| Owner | Filings | Most Recent |
|---|---|---|
| ABS PARTNERS REAL ESTATE, LLC | 85 | 07/08/2026 |
| 184 ASSOCIATES LLC C O ABS P | 20 | 07/08/2026 |
| 184 ASSOCIATES LLC C/O ABS P | 16 | 03/22/2026 |
| PHOENIX SUTTON STR INC | 10 | 03/22/2026 |
| 915 BROADWAY ASSOCIATES | 290 | 03/22/2026 |
| JRR CONTRACTING | 2 | 03/22/2026 |
| OWNER OF 915 BROADWAY | 2 | 03/22/2026 |
| A & S CONSTRUCTION OF NEW | 3 | 03/22/2026 |
| EVEREST SCAFFOLDING INC | 1 | 03/22/2026 |
| A.S CONSTRUCTION | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALWAYS FAST SERVICES CORP | 4 | 08/05/2026 |
| PINBAR ARCHITECTURE | 1 | 07/29/2026 |
| TSF ENGINEERING, PC | 13 | 01/22/2026 |
| DE LA GARZA ARCHITECTURE LLC | 5 | 01/22/2026 |
| TULLER/MCNEALUS/FELD | 4 | 11/14/2025 |
| GEORGE J. XERAKIAS, PE | 5 | 07/30/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 05/08/2025 |
| JASON M APTOWITZ CONSULTING ENGINEE | 5 | 09/09/2024 |
| MICHAEL ZENREICH ARCHITECT PC | 9 | 08/06/2024 |
| ALTAGRACIA ESTHER MARTINEZ, R.A. | 1 | 05/15/2024 |
| PATUXENT ENGINEERING LLC | 1 | 04/23/2024 |
| GREGORY COLSTON ARCHITECT | 1 | 07/05/2023 |
| WB ENGINEERS & CONSULTANTS PLLC | 6 | 08/24/2022 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 2 | 08/24/2022 |
| CLIFFORD DIAS, PE, PC | 2 | 06/27/2022 |
| WALTER T. GORMAN, P.E., P.C. | 8 | 06/13/2022 |
| CES ENGINEERING LLC | 4 | 05/23/2022 |
| PATINO ARCHITECTURE, PLLC | 2 | 04/19/2022 |
| ENTHINK ENGINEERS LLC | 2 | 04/04/2022 |
| PIRO STUDIO LLC | 1 | 01/11/2022 |
| ARCO ENGINEERING PC | 4 | 10/11/2021 |
| ASIF JAMIL, RA | 1 | 04/15/2021 |
| SALVATOR A. CARADONNA JR. | 2 | 10/08/2020 |
| MG ENGINEERING D.P.C. | 4 | 06/10/2020 |
| GREEN DESIGN | 2 | 05/29/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| WALTER T GORMAN PE | 22 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 2 | 03/21/2026 |
| MICHAEL ZENREICH ARCHITECT | 46 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 12 | 03/21/2026 |
| NYCCODE | 12 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 16 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 2 | 03/21/2026 |
| YAO W GUO ARCHITECT, PC | 8 | 03/21/2026 |
| DI DIO ARCHITECTURE, PC | 2 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRR CONTRACTING INC | General Contractor | 22 | 07/08/2026 |
| L&K PARTNERS, INC | General Contractor | 17 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 10 | 08/07/2026 |
| E AND G MODICA CONTRACTIN | General Contractor | 7 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 7 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 7 | 07/08/2026 |
| SARK FLOORING LLC | General Contractor | 4 | 07/08/2026 |
| PREMIER SANITATION LLC | General Contractor | 4 | 07/08/2026 |
| JACOB NAFTALY | Electrical | 4 | 03/21/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 4 | 03/21/2026 |
| PALONE BROTHERS AIR | General Contractor | 4 | 07/08/2026 |
| A.G.S IMPROVEMENTS INC | General Contractor | 3 | 03/21/2026 |
| LT FIRE PROTECTION CORP | Fire Protection | 3 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 07/08/2026 |
| G. C. PLBG & HTG INC | Plumbing | 3 | 07/08/2026 |
| NATIONAL MAINTENANCE | Scaffold | 2 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| ANESIS SERVICES CORP | Fire Protection | 2 | 07/08/2026 |
| EXPERT FIRE SPRINKLER,LLC | Fire Protection | 2 | 07/08/2026 |
| SKH MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| TOWER FIRE PROTECTION INC | Fire Protection | 2 | 07/08/2026 |
| BREFFNI MECHANICAL INC | General Contractor | 2 | 03/21/2026 |
| FOLOR INC | General Contractor | 2 | 03/21/2026 |
| RINNOVO CONSTRUCTION, LLC | General Contractor | 2 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| RI CONSULTING SERVICES IN | 8904 | 1 | 04/17/2026 |
| TSF ENGINEERING, PC | 1274 | 7 | 01/22/2026 |
| JASON M APTOWITZ CONSULTI | 5671 | 3 | 11/14/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 5 | 07/30/2025 |
| WALTER T. GORMAN, P.E., P | 268 | 11 | 03/21/2025 |
| DNA CONTROLLED INSPECTION | 554 | 5 | 08/06/2024 |
| MICHAEL ZENREICH ARCHITEC | 1724 | 9 | 08/06/2024 |
| SOCOTEC ENGINEERING | 4983 | 1 | 05/07/2024 |
| METROSPEC SIA | 6420 | 1 | 10/24/2022 |
| SKYLINE ENGINEERING, PLLC | 267 | 10 | 08/24/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/06/2026 |
| DOB NOW | General Construction | Signed-off | JRR CONTRACTING INC | 06/26/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 05/13/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ANDAMIO SCAFFOLDING LLC | 05/07/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | M.G.R. RESTORATION INC | 04/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NUCOR CONSTRUCTION CORP | 02/04/2026 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 02/03/2026 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 10/07/2025 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 09/11/2025 |
| DOB NOW | General Construction | Permit Issued | JRR CONTRACTING INC | 09/11/2025 |
| DOB NOW | General Construction | Permit Issued | JRR CONTRACTING INC | 09/10/2025 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 09/10/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/09/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SARK FLOORING LLC | 04/30/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | JRR CONTRACTING INC | 04/02/2025 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 01/16/2025 |
| DOB NOW | General Construction | Permit Issued | JRR CONTRACTING INC | 01/14/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | EXTERIOR WALL & BUILDING | 12/30/2024 |
| DOB NOW | Sprinklers | Signed-off | DV PLUMBING INC | 12/19/2024 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 10/22/2024 |
| DOB NOW | General Construction | Permit Issued | JRR CONTRACTING INC | 10/17/2024 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 10/08/2024 |
| DOB NOW | Supported Scaffold | Signed-off | JRR CONTRACTING INC | 10/04/2024 |
| DOB NOW | Plumbing | Signed-off | A + SPRINKLER CORP | 08/13/2024 |
| DOB NOW | Plumbing | Signed-off | A PLUS PLUMBING CORP | 08/05/2024 |
| DOB NOW | Mechanical Systems | Signed-off | NUCOR CONSTRUCTION CORP | 07/25/2024 |
| DOB NOW | Plumbing | Signed-off | GEOFFREY A. LAGAS & ASSOC | 07/16/2024 |
| DOB NOW | Sprinklers | Signed-off | DV PLUMBING INC | 06/07/2024 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 06/04/2024 |
| DOB NOW | General Construction | Signed-off | NUCOR CONSTRUCTION CORP | 05/23/2024 |
| DOB NOW | General Construction | Permit Issued | JRR CONTRACTING INC | 05/21/2024 |
| DOB NOW | Structural | Permit Issued | JRR CONTRACTING INC | 05/21/2024 |
| DOB NOW | Supported Scaffold | Signed-off | JRR CONTRACTING INC | 05/16/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | URBAN INTELLIGENCE, INC | 04/23/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | JRR CONTRACTING INC | 04/17/2024 |
| DOB NOW | Sprinklers | Permit Issued | LT FIRE PROTECTION CORP | 04/11/2024 |
| DOB NOW | Plumbing | Permit Issued | G. C. PLBG & HTG INC | 04/11/2024 |
| DOB NOW | General Construction | Signed-off | E AND G MODICA CONTRACTIN | 02/08/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 12/12/2023 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 12/12/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/21/2025 | — | — | Ventilation Systems | — |
| 01/26/2024 | Signed-off | SARK FLOORING LLC | Air Conditioning Systems | Cooling N/A N/A 30,000 CFM · Ductwork ×25 Mitsubishi Electric PUHY-EP144TNU-A.TH 12 tons · Vrf Outdoor ×2 Greenheck csp-a390-vg 230 CFM · Exhaust Fan ×1 |
| 10/24/2022 | Permit Issued | RINNOVO CONSTRUCTION, LLC | Associated Ducts and Piping | Ducts & Piping N/A NA 15 tons · Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/26/2024 | Permit Issued | LT FIRE PROTECTION CORP | 34 heads |
| 08/23/2023 | — | — | 8 heads |
| 10/24/2022 | Permit Issued | DENKO MECHANICAL INC | 79 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/26/2024 | Permit Issued | G. C. PLBG & HTG INC | Water/Sanitary |
| 08/23/2023 | — | — | Water/Sanitary |
| 10/24/2022 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | SALVATORE CAMPISI & SONS | General Wiring |
| 05/12/2026 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 07/02/2025 | Permit Issued | SALVATORE CAMPISI & SONS | General Wiring |
| 09/02/2024 | Complete | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 04/22/2024 | Complete | 5 J'S ELECTL CONTS CORP | — |
| 03/25/2024 | Permit Issued | SALVATORE CAMPISI & SONS | General Wiring |
| 06/20/2023 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 11/23/2022 | Permit Issued | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 08/29/2022 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 04/06/2022 | Complete | M&T ELECTRICAL LLC | — |
| 04/05/2022 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 11/10/2021 | Complete | V ELECTRIC NY INC | General Wiring |
| 08/26/2021 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 10/14/2020 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 10/14/2020 | Complete | RAINBOW ELECTRIC CO., INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2024 | Permit Issued | JRR CONTRACTING INC | Masonry |
| 05/15/2024 | Permit Issued | JRR CONTRACTING INC | 1 scope_items |
| 11/17/2023 | Permit Issued | JRR CONTRACTING INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Scaffold |
| 05/13/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| 05/29/2020 | Permit Issued | PHOENIX SUTTON STR INC | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2026 | Permit Issued | M.G.R. RESTORATION INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/24/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/20/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/20/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/23/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/23/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/15/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/21/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/29/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/29/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/23/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/29/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/17/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/12/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/05/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/28/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/06/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/17/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/28/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/15/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/10/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/01/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/27/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/27/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/08/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Water Test | Certified | View ↗ |
| 12/07/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/16/2026 | Post-installed Anchors | Md Istiaque Hasan | special |
| 04/16/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Md Istiaque Hasan | special |
| 01/05/2026 | Final | Javier de la Garza | progress |
| 05/20/2025 | Structural Stability – Alterations of existing buildings | George Xerakias | special |
| 05/20/2025 | Alternative Materials - OTCR Buildings Bulletin Number | George Xerakias | special |
| 05/20/2025 | Post-installed Anchors | George Xerakias | special |
| 03/23/2025 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 03/23/2025 | Sprinkler Systems | Walter Gorman | special |
| 02/11/2025 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 02/11/2025 | Sprinkler Systems | Walter Gorman | special |
| 01/29/2025 | Post-installed Anchors | George Xerakias | special |
| 01/29/2025 | Alternative Materials - OTCR Buildings Bulletin Number | George Xerakias | special |
| 01/29/2025 | Structural Stability – Alterations of existing buildings | George Xerakias | special |
| 09/19/2024 | Structural Stability – Alterations of existing buildings | George Xerakias | special |
| 09/19/2024 | Alternative Materials - OTCR Buildings Bulletin Number | George Xerakias | special |
| 09/19/2024 | Post-installed Anchors | George Xerakias | special |
| 09/10/2024 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 09/10/2024 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 09/10/2024 | Masonry | JASON APTOWITZ | special |
| 09/10/2024 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 09/10/2024 | Structural Stability – Alterations of existing buildings | JASON APTOWITZ | special |
| 09/10/2024 | Final | JASON APTOWITZ | progress |
| 07/18/2024 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 04/18/2024 | Fire-Resistance Rated Construction | Walter Gorman | progress |
| 04/04/2024 | Final | Walter Gorman | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Charles Schwab | Office | — | Project M01421670 |
| Ezra | Office | Floor 4 | Project M01338993 |
| LHH | Office | Floor 2 | Project M08009249 Project M08009310 Project M08009359 Project M08004683 |
| Spectrum - Quanta | Office | Floor 15 | Project M00741929 Project M00747019 |
| Simons -sandbox Films | Office | Floor 10 | Project M00752913 Project M00752985 Project M00753007 |
| Freeline Therapeutics | Office | Floor 10 | Project M00636667 |
| General Assembly | Office | Floors 2–4 | Project M00619146 Project M00524736 Project M00516592 |