BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Bloomberg Tower
731 LEXINGTON AVENUE · BIN 1086160
💬 Discuss this project
2001Year Built
54Stories
RMBuilding Class
C5-2Zoning
1,103,169 sfGross Floor Area
109Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: One Beacon Court Condominium · 84,348 sf lot · 13.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBloomberg1p · 1 filing · 2 docs
BulkheadBloomberg2p · 1 filing · 14 docs
Floor 5083p · 5 filings · 20 docs
Floor 49Unit 49D92p · 7 filings · 20 docs
Floor 48Unit 48B4p · 2 filings · 10 docs
Floor 47
Floor 46Unit 46A9p · 1 filing · 7 docs
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40Unit 40F8p · 1 filing · 4 docs
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29Vornado Realty Trust18p · 3 filings · 20 docs
Floor 28Bloomberg125p · 20 filings · 20 docs
Floor 27Bloomberg89p · 2 filings · 20 docs
Floor 26Bloomberg71p · 1 filing · 14 docs
Floor 25Bloomberg16p · 2 filings · 6 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14Mechanical ductwork demolition and installationUnder Construction9p · 1 filing · 5 docs
Floor 13Mechanical ductwork demolition and installationUnder Construction8p · 1 filing · 5 docs
Floor 12
Floor 11
Floor 10
Floor 9Bloomberg15p · 2 filings · 4 docs
Floor 8Bloomberg14p · 2 filings · 4 docs
Floor 7BloombergUnder Construction13p · 24 filings · 20 docs
Floor 6BloombergUnder Construction107p · 16 filings · 20 docs
Floor 5BloombergUnder Construction21p · 4 filings · 20 docs
Floor 4Bloomberg123p · 2 filings · 20 docs
Floor 3Bloomberg175p · 8 filings · 20 docs
Floor 2Bloomberg, H&M PseUnder Construction228p · 16 filings · 20 docs
Floor 1Capital One, Ozdilek USA, Unit 3M +3Under Construction606p · 25 filings · 20 docs
MezzanineHutong, Capital One246p · 7 filings · 20 docs
CellarHutong29p · 4 filings · 20 docs
Sub-CellarBloomberg, Hutong157p · 11 filings · 20 docs
Site & exteriorVisual Comfort &, Capital One +1Under Construction17p · 6 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust76410/17/2026
731 Office One8503/21/2026
731 Limited Partnership2903/21/2026
Seven Thirty One2703/21/2026
Home Depot USA1603/21/2026
731 Llimited Partnership Park803/21/2026
Mendik Realty Co703/21/2026
Giancarlo Giammetti Condo Unit603/21/2026
Capital One507/08/2026
Alfa Consulting407/08/2026
989 Properties403/21/2026
Allied Partners403/21/2026
1 Beacon Court Condo Rose Associates303/21/2026
Vno One Park203/22/2026
731 Properties203/21/2026
731 Ltd P Ship203/21/2026
Malcon Construction103/22/2026
Beacon5152 Beacon5152103/22/2026
731 Limites Part103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KLH Professional Engineers, PSC609/29/2026
TPG Architecture209/28/2026
Crown Architecture & Consulting1109/08/2026
Randall P. Collins Architect2807/30/2026
Leon Skvirsky PE107/16/2026
Spectorgroup Architecture305/22/2026
John F. Giuseffi, Architect104/24/2026
Armour Unsderfer Engineering Inc, P104/14/2026
Karacoban Engineering303/27/2026
Tahir Demircioglu Architect103/23/2026
Wellworth Consulting103/18/2026
Goldman Copeland Associates903/17/2026
WB Engineers & Consultants2503/05/2026
Aeis412/17/2025
Severud Associates112/02/2025
Woods Bagot Architects511/30/2025
Mayerfeld Architecture407/07/2025
Lawless & Mangione107/22/2024
Mdeas Architects105/14/2024
New Age204/30/2024
Thornton Tomasetti1202/21/2024
Takfen Architecture611/27/2023
Fresh Meadow Mechanical211/03/2023
Deborah Berke Partners110/30/2023
CES Engineering310/27/2023
Salvator A. Caradonna JR210/25/2023
Severud Associates Consulting Engineering408/22/2023
Freyer Collaborative Architects203/10/2023
M-Engineering New York611/15/2022
The Eipel Engineering Group209/15/2022
Navi Structural Engineering208/10/2022
Cameron Engineering607/07/2022
SBLM Architects207/06/2022
Asda Architecture + Design206/09/2022
Jack Green Associates209/14/2021
Syska Hennessy Group509/02/2021
Highland Associates708/25/2021
Crown Arch and Consulting208/03/2021
Architectural and Engineering Services407/09/2021
Fiskaa Engineering704/20/2021
Shalat Architects103/15/2021
Robert Derector Associates1002/25/2021
IW Architecture106/15/2020
Khachaturian Engineering Associates302/04/2020
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM Construction ManagementGeneral Contractor6307/08/2026
Schimenti Construction CoGeneral Contractor1607/16/2026
Par Fire ProtectionFire Protection810/17/2026
Par Plumbing CoPlumbing707/08/2026
King Rose of NYGeneral Contractor610/10/2026
Forest ElectricGeneral Contractor503/22/2026
Forest ElectricElectrical503/21/2026
Reis EYGeneral Contractor507/08/2026
Clune Construction CoGeneral Contractor507/08/2026
Schimenti Construction CoScaffold403/21/2026
M.N.C. General ContractorsGeneral Contractor403/21/2026
George Breslaw PlumbingPlumbing407/08/2026
Petretti & AssociatesGeneral Contractor407/08/2026
Ashlar MechanicalFire Protection307/08/2026
AmokPlumbing307/08/2026
Alklem PlumbingPlumbing307/08/2026
Ambassador ConstructionGeneral Contractor307/08/2026
Forte Express P & HPlumbing307/08/2026
Forte Express P & HFire Protection307/08/2026
Sirina Fire ProtectionFire Protection307/08/2026
Reidy Contracting GroupGeneral Contractor304/09/2026
Turner Construction CompanyGeneral Contractor307/08/2026
Cardinal BuildersGeneral Contractor303/21/2026
D Reis ContractingGeneral Contractor307/08/2026
Abco-Peerless SprinklerFire Protection307/08/2026
Production GlueGeneral Contractor208/05/2026
Accurate MechanicalPlumbing207/08/2026
Mac FelderPlumbing207/08/2026
Pappas & Fodera Elect'lElectrical203/22/2026
Fresh Meadow Mechanical PlumbingPlumbing207/01/2026
Structure ToneGeneral Contractor207/08/2026
Tri-Star ConstructionGeneral Contractor204/09/2026
Neptune Signs & AwningsSign hanger207/08/2026
Vanguard Construction andGeneral Contractor210/09/2026
Fresh Meadow Electrical ContractingElectrical203/22/2026
Service Sign Erectors CoSign hanger207/08/2026
S.B.A. PlumbingPlumbing207/08/2026
AmokFire Protection207/08/2026
Malcon ConstructionGeneral Contractor207/08/2026
C. W. GreeneElectrical203/22/2026
Par Plumbing Cospecialty_contractor203/21/2026
M&T Plumbing and Heating CoPlumbing207/08/2026
United Fire ProtectionFire Protection107/08/2026
J.A. Lee Electric ServicesElectrical103/22/2026
Patriot ElectricElectrical103/22/2026
SRM Electrical ServiceElectrical103/22/2026
Warren Ostroff ElectricElectrical103/22/2026
WCK ElectricElectrical103/22/2026
American Construction ManGeneral Contractor107/08/2026
Buch ConstructionGeneral Contractor110/01/2026
Fresh Meadow Mechanicalspecialty_contractor107/08/2026
Gannon ContractingGeneral Contractor107/08/2026
L&K PartnersGeneral Contractor107/08/2026
Retail Constru & Signagespecialty_contractor107/08/2026
Spring ScaffoldingScaffold104/09/2026
Capitol Design & MaintenanceSign hanger107/22/2026
Mauceri Sign CoSign hanger107/08/2026
A Plus PlumbingPlumbing110/14/2026
A Plus PlumbingFire Protection110/14/2026
Bedrock Plumbing & HeatingPlumbing108/26/2026
Full Capacity FireFire Protection107/08/2026
HT Plumbing & HeatingPlumbing106/28/2026
Mill Brook Fire ProtectionFire Protection108/14/2026
Parkview P&HPlumbing107/08/2026
Tristate Plumbing ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants20031209/29/2026
Asda Architecture + Desig2015104/24/2026
Hansen Engineering8174904/24/2026
Metric Consulting and Ins1803503/27/2026
Project Tactical Solution58593912/10/2025
AK Engineering678405/14/2024
Alan D Marcus, PE1761605/14/2024
Shahrish Shuvo Engineering8524105/06/2024
New Age Engineering7746204/30/2024
Outsource Special Inspection2827602/21/2024
Architectural Inspection5416405/16/2023
Freyer Collaborative Architects2198203/10/2023
MW Professional Engineering570312/13/2022
Becker Engineering6331411/15/2022
Delta Testing Labs687610/04/2022
Jack Green Associates422209/14/2021
G&G Sprinkler Services2782308/25/2021
Atlantic Engineeringlabor1381107/21/2021
Bureau Veritas Na6902204/20/2021
Synergy Engineering7841102/25/2021
Alpha Engineering3448111/04/2020
Domani Inspection Service843302/04/2020
Walter T. Gorman, P.E., P268101/07/2020
Focal Point Architecture/787110/29/2019
Building Lifecycle
All (300)Filed (79)Permit Issued (80)Signed Off (29)Facade (FISP) (3)Violation (2)Inspection (49)Objection (28)Special Inspection (30)
10/15/2026
Permit issued — Sprinklers
M01436602-S2-EW-SP
10/13/2026
Permit issued — Sprinklers
M01367318-S1-EW-SP
10/13/2026
Permit issued — Plumbing
M01367318-S3-PL
10/09/2026
Permit issued — Mechanical Systems
M01342455-I1-MS
10/07/2026
Permit issued — Mechanical Systems
M01367318-S2-MS
10/06/2026
Signed off — Alteration
M00750594-I1
10/01/2026
Permit issued — General Construction
M01367318-I1-GC
09/30/2026
Permit issued — General Construction
M01436602-I1-GC
09/29/2026
Filed — Alteration
Modify the existing sprinkler fixtures for Capital One Bank.
M01436602-S2
09/29/2026
Filed — Alteration
Modify the existing sprinkler fixtures for Capital One Bank.
M01436602-S1
09/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Benjamin Plotnick
09/29/2026
Special inspection requirement — Lighting controls
Benjamin Plotnick
09/28/2026
Filed — Alteration
Modify the existing sprinkler fixtures for Capital One Bank.
M01436602-I1
09/08/2026
Filed — No Work
M01393927-I1
09/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/25/2026
Permit issued — Plumbing
M01367132-I1-PL
08/21/2026
Special inspection requirement — Interior lighting power
Benjamin Plotnick
08/13/2026
Permit issued — Sprinklers
M01367134-I1-EW-SP
08/05/2026
Special inspection requirement — Final
Benjamin Plotnick
08/04/2026
Permit issued — General Construction
M01421996-I1-GC
08/03/2026
Special inspection requirement — Mechanical Systems
Benjamin Plotnick
08/03/2026
Special inspection requirement — Sprinkler Systems
Benjamin Plotnick
08/03/2026
Special inspection requirement — Final
Benjamin Plotnick
07/31/2026
Objection resolved — Addressed
07/30/2026
Filed — No Work
M01436435-I1
07/30/2026
Objection raised — Other
07/21/2026
Permit issued — Sign
M01419365-I1-SG
07/16/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING ENTRANCE CANOPY - VISUAL COMFORT & CO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01419365-I1
07/16/2026
Special inspection requirement — Final
LEON SKVIRSKY
07/15/2026
Permit issued — Mechanical Systems
M01366981-I1-MS
07/09/2026
Signed off — Alteration
Architectural work on the 3rd floor as indicated on drawings
M00839285-I1
07/09/2026
Signed off — Alteration
Mechanical work on the 3rd floor as indicated on drawings.
M00839314-I1
07/09/2026
Signed off — Alteration
Structural work on the 3rd floor as indicated on drawings
M00839336-I1
07/09/2026
Permit issued — Structural
M01367137-I1-ST
07/08/2026
Permit issued — General Construction
M01366929-I1-GC
07/07/2026
Filed — Alteration
Filing herewith for a temp structure as per plans.
M01421996-I1
07/01/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Other
06/25/2026
Filed — No Work
M01412308-I1
06/24/2026
Special inspection requirement — Final
Randall Collins
06/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2026
Special inspection requirement — Fenestration air leakage
Ryan Hansen
05/28/2026
Special inspection requirement — Air barrier continuity plan testing
Ryan Hansen
05/28/2026
Special inspection requirement — Air barrier — testing
Ryan Hansen
05/28/2026
Special inspection requirement — Final
Ryan Hansen
05/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/28/2026
Special inspection requirement — Air barrier - visual inspection
Ryan Hansen
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/22/2026
Filed — Alteration
Interior demolition of non load bearing partitions on the 1st floor and modification of existing storefront as indicated on drawings.
M01367279-P2
05/15/2026
Special inspection requirement — Final
Ryan Hansen
05/15/2026
Special inspection requirement — Air barrier — testing
Ryan Hansen
05/15/2026
Special inspection requirement — Air barrier - visual inspection
Ryan Hansen
05/15/2026
Special inspection requirement — Fenestration air leakage
Ryan Hansen
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2026
Special inspection requirement — Air barrier continuity plan testing
Ryan Hansen
05/05/2026
Permit issued — General Construction
M01389110-I1-GC
05/01/2026
Filed — Alteration
Plumbing work on the 1st floor (Visual Comfort) as indicated on drawings.
M01367132-P1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPar Fire Protection10/15/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing10/13/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing10/13/2026
DOB NOWMechanical SystemsPermit IssuedKing Rose of NY10/09/2026
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and10/07/2026
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and10/01/2026
DOB NOWGeneral ConstructionPermit IssuedBuch Construction09/30/2026
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating08/25/2026
DOB NOWSprinklersPermit IssuedMill Brook Fire Protection08/13/2026
DOB NOWGeneral ConstructionPermit IssuedProduction Glue08/04/2026
DOB NOWSignPermit IssuedCapitol Design & Maintenance07/21/2026
DOB NOWMechanical SystemsPermit IssuedSchimenti Construction Co07/15/2026
DOB NOWStructuralPermit IssuedSchimenti Construction Co07/09/2026
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co07/08/2026
DOB NOWGeneral ConstructionSigned-offClune Construction Co05/05/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co04/06/2026
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction03/27/2026
DOB NOWSprinklersPermit IssuedFull Capacity Fire03/25/2026
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction03/23/2026
DOB NOWConstruction FencePermit IssuedSpring Scaffolding03/23/2026
DOB NOWGeneral ConstructionSigned-offKing Rose of NY02/20/2026
DOB NOWPlumbingSigned-offMichael Burns P&H01/27/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler01/09/2026
DOB NOWMechanical SystemsPermit IssuedTurner Construction Company01/08/2026
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company01/08/2026
DOB NOWStructuralPermit IssuedTurner Construction Company01/08/2026
DOB NOWPlumbingSigned-offPar Plumbing Co01/07/2026
DOB NOWGeneral ConstructionSigned-offKing Rose of NY12/16/2025
DOB NOWMechanical SystemsSigned-offKing Rose of NY12/15/2025
DOB NOWPlumbingSigned-offAlklem Plumbing07/01/2025
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler06/25/2025
DOB NOWSprinklersSigned-offForte Express P & H06/25/2025
DOB NOWPlumbingSigned-offForte Express P & H06/25/2025
DOB NOWPlumbingPermit IssuedHT Plumbing & Heating06/23/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone06/10/2025
DOB NOWMechanical SystemsSigned-offStructure Tone06/10/2025
DOB NOWPlumbingSigned-offMac Felder02/25/2025
DOB NOWSprinklersSigned-offLawrence J. Levine02/13/2025
DOB NOWMechanical SystemsSigned-offReidy Contracting Group02/12/2025
DOB NOWGeneral ConstructionSigned-offReidy Contracting Group02/12/2025
+ 60 more permits on file
4 projects · most recent 09/29/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2026Permit IssuedBuch ConstructionHeating and Air Conditioning Systems—
03/27/2026Permit IssuedVanguard Construction andAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane GEVK048 51,300 BTU · Wshp ×1
GEVK072 77,900 BTU · Wshp ×1
Heating
Ventilation
Mars ×1
10/27/2023Permit IssuedD Reis ContractingAir Conditioning Systems
Cooling
Ae-Air 4APHBCX-31 RH 10,400 BTU · Fan Coil Indoor ×8
10APHBCX-41 LH 24,800 BTU · Fan Coil Indoor ×4
12APHBC-32 LH 22,600 BTU · Fan Coil Indoor ×4
12APHBCX32 19,900 BTU · Fan Coil Indoor ×4
12MBX-3HW 25,700 BTU · Fan Coil Indoor ×4
12MBX-3HW 120V 27,900 BTU · Fan Coil Indoor ×4
16MBX-4HW 43,600 BTU · Fan Coil Indoor ×4
4APHBCX-31 LH 10,200 BTU · Fan Coil Indoor ×4
4APHBCX-32 LH 9,000 BTU · Fan Coil Indoor ×4
4APHBCX-32 RH 9,400 BTU · Fan Coil Indoor ×4
6APHBCX-32 LH 11,500 BTU · Fan Coil Indoor ×4
8APHBC-31 LH 13,500 BTU · Fan Coil Indoor ×4
Multiaqua MHQWW-09-H-3-U 7,671 BTU · Fan Coil Indoor ×4
MHQWW-18-H-3-U 17,448 BTU · Fan Coil Indoor ×4
07/07/2022Permit IssuedJRM Construction ManagementAir Conditioning Systems
Cooling
Geocomfort GZS048 50,287 BTU · Wshp ×2
7 projects · most recent 09/29/2026
FiledStatusContractorScope
09/29/2026Permit IssuedPar Fire Protection—
04/16/2026Permit IssuedLeguci Piping & Heating—
03/27/2026Permit IssuedA Plus Plumbing—
03/17/2026Permit IssuedFull Capacity Fire62 heads
12/10/2025Permit IssuedAbco-Peerless Sprinkler10 heads
10/27/2023Signed-offForte Express P & H192 heads
07/07/2022——3 heads
7 projects · most recent 05/01/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
05/01/2026Permit IssuedBedrock Plumbing & HeatingWater/Sanitary
03/27/2026Permit IssuedA Plus PlumbingWater/Sanitary
03/17/2026Permit IssuedPar Plumbing CoWater/Sanitary
12/17/2025Permit IssuedHT Plumbing & HeatingWater/Sanitary
12/10/2025Signed-offPar Plumbing CoWater/Sanitary
07/07/2025Signed-offAlklem PlumbingGas, Water/Sanitary
07/07/2022——Storm
25 projects · most recent 10/15/2026
General Wiring
FiledStatusContractorScope
10/15/2026Permit IssuedForest ElectricGeneral Wiring
10/13/2026Permit IssuedBigman BrothersGeneral Wiring
10/09/2026CompleteForest ElectricGeneral Wiring
07/30/2026Permit IssuedPrecision Electrical ContGeneral Wiring
06/26/2026Permit IssuedCloonagh ElectricalGeneral Wiring
06/16/2026Permit IssuedForest ElectricGeneral Wiring
06/09/2026Permit IssuedNee Electrical—
05/14/2026Permit IssuedNee Electrical—
04/27/2026CompleteForest ElectricGeneral Wiring
04/14/2026Permit IssuedMatros Automated Electrical—
01/14/2026CompleteForest ElectricGeneral Wiring
12/15/2025CompleteC. W. GreeneGeneral Wiring
12/15/2025CompleteC. W. GreeneGeneral Wiring
12/12/2025CompleteC. W. GreeneGeneral Wiring
12/12/2025CompleteC. W. GreeneGeneral Wiring
6 projects · most recent 04/14/2026
Steel Concrete
FiledStatusContractorScope
04/14/2026Permit IssuedSchimenti Construction Co1 scope_items
12/02/2025Permit IssuedTurner Construction CompanySteel, Concrete
02/21/2024Signed-offD Reis ContractingSteel, Concrete
08/22/2023Signed-offJRM Construction ManagementSteel
12/29/2022——1 scope_items
10/04/2022Permit IssuedJRM Construction ManagementSteel
1 project · most recent 03/18/2026
Fence
FiledStatusContractorScope
03/18/2026Permit IssuedSpring ScaffoldingFence
2 projects · most recent 12/10/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/10/2025Permit IssuedAbco-Peerless SprinklerTenant Protection Plan 72 Hour
12/02/2025Permit IssuedTurner Construction CompanyTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 54
DateTypeResultReport
09/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/23/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
Latest 25 of 54.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/29/2026HVAC-R and service water heating system controlsBenjamin Plotnickenergy_progress
09/29/2026Lighting controlsBenjamin Plotnickenergy_progress
08/21/2026Interior lighting powerBenjamin Plotnickenergy_progress
08/05/2026FinalBenjamin Plotnickprogress
08/03/2026FinalBenjamin Plotnickprogress
08/03/2026Mechanical SystemsBenjamin Plotnickspecial
08/03/2026Sprinkler SystemsBenjamin Plotnickspecial
07/16/2026FinalLEON SKVIRSKYprogress
06/24/2026FinalRandall Collinsprogress
05/28/2026FinalRyan Hansenprogress
05/28/2026Air barrier — testing Ryan Hansenenergy_progress
05/28/2026Fenestration air leakageRyan Hansenenergy_progress
05/28/2026Tenant Protection Plan Compliance—special
05/28/2026Air barrier continuity plan testingRyan Hansenenergy_progress
05/28/2026Air barrier - visual inspectionRyan Hansenenergy_progress
05/15/2026Air barrier — testing Ryan Hansenenergy_progress
05/15/2026Air barrier - visual inspectionRyan Hansenenergy_progress
05/15/2026Tenant Protection Plan Compliance—special
05/15/2026Fenestration air leakageRyan Hansenenergy_progress
05/15/2026Air barrier continuity plan testingRyan Hansenenergy_progress
05/15/2026FinalRyan Hansenprogress
05/01/2026Tenant Protection Plan ComplianceRyan Hansenspecial
04/28/2026Public Assembly Emergency Lighting—progress
04/09/2026Structural Steel - WeldingRyan Hansenspecial
04/09/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Capital OneBank / Financial branchFloor 1, Mezzanine
Project M01436602 Alteration · Permit Entire · 09/28/2026
Project M00950125 Alteration · LOC Issued · 10/25/2023
Project M00950152 Alteration · LOC Issued · 10/25/2023
Project M00603895 Alteration · LOC Issued · 11/08/2021
Project M00603901 Alteration · LOC Issued · 11/08/2021
Project M00603906 Alteration · LOC Issued · 11/08/2021
Project M00603847 Alteration · LOC Issued · 10/29/2021
Project M00603858 Alteration · LOC Issued · 10/29/2021
Visual Comfort &RetailFloor 1
Project M01419365 Alteration · Permit Entire · 07/16/2026
Project M01366981 Alteration · Permit Entire · 04/16/2026
Project M01367132 Alteration · Permit Entire · 04/16/2026
Project M01367134 Alteration · Permit Entire · 04/16/2026
Project M01366929 Alteration · Permit Entire · 04/14/2026
Project M01367137 Alteration · Permit Entire · 04/14/2026
Ozdilek USARetailFloor 1
Project M01367318 Alteration · Permit Entire · 03/23/2026
BloombergOfficeSub-cellar, Floors 1–9, 25–28
Project M01298845 Alteration · Permit Entire · 12/10/2025
Project M01298779 Alteration · Permit Entire · 12/09/2025
Project M01298881 Alteration · Permit Entire · 12/02/2025
Project M01298378 Alteration · Permit Entire · 11/30/2025
Project M01309292 Alteration · LOC Issued · 11/12/2025
Project M01221466 Alteration · LOC Issued · 05/20/2025
Project M01144456 Alteration · LOC Issued · 12/18/2024
Project M00839285 Alteration · LOC Issued · 08/22/2023
Project M00839314 Alteration · LOC Issued · 08/22/2023
Project M00839336 Alteration · LOC Issued · 08/22/2023
Project M00859479 Alteration · LOC Issued · 05/16/2023
Project M00859490 Alteration · LOC Issued · 05/15/2023
HutongRestaurant / Food ServiceCellar, Floor 1, Mezzanine
Project M01202131 Alteration · Permit Entire · 03/28/2025
Project M00457425 Alteration · Filing Withdrawn · 04/20/2021
Project M00456550 Alteration · Filing Withdrawn · 03/15/2021
CapitalOne cafeBank / Financial branch—
Project M00747588 Alteration · LOC Issued · 06/09/2022
Project M00747589 Alteration · LOC Issued · 06/09/2022
Tempur Sealy InternationalRetailFloor 1
Project M00305470 Alteration · LOC Issued · 02/24/2020
Project M00305475 Alteration · LOC Issued · 02/24/2020
Project M00305478 Alteration · LOC Issued · 02/24/2020
H&M PseRetailFloors 1, 2
Project M00239250 Alteration · LOC Issued · 11/01/2019
Project M00238898 Alteration · LOC Issued · 10/29/2019
Project M00239208 Alteration · LOC Issued · 10/29/2019
LäderachRetailFloor 1
Project M00200566 Alteration · LOC Issued · 08/20/2019
Project M00202390 Alteration · LOC Issued · 08/19/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,063 on file (BIS + DOB NOW)
▸Plans & Drawings210
▸DOB NOWPlans/Sketch132
10/04/2026M01436602-I1Request digital key ↗
10/04/2026M01436602-S1Request digital key ↗
10/04/2026M01436602-S2Request digital key ↗
Showing 3 of 132 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly27
09/05/2026M00110930-I1Request digital key ↗
09/05/2026M00172586-I1Request digital key ↗
09/05/2026M00170163-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing16
09/05/2026M00202390-I1Request digital key ↗
09/05/2026M00229149-I1Request digital key ↗
09/05/2026M00239196-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems13
09/05/2026M00200566-I1Request digital key ↗
09/05/2026M00229144-I1Request digital key ↗
09/05/2026M00238898-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler13
09/05/2026M00202390-I1Request digital key ↗
09/05/2026M00229152-I1Request digital key ↗
09/05/2026M00239208-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Structural6
09/05/2026M00199199-I1Request digital key ↗
09/04/2026M00239250-I1Request digital key ↗
Showing 2 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00351568-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
10/13/2026M01393927-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00456550-I1Request digital key ↗
▸Applications & Permits524
▸BISPLAN / WORK APPROVAL APPLICATION299
12/22/2025122385855Open ↗
12/22/2025122083011Open ↗
08/20/2025123852624Open ↗
Showing 3 of 299 on file for this type
▸BISWORK PERMIT APPLICATION206
03/29/2021123909743Open ↗
03/29/2021123909743Open ↗
Showing 2 of 206 on file for this type
▸BISPLACE OF ASSEMBLY19
07/21/2021104386558Open ↗
Showing 1 of 19 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZRD1-Zoning Resolution Determination4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications971
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION303
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 303 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature205
10/13/2026M01393927-I1Open ↗
10/01/2026M01436602-I1Open ↗
10/01/2026M01436602-S1Open ↗
Showing 3 of 205 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature174
10/01/2026M01436602-S2Open ↗
10/01/2026M01436602-S1Open ↗
09/29/2026M01221466-S2Open ↗
Showing 3 of 174 on file for this type
▸DOB NOWProgress Inspector Seal & Signature166
10/01/2026M01436602-I1Open ↗
10/01/2026M01436602-S1Open ↗
10/01/2026M01436602-S1Open ↗
Showing 3 of 166 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment216
▸BISSCHEDULE B - PLUMBING64
01/20/2021123825584Open ↗
01/15/2021123825584Open ↗
Showing 2 of 64 on file for this type
▸BISSELF-CERT PLUMBING NOTICE53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA19
08/17/2023123826468Open ↗
04/05/2022123382650Open ↗
Showing 2 of 19 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8516
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection53
▸DOB NOWTenant Protection Plan27
09/05/2026M00199199-I1Open ↗
09/04/2026M00329212-P1Open ↗
09/04/2026M00329212-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTenant Protection Plan and Notes26
04/22/2021123909743Open ↗
Showing 1 of 26 on file for this type
▸Environmental & Asbestos62
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00246182-P3Open ↗
09/03/2026M00246182-P2Open ↗
09/03/2026M00246182-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance139
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 62 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
05/09/2022140906143Open ↗
05/05/2022140906143Open ↗
05/03/2022123569771Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY19
01/06/2023123909743Open ↗
01/06/2023123909743Open ↗
05/03/2022123569771Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
09/03/2026M00555196-I1Open ↗
Showing 1 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)7
02/13/2025123852624Open ↗
02/10/2025123826468Open ↗
11/18/2024140604709Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports74
▸BISTECHNICAL REPORT: RESPONSIBILITY67
11/18/2024140604709Open ↗
09/13/2023123792333Open ↗
01/06/2023123909743Open ↗
Showing 3 of 67 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/11/2025123852624Open ↗
11/16/2022123419693Open ↗
▸BISMECHANICAL SYSTEMS1
02/11/2025123852624Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs228
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST125
12/23/2025122899998Open ↗
08/21/2025123852624Open ↗
02/12/2025123826468Open ↗
Showing 3 of 125 on file for this type
▸BISADMINISTRATIVE OBJECTIONS46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION27
12/23/2025122899998Open ↗
11/03/2023140317949Open ↗
Showing 2 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
11/17/2023102441350Open ↗
09/14/2023102441350Open ↗
07/18/2022102441350Open ↗
Showing 3 of 10 on file for this type
▸BISFINAL8
02/11/2025123852624Open ↗
11/18/2024140604709Open ↗
11/18/2024140604709Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
09/27/2023102441350Open ↗
09/27/2023102441350Open ↗
08/19/2021102441350Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership240
▸BISCOST AFFIDAVIT230
05/09/2022140906143Open ↗
05/05/2022140906143Open ↗
05/03/2022123569771Open ↗
Showing 3 of 230 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
12/23/2025122899998Open ↗
02/11/2025123852624Open ↗
02/10/2025123826468Open ↗
Showing 3 of 9 on file for this type
▸BISENGINEERS AFFIDAVIT RE: OPEN BPP REQUIRED ITEM ZD01231
07/25/2025102441350Open ↗
▸Filing & Intake Forms275
▸BISEFILING COVER SHEET124
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 124 on file for this type
▸BISADDITIONAL INFORMATION81
09/27/2023102441350Open ↗
09/11/2023102441350Open ↗
03/07/2023102441350Open ↗
Showing 3 of 81 on file for this type
▸BISBOROUGH INTAKE FORM58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸Other Documents43
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWAlternate Plan 71
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 81
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 21
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 61
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 101
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 51
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 41
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 111
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 91
10/13/2026M01393927-I1Open ↗
▸DOB NOWAlternate Plan 31
10/13/2026M01393927-I1Open ↗