4 | Project Q01044694 Project Q01044715 |
| Savanna Maman Commissary | Restaurant / Food Service | Floor 1 | Project Q00730265 Project Q00773307 |
| Maman Commissary | Restaurant / Food Service | Floor 1 | Project Q00773236 |
| Spaces | Office | Floor 3 | Project Q00796091 Project Q00796110 Project Q00796123 |
| Sans Bakery | Restaurant / Food Service | Floor 1 | Project Q00511652 |
| Juice Press Commissary | Restaurant / Food Service | Floor 1 | Project Q00311135 Project Q00311146 Project Q00311168 |
| MTP Parking | Parking | Sub-basement | Project Q00210032 |