| Owner | Filings | Most Recent |
|---|---|---|
| RMOD CONSULTANTS | 12 | 07/08/2026 |
| ASPREY | 7 | 07/08/2026 |
| RCGL 680 MANAGEMENT | 34 | 07/08/2026 |
| THOR EQUITIES | 11 | 07/08/2026 |
| TZ 680 MADISON OWNER LLC | 1 | 03/22/2026 |
| METROPOLITAN ENTERPRISES | 2 | 03/22/2026 |
| THOR 680 MADISON AVE | 40 | 03/22/2026 |
| DIGBY MANAGEMENT | 4 | 03/22/2026 |
| 680 SPECIAL LLC | 4 | 03/22/2026 |
| AGE 680 MADISON | 179 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 08/12/2026 |
| SAWYER BERSON ARCHITECTURE | 2 | 08/07/2026 |
| DESIGN REPUBLIC | 1 | 04/23/2026 |
| SURFACE DESIGN | 1 | 04/10/2026 |
| RAND ENGINEERING & ARCHITECTURE DPC | 1 | 01/22/2026 |
| STEVEN KRATCHMAN ARCHITECT, PC | 1 | 01/29/2025 |
| GALLIGAN ASSOCIATES, LLC | 2 | 08/26/2024 |
| MICHAEL ZENREICH ARCHITECT PC | 2 | 06/24/2024 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 2 | 03/27/2024 |
| DEREK ZIEMER ARCHITECTURE, PLLC | 2 | 03/20/2024 |
| NEW YORK ENGINEERS LLC | 2 | 03/20/2024 |
| SAWICKITARELLA ARCHITECTURE+DESIGN | 2 | 10/17/2023 |
| E4P CONSULTING ENGINEERING PLLC | 1 | 10/17/2023 |
| PLAN B ENGINEERING | 1 | 08/25/2023 |
| ROBERT SILMAN ASSOC STRUCT ENG DPC | 1 | 07/07/2023 |
| CES ENGINEERING LLC | 2 | 07/06/2023 |
| THREE STUDIO ARCHITECTURE, D.P.C. | 1 | 06/16/2023 |
| ROSINI ENGINEERING, PC | 6 | 04/21/2023 |
| TPG ARCHITECTURE, LLP | 2 | 09/16/2022 |
| EC EXPEDITING SERVICES | 2 | 01/27/2021 |
| ROYAL ENGINEERING, P.C | 2 | 01/03/2020 |
| HAMANN ENGINEERING, PLLC | 1 | 08/28/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 03/21/2026 |
| METROPOLIS GROUP INC | 16 | 03/21/2026 |
| DEREK ZIEMER ARCHITECTURE | 6 | 03/21/2026 |
| SUSKA | 4 | 03/21/2026 |
| NYCCODE | 10 | 03/21/2026 |
| EA DESIGN GROUP | 4 | 03/21/2026 |
| SUPPORT BUILDINGS OF NEW YORK | 1 | 03/21/2026 |
| CODE | 4 | 03/21/2026 |
| BIG ORANGE EXPEDITING | 2 | 03/21/2026 |
| SUPPORT BUILDINGS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CLARK CONSTRUCTION CORP | General Contractor | 14 | 07/08/2026 |
| TECTONIC BUILDERS INC | General Contractor | 8 | 07/08/2026 |
| TRIBUTE RESTORATION INC | General Contractor | 6 | 09/19/2026 |
| NICON BUILD LLC | General Contractor | 3 | 07/08/2026 |
| ADVANTAGECONTRACTING COR | General Contractor | 3 | 07/08/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 3 | 03/21/2026 |
| MICHILLI INC | General Contractor | 3 | 07/08/2026 |
| NABRU DESIGN COMPANY INC | General Contractor | 3 | 03/21/2026 |
| OCA BUILDERS INC | General Contractor | 3 | 03/21/2026 |
| ASA BUILDING MAINT INC | General Contractor | 2 | 03/21/2026 |
| CAPITAL IMPROVEMENT SERVICES | General Contractor | 2 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| FORTE EXPRESS P & H INC | Fire Protection | 2 | 07/08/2026 |
| WARREN OSTROFF | Electrical | 2 | 03/21/2026 |
| DEMAR PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| FORTE EXPRESS P & H INC | Plumbing | 2 | 07/08/2026 |
| EMPIRE STATE ELEC MAINT & | Electrical | 2 | 03/22/2026 |
| NORTHEAST PLBG & HTG CORP | Plumbing | 1 | 07/08/2026 |
| ELPO ELECTRICAL CONTG INC | Electrical | 1 | 03/22/2026 |
| AMOK INC | Fire Protection | 1 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 1 | 07/08/2026 |
| DEMAR PLUMBING CORP | General Contractor | 1 | 07/08/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 1 | 07/08/2026 |
| URBAN INTELLIGENCE, INC | General Contractor | 1 | 08/13/2026 |
| A PLUS PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| FRANCISCO D. PEREZ PE | 3306 | 1 | 08/25/2026 |
| DOMANI INSPECTION SERVICE | 843 | 6 | 08/07/2026 |
| AK ENGINEERING PC | 678 | 6 | 04/23/2026 |
| WALTER T. GORMAN, P.E., P | 268 | 1 | 04/10/2026 |
| SURFACE DESIGN PROFESSION | 3968 | 1 | 04/10/2026 |
| NEW AGE ENGINEERING PLLC | 7746 | 2 | 08/26/2024 |
| MICHAEL ZENREICH ARCHITEC | 1724 | 2 | 06/24/2024 |
| RYAN SPECIAL ENGINEERING | 2018 | 5 | 03/27/2024 |
| THE EIPEL ENGINEERING GRO | 2714 | 2 | 03/27/2024 |
| CTHREE ARCHITECTURE + DES | 1124 | 1 | 10/17/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 09/16/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 09/04/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | URBAN INTELLIGENCE, INC | 08/12/2026 |
| DOB NOW | General Construction | Permit Issued | ADVANTAGECONTRACTING COR | 06/10/2026 |
| DOB NOW | General Construction | Signed-off | ADVANTAGECONTRACTING COR | 06/09/2026 |
| DOB NOW | Structural | Permit Issued | CLARK CONSTRUCTION CORP | 06/02/2026 |
| DOB NOW | Structural | Permit Issued | CLARK CONSTRUCTION CORP | 06/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLARK CONSTRUCTION CORP | 06/01/2026 |
| DOB NOW | General Construction | Permit Issued | CLARK CONSTRUCTION CORP | 06/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ADVANTAGECONTRACTING COR | 02/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | FORTE EXPRESS P & H INC | 11/18/2025 |
| DOB NOW | Plumbing | Permit Issued | FORTE EXPRESS P & H INC | 11/18/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEPOL CONSTRUCTION INC | 10/07/2025 |
| DOB NOW | Structural | Permit Issued | CLARK CONSTRUCTION CORP | 06/05/2025 |
| DOB NOW | General Construction | Permit Issued | CLARK CONSTRUCTION CORP | 06/04/2025 |
| DOB NOW | Structural | Permit Issued | CLARK CONSTRUCTION CORP | 06/04/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CLARK CONSTRUCTION CORP | 06/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | FORTE EXPRESS P & H INC | 11/20/2024 |
| DOB NOW | Sprinklers | Permit Issued | FORTE EXPRESS P & H INC | 11/20/2024 |
| DOB NOW | Plumbing | Signed-off | DEMAR PLUMBING CORP | 08/29/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | DEMAR PLUMBING CORP | 08/29/2024 |
| DOB NOW | Structural | Permit Issued | CLARK CONSTRUCTION CORP | 06/13/2024 |
| DOB NOW | General Construction | Permit Issued | CLARK CONSTRUCTION CORP | 06/13/2024 |
| DOB NOW | Structural | Permit Issued | CLARK CONSTRUCTION CORP | 06/13/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | CLARK CONSTRUCTION CORP | 06/12/2024 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 04/16/2024 |
| DOB NOW | Mechanical Systems | Signed-off | NICON BUILD LLC | 04/12/2024 |
| DOB NOW | Structural | Signed-off | NICON BUILD LLC | 04/08/2024 |
| DOB NOW | Plumbing | Signed-off | NORTHEAST PLBG & HTG CORP | 04/02/2024 |
| DOB NOW | General Construction | Signed-off | NICON BUILD LLC | 03/28/2024 |
| DOB NOW | General Construction | Signed-off | ASA BUILDING MAINT | 02/28/2024 |
| DOB NOW | General Construction | Permit Issued | CAPITAL IMPROVEMENT SERVI | 09/20/2023 |
| DOB NOW | General Construction | Signed-off | DK CONSTRUCTION ONE, CORP | 07/11/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | TECTONIC BUILDERS INC | 04/26/2023 |
| DOB NOW | General Construction | Permit Issued | TECTONIC BUILDERS INC | 04/20/2023 |
| DOB NOW | Plumbing | Signed-off | DEMAR PLUMBING CORP | 12/22/2022 |
| DOB NOW | Plumbing | Signed-off | AMOK INC | 12/22/2022 |
| DOB NOW | General Construction | Permit Issued | CAPITAL IMPROVEMENT SERVI | 09/23/2022 |
| DOB NOW | General Construction | Permit Issued | NABRU DESIGN COMPANY INC | 09/16/2022 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 04/21/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/07/2026 | Permit Issued | CLARK CONSTRUCTION CORP | Heating and Air Conditioning Systems | |
| 01/22/2026 | Permit Issued | ADVANTAGECONTRACTING COR | Heating and Air Conditioning Systems | Heat / Cool Daikin BCHD0101 1,255 CFM · Fan Coil Indoor ×1 |
| 10/17/2023 | — | — | Associated Ducts and Piping | Ducts & Piping |
| 04/08/2022 | Permit Issued | TECTONIC BUILDERS INC | Air Conditioning Systems | Cooling Trane GEHE0423 41,700 BTU · Furnace ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | FORTE EXPRESS P & H INC | Sprinkler System |
| 03/20/2024 | Signed-off | A + SPRINKLER CORP | 85 heads |
| 04/08/2022 | Signed-off | A + SPRINKLER CORP | 19 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | FORTE EXPRESS P & H INC | Gas, Storm, Water/Sanitary |
| 08/26/2024 | Signed-off | DEMAR PLUMBING CORP | Water/Sanitary |
| 04/08/2022 | Signed-off | A PLUS PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/10/2026 | Permit Issued | 5 J'S ELECTL CONTS CORP | — |
| 08/04/2026 | Permit Issued | 5 J'S ELECTL CONTS CORP | — |
| 01/22/2026 | Permit Issued | DELTA PHASE ELEC'L CORP. | General Wiring |
| 12/12/2025 | Permit Issued | WARREN OSTROFF ELEC., INC | 1 meters, 1 new_meters |
| 10/12/2025 | Complete | GREEN APPLE ELECL SVCS LL | — |
| 09/04/2025 | Permit Issued | WARREN OSTROFF ELEC., INC | — |
| 09/04/2025 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 08/13/2025 | Complete | EMPIRE STATE ELEC MAINT & | — |
| 08/13/2025 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring |
| 04/04/2024 | Permit Issued | EMPIRE STATE ELEC MAINT & | — |
| 03/04/2024 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring, Lighting |
| 02/13/2024 | Complete | OPTIMAL ELECTRIC, INC | General Wiring |
| 10/17/2023 | Complete | ARGON ELECTRICAL CORP | General Wiring |
| 10/14/2022 | Complete | GEDNEY ELECTRIC, LLC | General Wiring |
| 08/05/2019 | Complete | ELPO ELECTRICAL CONTG INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | CLARK CONSTRUCTION CORP | Steel, Concrete |
| 02/06/2020 | Permit Issued | MICHILLI INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | Permit Issued | URBAN INTELLIGENCE, INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | TRIBUTE RESTORATION INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/11/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 07/06/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/22/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 06/05/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 05/29/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/28/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 04/21/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/20/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/18/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 02/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/18/2025 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 12/03/2025 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 09/08/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/15/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/28/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/21/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/15/2026 | Post-installed Anchors | FRANCISCO PEREZ | special |
| 04/28/2026 | Lighting in dwelling units | JOHN MCMONAGLE | energy_progress |
| 04/28/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 04/28/2026 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 04/28/2026 | Final | JOHN MCMONAGLE | progress |
| 03/20/2026 | Tenant Protection Plan Compliance | Ari Kamo | special |
| 03/18/2026 | Final | Benson Gillespie | progress |
| 03/18/2026 | Tenant Protection Plan Compliance | Walter Gorman | special |
| 03/18/2026 | Masonry | MOLLY FORR | special |
| 03/18/2026 | Post-installed Anchors | MOLLY FORR | special |
| 03/05/2026 | Final | Ari Kamo | progress |
| 01/22/2026 | Concrete - Cast-In-Place | Ari Kamo | special |
| 01/22/2026 | Post-installed Anchors | Ari Kamo | special |
| 01/15/2026 | Tenant Protection Plan Compliance | Ari Kamo | special |
| 01/15/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 01/13/2026 | Mechanical Systems | Ari Kamo | special |
| 01/13/2026 | Final | Ari Kamo | progress |
| 08/16/2024 | Tenant Protection Plan Compliance | Stephen Shishko | special |
| 07/18/2024 | HVAC-R and service water piping design and insulation | PETER MOKRIS | energy_progress |
| 07/18/2024 | HVAC-R and service water heating equipment | PETER MOKRIS | energy_progress |
| 07/18/2024 | HVAC-R and service water heating system controls | PETER MOKRIS | energy_progress |
| 06/27/2024 | Energy Code Compliance Inspections | PETER MOKRIS | progress |
| 06/25/2024 | Lighting controls | Michael Zenreich | energy_progress |
| 06/25/2024 | Interior lighting power | Michael Zenreich | energy_progress |