| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00480814 ↗ | NASSAU BOULEVARD QUEENS | Alteration | Permit Issued | 03/17/2021 | 09/22/2026 | Design AECOM Owner CITY OF NEW YORK Contractor JOHN P PICONE INC | FILING HEREWITH CONTRACT JA-179: JAMAICA WRRF STRUCTURAL ACTIVITIES AS PER SUBMITTED PLANS. |
| S00870290 ↗ | 751 MILL ROAD STATEN ISLAND | Alteration | Permit Issued | 05/11/2023 | 09/21/2026 | Contractor STRATIS CONTRACTING CORP | RPZ replacements, construction of a new water supply loop to improve water distribution through the facility. Connection of water loop to De… |
| S00500799 ↗ | HANNAH STREET STATEN ISLAND | New Building | Permit Issued | 09/14/2021 | 08/13/2026 | Design NYC DEP Contractor JOHN P PICONE INC Filer HDR | the installation of solar panels on the new Electrical building (FILING NUMBER: S00500799-I1) to comply to LL92 and LL94 |
| M01093333 ↗ | 550 FDR DRIVE MANHATTAN | New Building | Permit Issued | 07/14/2025 | 08/05/2026 | Design WESLER-COHEN ASSOCIATES Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | INSTALLATION OF ONE UNIT HEATER AND EXHAUST FANS IN NEW COMFORT STATION (PUBLIC RESTROOM) IN EAST RIVER PARK. |
| S00877177 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 08/05/2026 | Design NYC DEP Contractor WELKIN ENTERPRISES,LLC | FILING HEREWITH FOR SANITARY, WATER SERVICE AND STORM PIPING WITH FIXTURES FOR PUMP STATION BUILDING AND SURROUNDING AREA AS PER PLANS. NO … |
| Q08041347 ↗ | 73-50 LITTLE NECK PARKWAY QUEENS | Alteration | Permit Issued | 12/09/2022 | 07/16/2026 | Design COLLADO ENGINEERING Contractor OLYMPIC PLBG & HTG SVC IN | INSTALLATION OF NEW BOILER AS PER PLANS FILED HEREWITH. |
| Name | Projects together | Most recent |
|---|---|---|
| KS ENGINEERS, P.C. | 7 | 09/09/2024 |
| NYC DEP | 7 | 10/30/2023 |
| AECOM | 6 | 04/17/2026 |
| WESLER-COHEN ASSOCIATES | 6 | 07/21/2025 |
| BIG ARCHITECTURE DPC | 5 | 07/21/2025 |
| CSA GROUP NY ARCHITECTS & ENGINEERS | 4 | 03/09/2023 |
| HRM ENGINEERING SERVICES, PC | 4 | 11/01/2022 |
| WILLIAM B. LOFTUS, P.E. | 4 | 10/23/2023 |
| JACOBS | 3 | 12/11/2023 |
| RONNETTE RILEY ARCHITECT | 3 | 10/28/2022 |
| AKRF, INC. | 2 | 06/07/2024 |
| CALLISONRTKL | 2 | 07/21/2025 |
| SYED MOHAMMAD NAEEM AKHTER, PE | 2 | 05/12/2023 |
| URBANTECH CONSULTING ENGINEERING PC | 2 | 05/12/2023 |
| COLLADO ENGINEERING | 1 | 12/09/2022 |
| FRENCH & PARRELLO ASSOCIATES | 1 | 12/23/2019 |
| GEDEON ENGINEERING, PC | 1 | 07/11/2024 |
| LEVENBETTS | 1 | 07/11/2024 |
| MATHEWS NIELSEN | 1 | 06/07/2023 |
| NANDINEE PHOOKAN ARCHITECTS | 1 | 01/05/2022 |
| NLG ENGINEERING PC | 1 | 11/07/2023 |
| OFFICE FOR THE NEXT ENVIRONMENT ARC | 1 | 06/07/2023 |
| PLUS GROUP CONSULTING ENGG, PLLC | 1 | 07/11/2024 |
| STV INCORPORATED | 1 | 11/04/2022 |
| WJY ELECTRIC INC. | 1 | 05/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| JOHN P PICONE INC | 10 | 10/30/2023 |
| SKANSKA USA CIVIL NORTHEA | 9 | 11/04/2022 |
| IPC RESILIENCY PARTNERS | 7 | 07/21/2025 |
| HALMAR INTERNATIONAL LLC | 4 | 04/17/2026 |
| BISSETTA & LIST INC | 3 | 03/09/2023 |
| CIVETTA MECHANICAL, LLC | 3 | 09/09/2024 |
| SIRINA FIRE PROT CORP | 3 | 03/09/2023 |
| GRAMERCY GROUP, INC | 2 | 12/07/2021 |
| AGEE HEATING SVC CORP | 1 | 10/27/2022 |
| ALPINE ENTERPRISES NY LTD | 1 | 07/11/2024 |
| ENOBRAC PLUMBING, INC | 1 | 11/07/2023 |
| JOBCO INCORPORATED | 1 | 07/11/2024 |
| MAC FELDER INC | 1 | 05/23/2023 |
| MACCARONE PLUMBING INC | 1 | 07/11/2024 |
| OLYMPIC PLBG & HTG SVC IN | 1 | 12/09/2022 |
| R.W. DAKE & CO.,INC | 1 | 09/13/2024 |
| RAEL AUTOMATIC SPR.CO INC | 1 | 10/05/2022 |
| SQUAN CONSTRUCTION SERVIC | 1 | 12/23/2019 |
| STRATIS CONTRACTING CORP | 1 | 05/23/2023 |
| WASOFF PLBG. & UTL.CO INC | 1 | 03/24/2021 |
| WELKIN ENTERPRISES,LLC | 1 | 08/11/2023 |
| WINICK PRODUCTIONS, LLC | 1 | 05/23/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| VORNADO REALTY TRUST | 14 | 03/09/2023 |
| CITY OF NEW YORK (NYCDDC) | 2 | 09/28/2021 |
| MTA | 2 | 05/12/2023 |
| ATCO PROPERTIES & MGMT | 1 | 12/23/2019 |
| NYC ECONOMIC DEVELOPMENT CORP | 1 | 04/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NOEL BUILDING CONSULTING INC | 14 | 03/09/2023 |
| SMB CONSULTANT | 7 | 07/21/2025 |
| RPO INC. | 5 | 11/07/2023 |
| JAM CONSULTANTS, INC. | 4 | 01/31/2024 |
| A+ EXPEDITING INC. | 2 | 05/12/2023 |
| A1 EXPEDITING SERVICE CORP. | 2 | 10/30/2023 |
| HDR | 2 | 10/23/2023 |
| NYCD GROUP, INC. | 2 | 07/21/2025 |
| P.WOLFE CONSULTANTS, INC. | 2 | 09/28/2021 |
| BELFIORE DEVELOPMENT GROUP | 1 | 04/14/2021 |
| CCM CONSULTING GROUP, INC. | 1 | 04/17/2026 |
| WILLIAM VITACCO ASSOCIATES | 1 | 07/11/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00480814 ↗ | NASSAU BOULEVARD QUEENS | Alteration | Permit Issued | 03/17/2021 | 09/22/2026 | Design AECOM Owner CITY OF NEW YORK Contractor JOHN P PICONE INC | FILING HEREWITH CONTRACT JA-179: JAMAICA WRRF STRUCTURAL ACTIVITIES AS PER SUBMITTED PLANS. |
| S00870290 ↗ | 751 MILL ROAD STATEN ISLAND | Alteration | Permit Issued | 05/11/2023 | 09/21/2026 | Contractor STRATIS CONTRACTING CORP | RPZ replacements, construction of a new water supply loop to improve water distribution through the facility. Connection of water loop to De… |
| S00500799 ↗ | HANNAH STREET STATEN ISLAND | New Building | Permit Issued | 09/14/2021 | 08/13/2026 | Design NYC DEP Contractor JOHN P PICONE INC Filer HDR | the installation of solar panels on the new Electrical building (FILING NUMBER: S00500799-I1) to comply to LL92 and LL94 |
| M01093333 ↗ | 550 FDR DRIVE MANHATTAN | New Building | Permit Issued | 07/14/2025 | 08/05/2026 | Design WESLER-COHEN ASSOCIATES Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | INSTALLATION OF ONE UNIT HEATER AND EXHAUST FANS IN NEW COMFORT STATION (PUBLIC RESTROOM) IN EAST RIVER PARK. |
| S00877177 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 08/05/2026 | Design NYC DEP Contractor WELKIN ENTERPRISES,LLC | FILING HEREWITH FOR SANITARY, WATER SERVICE AND STORM PIPING WITH FIXTURES FOR PUMP STATION BUILDING AND SURROUNDING AREA AS PER PLANS. NO … |
| Q08041347 ↗ | 73-50 LITTLE NECK PARKWAY QUEENS | Alteration | Permit Issued | 12/09/2022 | 07/16/2026 | Design COLLADO ENGINEERING Contractor OLYMPIC PLBG & HTG SVC IN | INSTALLATION OF NEW BOILER AS PER PLANS FILED HEREWITH. |
| M01077038 ↗ | 546 FDR DRIVE | New Building | Permit Issued | 07/22/2024 | 07/14/2026 | Design WESLER-COHEN ASSOCIATES Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | STRUCTURAL WORK FOR ONE STORY MAINTENANCE AND OPERATION PRE-FABRICATED 967 SF NEW BUILDING IN EAST RIVER PARK. |
| M01092834 ↗ | GRAND STREET MANHATTAN | New Building | Permit Issued | 09/03/2024 | 07/14/2026 | Design WESLER-COHEN ASSOCIATES Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | STRUCTURAL WORK FOR ONE STORY TRACK AND FIELD NEW BUILDING IN EAST RIVER PARK. |
| M00771685 ↗ | GRAND STREET MANHATTAN | New Building | Permit Issued | 10/25/2022 | 07/13/2026 | Design KS ENGINEERS, P.C. Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | STRUCTURAL WORK FOR ONE STORY MAINTENANCE AND OPERATION PRE-FABRICATED 968 SF NEW BUILDING IN EAST RIVER PARK. |
| Q00852492 ↗ | 117-05 SUTPHIN BOULEVARD QUEENS | Alteration | Permit Issued | 01/19/2024 | 07/06/2026 | Design LEVENBETTS Contractor JOBCO INCORPORATED | Structural work as shown on plans. |
| X00631080 ↗ | LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 12/07/2021 | 06/23/2026 | Design NYC DEP Contractor GRAMERCY GROUP, INC | Demolition and reconstruction of the top-level (roof) and the subfloors of the pumping station structure. Work also includes replacement st… |
| S00883599 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 06/09/2023 | 06/04/2026 | Design NYC DEP Contractor JOHN P PICONE INC | STRUCTURAL WORK FOR PUMPING STATION SITE CIVIL CONSTRUCTION INCLUDING GRADING,ASPHALT,PAVERS,CURBS,SIDEWALKS & LANDSCAPING AS PER PLANS FILE… |
| S00500782 ↗ | HANNAH STREET STATEN ISLAND | New Building | Permit Issued | 05/14/2021 | 06/03/2026 | Design NYC DEP Contractor JOHN P PICONE INC Filer HDR | Ventilation System |
| S00500812 ↗ | HANNAH STREET STATEN ISLAND | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/06/2021 | 06/02/2026 | Design NYC DEP Contractor JOHN P PICONE INC | The construction of an interim wet well that will be a temporary underground chamber to house submersible pumps. |
| S00879309 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 06/02/2026 | Design WILLIAM B. LOFTUS, P.E. Contractor JOHN P PICONE INC Filer RPO INC. | Support of excavation work in conjunction with application #S00500812-I1. |
| S00907716 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 08/09/2023 | 06/02/2026 | Design WILLIAM B. LOFTUS, P.E. Contractor JOHN P PICONE INC Filer RPO INC. | Support of excavation work in conjunction with application #S00883599-S1. |
| M00771659 ↗ | 430 FDR DRIVE WEST LANE MANHATTAN | Alteration | Permit Issued | 10/25/2022 | 04/03/2026 | Design KS ENGINEERS, P.C. Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | STRUCTURAL WORK ASSOCIATED WITH THE INSTALLATION OF A PROPOSED 946 SF PHOTOVOLTAIC CANOPY WITH COLUMNS AND FOOTINGS OVER ELECTRIC VEHICLE CH… |
| M00771676 ↗ | GRAND STREET MANHATTAN | Alteration | Permit Issued | 10/25/2022 | 04/03/2026 | Design KS ENGINEERS, P.C. Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | STRUCTURAL WORK ASSOCIATED WITH THE PROPOSED 1,716 SF PHOTOVOLTAIC CANOPY WITH COLUMNS AND FOOTINGS OVER ELECTRIC VEHICLE CHARGING STATIONS … |
| M00973102 ↗ | 1616 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2024 | 03/26/2026 | Design AECOM Contractor HALMAR INTERNATIONAL LLC | Remove existing storefront panels, entrance doors, concrete knee walls & ramp to facilitate metro North Railroad viaduct replacement. Site… |
| M00646149 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 01/04/2022 | 02/26/2026 | Design WESLER-COHEN ASSOCIATES Contractor JOHN P PICONE INC Filer JAM CONSULTANTS, INC. | Proposed mechanical work in conjunction with NB application M00648045. |
| M00652446 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 01/05/2022 | 02/26/2026 | Design NANDINEE PHOOKAN ARCHITECTS Contractor JOHN P PICONE INC Filer JAM CONSULTANTS, INC. | Proposed general construction as per plans |
| M00646155 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 12/29/2021 | 02/06/2026 | Contractor JOHN P PICONE INC | Proposed foundation and structural work in conjunction with application M00652446 |
| S01091681 ↗ | GULF AVENUE STATEN ISLAND | Alteration | Permit Issued | 09/13/2024 | 10/27/2025 | Contractor R.W. DAKE & CO.,INC | Application filed for structural modification/additional which includes trenching and installing footings and concrete pads for electrical c… |
| M01048208 ↗ | 570 GRAND STREET MANHATTAN | Alteration | Permit Issued | 06/07/2024 | 06/03/2025 | Design AKRF, INC. Contractor IPC RESILIENCY PARTNERS | REMOVE EXISTING GUARD BOOTH, PAVEMENT AND FENCE . INSTALL NEW PAVEMENT, LANDSCAPING AND ASSOCIATED SITE WORK AT THE EXISTING PARKING LOT, WO… |
| Q00484262 ↗ | NASSAU BOULEVARD QUEENS | Alteration | Permit Issued | 03/24/2021 | 05/02/2025 | Design AECOM Owner CITY OF NEW YORK Contractor WASOFF PLBG. & UTL.CO INC | FILING HEREWITH CONTRACT JA-179: INSTALLATION OF BULK FUEL STORAGE TANKS (2),STANDBY GENERATOR DAY TANKS (2), BLACK START GENERATOR DAY TAN… |
| M00942003 ↗ | GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 01/31/2024 | — | Design KS ENGINEERS, P.C. | — |
| M00942006 ↗ | GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 01/31/2024 | — | Design KS ENGINEERS, P.C. Filer JAM CONSULTANTS, INC. | — |
| M00941996 ↗ | GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 12/11/2023 | — | Design JACOBS | — |
| M00941999 ↗ | GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 12/11/2023 | — | Design JACOBS Filer JAM CONSULTANTS, INC. | — |
| M00858334 ↗ | 1560 PARK AVENUE MANHATTAN | New Building | Permit Issued | 04/17/2023 | 08/09/2023 | Design WJY ELECTRIC INC. Owner MTA Contractor HALMAR INTERNATIONAL LLC Filer A+ EXPEDITING INC. | GREEN HOUSE BUILDING (A) UNDERNEATH METRONORTH LINE |
| M00868290 ↗ | 1560A PARK AVENUE MANHATTAN | New Building | Permit Issued | 05/04/2023 | 06/15/2023 | Owner MTA Contractor HALMAR INTERNATIONAL LLC Filer A+ EXPEDITING INC. | New Green House Building (B) underneath Metro North Line as per the plans filed herewith |
| M00632264 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/24/2022 | 06/14/2023 | Design HRM ENGINEERING SERVICES, PC Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Interior Alteration to existing concourse level space. New HVAC ductwork to be installed. No change of use, egress or occupancy under this… |
| M00878758 ↗ | 545 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 05/23/2023 | 06/02/2023 | Contractor WINICK PRODUCTIONS, LLC | Temporary structures for the Sonic Sphere project within the The Shed. All structures removed after the programming. No changes to existing … |
| X00485343 ↗ | LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 04/14/2021 | 04/27/2023 | Design NYC DEP Contractor GRAMERCY GROUP, INC | LEGALIZATION OF THE EXISTING BULKHEAD ON THE GROUND LEVEL AND THE EXISTING PUMPING STATION AT SUB-FLOOR LEVELS |
| M00854618 ↗ | 103 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 04/12/2023 | 04/19/2023 | Design NLG ENGINEERING PC Contractor HALMAR INTERNATIONAL LLC Filer RPO INC. | Modification to the Plumbing system on the 11th floor. No change in occupancy, use or egress. |
| M00632233 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/28/2022 | 02/24/2023 | Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Interior Alteration to existing concourse level space. New Plumbing fixtures and sprinkler heads to be installed. No change of use, egress… |
| M00674330 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 10/06/2022 | 02/14/2023 | Design AECOM Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Install steel beams, concrete slabs, Removal of concrete slabs, steel beams. No change of use, egress occupancy under this application. (Pac… |
| M00659394 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 10/20/2022 | 12/26/2022 | Design RONNETTE RILEY ARCHITECT Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Interior Renovation, Walls, Masonry & finishes. No change of use, egress or occupancy under this application. Package 14B |
| M00632307 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/18/2022 | 11/16/2022 | Design HRM ENGINEERING SERVICES, PC Owner VORNADO REALTY TRUST Contractor AGEE HEATING SVC CORP | Installation of fuel storage tank for emergency generator. No change of use, egress or occupancy under this application. See comment#24 |
| M00659395 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 10/05/2022 | 10/21/2022 | Owner VORNADO REALTY TRUST Contractor RAEL AUTOMATIC SPR.CO INC | Remove existing and install new sprinkler heads/branch piping (24 new heads). No change of use, egress or occupancy under this application. |
| M00472665 ↗ | 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/23/2021 | 09/24/2022 | Design HRM ENGINEERING SERVICES, PC Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Removal of existing mechanical equipment within the spaces back to the main equipment. No change of use, egress or occupancy under this app… |
| M00483252 ↗ | 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/26/2021 | 09/24/2022 | Design STV INCORPORATED Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Alteration to 1st floor and cellar level spaces, removal of partitions, doors, finishes, exterior stone cladding, exterior storefront and ce… |
| M00484689 ↗ | 7 AVENUE MANHATTAN | Alteration | Permit Issued | 04/26/2021 | 09/24/2022 | Design AECOM Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Install steel beams and concrete slabs. No change of use, egress or occupancy under this application. See comment#24 |
| M00468623 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/20/2021 | 09/09/2022 | Design HRM ENGINEERING SERVICES, PC Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Interior Renovation fort MTA train crew quarters for men's and women's lockers. Mechanical work to be done. No change of use, egress or oc… |
| M00632203 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 03/09/2022 | 04/28/2022 | Design RONNETTE RILEY ARCHITECT Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Interior Alteration to existing concourse level space. New partitions, doors finishes, ceiling, lighting fixtures and mill work. No change… |
| M00472703 ↗ | 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/27/2021 | 01/31/2022 | Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Removal of pl & sp syst. back to their main branches, Re-connection of the remaining sp. syst. to the main branch & rerouting of the pl. sys… |
| M00468601 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/18/2021 | 11/08/2021 | Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Interior Renovation of MTA train crew quarters. Plumbing and sprinkler work to be done. No change of use, egress or occupancy under this a… |
| M00615991 ↗ | GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 10/22/2021 | — | Design KS ENGINEERS, P.C. Filer SMB CONSULTANT | — |
| M00468590 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/18/2021 | 09/09/2021 | Design RONNETTE RILEY ARCHITECT Owner VORNADO REALTY TRUST Contractor SKANSKA USA CIVIL NORTHEAST | Interior Renovation for MTA train crew quarters for men's & women's lockers, extension to rest rooms, Break areas, associated service and ti… |
| M00261531 ↗ | 630 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/23/2019 | 05/29/2020 | Design FRENCH & PARRELLO ASSOCIATES Owner ATCO PROPERTIES & MGMT Contractor SQUAN CONSTRUCTION SERVIC | MODIFICATION TO AT&T SITE. RELOCATE(12) ANTENNA AND (8) RRH UNITS WITH RELATED EQUIPMENT ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHAN… |
| Building | Filings | Most Recent |
|---|---|---|
| 1616 PARK AVENUE ↗ | 5 | 04/17/2026 |
| 550 FDR DRIVE ↗ | 4 | 07/21/2025 |
| GULF AVENUE ↗ | 1 | 09/13/2024 |
| GRAND STREET ↗ | 15 | 09/09/2024 |
| 546 FDR DRIVE ↗ | 5 | 07/22/2024 |
| 117-05 SUTPHIN BOULEVARD ↗ | 5 | 07/11/2024 |
| 570 GRAND STREET ↗ | 1 | 06/07/2024 |
| GRAND STREET ↗ | 6 | 11/08/2023 |
| HANNAH STREET ↗ | 5 | 10/30/2023 |
| HANNAH STREET ↗ | 1 | 10/23/2023 |
| HANNAH STREET ↗ | 5 | 08/11/2023 |
| 103 EAST 125 STREET ↗ | 4 | 08/10/2023 |
| 430 FDR DRIVE WEST LANE ↗ | 1 | 06/07/2023 |
| 545 WEST 30 STREET ↗ | 1 | 05/23/2023 |
| 751 MILL ROAD ↗ | 1 | 05/11/2023 |
| 1560A PARK AVENUE ↗ | 1 | 05/09/2023 |
| 1560 PARK AVENUE ↗ | 1 | 04/25/2023 |
| 250 WEST 34 STREET ↗ | 17 | 03/09/2023 |
| 73-50 LITTLE NECK PARKWAY ↗ | 1 | 12/09/2022 |
| 7 AVENUE ↗ | 10 | 11/04/2022 |
| 01 MANHATTAN PLAZA ↗ | 3 | 01/05/2022 |
| LAFAYETTE AVENUE ↗ | 3 | 12/07/2021 |
| NASSAU BOULEVARD ↗ | 2 | 03/24/2021 |
| 630 3 AVENUE ↗ | 1 | 12/23/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 05/15/2026 | Structural Steel - Welding | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Subgrade Inspections | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Post-installed Anchors | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Structural Stability – Alterations of existing buildings | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Structural Cold-Formed Steel | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Concrete - Cast-In-Place | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 05/15/2026 | Final | 1616 PARK AVENUE | IAN JONATHAN GONZALES | progress |
| 03/18/2026 | Final | 1616 PARK AVENUE | IAN JONATHAN GONZALES | progress |
| 03/18/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Subgrade Inspections | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Structural Steel - Welding | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Structural Stability – Alterations of existing buildings | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Structural Cold-Formed Steel | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Post-installed Anchors | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/18/2026 | Concrete - Cast-In-Place | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 10/20/2025 | Duct leakage testing, insulation and design | 550 FDR DRIVE | ANDREW SZULCZEWSKI | energy_progress |
| 10/20/2025 | Maintenance information | 550 FDR DRIVE | ANDREW SZULCZEWSKI | energy_progress |
| 10/20/2025 | Ventilation and air distribution system | 550 FDR DRIVE | ANDREW SZULCZEWSKI | energy_progress |
| 09/17/2025 | Duct leakage testing, insulation and design | GRAND STREET | ANDREW SZULCZEWSKI | energy_progress |
| 08/06/2025 | Masonry | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 08/06/2025 | Fire-Resistant Penetrations and Joints | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 08/06/2025 | Final | 1616 PARK AVENUE | Philip Miller | progress |
| 08/06/2025 | Fire-Resistance Rated Construction | 1616 PARK AVENUE | IAN JONATHAN GONZALES | progress |
| 03/14/2025 | Fire-Resistant Penetrations and Joints | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 03/14/2025 | Final | 1616 PARK AVENUE | Philip Miller | progress |
| 03/14/2025 | Fire-Resistance Rated Construction | 1616 PARK AVENUE | IAN JONATHAN GONZALES | progress |
| 03/14/2025 | Masonry | 1616 PARK AVENUE | IAN JONATHAN GONZALES | special |
| 11/14/2024 | Vestibules | GRAND STREET | ANDREW SZULCZEWSKI | energy_progress |
| 10/07/2024 | Designated Seismic System | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Concrete - Cast-In-Place | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Excavations - Sheeting, Shoring, and Bracing | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Post-installed Anchors | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Structural Steel - Details | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Structural Steel - High Strength Bolting | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Structural Steel - Welding | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Subgrade Inspections | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Subsurface Conditions – Fill Placement & In-Place Density | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Final | 550 FDR DRIVE | ANDREW SZULCZEWSKI | progress |
| 10/07/2024 | Footing and Foundation | 550 FDR DRIVE | ANDREW SZULCZEWSKI | progress |
| 10/07/2024 | Designated Seismic System | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Concrete - Cast-In-Place | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Final | 550 FDR DRIVE | ANDREW SZULCZEWSKI | progress |
| 10/07/2024 | Subsurface Conditions – Fill Placement & In-Place Density | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Subgrade Inspections | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Structural Steel - Welding | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Structural Steel - High Strength Bolting | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Post-installed Anchors | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |
| 10/07/2024 | Structural Steel - Details | 550 FDR DRIVE | ANDREW SZULCZEWSKI | special |