| Owner | Filings | Most Recent |
|---|---|---|
| SL Green Realty | 291 | 10/17/2026 |
| Tishman Speyer Properties | 162 | 03/21/2026 |
| Metropolitan Leasehold | 142 | 03/22/2026 |
| 885 Third | 88 | 03/21/2026 |
| 885 Third Ave Corp Hines International | 35 | 03/21/2026 |
| 53rd at Third Venture | 19 | 03/21/2026 |
| Hines Interest | 17 | 03/21/2026 |
| Metro 885 3rd Ave | 10 | 03/21/2026 |
| Hines | 9 | 03/21/2026 |
| CB Rihard Ellis As Agents for 88 | 9 | 03/21/2026 |
| 885 Third Ave Leasehold | 5 | 03/21/2026 |
| Hines Interests LP Agt for 885 | 3 | 03/21/2026 |
| Third Avenue Company | 3 | 03/21/2026 |
| 3 AVE | 3 | 03/21/2026 |
| 53 St Venture | 3 | 03/21/2026 |
| HFZ Capital Group | 2 | 03/21/2026 |
| Third Avenue Co Block | 2 | 03/21/2026 |
| Hines Interest Limited Partnersh | 2 | 03/21/2026 |
| CB Richard Ellis | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Tan Engineering | 9 | 10/16/2026 |
| Icor Associates | 3 | 09/08/2026 |
| Gensler | 2 | 08/24/2026 |
| AMA Consulting Engineers | 61 | 07/27/2026 |
| Loffredo Brooks Architects | 12 | 07/23/2026 |
| Plus Group Consulting Engineering | 3 | 07/17/2026 |
| DJ Associates Architect | 1 | 07/16/2026 |
| Cany Architecture & Engineering | 3 | 01/15/2026 |
| Tohfaz Uddin PE | 6 | 12/19/2025 |
| TYLN | 1 | 12/16/2025 |
| Alan Feld | 1 | 09/19/2025 |
| Mdeas Architects | 20 | 12/04/2024 |
| Gilsanz Murray Steficek | 1 | 12/28/2023 |
| Ashraf | 7 | 10/19/2022 |
| Urban Integrations | 1 | 02/04/2022 |
| Vocon | 1 | 12/09/2021 |
| Severud Associates | 1 | 06/30/2021 |
| Leroy Hildrey Harris | 1 | 10/09/2019 |
| KZ Engineering | 1 | 12/11/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| Desarno Associates | 122 | 03/21/2026 |
| Codegreen | 32 | 03/21/2026 |
| United Safety Consultants | 1 | 03/21/2026 |
| Rizzo Group | 6 | 03/21/2026 |
| Spring Scaffolding | 12 | 03/21/2026 |
| Municipal Expediting | 8 | 03/21/2026 |
| Smep Design & Consultation | 4 | 03/21/2026 |
| Metropolis Group | 2 | 03/21/2026 |
| Eurocelt Expediting | 14 | 03/21/2026 |
| Milrose Consultants | 1 | 03/21/2026 |
| Synergy Building Consultants | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Spring Scaffolding | Scaffold | 24 | 10/04/2026 |
| Archstone Builders | General Contractor | 22 | 07/08/2026 |
| Synergy Construction | General Contractor | 18 | 08/01/2026 |
| Versatile Services | General Contractor | 14 | 07/08/2026 |
| W5 Group | General Contractor | 11 | 10/04/2026 |
| Republic Exterior Service | Scaffold | 10 | 07/08/2026 |
| Finaly General Contracting | General Contractor | 9 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 5 | 07/08/2026 |
| Enobrac Plumbing | Fire Protection | 5 | 07/08/2026 |
| Structural Preserv System | General Contractor | 4 | 08/26/2026 |
| Enobrac Plumbing | Plumbing | 4 | 07/08/2026 |
| A&A Plumbing | Plumbing | 4 | 07/08/2026 |
| Skyline Restoration | specialty_contractor | 3 | 07/08/2026 |
| Crossland Mechanical | specialty_contractor | 3 | 07/08/2026 |
| NY Plumbing & Heating | Plumbing | 3 | 07/08/2026 |
| Advanced Plumbing | Fire Protection | 3 | 07/08/2026 |
| Andamio Scaffolding | Scaffold | 3 | 03/21/2026 |
| Advanced Plumbing | Plumbing | 3 | 07/08/2026 |
| East Coast Office Solut | General Contractor | 3 | 07/08/2026 |
| Ballylough Construction | General Contractor | 2 | 04/09/2026 |
| Tuxedo Electrical Contracting | Electrical | 2 | 03/21/2026 |
| PSI Partners | Fire Protection | 2 | 07/08/2026 |
| Universal Contracting of | General Contractor | 2 | 08/06/2026 |
| Miller Plumbing & Heating | Plumbing | 2 | 08/18/2026 |
| Miller Plumbing & Heating | Fire Protection | 2 | 08/21/2026 |
| Blade Contracting | Scaffold | 2 | 03/21/2026 |
| W & M Sprinkler-NYC | Fire Protection | 1 | 10/06/2026 |
| Chapman & Chapman Electrical | Electrical | 1 | 03/21/2026 |
| Adco Electrical | Electrical | 1 | 03/21/2026 |
| Allstate Electric | Electrical | 1 | 03/21/2026 |
| Five Star Electric | Electrical | 1 | 03/21/2026 |
| Dal Electrical | Electrical | 1 | 03/21/2026 |
| Tuxedo Electrical Contracting | Electrical | 1 | 03/22/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 1 | 03/21/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 1 | 03/21/2026 |
| Air Stream Air Conditioning | specialty_contractor | 1 | 04/09/2026 |
| Access Plumbing | Plumbing | 1 | 10/01/2026 |
| Aggressive Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Aqueduct Mechanical | Fire Protection | 1 | 07/08/2026 |
| CM Plumbing | Plumbing | 1 | 07/08/2026 |
| Connelly & Sons Plumbing | Plumbing | 1 | 07/08/2026 |
| Denko Mechanical | Fire Protection | 1 | 07/08/2026 |
| Firequest | Fire Protection | 1 | 10/01/2026 |
| Five Borough NYC | Fire Protection | 1 | 07/08/2026 |
| Mega Plumbing | Fire Protection | 1 | 06/28/2026 |
| Mega Plumbing | Plumbing | 1 | 06/28/2026 |
| Otec Plumbing & Heating Services | Plumbing | 1 | 07/08/2026 |
| Danny Ramnarian | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Tan Engineering | 1291 | 10 | 10/16/2026 |
| Alan Margolin & Associates | 423 | 57 | 07/27/2026 |
| DJ Associates Architect | 2852 | 3 | 07/17/2026 |
| O'Rourke Engineering | 5873 | 3 | 07/17/2026 |
| Metrospec Sia | 6420 | 4 | 04/22/2026 |
| Socotec Engineering | 4983 | 4 | 12/16/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 10/07/2026 |
| DOB NOW | Sprinklers | Permit Issued | W & M Sprinkler-NYC | 10/05/2026 |
| DOB NOW | Plumbing | Permit Issued | Access Plumbing | 09/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | Firequest | 09/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | Miller Plumbing & Heating | 08/20/2026 |
| DOB NOW | General Construction | Permit Issued | Structural Preserv System | 08/19/2026 |
| DOB NOW | General Construction | Permit Issued | Structural Preserv System | 08/18/2026 |
| DOB NOW | Plumbing | Permit Issued | Miller Plumbing & Heating | 08/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 08/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Synergy Construction | 07/31/2026 |
| DOB NOW | General Construction | Permit Issued | Synergy Construction | 07/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Universal Contracting of | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | Universal Contracting of | 07/17/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 07/01/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Metrotech Mechanical | 05/26/2026 |
| DOB NOW | Structural | Permit Issued | Structural Preserv System | 03/23/2026 |
| DOB NOW | Structural | Permit Issued | Structural Preserv System | 03/23/2026 |
| DOB NOW | Sprinklers | Signed-off | Five Borough NYC | 03/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Synergy Construction | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | Synergy Construction | 03/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Synergy Construction | 02/27/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 02/27/2026 |
| DOB NOW | General Construction | Permit Issued | Synergy Construction | 02/26/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 12/22/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 12/16/2025 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 11/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Air Stream Air Conditioni | 11/13/2025 |
| DOB NOW | Sprinklers | Permit Issued | Real Plumbing | 11/05/2025 |
| DOB NOW | Plumbing | Permit Issued | Mega Plumbing | 11/05/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 10/15/2025 |
| DOB NOW | Sprinklers | Signed-off | S. Tieger Plumbing Co | 10/14/2025 |
| DOB NOW | Sprinklers | Permit Issued | Aqueduct Mechanical | 10/03/2025 |
| DOB NOW | Plumbing | Permit Issued | Otec Plumbing & Heating Services | 09/29/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Ballylough Construction | 09/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Finaly General Contracting | 09/25/2025 |
| DOB NOW | General Construction | Permit Issued | Ballylough Construction | 09/25/2025 |
| DOB NOW | General Construction | Signed-off | Finaly General Contracting | 09/23/2025 |
| DOB NOW | Plumbing | Signed-off | Miller Plumbing & Heating | 03/25/2025 |
| DOB NOW | Sprinklers | Signed-off | Miller Plumbing & Heating | 03/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Synergy Construction | 03/17/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/16/2026 | Permit Issued | Ballylough Construction | Air Conditioning Systems | Cooling Mitsubishi Electric MXZ-SM72TAM 69,000 BTU · Condensing Unit ×2 TUHYE0964AN41AN 96,000 BTU · Vrf Outdoor ×2 MXZ-SM120TAM 96,000 BTU · Condensing Unit ×1 Trane TRANE - NTXMSM72A1123AA 69,000 BTU · Vrf Indoor ×10 TRANE - TUHYH0964AN40AN 96,000 BTU · Condensing Unit ×10 TRANE - NTXMSM96A1123AA 96,000 BTU · Condensing Unit ×5 |
| 07/17/2026 | Permit Issued | Universal Contracting of | Heating and Air Conditioning Systems | Heat / Cool Daikin MODEL #RWEQ96TBYDA-HR / R-410A 103,000 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | Permit Issued | Real Plumbing | 54 heads |
| 07/27/2026 | Permit Issued | Miller Plumbing & Heating | — |
| 07/17/2026 | Permit Issued | Firequest | 86 heads |
| 02/27/2026 | Signed-off | Five Borough NYC | 21 heads |
| 09/22/2025 | Signed-off | Denko Mechanical | 61 heads |
| 11/20/2024 | Permit Issued | Advanced Plumbing | 582 heads |
| 05/28/2024 | Permit Issued | V'S Prime Mechanical | — |
| 10/12/2023 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | — | — | — |
| 07/27/2026 | Permit Issued | Miller Plumbing & Heating | Water/Sanitary |
| 07/17/2026 | Permit Issued | Access Plumbing | Water/Sanitary |
| 04/22/2026 | Permit Issued | Real Plumbing | Gas, Water/Sanitary |
| 02/27/2026 | — | — | — |
| 09/22/2025 | Signed-off | A&A Plumbing | Water/Sanitary |
| 10/12/2023 | — | — | Water/Sanitary |
| 09/22/2021 | Permit Issued | Advanced Plumbing | Water/Sanitary |
| 02/17/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Complete | Tuxedo Electrical Contracting | General Wiring |
| 07/27/2026 | Permit Issued | Forest Brook Electrical Contracting | General Wiring |
| 01/16/2026 | Complete | Tuxedo Electrical Contracting | General Wiring |
| 01/16/2026 | Complete | Tuxedo Electrical Contracting | General Wiring |
| 12/01/2025 | Permit Issued | Top Shelf Electric | — |
| 11/05/2025 | Complete | Update Systems Electrical | General Wiring |
| 09/28/2025 | Cancelled | WCK Electric | General Wiring |
| 05/07/2024 | Complete | Power-Tech Installation Electric | General Wiring |
| 08/18/2023 | Permit Issued | M.C. Electrical NY | General Wiring |
| 07/14/2023 | Permit Issued | M.C. Electrical NY | General Wiring |
| 11/03/2022 | Permit Issued | Tuxedo Electrical Contracting | General Wiring |
| 05/24/2022 | Permit Issued | Premier Electric | General Wiring |
| 03/25/2022 | Permit Issued | Amergy Electric of NY | General Wiring |
| 03/03/2022 | Complete | Nash Electric Services | — |
| 12/09/2021 | Permit Issued | Amergy Electric of NY | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/08/2026 | — | — | 1 scope_items |
| 08/24/2026 | Permit Issued | W & M Sprinkler-NYC | Steel |
| 01/15/2026 | Permit Issued | Structural Preserv System | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/19/2025 | Permit Issued | Spring Scaffolding | Sidewalk Shed |
| 12/11/2017 | Permit Issued | Blade Contracting | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2025 | Permit Issued | Structural Preservation System | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2025 | Permit Issued | Structural Preservation System | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/22/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/10/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/10/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/02/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 05/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/19/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/12/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/12/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/09/2026 | Maintenance information | Roger Tan | energy_progress |
| 10/09/2026 | HVAC-R and service water piping design and insulation | Roger Tan | energy_progress |
| 10/09/2026 | HVAC-R and service water heating system controls | Roger Tan | energy_progress |
| 10/09/2026 | HVAC-R and service water heating equipment | Roger Tan | energy_progress |
| 10/09/2026 | Shutoff dampers | Roger Tan | energy_progress |
| 10/09/2026 | Mechanical Systems | Roger Tan | special |
| 10/09/2026 | Fire-Resistant Penetrations and Joints | Roger Tan | special |
| 10/09/2026 | Final | Roger Tan | progress |
| 08/18/2026 | Final | MARISA HARTE | progress |
| 08/07/2026 | Final | — | progress |
| 07/07/2026 | Metering | David Shteierman | energy_progress |
| 07/07/2026 | HVAC-R and service water heating system controls | David Shteierman | energy_progress |
| 07/07/2026 | Energy Code Compliance Inspections | David Shteierman | progress |
| 07/07/2026 | Post-installed Anchors | BRIAN O'ROURKE | special |
| 07/07/2026 | Post-installed Anchors | — | special |
| 07/07/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/07/2026 | Maintenance information | — | energy_progress |
| 07/07/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/07/2026 | HVAC-R and service water heating equipment | David Shteierman | energy_progress |
| 07/07/2026 | Maintenance information | David Shteierman | energy_progress |
| 07/07/2026 | HVAC-R and service water piping design and insulation | David Shteierman | energy_progress |
| 07/07/2026 | Duct leakage testing, insulation and design | David Shteierman | energy_progress |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/06/2026 | Metering | David Shteierman | energy_progress |
| 07/06/2026 | Interior lighting power | David Shteierman | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Mamo | Restaurant / Food Service | Cellar, Floor 1, Mezzanine | Project M01284635 Project M01284648 Project M01284653 Project M01284654 |
| Reitler Kailas & Rosenblatt | Office | Floors 20, 21 | Project M00547055 Project M00547071 Project M00547081 Project M00547087 Project M00547130 |