| Owner | Filings | Most Recent |
|---|---|---|
| SIUH | 14 | 09/29/2026 |
| NORTHWELL HEALTH (SIUH) | 146 | 03/22/2026 |
| STATEN ISLAND UNVRST HOSPITAL | 3 | 03/22/2026 |
| SAL CALCAGNO CONST. CORP. | 1 | 03/22/2026 |
| SAL CALCAGNA CONST. CO | 1 | 03/22/2026 |
| THE STATEN HOSPITAL | 2 | 03/22/2026 |
| S I UNIVERSITY HOSPITAL | 139 | 03/22/2026 |
| SI UNIV HOSPITAL | 12 | 03/21/2026 |
| STATEN ISL. UNIV. HOSPITAL | 10 | 03/21/2026 |
| STATEN UNIVERSITY HOSPITAL | 6 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MAGARAM ENGINEERING SERVICES | 1 | 08/13/2026 |
| GILSANZ MURRAY STEFICEK LLP | 12 | 07/21/2026 |
| LIZARDOS ENGINEERING | 3 | 07/16/2026 |
| LEVIN ENGINEERING PLLC | 3 | 06/25/2026 |
| JEFFREY PRITCHETT | 3 | 06/22/2026 |
| LILKER ASSOCIATES CONSULTING ENGINE | 13 | 06/02/2026 |
| BR+A CONSULTING ENGINEERS | 8 | 04/07/2026 |
| EYP ARCHITETURE & ENGINEERING | 5 | 04/02/2026 |
| HDR ARCHITECTURE & ENGINEERING | 2 | 04/02/2026 |
| AKF ENGINEERS, LLP | 11 | 04/01/2026 |
| JAROS BAUM & BOLLES | 1 | 03/25/2026 |
| THE MCGUIRE GROUP ARCHITECTS | 1 | 03/12/2026 |
| ROBERT DRUCTOR | 1 | 02/05/2026 |
| HDR | 2 | 12/31/2025 |
| WELLWORTH CONSULTING LLC | 14 | 12/30/2025 |
| JEFFREY BERMAN ARCHITECT | 2 | 12/12/2025 |
| DAVID J DARCY, ARCHITECT | 2 | 12/05/2025 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 2 | 08/19/2025 |
| KMB DESIGN GROUP, LLC | 1 | 04/03/2025 |
| SHANE R. HAMILTON | 2 | 01/10/2025 |
| WSP | 1 | 10/18/2024 |
| FRANCIS CAUFFMAN ARCHITECTS (FCA) | 3 | 10/03/2024 |
| GT WIRELESS ENGINEERING, PLLC | 2 | 10/01/2024 |
| DONALD H BERG, ARCHITECT | 1 | 05/09/2024 |
| KALLEN AND LEMELSON | 6 | 01/10/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| UPRIGHT EXPEDITERS | 72 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 42 | 03/21/2026 |
| METROPOLIS GROUP INC | 20 | 03/21/2026 |
| DAVID J DARCY ARCHITECT | 16 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 14 | 03/21/2026 |
| SUPPORT BUILDINGS OF NEW YORK | 4 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 3 | 03/21/2026 |
| DSENY ENGINEERING SERVICES | 2 | 03/21/2026 |
| RIGHT WAY SERVICES NYC | 2 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SPRING SCAFFOLDING LLC | General Contractor | 33 | 07/08/2026 |
| E.W. HOWELL CO, LLC | General Contractor | 32 | 09/10/2026 |
| CAPITAL CONTR P&H CORP | Plumbing | 17 | 07/16/2026 |
| HUNTER ROBERTS CONSTRUCTION | General Contractor | 15 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 14 | 07/08/2026 |
| B.R. FRIES & ASSOCIATES LLC | General Contractor | 9 | 07/08/2026 |
| TALISEN CONSTRUCTION CORP | General Contractor | 8 | 03/21/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 7 | 07/08/2026 |
| CENTRAL CONSULTING & CONT | General Contractor | 7 | 07/08/2026 |
| PLAZA CONSTRUCTION LLC | General Contractor | 6 | 07/08/2026 |
| TAIBE, GRACE | Electrical | 5 | 03/21/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 5 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 5 | 07/08/2026 |
| UNITY CONSTR. SVCS INC | General Contractor | 5 | 07/08/2026 |
| PASCARELLA, JOSEPH | Electrical | 5 | 03/21/2026 |
| ARROYO, RAFAEL | Electrical | 4 | 03/21/2026 |
| DNA CONTRACTING LLC | General Contractor | 4 | 07/08/2026 |
| SCARAN OIL SERVICE INC | General Contractor | 4 | 03/21/2026 |
| MICHAELOFF, STEVEN | Electrical | 4 | 03/21/2026 |
| STARR INDUSTRIES LLC | General Contractor | 4 | 09/07/2026 |
| TILOSCO INC | General Contractor | 4 | 03/21/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 4 | 07/08/2026 |
| MORELAND CONSTRUCTION GR* | General Contractor | 3 | 03/21/2026 |
| CONSIGLI CONSTRUCTION CO | General Contractor | 3 | 09/24/2026 |
| E.T. VANDERBECK INC | General Contractor | 3 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AMARACON TESTING & INSPEC | 5842 | 11 | 07/21/2026 |
| MT GROUP | 798 | 6 | 07/16/2026 |
| BIG APPLE GROUP NY A RMA | 9168 | 30 | 06/25/2026 |
| BANGASH ASSOCIATES INC | 8488 | 1 | 06/08/2026 |
| A TECH ENGINEERING NYC, P | 6738 | 8 | 12/05/2025 |
| ATLAS ATC ENGINEERING INC | 8011 | 2 | 05/21/2025 |
| KMB DESIGN GROUP, LLC | 513 | 1 | 04/03/2025 |
| CC@A ENGINEERING P.C | 1854 | 6 | 01/10/2025 |
| R MARSAC CONSULTING LLC | 329 | 2 | 10/01/2024 |
| GILSANZ MURRAY STEFICEK | 240 | 3 | 03/27/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | SPRING SCAFFOLDING LLC | 09/30/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SPRING SCAFFOLDING LLC | 09/30/2026 |
| DOB NOW | Antenna | Permit Issued | COMMUNICATION COMPONENT S | 09/28/2026 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 09/23/2026 |
| DOB NOW | Structural | Permit Issued | E.W. HOWELL CO, LLC | 09/09/2026 |
| DOB NOW | General Construction | Permit Issued | E.W. HOWELL CO, LLC | 09/09/2026 |
| DOB NOW | General Construction | Permit Issued | E.W. HOWELL CO, LLC | 09/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | E.W. HOWELL CO, LLC | 09/09/2026 |
| DOB NOW | Structural | Permit Issued | E.W. HOWELL CO, LLC | 09/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | STARR INDUSTRIES LLC | 09/03/2026 |
| DOB NOW | Plumbing | Permit Issued | CIVETTA MECHANICAL, LLC | 07/31/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 07/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 06/26/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | STARR INDUSTRIES LLC | 06/24/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 06/17/2026 |
| DOB NOW | Plumbing | Permit Issued | SIRINA FIRE PROT CORP | 06/17/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 06/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | STARR INDUSTRIES LLC | 06/09/2026 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 06/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | STARR INDUSTRIES LLC | 06/08/2026 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 06/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SPRING SCAFFOLDING LLC | 06/01/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 05/29/2026 |
| DOB NOW | Foundation | Permit Issued | E.W. HOWELL CO, LLC | 05/22/2026 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 05/20/2026 |
| DOB NOW | Antenna | Permit Issued | VERTICAL SOLUTIONS INC | 04/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | E.W. HOWELL CO, LLC | 04/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 04/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MARLIN MECHANICAL INC | 04/01/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 03/31/2026 |
| DOB NOW | Structural | Permit Issued | UNITY CONSTR. SVCS INC | 03/23/2026 |
| DOB NOW | Structural | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 03/23/2026 |
| DOB NOW | General Construction | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 03/23/2026 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 03/23/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 03/11/2026 |
| DOB NOW | Construction Fence | Signed-off | SPRING SCAFFOLDING LLC | 03/04/2026 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 03/04/2026 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 02/24/2026 |
| DOB NOW | General Construction | Permit Issued | THE WHITING-TURNER CONTRA | 02/23/2026 |
| DOB NOW | General Construction | Signed-off | MORELAND CONSTRUCTION GR* | 12/19/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/02/2026 | Permit Issued | MARLIN MECHANICAL INC | Air Conditioning Systems | |
| 03/25/2026 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Air Conditioning Systems | Cooling Haakon ×1 |
| 01/05/2026 | — | — | Air Conditioning Systems, Refrigeration Systems | Cooling Mitsubishi Electric Mitsubishi Electric 37,200 BTU · Split System ×1 PKA-AK36NL 37,200 BTU · Vrf Indoor ×1 PUY-AK36NL 37,200 BTU · Split System ×1 |
| 01/10/2025 | Permit Issued | E.W. HOWELL CO, LLC | Air Conditioning Systems | Cooling United Cool Air E3G4AS 58,300 BTU ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | SIRINA FIRE PROT CORP | 4 heads |
| 06/02/2026 | Permit Issued | FULL CAPACITY FIRE CORP | Sprinkler System |
| 04/01/2026 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 01/23/2026 | — | — | 14 heads |
| 12/31/2025 | — | — | 109 heads |
| 10/18/2024 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 08/16/2023 | Permit Issued | SIRINA FIRE PROT CORP | 36 heads |
| 11/22/2022 | Signed-off | AGGRESSIVE FIRE PROT LLC | 694 heads |
| 08/01/2022 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 54 heads |
| 11/02/2021 | — | — | 25 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/16/2026 | Permit Issued | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 06/02/2026 | Permit Issued | CAPITAL CONTR P&H CORP | Medical Gas, Water/Sanitary |
| 04/01/2026 | Permit Issued | CIVETTA MECHANICAL LLC | Water/Sanitary |
| 01/23/2026 | — | — | — |
| 12/31/2025 | — | — | Medical Gas, Water/Sanitary |
| 12/05/2025 | Signed-off | CAPITAL CONTR P&H CORP | Medical Gas |
| 08/18/2025 | Permit Issued | CAPITAL CONTR P&H CORP | Gas, Water/Sanitary |
| 11/22/2022 | Signed-off | CAPITAL CONTR P&H CORP | Medical Gas, Storm, Water/Sanitary |
| 11/02/2021 | Permit Issued | PAR PLUMBING CO., INC | Medical Gas, Plumbing-Sprinkler, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/19/2026 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 06/15/2026 | Permit Issued | FRED GELLER ELEC'L INC. | General Wiring |
| 06/12/2026 | Permit Issued | FRED GELLER ELEC'L INC. | General Wiring |
| 06/05/2026 | Permit Issued | J.A. LEE ELEC SVCS LLC | — |
| 06/04/2026 | Permit Issued | J.A. LEE ELEC SVCS LLC | — |
| 04/30/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 02/20/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 02/19/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 02/13/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 12/23/2025 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 12/10/2025 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 10/02/2025 | Permit Issued | MARTINEZ ELECTRICAL CONT | General Wiring |
| 06/20/2025 | Complete | ROCKMOR ELEC. ENTERPR INC | — |
| 05/28/2025 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 05/20/2025 | Complete | TOP SHELF ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/21/2026 | Permit Issued | E.W. HOWELL CO, LLC | 2 scope_items |
| 06/02/2026 | Permit Issued | MARLIN MECHANICAL INC | Steel |
| 03/25/2026 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Steel |
| 02/05/2026 | Permit Issued | THE WHITING-TURNER CONTRA | 1 scope_items |
| 12/31/2025 | Permit Issued | CONSIGLI CONSTRUCTION CO | Steel |
| 12/17/2025 | Permit Issued | E.W. HOWELL CO, LLC | Steel |
| 05/21/2025 | Permit Issued | B.R. FRIES & ASSOCIATES L | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/26/2023 | Permit Issued | EAGLE SCAFFOLDING SVCS IN | Sidewalk Shed |
| 08/28/2023 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| 10/26/2021 | Permit Issued | CEE JAY REAL ESTATE DEVEL | Fence |
| 11/25/2019 | Permit Issued | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| 05/14/2018 | Permit Issued | E.W. HOWELL CO, LLC | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/13/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/23/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 03/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 03/26/2026 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 03/26/2026 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/20/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/20/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/30/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/27/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/12/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/18/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/26/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/26/2026 | Post-installed Anchors | — | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | CHRISTOPHER BEHLE | special |
| 07/16/2026 | Structural Steel - Welding | CONNIE PISANI | special |
| 07/16/2026 | Structural Steel - High Strength Bolting | CONNIE PISANI | special |
| 07/16/2026 | Structural Steel - Details | CONNIE PISANI | special |
| 07/16/2026 | Footing and Foundation | CONNIE PISANI | progress |
| 07/16/2026 | Concrete - Cast-In-Place | CONNIE PISANI | special |
| 07/16/2026 | Subsurface Investigations (Borings/Test Pits) | NIDAL ABISAAB | special |
| 07/16/2026 | Post-installed Anchors | CONNIE PISANI | special |
| 07/16/2026 | Structural Stability – Alterations of existing buildings | CONNIE PISANI | special |
| 07/16/2026 | Final | CONNIE PISANI | progress |
| 07/16/2026 | Deep Foundation Elements | NIDAL ABISAAB | special |
| 06/18/2026 | Sprinkler Systems | SOORJBALLY HARILALL | special |
| 05/13/2026 | Post-installed Anchors | FAZAL BANGASH | special |
| 05/13/2026 | Structural Stability – Alterations of existing buildings | FAZAL BANGASH | special |
| 04/29/2026 | HVAC-R and service water piping design and insulation | SOORJBALLY HARILALL | energy_progress |
| 04/29/2026 | Mechanical Systems | SOORJBALLY HARILALL | special |
| 04/29/2026 | Post-installed Anchors | SOORJBALLY HARILALL | special |
| 04/29/2026 | Energy Code Compliance Inspections | SOORJBALLY HARILALL | progress |
| 04/29/2026 | Final | SOORJBALLY HARILALL | progress |
| 04/29/2026 | Duct leakage testing, insulation and design | SOORJBALLY HARILALL | energy_progress |
| 04/06/2026 | Final | Donald Glitsis | progress |
| 04/06/2026 | Fire-Resistance Rated Construction | CONNIE PISANI | progress |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | CONNIE PISANI | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Northwell Health - Staten Island University Hosipital | Medical / Healthcare | — | Project S01330308 |
| Northwell Health | Medical / Healthcare | Floors 2–4 | Project S01327153 Project S01110128 Project S00422592 |
| Northwell Health Siu | Medical / Healthcare | Floor 2 | Project S00992007 |
| Siuh Comprehensivee Cancer Center | Medical / Healthcare | — | Project S00729413 |
| Siuh Cancer Center | Medical / Healthcare | — | Project S00629174 |
| SIUH North Campus | Medical / Healthcare | Floor 4 | Project S00460092 |
| Siuh Comprehensive Cancer Center | Medical / Healthcare | Floor 2 | Project S00272346 Project S00228951 Project S00232914 |