| Owner | Filings | Most Recent |
|---|---|---|
| Sage Realty | 814 | 10/20/2026 |
| Sage Realty Corporation As Agent | 285 | 03/21/2026 |
| 7 Third Ave Leasehold | 2 | 03/22/2026 |
| Madison Ave | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Gilsanz Murray Steficek | 2 | 10/20/2026 |
| Patti & Anthes Consulting Engineers | 51 | 10/19/2026 |
| LPJ Architect | 1 | 10/16/2026 |
| Atelier Avenir Architecture | 2 | 08/28/2026 |
| Roy Gee Associates | 13 | 04/02/2026 |
| Cosentini Associates | 4 | 03/27/2026 |
| Fogarty Finger Architecture | 3 | 11/21/2025 |
| Omcg Architecture Studios | 2 | 09/11/2025 |
| TPG Architecture | 1 | 07/22/2025 |
| John F. Giuseffi, Architect | 1 | 07/08/2025 |
| Zenith Home Inspections | 2 | 04/17/2025 |
| St | 6 | 04/15/2025 |
| SSM Design LLP D/B/A Spector Group | 5 | 08/28/2024 |
| EDG | 2 | 07/01/2024 |
| C3D Architecture | 3 | 06/11/2024 |
| The Vsa Group | 2 | 11/15/2023 |
| Concessi Engineering | 33 | 10/26/2023 |
| Tohfaz Uddin PE | 1 | 09/01/2023 |
| Gad Ashoori PE | 1 | 05/23/2023 |
| Socotec | 1 | 01/24/2023 |
| Enthink Engineers | 1 | 12/15/2022 |
| CD&A | 2 | 08/23/2022 |
| Montroy Architecture | 1 | 05/25/2022 |
| FL&M Engineering Design & Inspection | 4 | 03/21/2022 |
| Shane R. Hamilton | 4 | 10/19/2020 |
| Cortland Morgan, Architect, AIA | 1 | 09/17/2020 |
| Baileys Engineering | 1 | 02/14/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Mbe Code Zoning | 194 | 03/21/2026 |
| Green Studio | 8 | 03/21/2026 |
| Y A Consulting Expediting | 20 | 03/21/2026 |
| JP Expedite | 4 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| LMS-Ace Services | 2 | 03/21/2026 |
| Bay Ridge Buildings Consulting | 1 | 03/21/2026 |
| JM Zoning | 4 | 03/21/2026 |
| Metropolis Group | 12 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| John Gallin & Son | General Contractor | 22 | 07/08/2026 |
| Wko Design Build | General Contractor | 22 | 07/08/2026 |
| Clune Construction Co | General Contractor | 13 | 07/08/2026 |
| George Breslaw Plumbing | Plumbing | 13 | 07/10/2026 |
| Metro Fire Protection | Fire Protection | 13 | 07/10/2026 |
| Wesbuilt Construction Man | General Contractor | 12 | 10/10/2026 |
| Pebble Craft | General Contractor | 9 | 07/08/2026 |
| Core Four Construction | General Contractor | 8 | 07/08/2026 |
| B & A Restoration Contracting | specialty_contractor | 7 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 6 | 07/08/2026 |
| Mac Felder | Plumbing | 5 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Five Star Electric | Electrical | 4 | 03/21/2026 |
| A.W. & S. Construction Co | General Contractor | 4 | 03/21/2026 |
| Kingdom County Construction | General Contractor | 4 | 03/21/2026 |
| Tri-Star Construction | General Contractor | 4 | 03/21/2026 |
| Universal Management & Cont | General Contractor | 4 | 03/21/2026 |
| Andamio Scaffolding | Scaffold | 3 | 03/21/2026 |
| Wesbuilt Construction Man | Scaffold | 3 | 07/08/2026 |
| Accord Contracting and Management | General Contractor | 3 | 07/08/2026 |
| Everest Scaffolding | Scaffold | 3 | 07/08/2026 |
| M&T Plumbing and Heating Co | Plumbing | 3 | 07/08/2026 |
| 20/20 General Contracting | Scaffold | 3 | 03/21/2026 |
| 20/20 General Contracting | General Contractor | 3 | 03/21/2026 |
| Universal Fire Sprinkler | Fire Protection | 2 | 08/26/2026 |
| Tikvah Electric Co | Electrical | 2 | 03/21/2026 |
| Cauldwell Wingate Co | General Contractor | 2 | 03/21/2026 |
| Eagle Scaffolding Services | Scaffold | 2 | 03/21/2026 |
| City Signs | Sign hanger | 2 | 07/08/2026 |
| M&T Plumbing and Heating Co | Fire Protection | 2 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 1 | 07/08/2026 |
| Fresh Meadow Mechanical | specialty_contractor | 1 | 07/08/2026 |
| A + Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| City/Suburban Plumbing | Plumbing | 1 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 1 | 07/08/2026 |
| Matros Automated Electrical | Electrical | 1 | 03/22/2026 |
| Go Pro Fire Protection | Fire Protection | 1 | 07/08/2026 |
| K.M.D. Mechanical 1443 | Fire Protection | 1 | 07/08/2026 |
| Forest Electric | Electrical | 1 | 03/21/2026 |
| Five Borough Electric | Electrical | 1 | 03/22/2026 |
| Epic Electric | Electrical | 1 | 03/22/2026 |
| Brooklyn-Queens Electric | Electrical | 1 | 03/21/2026 |
| New York Park Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| The Sci Construction | General Contractor | 1 | 04/09/2026 |
| Real Temp HVAC Mechanical | specialty_contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Trolydia Testing & Inspec | 4422 | 34 | 10/19/2026 |
| Sag Engineering & Consulting | 608 | 31 | 09/09/2026 |
| Gilsanz Murray Steficek | 240 | 1 | 06/26/2026 |
| Metrospec Sia | 6420 | 3 | 04/15/2025 |
| STE | 5741 | 2 | 07/11/2024 |
| EDG | 2578 | 2 | 07/01/2024 |
| The Vsa Group | 1767 | 2 | 11/15/2023 |
| Concessi Engineering | 540 | 31 | 10/26/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | George Breslaw Plumbing | 10/20/2026 |
| DOB NOW | General Construction | Permit Issued | Wesbuilt Construction Man | 10/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Wesbuilt Construction Man | 10/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Universal Fire Sprinkler | 08/14/2026 |
| DOB NOW | Plumbing | Permit Issued | George Breslaw Plumbing | 07/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Metro Fire Protection | 07/08/2026 |
| DOB NOW | Structural | Permit Issued | Wesbuilt Construction Man | 07/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Wesbuilt Construction Man | 07/07/2026 |
| DOB NOW | General Construction | Permit Issued | Wesbuilt Construction Man | 06/30/2026 |
| DOB NOW | General Construction | Signed-off | Clune Construction Co | 04/03/2026 |
| DOB NOW | Plumbing | Permit Issued | George Breslaw Plumbing | 12/22/2025 |
| DOB NOW | Sprinklers | Signed-off | Metro Fire Protection | 12/19/2025 |
| DOB NOW | Sprinklers | Permit Issued | Metro Fire Protection | 12/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Clune Construction Co | 12/16/2025 |
| DOB NOW | General Construction | Signed-off | Clune Construction Co | 12/15/2025 |
| DOB NOW | General Construction | Permit Issued | Core Four Construction | 11/25/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Core Four Construction | 11/25/2025 |
| DOB NOW | Sprinklers | Signed-off | Metro Fire Protection | 10/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | A + Sprinkler | 10/14/2025 |
| DOB NOW | Sprinklers | Signed-off | Metro Fire Protection | 09/16/2025 |
| DOB NOW | Plumbing | Signed-off | Mac Felder | 09/15/2025 |
| DOB NOW | Plumbing | Signed-off | Mac Felder | 09/10/2025 |
| DOB NOW | General Construction | Signed-off | The Sci Construction | 08/20/2025 |
| DOB NOW | Plumbing | Signed-off | City/Suburban Plumbing | 08/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Clune Construction Co | 08/15/2025 |
| DOB NOW | General Construction | Signed-off | Clune Construction Co | 08/15/2025 |
| DOB NOW | Plumbing | Signed-off | Mac Felder | 08/15/2025 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 08/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Tri-Star Construction | 08/07/2025 |
| DOB NOW | General Construction | Signed-off | Tri-Star Construction | 08/07/2025 |
| DOB NOW | General Construction | Signed-off | Clune Construction Co | 07/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Clune Construction Co | 07/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. Construction Co | 07/01/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. Construction Co | 06/26/2025 |
| DOB NOW | Sprinklers | Signed-off | Metro Fire Protection | 06/02/2025 |
| DOB NOW | Plumbing | Signed-off | Mac Felder | 05/22/2025 |
| DOB NOW | Sprinklers | Signed-off | Metro Fire Protection | 05/14/2025 |
| DOB NOW | General Construction | Signed-off | Clune Construction Co | 05/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Clune Construction Co | 05/05/2025 |
| DOB NOW | Sign | Signed-off | Elmer Dawson | 04/17/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/09/2026 | Permit Issued | Wesbuilt Construction Man | Air Conditioning Systems, Others | Cooling Bosch CL012 400 CFM ×1 CL018 600 CFM · Heat Pump Outdoor ×1 CL024 800 CFM · Heat Pump Outdoor ×1 CL036 1,200 CFM · Heat Pump Outdoor ×1 |
| 06/26/2026 | Permit Issued | Wesbuilt Construction Man | Others | — |
| 04/09/2026 | Signed-off | Clune Construction Co | Others | Other N/A .NA ×1 |
| 04/09/2026 | Signed-off | A.W. & S. Construction Co | Others | Other __Junk__ . ×1 |
| 03/27/2026 | Signed-off | Tri-Star Construction | Air Conditioning Systems | |
| 09/11/2025 | Signed-off | Clune Construction Co | Others | Other __Junk__ . ×1 |
| 09/03/2024 | Signed-off | John Gallin & Son | Others | Other __Junk__ . ×1 |
| 05/10/2024 | Permit Issued | Accord Contracting and Management | Associated Ducts and Piping | Ducts & Piping __Junk__ . ×2 |
| 04/23/2024 | Permit Issued | Core Four Construction | Others | Other __Junk__ . ×1 |
| 07/14/2022 | Permit Issued | Universal Management & Cont | Associated Ducts and Piping | Ducts & Piping __Junk__ . ×1 |
| 10/19/2020 | Permit Issued | 20/20 General Contracting | Associated Ducts and Piping | — |
| 07/27/2020 | Permit Issued | Wko Design Build | Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | — | — | Sprinkler System |
| 06/26/2026 | Permit Issued | Metro Fire Protection | Sprinkler System |
| 04/09/2026 | Signed-off | Metro Fire Protection | Sprinkler System |
| 04/09/2026 | Permit Issued | A + Sprinkler | 97 heads |
| 03/27/2026 | Signed-off | Full Capacity Fire | Sprinkler System |
| 10/30/2025 | Permit Issued | Metro Fire Protection | Sprinkler System |
| 09/11/2025 | Signed-off | Metro Fire Protection | Sprinkler System |
| 09/03/2024 | Permit Issued | Metro Fire Protection | Sprinkler System |
| 05/10/2024 | Permit Issued | Metro Fire Protection | Sprinkler System |
| 03/03/2022 | Permit Issued | Universal Fire Sprinkler | — |
| 06/03/2021 | Signed-off | Metro Fire Protection | 37 heads |
| 10/28/2020 | Signed-off | M&T Plumbing and Heating Co | 1 heads |
| 07/27/2020 | Permit Issued | Abco-Peerless Sprinkler | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | George Breslaw Plumbing | Water/Sanitary |
| 06/26/2026 | Permit Issued | George Breslaw Plumbing | Water/Sanitary |
| 04/09/2026 | Signed-off | Mac Felder | Water/Sanitary |
| 04/09/2026 | Signed-off | Mac Felder | Water/Sanitary |
| 03/27/2026 | Signed-off | City/Suburban Plumbing | Water/Sanitary |
| 10/30/2025 | Permit Issued | George Breslaw Plumbing | Water/Sanitary |
| 09/11/2025 | — | — | — |
| 05/10/2024 | Permit Issued | George Breslaw Plumbing | Water/Sanitary |
| 03/26/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | Permit Issued | Cloonagh Electrical | General Wiring |
| 08/23/2026 | Complete | Epic Electric | General Wiring |
| 01/09/2026 | Permit Issued | Forest Electric | General Wiring |
| 01/06/2026 | Complete | Ennell Group Electric | General Wiring |
| 01/05/2026 | Complete | Cloonagh Electrical | General Wiring |
| 12/09/2025 | Permit Issued | Cloonagh Electrical | General Wiring |
| 10/09/2025 | Complete | Leader Electric Co | General Wiring |
| 09/22/2025 | Complete | Forest Electric | General Wiring |
| 09/16/2025 | Complete | Tikvah Electric Co | General Wiring |
| 09/15/2025 | Permit Issued | Tikvah Electric Co | General Wiring |
| 09/11/2025 | Complete | Jam Electrical | — |
| 07/30/2025 | Complete | Omta Tech | General Wiring |
| 07/17/2025 | Permit Issued | Jorob Contracting & Electrical Co | General Wiring |
| 06/24/2025 | Permit Issued | Omta Tech | General Wiring |
| 05/14/2025 | Permit Issued | Omta Tech | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/26/2026 | Permit Issued | George Breslaw Plumbing | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/17/2020 | Permit Issued | 20/20 General Contracting | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/13/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/08/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/06/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/21/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/17/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | Lighting controls | Chester Kowalski | energy_progress |
| 08/13/2026 | Post-installed Anchors | Chester Kowalski | special |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 08/13/2026 | HVAC-R and service water heating system controls | Chester Kowalski | energy_progress |
| 08/13/2026 | Maintenance information | Chester Kowalski | energy_progress |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 08/13/2026 | Final | Chester Kowalski | progress |
| 08/13/2026 | HVAC-R and service water piping design and insulation | Chester Kowalski | energy_progress |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 08/13/2026 | Interior lighting power | Chester Kowalski | energy_progress |
| 08/13/2026 | Final | Chester Kowalski | progress |
| 08/13/2026 | HVAC-R and service water heating equipment | Chester Kowalski | energy_progress |
| 08/13/2026 | Duct leakage testing, insulation and design | Chester Kowalski | energy_progress |
| 08/13/2026 | Mechanical Systems | Chester Kowalski | special |
| 08/13/2026 | Electrical motors and elevators | Chester Kowalski | energy_progress |
| 08/13/2026 | Post-installed Anchors | Chester Kowalski | special |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 08/13/2026 | Energy Code Compliance Inspections | Chester Kowalski | progress |
| 08/13/2026 | Post-installed Anchors | Chester Kowalski | special |
| 08/13/2026 | Sprinkler Systems | Chester Kowalski | special |
| 08/13/2026 | Sprayed fire-resistant materials | Chester Kowalski | special |
| 04/30/2026 | Sprinkler Systems | Chester Kowalski | special |
| 04/30/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 04/30/2026 | Post-installed Anchors | Chester Kowalski | special |
| 04/30/2026 | Post-installed Anchors | Chester Kowalski | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| First Commercial Bank | Office | Floor 35 | Project M01256291 |
| Sage | Office | Floor 37 | Project M01092433 |
| Serafina | Restaurant / Food Service | Sub-cellar, Cellar, Floor 1 | Project M08000114 Project M00817377 Project M00708976 Project M00788819 Project M00788822 |
| Hudson Bay Capital Management | Office | Floor 30 | Project M00844424 |
| Hopson | Office | Floor 28 | Project M00789198 |
| Mother Cabrini | Office | Floors 22, 23 | Project M00716332 Project M00716345 Project M00716373 |
| Dewey Pegno & Kramarsky | Office | Floor 29 | Project M00701338 Project M00701341 Project M00704404 Project M00704389 |
| Sedal McCambridge | Office | Floor 24 | Project M00511035 Project M00511048 |
| LensCrafters | Retail | Floor 1 | Project M00417126 Project M00394371 Project M00394582 Project M00394603 |
| Cabrini | Office | Floor 22 | Project M00375195 |