| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01467474 | 366 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 09/29/2026 | 09/28/2026 | — | Permit for electrical wiring of temporary standpipe air compressor motor. |
| B01456353 | 50 SPARROW WAY BROOKLYN | New Job Filing | Job in process | 09/04/2026 | 09/03/2026 | — | Temporary power wiring for personnel and material hoist on construction site. |
| Q01455821 | 50-25 BARNETT AVENUE QUEENS | New Job Filing | Job in process | 09/03/2026 | 09/02/2026 | — | Complete light and power wiring daycare fit out. |
| M01451283 | 112 11 AVENUE MANHATTAN | New Job Filing | Job in process | 08/25/2026 | 08/24/2026 | — | Wiring of temp power for hoist. |
| X01447894 | 671 TINTON AVENUE BRONX | New Job Filing | Complete | 08/18/2026 | 08/17/2026 | — | Permit for missing apartment sub-panels from permit #X01065865-I1-EL. |
| B00435488 | 14 PILLING STREET BROOKLYN | New Job Filing | Job in process | 12/02/2020 | 08/05/2026 | — | Subsequent filing to reinstate abandoned permit B143666. |
| Name | Projects together | Most recent |
|---|---|---|
| Nyc Hpd | 29 | — |
| Nyc Hpd - Office Of Development | 27 | — |
| Hp Mjm Housing Development | 14 | — |
| Boulevard Together Developer Llc | 9 | — |
| 220E178 Llc | 8 | — |
| Cadman Associates Llc | 6 | — |
| Phipps Houses | 5 | — |
| 1065 Atlantic Avenue Llc | 5 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01467474 | 366 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 09/29/2026 | 09/28/2026 | — | Permit for electrical wiring of temporary standpipe air compressor motor. |
| B01456353 | 50 SPARROW WAY BROOKLYN | New Job Filing | Job in process | 09/04/2026 | 09/03/2026 | — | Temporary power wiring for personnel and material hoist on construction site. |
| Q01455821 | 50-25 BARNETT AVENUE QUEENS | New Job Filing | Job in process | 09/03/2026 | 09/02/2026 | — | Complete light and power wiring daycare fit out. |
| M01451283 | 112 11 AVENUE MANHATTAN | New Job Filing | Job in process | 08/25/2026 | 08/24/2026 | — | Wiring of temp power for hoist. |
| X01447894 | 671 TINTON AVENUE BRONX | New Job Filing | Complete | 08/18/2026 | 08/17/2026 | — | Permit for missing apartment sub-panels from permit #X01065865-I1-EL. |
| B00435488 | 14 PILLING STREET BROOKLYN | New Job Filing | Job in process | 12/02/2020 | 08/05/2026 | — | Subsequent filing to reinstate abandoned permit B143666. |
| B01439079 | 1542 EAST NEW YORK AVENUE BROOKLYN | New Job Filing | Job in process | 07/30/2026 | 07/29/2026 | — | Temporary electrical power and light wiring for construction site and building. |
| Q01293441 | 50-25 BARNETT AVENUE QUEENS | New Job Filing | Job in process | 09/25/2025 | 07/28/2026 | — | Subsequent filing as per inspector request to ADD EPR to filing and new contractor information. |
| X01437994 | 21 EAST CLARKE PLACE BRONX | New Job Filing | Job in process | 07/29/2026 | 07/28/2026 | — | Install Temporary Con-ed Service inside sidewalk shed. 1 10PT meter to be installed. |
| M01421976 | 245 EAST 124 STREET MANHATTAN | New Job Filing | Job in process | 06/24/2026 | 06/24/2026 | — | Furnish and install an additional 100A meter for retail space along with a 200A panel. |
| X01393936 | BROOK AVENUE BRONX | New Job Filing | Job in process | 04/28/2026 | 04/28/2026 | — | Permit for electrical wiring of temporary standpipe air compressor motor installed in the cellar. |
| M01387299 | 431 E 118 STREET MANHATTAN | New Job Filing | Job in process | 04/15/2026 | 04/15/2026 | — | New conduit for con-ed POE, due to damaged service feeders. Install 200amp bypass meter pan for PLP area with 100amp 2 separate meter pan fo… |
| B01381552 | 366 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 04/01/2026 | 04/01/2026 | — | Wiring for temporary power for multiple dual personnel hoist on construction site using generator for hoists. |
| B01373989 | 366 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 03/18/2026 | 03/19/2026 | — | Temporary electrical switchgear placed for use during construction included for all lights, receptacles, pumps, and jobsite generators. |
| X01364399 | 521 EAST TREMONT AVENUE BRONX | New Job Filing | Job in process | 02/25/2026 | 02/25/2026 | — | Permit for electrical wiring of temporary standpipe air compressor motor. |
| Q01362276 | 20-22 36 STREET QUEENS | New Job Filing | Job in process | 02/19/2026 | 02/23/2026 | — | Install 2 family's residential house new Up coming Coned service work with wiring for light and power with Heat and Cold. |
| X01345514 | 521 EAST TREMONT AVENUE BRONX | New Job Filing | Job in process | 01/12/2026 | 01/12/2026 | — | Furnish and install temporary light and power for temporary construction including construction equipment. |
| B01329100 | 366 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 12/16/2025 | 12/16/2025 | — | Complete electrical fit out for new residential building including 283 residential units. |
| B01328418 | 161 EMERSON PLACE | New Job Filing | Job in process | 12/04/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 103 residential units. |
| Q01329149 | 19-19 CORNAGA AVENUE QUEENS | New Job Filing | Job in process | 12/05/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 92 residential units. |
| X01231616 | 960 TINTON AVENUE BRONX | New Job Filing | Job in process | 12/10/2025 | 12/15/2025 | — | Selective electrical work and selective light and power wiring for all 53 units, utility areas, and public spaces as per electrical layout. |
| X01328859 | 625 BROOK AVENUE BRONX | New Job Filing | Job in process | 12/09/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 166 residential units. |
| X01329043 | BROOK AVENUE BRONX | New Job Filing | Job in process | 12/11/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 254 residential units. |
| X01329179 | 410 BEDFORD PARK BOULEVARD BRONX | New Job Filing | Job in process | 12/10/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 277 residential units. |
| X01329480 | 706 UNION AVENUE BRONX | New Job Filing | Job in process | 12/09/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 29 residential units. |
| X01330582 | 521 EAST TREMONT AVENUE BRONX | New Job Filing | Job in process | 12/08/2025 | 12/15/2025 | — | Complete electrical fit out for new residential building including 213 residential units. |
| B01233827 | 161 EMERSON PLACE | New Job Filing | Job in process | 12/04/2025 | 12/04/2025 | — | Temporary electrical service along with temporary light and power for new building including underground work. |
| X01326634 | 410 BEDFORD PARK BOULEVARD BRONX | New Job Filing | Job in process | 12/01/2025 | 12/01/2025 | — | Temporary electrical service along with temporary light and power for new building. |
| M01324088 | 279 EAST 3 STREET MANHATTAN | New Job Filing | Job in process | 11/24/2025 | 11/24/2025 | — | Light and power wiring for 1st floor lobby entrance area only along with panel work. |
| X01323293 | 21 EAST CLARKE PLACE BRONX | New Job Filing | Job in process | 11/21/2025 | 11/21/2025 | — | Complete electrical fit out for new residential building including 210 residential units. |
| X01316583 | 625 BROOK AVENUE BRONX | New Job Filing | Job in process | 11/10/2025 | 11/10/2025 | — | Permit for electrical wiring of temporary standpipe air compressor motor installed on the first floor. |
| X01311445 | 625 BROOK AVENUE BRONX | New Job Filing | Job in process | 10/30/2025 | 10/30/2025 | — | TEMPORARY POWER FOR MULTIPLE DUAL PERSONNEL AND MATERIAL HOIST ON CONSTRUCTION SITE. |
| X00861432 | 1840 ANTHONY AVENUE BRONX | New Job Filing | Job in process | 04/18/2023 | 10/03/2025 | — | Subsequent filing to amend existing permit X00861432-I1-EL with additional items missing as mentioned from the 08/15/2025 inspection. |
| M01155597 | 270 EAST 2 STREET MANHATTAN | New Job Filing | Cancelled | 09/15/2025 | 09/19/2025 | — | Complete electrical fit out for new residential building including 75 units, utility areas along with all other electrical work including EP… |
| Q01275706 | 99-15 200 STREET QUEENS | New Job Filing | Complete | 08/21/2025 | 08/25/2025 | — | Install 3 gang outdoor type Meter pan with 3 100 Amp service switch. Also some light and power wiring inside the apartment. |
| Q01275732 | 104-11 200 STREET QUEENS | New Job Filing | Complete | 08/21/2025 | 08/25/2025 | — | Install 3 Gang Meter pan with 3 100 Amp service switch. With 3 CB panel |
| M01276449 | 510 WEST 46 STREET MANHATTAN | New Job Filing | Job in process | 08/22/2025 | 08/22/2025 | — | Light and power wiring for 1st floor lobby entrance area only along with panel work. |
| M01276460 | 750 COLUMBUS AVENUE MANHATTAN | New Job Filing | Complete | 08/22/2025 | 08/22/2025 | — | Light and power wiring for 1st floor reception area along with (2) office spaces. |
| X01275159 | 625 BROOK AVENUE BRONX | New Job Filing | Job in process | 08/21/2025 | 08/22/2025 | — | 1600A electrical temporary service for use during temporary construction including service, temp light and power along with underground as r… |
| X01275838 | BROOK AVENUE BRONX | New Job Filing | Job in process | 08/21/2025 | 08/22/2025 | — | Temporary electrical switchboard, light, power, and wiring including underground conduits as required for building and site. |
| Q01269923 | 19-19 CORNAGA AVENUE QUEENS | New Job Filing | Job in process | 08/11/2025 | 08/12/2025 | — | Wiring for dual personnel/material hoist including wiring for temporary generator power for hoist and generator for hoists. |
| Q01227320 | 92-08 175 STREET QUEENS | New Job Filing | Complete | 05/16/2025 | 05/16/2025 | — | Energize existing PLP meter equipment by Con Edison. |
| Q01227331 | 92-08 175 STREET QUEENS | New Job Filing | Complete | 05/16/2025 | 05/16/2025 | — | Energize 2 existing PLP meter equipment by Con Edison. |
| Q01211823 | 92-08 175 STREET QUEENS | New Job Filing | Complete | 04/16/2025 | 04/30/2025 | — | Energize existing PLP meter equipment by Con Edison. |
| Q01212184 | 92-08 175 STREET QUEENS | New Job Filing | Complete | 04/17/2025 | 04/30/2025 | — | Energize 2 existing PLP meter equipment by Con Edison. |
| B01208364 | 240 HUNTINGTON STREET BROOKLYN | New Job Filing | Job in process | 04/09/2025 | 04/09/2025 | — | Complete light and power wiring for 1st floor Coffee Shop. |
| B01206114 | 2817 FOSTER AVENUE BROOKLYN | New Job Filing | Job in process | 04/04/2025 | 04/04/2025 | — | Complete service work with existing risers for 20 residential units. |
| Q01203162 | 20-21 35 STREET QUEENS | New Job Filing | Job in process | 03/31/2025 | 03/31/2025 | — | Light and power wiring on the 1st and 2nd floor of the residential house. |
| Q01194873 | 15-21 VILLAGE LANE QUEENS | New Job Filing | Job in process | 03/14/2025 | 03/14/2025 | — | Complete electrical fit out for new residential building including 133 residential units, parking area, along with all other electrical work… |
| X01193198 | SPOFFORD AVENUE BRONX | New Job Filing | Job in process | 03/14/2025 | 03/14/2025 | — | Complete electrical fit out for new residential building including 135 residential units, parking area, along with all other electrical work… |
| X01193462 | 1201 SPOFFORD AVENUE BRONX | New Job Filing | Job in process | 03/14/2025 | 03/14/2025 | — | Complete electrical fit out for new residential building including 224 residential units, parking area, along with all other electrical work… |
| Q01192803 | 19-19 CORNAGA AVENUE QUEENS | New Job Filing | Job in process | 03/10/2025 | 03/10/2025 | — | Temporary electrical service along with temporary light and power for new building including underground work. |
| M01172324 | 354 WEST 54 STREET MANHATTAN | New Job Filing | Job in process | 01/27/2025 | 01/27/2025 | — | Complete electrical fit-out for 112 units including electrical service installation, electrical distribution and generator. |
| M01168118 | 354 WEST 54 STREET MANHATTAN | New Job Filing | Job in process | 01/16/2025 | 01/16/2025 | — | Permit for electrical wiring of temporary standpipe air compressor motor installed on the first floor. |
| M01155903 | 270 EAST 2 STREET MANHATTAN | New Job Filing | Job in process | 12/16/2024 | 12/16/2024 | — | Complete electrical fit out for new residential building including 75 units, utility areas along with all other electrical work including EP… |
| M01148390 | 311 11TH AVENUE MANHATTAN | New Job Filing | Complete | 11/26/2024 | 12/03/2024 | — | Cable pull only from main switchgear room distribution switch to commercial area. Cable to be left in a pull box to be extended and terminat… |
| Q01150298 | 15-21 VILLAGE LANE QUEENS | New Job Filing | Complete | 12/03/2024 | 12/03/2024 | — | Temporary light and power and temporary power to hoist. Permit to supersede electrical permit Q01047900-I1-EL. |
| Q01150306 | 15-21 VILLAGE LANE QUEENS | New Job Filing | Complete | 12/03/2024 | 12/03/2024 | — | Temporary power to standpipe alarm. Permit to supersede Q01064619-I1-EL. |
| S01078618 | 221 PORT RICHMONT AVENUE STATEN ISLAND | New Job Filing | Complete | 11/27/2024 | 11/27/2024 | — | Electrical permit to supersede temporary service for lighting and power on previous permit S00343859-I1-EL. |
| M01145896 | 354 WEST 54 STREET MANHATTAN | New Job Filing | Job in process | 11/21/2024 | 11/21/2024 | — | Wiring for temporary power for hoist on construction site. |
| B01141253 | 1045 ATLANTIC AVENUE BROOKLYN | New Job Filing | Job in process | 11/12/2024 | 11/12/2024 | — | Complete electrical fit out for new residential building including 456 residential units, parking area, along with all other electrical work… |
| B01139908 | 2237 EAST 38 STREET BROOKLYN | New Job Filing | Job in process | 11/08/2024 | 11/08/2024 | — | Electrical permit for 3 HVAC mini-split A/Cs. |
| X01105430 | 2721 COLDEN AVENUE BRONX | New Job Filing | Job in process | 09/03/2024 | 09/03/2024 | — | Complete electrical fit out out of new residential building including 43 units, parking area, along with all other electrical work. |
| Q01103637 | 33-25 72 STREET QUEENS | New Job Filing | Complete | 08/28/2024 | 08/30/2024 | — | Re-energize existing meters. |
| B01089543 | 5635 KINGS HIGHWAY BROOKLYN | New Job Filing | Complete | 07/31/2024 | 08/01/2024 | — | Permit for con-ed meter install due to damage or existing meter equipment only. |
| B01067135 | 456 CRESCENT STREET BROOKLYN | New Job Filing | Job in process | 06/20/2024 | 06/20/2024 | — | Installation of a 200A service switch, a 220V-1 phase system, and five new 100 Amp, 20-circuit panels. Additionally, installing 5 new meters… |
| X01065865 | 671 TINTON AVENUE BRONX | New Job Filing | Job in process | 06/12/2024 | 06/13/2024 | — | Complete electrical work for entire building including 126 apartments along with complete service work, and power to Mechanical equipment. E… |
| M01065154 | 354 WEST 54 STREET MANHATTAN | New Job Filing | Job in process | 06/11/2024 | 06/12/2024 | — | Complete temporary electrical service for construction services including service, lights, outlets, and underground distribution. |
| B01063300 | 2817 FOSTER AVENUE BROOKLYN | New Job Filing | Job in process | 06/07/2024 | 06/07/2024 | — | General light and power wiring for Basement. |
| B01025451 | 155 CLARKSON AVENUE BROOKLYN | New Job Filing | Job in process | 06/04/2024 | 06/04/2024 | — | Electrical permit only for 2000A service including all service switches, feeders, fire pump disconnects. EPR Approved # BK03249 dated Decemb… |
| X01053173 | 1876 BELMONT AVENUE BRONX | New Job Filing | Job in process | 05/20/2024 | 05/20/2024 | — | Complete electrical work for entire building including 134 apartments along with complete service work, generator standby power, and power t… |
| B01039107 | 155 CLARKSON AVENUE BROOKLYN | New Job Filing | Complete | 04/19/2024 | 04/19/2024 | — | Permit for Sidewalk Shed. |
| B01025437 | 1045 ATLANTIC AVENUE BROOKLYN | New Job Filing | Complete | 03/25/2024 | 03/26/2024 | — | Permit for electrical wiring of temporary standpipe air compressor motor installed on the first floor. Air compressor located in cellar, a… |
| X01020399 | SPOFFORD AVENUE BRONX | New Job Filing | Job in process | 03/14/2024 | 03/15/2024 | — | Furnish and Install temporary light and power including construction equipment and trailers through underground distribution. |
| B01017164 | 151 CLARKSON AVENUE BROOKLYN | New Job Filing | Job in process | 03/08/2024 | 03/11/2024 | — | Install 200Amp 3 phase service with 200Amp CB panel. |
| X01004579 | 191 TERRACE STREET BRONX | New Job Filing | Job in process | 03/05/2024 | 03/06/2024 | — | Remove interior meter and upgrade to an exterior meter with new 100A service with power and light rewiring. |
| B01003555 | 155 CLARKSON AVENUE BROOKLYN | New Job Filing | Complete | 02/09/2024 | 02/09/2024 | — | Install 200 Amp 3phase Temp service with 200Amp CB panel. |
| M00980382 | 270 EAST 2 STREET MANHATTAN | New Job Filing | Complete | 01/04/2024 | 01/05/2024 | — | Temporary power for material/personnel hoist on construction site. |
| X00985880 | 671 TINTON AVENUE BRONX | New Job Filing | Complete | 01/04/2024 | 01/05/2024 | — | TEMPORARY POWER FOR MULTIPLE DUAL PERSONNEL AND MATERIAL HOIST ON CONSTRUCTION SITE. |
| M00980436 | 270 EAST 2 STREET MANHATTAN | New Job Filing | Job in process | 01/02/2024 | 01/04/2024 | — | 800A temporary electrical service with temporary light and power wiring for new building. Temporary power running from 290 East 3rd Street… |
| B00800674 | 240 HUNTINGTON STREET BROOKLYN | New Job Filing | Complete | 12/08/2023 | 12/08/2023 | — | Complete electrical work for entire building along with mechanical HVAC system power wiring and complete service with EPR approval job # BK0… |
| B00970655 | 250 EUCLID AVENUE BROOKLYN | New Job Filing | Job in process | 12/01/2023 | 12/01/2023 | — | Complete electrical fitout for 403 apartments including electrical service installation with EPR approval job#MNBK01272 and approval date 12… |
| B00966088 | 212 ST JOHNS PLACE BROOKLYN | New Job Filing | Job in process | 11/21/2023 | 11/27/2023 | — | Application for Installation of 200A service switch with 200A -3ph bypass meter and 200A- 3ph panel (42 CKT). Additionally remove existing … |
| B00965284 | 806 PARK PLACE BROOKLYN | New Job Filing | Job in process | 11/20/2023 | 11/20/2023 | — | Apartment # 3R, Complete wiring for power, lighting & install 125 Amp new apartment panel with existing apartment feeder cable. |
| Q00964153 | 20-22 36 STREET QUEENS | New Job Filing | Job in process | 11/16/2023 | 11/20/2023 | — | Application for removing all existing light, power, wiring and install temporary light & power. |
| B00949882 | 420 CARROLL STREET BROOKLYN | New Job Filing | Complete | 10/18/2023 | 10/18/2023 | — | Permit for electrical wiring of temporary standpipe air compressor motor installed on the first floor. |
| B00945136 | 2 CYPRESS COURT BROOKLYN | New Job Filing | Job in process | 10/09/2023 | 10/12/2023 | — | Light and power wiring in the cellar, 1st and second floor along with the installation of one new meter 100Amp 208V-1P WP type meter pan. |
| X00923893 | 671 TINTON AVENUE BRONX | New Job Filing | Complete | 10/11/2023 | 10/11/2023 | — | Temporary electrical service for use of construction services located at 671 Tinton Avenue. This includes temporary power and lights for all… |
| X00930423 | 2851 DEWEY AVENUE BRONX | New Job Filing | Job in process | 09/07/2023 | 09/10/2023 | — | Install 3 gang 100AMP 3 wire meter pan with 1 125AMP C.B panel with 100AMP main. |
| X00930495 | 2853 DEWEY AVENUE BRONX | New Job Filing | Job in process | 09/07/2023 | 09/08/2023 | — | Install 3 gang 100AMP 3 wire meter pan with 1- 125AMP C.B panel with 100AMP main. |
| B00921893 | 800 EAST 39 STREET BROOKLYN | New Job Filing | Complete | 08/21/2023 | 08/21/2023 | — | Install one 100 amps outdoor meter with 100 amps Con Ed box and 2” new rigid pipe underground from coned box to sidewalk curb |
| Q00921917 | 89-35 187 PLACE QUEENS | New Job Filing | Complete | 08/21/2023 | 08/21/2023 | — | One 100 amps 3 gang outdoor meter and two 125 amps 20 circuit panel with main breaker for 1st floor and PLP and one 100 amps enclosure 60 am… |
| M00885405 | 537 WEST 59 STREET MANHATTAN | New Job Filing | Complete | 08/10/2023 | 08/10/2023 | — | 1600A temporary electrical service for use of construction services located at 537 West 59th Street. This includes temporary power and light… |
| S00916804 | 221 PORT RICHMONT AVENUE STATEN ISLAND | New Job Filing | Complete | 08/09/2023 | 08/09/2023 | — | Permit pulled to supersede open electrical permits S00698339 for wheelchair lift, S00623324 for the community center fit-out and S00462303 f… |
| B00912130 | 97 GLENMORE AVENUE BROOKLYN | New Job Filing | Job in process | 07/31/2023 | 07/31/2023 | — | Install 1600A temporary electrical service for use of construction services located at 117 Glenmore Avenue. This includes temporary power an… |
| S00911538 | 221 PORT RICHMONT AVENUE STATEN ISLAND | New Job Filing | Complete | 07/31/2023 | 07/31/2023 | — | Permit pulled to supersede open electrical permits S00698339, S00623324, S00462303, S00343859, and S00321554. |
| X00909460 | 425 GRAND CONCOURSE BRONX | New Job Filing | Complete | 07/27/2023 | 07/27/2023 | — | Permit pulled to supersede the remaining open electrical permits: Y158600, Y114463, Y084129 and Y067107. |
| B00906279 | 1325 BROADWAY BROOKLYN | New Job Filing | Complete | 07/18/2023 | 07/18/2023 | — | Permit for electrical wiring of temporary standpipe air compressor motor installed on first floor. |
| B00902602 | 1045 ATLANTIC AVENUE BROOKLYN | New Job Filing | Complete | 07/11/2023 | 07/11/2023 | — | Temporary electrical service for new building construction services including underground work, temporary service install, temporary riser c… |
| M00900094 | 345 WEST 58 STREET MANHATTAN | New Job Filing | Complete | 07/05/2023 | 07/05/2023 | — | Permit to supersede existing electrical permit Z143217 issued on 02/28/2014. |