Roof10p · 2 filings · 10 docs
Mechanical
Issued Permit Scope
Mechanical Systems
modification to existing HVAC system as per plans filed herewith. no change is use, egress or occupancy under this application.
On file for this project
6 documents · 1 drawing sheet
MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Floor 355p · 3 filings · 10 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Structural
Modification to plumbing fixtures and sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
On file for this project
4 documents · 2 drawing sheets
removal of plumbing fixtures and installation of temp loop system.
On file for this project
3 documents · 2 drawing sheets
Removal of existing stair on 35th floor and infill of the existing opening. No change in use, egress or occupancy.
On file for this project
3 documents
Floor 3451p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to plumbing fixtures and sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
On file for this project
4 documents
Installation of non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
On file for this project
3 documents
Slab infill, support of MEP equipment, MEP duct openings, (ADD. ALT): existing steel beam penetrations & reinforcement as per plans filed herewith. no change in use, egress or occupancy under this application.
On file for this project
5 documents
Latest 3 of 6 filings on this floor.
Floor 3353p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PROPOSE A VERY MINOR PARTITION CHANGE AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY
On file for this project
2 documents
Sprinkler modifications taking place on the 33rd FL construction /34th FL marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents
Mechanical modifications taking place on 33rd FL construction /34th FL marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3233p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEADS WITH PIPES.
On file for this project
8 documents · 1 drawing sheet
RENOVATION OF EXISTING OFFICE SPACES INCLUDING MODIFICATION OF PARTITIONS, FLOORING, AND CEILING. LIGHTING, AND MINOR CARPENTRY WORKS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF AC UNIT AND MODIFICATION OF DUCT WORKS, CEILING DIFFUSERS AND RETURN GRILLES.
On file for this project
9 documents · 1 drawing sheet
Floor 3132p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEADS WITH PIPES.
On file for this project
8 documents · 2 drawing sheets
RENOVATION OF EXISTING OFFICE SPACES INCLUDING MODIFICATION OF PARTITIONS, FLOORING, AND CEILING. LIGHTING, AND MINOR CARPENTRY WORKS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
15 documents
INSTALLATION OF AC UNIT AND MODIFICATION OF DUCT WORKS, CEILING DIFFUSERS AND RETURN GRILLES.
On file for this project
9 documents
Floor 301p · 1 filing · 3 docs
Mechanical
Mechanical modifications taking place on 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Floor 2949p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing modifications taking place on the 29th fl Con/30th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 29th fl Con/30th fl marketing fl as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Mechanical modifications taking place on 29th fl Con/30th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 288p · 3 filings · 10 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 28th floor (Permira) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system on the 28th floor (Permira) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing sprinkler system on the 28th floor (Permira) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 27Under Construction52p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing modifications taking place on the 27th fl Con/28th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on 27th fl Con/28th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents
Sprinkler modifications taking place on the 27th fl Con/28th fl marketing fl as per plans filed herewith. No change in use, egress or occupancy
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2640p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE 26TH FLOOR (PRE-BUILTS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
partial system replacement of an existing constant air volume system. the existing air handling unit and associated controls are outside of this scope of work.
On file for this project
5 documents
Installation of sprinkler heads and piping to provide coverage of new office layout as shown on plans filed herewith.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 2515p · 3 filings · 11 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 25TH FLOOR (NEWLIGHT PARTNERS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
MODIFICATIONS TO THE EXISTING PLUMBING SYSTEM ON THE 25TH FLOOR (NEWLIGHT PARTNERS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE 25TH FLOOR (NEWLIGHT PARTNERS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 2444p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Filing herewith plumbing plans to indicate plumbing work as shown on plans. There will be no change of use, occupancy or egress under this application.
On file for this project
4 documents · 1 drawing sheet
FILING HERWITH STANDPIPE DRAWINGS TO INDICATE THE RELOCATION OF FIRE HOSE CABINET AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
12 documents · 2 drawing sheets
FILING HEREWITH ARCHOTECTURAL PLANS FOR INTERIOR RENOVATION. WORK TYPE TO INCLUDE NON-STRUCTURAL DEMO AND GENERAL CONSTRION WORK AS SHOWN ON PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2350p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith plumbing plans to indicate plumbing work as shown on plans. There will be no change of use, occupancy or egress under this application.
On file for this project
4 documents · 1 drawing sheet
FILING HERWITH STANDPIPE DRAWINGS TO INDICATE THE RELOCATION OF FIRE HOSE CABINET AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
12 documents · 1 drawing sheet
FILING HEREWITH ARCHOTECTURAL PLANS FOR INTERIOR RENOVATION. WORK TYPE TO INCLUDE NON-STRUCTURAL DEMO AND GENERAL CONSTRION WORK AS SHOWN ON PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 22Under Construction13p · 17 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Interior renovation as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 5 drawing sheets
Modifications to existing mechanical system as per plans filed herewith.
On file for this project
5 documents
Modification to Plumbing and Sprinkler Systems as per plans filed herewith.
On file for this project
3 documents
Latest 3 of 17 filings on this floor.
Floor 2189p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural changes as indicated on plans.
On file for this project
43 documents · 2 drawing sheets
Structural modifications taking place on the 20th fl construction 21st floor marketing as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Floor 20Under Construction168p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Alt Co filed to include accessory Terrace on CO and to increase population on the 20th construction/ 21st marketing floor
On file for this project
16 documents · 1 drawing sheet
Project M01199136Permit Issued · 01/20/2026
Sprinkler modifications taking place on the 20th Fl construction/21st Fl marketing as per plans filed herewith. No change in use, egress or occupancy
On file for this project
6 documents
Project M01199132Permit Issued · 01/13/2026
Mechanical modifications taking place on 20th Fl construction/21st Fl marketing as per plans filed herewith. No change in use, egress or occupancy
On file for this project
11 documents
Latest 3 of 11 filings on this floor.
Floor 1970p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Plumbing modifications taking place on the 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents
Sprinkler modifications taking place on the 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents
General construction modifications taking place on the 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
7 documents
Latest 3 of 9 filings on this floor.
Floor 1854p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural Modifications: Installation of new steel beams, brackets, bases, new rough slab stair openings and stringers on the 18 (M)/ 17 (CO) & 19 (M)/ 18 (CO) Floors as per plans (Audax Group - Connecting Stairs.) No change to use, egress or occupancy.
On file for this project
5 documents
Replace (7) WC, (6) Lavs, (3) URs, (2) DFs and Install (1) HWH, (2) Chillers, (2) CM, (1) IM, (1) FD and associated CW/sanitary piping on the 18th Floor; and Replace (1) Water Dispenser on the 19th Floor as per plans (Audax Group - Buildout & Stairs.)
On file for this project
7 documents · 1 drawing sheet
Relocation of (1) FHC and SD piping on the 18th Floor; Install (8) temporary head and loop and Install (137) new heads and associated piping on 18th Floor; Relocate (2) existing heads on the 19th Floor as per plans (Audax Group.) No change to u, e or o.
On file for this project
4 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1718p · 4 filings · 17 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Structural
Plumbing modifications taking place on the 16th fl Con/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Structural modifications taking place on the 16th & 17th construction, 17th & 18th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents
General construction modifications taking place on the 16th & 17th construction, 17th & 18th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 16Under Construction67p · 16 filings · 20 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing modifications taking place on the 16th fl Con/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents
Sprinkler modifications taking place on the 16th fl Con/17th fl marketing fl as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents · 3 drawing sheets
Structural modifications taking place on the 16th & 17th construction, 17th & 18th marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents
Latest 3 of 16 filings on this floor.
Floor 1567p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
ADDITIONS/MODIFICATIONS TO EXISTING SPRINKLER/STANDPIPE. EXISTING SP TEMP LOOP IN PLACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Modifications to existing PL system, fixtures and related piping. Piping work under 15th floor slab. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
MECHANICAL WORK AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 14
Floor 1363p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Raymond James- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents
Modifications to the existing standpipe system (Raymond James- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing plumbing system (Raymond James- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Latest 3 of 7 filings on this floor.
Floor 1296p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents
Modifications to the existing HVAC system (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 1195p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing HVAC system (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 1071p · 7 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Raymond James- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Modifications to the existing standpipe system (Raymond James- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing plumbing system (Raymond James- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 938p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing plumbing system (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Installation of new sprinkler heads and associated piping (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing HVAC system (Raymond James) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 8
Floor 738p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modifications to the existing standpipe system (Pzena) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Installation of a new sprinkler system (Pzena) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to the existing plumbing system (Pzena) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 6125p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Mechanical modifications taking place on the 2, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 2 drawing sheets
General construction modifications taking place on the 2nd, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 9 drawing sheets
Sprinkler modifications taking place on the 2, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
8 documents
Latest 3 of 5 filings on this floor.
Floor 5124p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Mechanical modifications taking place on the 2, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 4 drawing sheets
General construction modifications taking place on the 2nd, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 7 drawing sheets
Sprinkler modifications taking place on the 2, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
8 documents
Latest 3 of 5 filings on this floor.
Floor 4123p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Mechanical modifications taking place on the 2, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 2 drawing sheets
General construction modifications taking place on the 2nd, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 8 drawing sheets
Sprinkler modifications taking place on the 2, 4-6 floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
8 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction49p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to Plumbing and Sprinkler systems as per plans filed herewith.
On file for this project
4 documents · 2 drawing sheets
Interior renovation as per plans filed herewith.
On file for this project
5 documents
Modification to Mechanical systems as per plans filed herewith.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2285p · 19 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on 1st & 2nd floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
13 documents · 4 drawing sheets
Latest 3 of 19 filings on this floor.
Floor 1220p · 27 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
General construction modifications taking place on the 1st floor facade as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 2 drawing sheets
Replacement of (2) WSHPs in-kind. (1) 10-ton and (1) 7.5-ton.
On file for this project
3 documents · 2 drawing sheets
Plumbing modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 25 filings on this floor.
Cellar36p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications taking place on the Cellar as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
General construction modifications taking place on the cellar, 1st-3rd floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents
Sprinkler modifications taking place on cellar, 1st thru 3rd floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Sub-Cellar21p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MODIFICATION TO EXISTING PLUMBING/SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 3 drawing sheets
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 8 drawing sheets
MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Site & exterior28p · 9 filings · 20 docs
ArchitectureCivilEquipmentMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Sign · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS AT PARK AVENUE AND EAST 51ST STREET ELEVATIONS.
On file for this project
6 documents · 7 drawing sheets
General construction modifications taking place on the 1st floor facade as per plans filed herewith. No change in use, egress or occupancy
On file for this project
10 documents · 12 drawing sheets
INSTALL ILLUMINATED WINDOW SIGN ON INTERIOR WALL (MUTUAL OF AMERICA FINANCIAL GROUP)
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Filed — no permit issued8p · 2 filings · 5 docs
ArchitectureGeneral
IRA to assist with Condition Assessment
On file for this project
2 documents · 1 drawing sheet
General construction modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 7 drawing sheets