| Owner | Filings | Most Recent |
|---|---|---|
| RXR Realty | 344 | 08/30/2026 |
| Paramount Group | 325 | 03/21/2026 |
| Old Slip Properties | 311 | 03/21/2026 |
| Old Slip Associates | 46 | 03/21/2026 |
| Slip Associates LP Financial Square | 12 | 03/21/2026 |
| New York City Economic Development | 9 | 07/08/2026 |
| Fire Department of the City of New York | 7 | 03/21/2026 |
| CB Richard Ellis | 6 | 03/21/2026 |
| Assay Partners | 2 | 03/21/2026 |
| Ols Slip Associates | 2 | 03/21/2026 |
| 32 Slipstream | 1 | 03/22/2026 |
| RXR Construction Services | 1 | 03/22/2026 |
| Nycedc | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/13/2015 | $197.5M | — | OLD SLIP PROPERTY LLC → 32 SLIPSTREAM, LLC | $203/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Ware Malcomb | 1 | 09/15/2026 |
| Nelson Architecture & Interiors | 11 | 08/12/2026 |
| AKF Engineers | 47 | 08/11/2026 |
| MG Engineering | 2 | 07/07/2026 |
| CFS Engineering | 3 | 06/27/2025 |
| G3 Architecture Interiors Planning | 1 | 06/27/2025 |
| Ospino Engineering | 2 | 10/01/2024 |
| Thornton Tomasetti | 2 | 08/14/2024 |
| Vocon | 1 | 01/10/2024 |
| Rise Projects | 1 | 12/14/2023 |
| Env Architects | 1 | 09/28/2022 |
| Rodney D. Gibble Consulting Engineering | 3 | 03/22/2022 |
| HLW International | 1 | 03/22/2022 |
| Little Diversified Architectural Co | 4 | 12/03/2021 |
| Bonsignore Architects | 1 | 09/22/2021 |
| Cosentini Associates | 5 | 02/10/2021 |
| SSM Design LLP D/B/A Spector Group | 1 | 11/26/2019 |
| John P. Fox, Architect | 1 | 02/15/2019 |
| Paul Perdek, Prof. Engineering | 2 | 06/28/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Empire City Consultants | 12 | 03/21/2026 |
| Codegreen | 56 | 03/21/2026 |
| Metropolis Group | 4 | 03/21/2026 |
| Rizzo Group | 4 | 03/21/2026 |
| Hierarch-E | 4 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| Milrose Consultants | 8 | 03/21/2026 |
| Cornerstone | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RXR Construction Service | General Contractor | 62 | 08/25/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 14 | 08/30/2026 |
| Par Fire Protection | Fire Protection | 11 | 07/08/2026 |
| PJP Installers | Scaffold | 7 | 07/08/2026 |
| SHR Group | General Contractor | 7 | 07/08/2026 |
| Theodore Williams Construction | General Contractor | 6 | 07/08/2026 |
| Nead Electric | Electrical | 6 | 03/21/2026 |
| MJH Energy Consulting | Plumbing | 4 | 07/29/2026 |
| Henegan Construction Co | General Contractor | 4 | 03/21/2026 |
| MJH Energy Consulting | Fire Protection | 4 | 07/29/2026 |
| Whalen Construction | General Contractor | 4 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 3 | 07/08/2026 |
| S.B.A. Plumbing | Plumbing | 2 | 07/08/2026 |
| Difazio Electric NY | Electrical | 2 | 03/22/2026 |
| Adco Electrical | Electrical | 2 | 03/21/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 2 | 03/21/2026 |
| Coyle Contracting | General Contractor | 2 | 07/08/2026 |
| SHR Group | Scaffold | 2 | 07/08/2026 |
| Clune Construction Co | General Contractor | 1 | 09/18/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 1 | 03/21/2026 |
| Usis Electric | Electrical | 1 | 03/22/2026 |
| Transform Electl Contractors I | Electrical | 1 | 03/22/2026 |
| Allran Electric of NY | Electrical | 1 | 03/22/2026 |
| P.E. Stone | Electrical | 1 | 03/22/2026 |
| Ashlar Mechanical | Fire Protection | 1 | 07/08/2026 |
| Demar Mechanical | Plumbing | 1 | 07/08/2026 |
| Demar Plumbing | Fire Protection | 1 | 07/08/2026 |
| Donato Plumbing | Plumbing | 1 | 08/26/2026 |
| KG Sprinkler | Fire Protection | 1 | 07/23/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| Maccarone Plumbing | Plumbing | 1 | 07/08/2026 |
| Egg Electric | Electrical | 1 | 03/21/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/21/2026 |
| Kleinknecht Electric Co | Electrical | 1 | 03/22/2026 |
| Stanco System Electrical Cont | Electrical | 1 | 03/21/2026 |
| Preferred Mechanical | Plumbing | 1 | 07/08/2026 |
| RJR Maintenance Group | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Consulting and Testing SE | 6152 | 34 | 08/12/2026 |
| Alan Margolin & Associates | 423 | 13 | 06/18/2026 |
| Codegreen | 510 | 9 | 12/17/2025 |
| CFS Engineering | 615 | 1 | 06/27/2025 |
| Skyline Engineering | 267 | 4 | 03/24/2022 |
| AK Engineering | 678 | 5 | 02/10/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Clune Construction Co | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 08/27/2026 |
| DOB NOW | Standpipe | Permit Issued | Abco-Peerless Sprinkler | 08/27/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 08/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | MJH Energy Consulting | 07/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | MJH Energy Consulting | 07/28/2026 |
| DOB NOW | Plumbing | Permit Issued | Donato Plumbing | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG Sprinkler | 07/22/2026 |
| DOB NOW | Plumbing | Permit Issued | MJH Energy Consulting | 04/23/2026 |
| DOB NOW | Sprinklers | Permit Issued | MJH Energy Consulting | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 04/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 04/22/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 03/27/2026 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 12/17/2025 |
| DOB NOW | Standpipe | Permit Issued | Abco-Peerless Sprinkler | 09/23/2025 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 09/23/2025 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 09/05/2025 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 09/05/2025 |
| DOB NOW | Plumbing | Permit Issued | Demar Mechanical | 09/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | Demar Plumbing | 09/04/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 08/14/2025 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 08/12/2025 |
| DOB NOW | General Construction | Signed-off | Coyle Contracting | 07/08/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Pedrol Contracting | 07/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Coyle Contracting | 07/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR Construction Service | 06/07/2025 |
| DOB NOW | General Construction | Permit Issued | RXR Construction Service | 06/07/2025 |
| DOB NOW | Sprinklers | Permit Issued | MJH Energy Consulting | 06/02/2025 |
| DOB NOW | Plumbing | Permit Issued | MJH Energy Consulting | 05/28/2025 |
| DOB NOW | Sprinklers | Signed-off | MJH Energy Consulting | 05/22/2025 |
| DOB NOW | Plumbing | Permit Issued | MJH Energy Consulting | 05/22/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | SHR Group | 05/13/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/27/2026 | Permit Issued | RXR Construction Service | Air Conditioning Systems | Cooling |
| 12/17/2025 | Permit Issued | RXR Construction Service | Air Conditioning Systems, Associated Ducts and Piping | |
| 07/14/2025 | Permit Issued | RXR Construction Service | Associated Ducts and Piping | Ducts & Piping N/A na |
| 05/16/2025 | Permit Issued | RXR Construction Service | Associated Ducts and Piping | Ducts & Piping N/A na |
| 04/01/2025 | Permit Issued | RXR Construction Service | Associated Ducts and Piping | Ducts & Piping N/A na |
| 10/27/2020 | Signed-off | RXR Construction & Development | Air Conditioning Systems | Cooling Vertiv CRV CR019RW 81,100 BTU · Crac Unit ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | — | — | — |
| 07/17/2026 | Permit Issued | KG Sprinkler | 116 heads |
| 03/27/2026 | Permit Issued | MJH Energy Consulting | 355 heads |
| 07/14/2025 | Permit Issued | Demar Plumbing | 173 heads |
| 05/15/2025 | Permit Issued | MJH Energy Consulting | 198 heads |
| 04/01/2025 | Signed-off | MJH Energy Consulting | 198 heads |
| 08/13/2024 | Signed-off | Par Fire Protection | 4 heads |
| 10/29/2020 | Signed-off | Par Fire Protection | — |
| 10/27/2020 | Signed-off | Par Fire Protection | 1 outlets |
| 10/23/2019 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | — | — | — |
| 07/17/2026 | Permit Issued | Donato Plumbing | Water/Sanitary |
| 03/27/2026 | Permit Issued | MJH Energy Consulting | Water/Sanitary |
| 01/20/2026 | Permit Issued | MJH Energy Consulting | Water/Sanitary |
| 07/14/2025 | Permit Issued | Demar Mechanical | Water/Sanitary |
| 07/14/2025 | — | — | — |
| 04/01/2025 | Permit Issued | MJH Energy Consulting | Water/Sanitary |
| 10/27/2020 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 01/09/2020 | Signed-off | Lab Plumbing & Heating Co | Water/Sanitary |
| 09/04/2019 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/02/2026 | Permit Issued | Arcadia Elect'l Co | General Wiring |
| 05/04/2026 | Permit Issued | Arcadia Elect'l Co | General Wiring |
| 03/12/2026 | Permit Issued | Transform Electl Contractors I | — |
| 03/12/2026 | Complete | Transform Electl Contractors I | General Wiring |
| 07/21/2025 | Permit Issued | Difazio Electric NY | — |
| 07/21/2025 | Permit Issued | Difazio Electric NY | — |
| 07/21/2025 | Permit Issued | Difazio Electric NY | — |
| 07/21/2025 | Permit Issued | Difazio Electric NY | — |
| 07/18/2025 | Complete | Usis Electric | — |
| 06/16/2025 | Complete | Transform Electl Contractors I | General Wiring |
| 05/27/2025 | Complete | Transform Electl Contractors I | General Wiring |
| 11/04/2024 | Permit Issued | V Electric NY | — |
| 08/09/2024 | Complete | Kleinknecht Electric Co | General Wiring |
| 01/23/2024 | Complete | Kleinknecht Electric Co | General Wiring |
| 10/17/2022 | Complete | H. & L. Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/26/2021 | Signed-off | RXR Construction & Development | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/01/2024 | Permit Issued | Pedrol Contracting | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/02/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/30/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/08/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/17/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/01/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/12/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/14/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/06/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/06/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/02/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/02/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/30/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/30/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/29/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Final | DAMIAN MELO | progress |
| 08/04/2026 | Duct leakage testing, insulation and design | DANIEL CREIGHTON | energy_progress |
| 08/04/2026 | Lighting controls | DANIEL CREIGHTON | energy_progress |
| 08/04/2026 | Interior lighting power | DANIEL CREIGHTON | energy_progress |
| 07/17/2026 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 07/17/2026 | Energy Code Compliance Inspections | DANIEL CREIGHTON | progress |
| 07/17/2026 | Final | DANIEL CREIGHTON | progress |
| 07/17/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 07/17/2026 | Mechanical Systems | DANIEL CREIGHTON | special |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 07/08/2026 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 07/08/2026 | Standpipe Systems | DANIEL CREIGHTON | special |
| 07/08/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 07/08/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/25/2026 | Final | Young Suh | progress |
| 06/25/2026 | Fire-Resistance Rated Construction | Young Suh | progress |
| 03/25/2026 | Metering | DANIEL CREIGHTON | energy_progress |
| 03/25/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 03/25/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 03/25/2026 | Duct leakage testing, insulation and design | DANIEL CREIGHTON | energy_progress |
| 03/25/2026 | Ventilation and air distribution system | DANIEL CREIGHTON | energy_progress |
| 03/25/2026 | Electrical motors and elevators | DANIEL CREIGHTON | energy_progress |
| 03/25/2026 | Interior lighting power | DANIEL CREIGHTON | energy_progress |
| 03/25/2026 | HVAC-R and service water heating system controls | DANIEL CREIGHTON | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Incadia | Office | Floor 4 | Project M01432972 Project M01432982 Project M01432991 |
| NYS CJC OIJ | Office | Floors 6, 35 | Project M01374244 Project M01374287 Project M01374310 Project M01374327 |
| Lamonsoff | Office | Floor 8 | Project M01320177 Project M01269902 Project M01269903 Project M01269886 |
| CFGMS | Office | Floor 6 | Project M01242530 Project M01242534 Project M01242537 Project M01242525 |
| Candid | Office | Floor 24 | Project M01240434 Project M01240449 |
| Daiwa Capital Markets | Office | Floor 11 | Project M00584098 |
| Truist - CRC Insurance | Office | Floor 4 | Project M00570943 Project M00570960 |
| Fuse FX | Office | Floor 17 | Project M00409426 Project M00409416 Project M00409419 Project M00410612 |
| Cahill Gordon & Reindel | Office | Floors 17–22 | Project M00214910 Project M00214922 Project M00214924 |
| RXR Construction Services | Office | Cellar, Floor 1 | Project M00202254 |