| Owner | Filings | Most Recent |
|---|---|---|
| BROOKFIELD | 177 | 07/08/2026 |
| BROOKLFIELD PROPERTIES | 207 | 07/08/2026 |
| BROOKFIELD PROPERTIES OPERATED BY C | 7 | 07/08/2026 |
| PLATINUM SERVICES NY | 10 | 07/08/2026 |
| WFP TOWER D | 306 | 03/22/2026 |
| NYC FACADE SAFETY CORP | 1 | 03/22/2026 |
| L K PARTNERS | 2 | 03/22/2026 |
| BROOKFIELD FINANCIA PROPERTIES | 226 | 03/22/2026 |
| TURNER CONSTRUCTION | 3 | 03/22/2026 |
| 4 WORLD FINANCIAL CENTER | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PERKINS and WILL | 39 | 08/28/2026 |
| TED MOUDIS ASSOCIATES | 8 | 07/20/2026 |
| ROBERT DERECTOR ASSOCIATES | 69 | 07/16/2026 |
| STUDIOS ARCHITECTURE | 5 | 07/14/2026 |
| THORNTON TOMASETTI | 35 | 07/13/2026 |
| AMA CONSULTING ENGINEERS, PC | 14 | 07/13/2026 |
| COSENTINI ASSOCIATES | 125 | 06/11/2026 |
| MONTROY ARCHITECTURE PLLC | 7 | 05/15/2026 |
| SPECTORGROUP ARCHITECTURE LLP | 1 | 05/11/2026 |
| BELLSEY & ASSOCIATES | 4 | 04/24/2026 |
| STARK CONSULTING, LLC | 2 | 02/24/2026 |
| RAFAEL PELLI | 1 | 02/13/2026 |
| HLW INTERNATIONAL | 1 | 02/13/2026 |
| BARAK PLISKIN | 3 | 12/30/2025 |
| MG ENGINEERING D.P.C. | 9 | 11/12/2025 |
| TPG ARCHITECTURE, LLP | 8 | 11/12/2025 |
| PLATFORM SOLUTIONS INC | 5 | 08/12/2025 |
| AZARKIAN ARCHITECTURE P.C. | 1 | 07/22/2025 |
| ASHRAF CORP | 2 | 06/25/2025 |
| EEA CONSULTING ENGINEERS | 3 | 06/24/2025 |
| TRICARICO ARCHITECTURE AND DESIGN | 2 | 06/24/2025 |
| Z.S. ENGINEERING, D.P.C. | 3 | 03/20/2025 |
| CONRADO GALLARDO | 4 | 10/29/2024 |
| RLG CONSULTATING ENGINEERS | 2 | 08/06/2024 |
| SKIDMORE OWINGS & MERRILL LLP | 4 | 06/27/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 491 | 03/21/2026 |
| DVA Advisors | 67 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 10 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 8 | 03/21/2026 |
| WALTER T GORMAN PE | 4 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| KD DESIGNS | 2 | 03/21/2026 |
| BUILDING BROTHERS | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 73 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 46 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 27 | 07/08/2026 |
| TULLA CONTRACTING CORP | General Contractor | 26 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 19 | 09/18/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 19 | 07/30/2026 |
| L&K PARTNERS, INC | General Contractor | 16 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 15 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 14 | 07/08/2026 |
| STEADFAST DEVELOPMENT AND | General Contractor | 10 | 07/08/2026 |
| CREATIVE INSTALLATIONS IN | General Contractor | 9 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 8 | 09/02/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 8 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 7 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 7 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 7 | 07/08/2026 |
| N-STORE SERVICES LLC | General Contractor | 6 | 03/21/2026 |
| SHAWMUT WOODWORKING & SUPPLY | General Contractor | 6 | 08/30/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 5 | 07/08/2026 |
| CITILINE RESTORATION LLC | General Contractor | 5 | 09/18/2026 |
| MANENGEERING BUREAU INC | Fire Protection | 5 | 07/08/2026 |
| MAC FELDER INC | Plumbing | 5 | 09/19/2026 |
| M. CARY INC | General Contractor | 4 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 4 | 03/21/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 4 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 194 | 08/28/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 27 | 05/12/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 17 | 02/24/2026 |
| KEYOWNER ENGINEERING, P.C | 4817 | 3 | 02/18/2026 |
| CONSULTING AND TESTING SE | 6152 | 11 | 11/12/2025 |
| WALTER T. GORMAN, P.E., P | 268 | 1 | 05/08/2024 |
| LEO Y LEE ASSOCIATES | 2481 | 1 | 04/12/2024 |
| DNA CONTROLLED INSPECTION | 554 | 15 | 01/31/2024 |
| TSF ENGINEERING, PC | 1274 | 5 | 01/03/2024 |
| HT ENGINEERING, PLLC | 6274 | 3 | 01/02/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | MAC FELDER INC | 09/18/2026 |
| DOB NOW | Plumbing | Permit Issued | MAC FELDER INC | 09/18/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 09/17/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 09/17/2026 |
| DOB NOW | Structural | Permit Issued | CITILINE RESTORATION LLC | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/16/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 09/01/2026 |
| DOB NOW | Structural | Permit Issued | SHAWMUT WOODWORKING & SUPPLY | 08/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SHAWMUT WOODWORKING & SUPPLY | 08/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SHAWMUT WOODWORKING & SUPPLY | 08/28/2026 |
| DOB NOW | General Construction | Permit Issued | SHAWMUT WOODWORKING & SUPPLY | 08/27/2026 |
| DOB NOW | Structural | Permit Issued | SHAWMUT WOODWORKING & SUPPLY | 08/27/2026 |
| DOB NOW | General Construction | Permit Issued | SHAWMUT WOODWORKING & SUPPLY | 08/27/2026 |
| DOB NOW | Standpipe | Permit Issued | PREFERRED SPKLR AND MECH | 07/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 07/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 06/17/2026 |
| DOB NOW | Standpipe | Permit Issued | PREFERRED SPKLR AND MECH | 06/16/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 06/15/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 06/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 06/15/2026 |
| DOB NOW | Standpipe | Permit Issued | PREFERRED SPKLR AND MECH | 06/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 06/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 06/08/2026 |
| DOB NOW | Standpipe | Permit Issued | PREFERRED SPKLR AND MECH | 06/08/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 06/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 06/02/2026 |
| DOB NOW | Standpipe | Permit Issued | PREFERRED SPKLR AND MECH | 06/02/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 06/01/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 06/01/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 05/19/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 05/19/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 05/05/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 04/29/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 04/29/2026 |
| DOB NOW | Structural | Permit Issued | TULLA CONTRACTING CORP | 04/28/2026 |
| DOB NOW | General Construction | Permit Issued | TULLA CONTRACTING CORP | 04/27/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 04/23/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/20/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 07/15/2026 | Permit Issued | SHAWMUT WOODWORKING & SUP | Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 07/14/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Ventilation Systems | Cooling Iec HPY14 43,800 BTU · Fan Coil Indoor ×16 HPY18 59,500 BTU · Fan Coil Indoor ×10 HPY10 29,200 BTU · Fan Coil Indoor ×6 HPY12 37,300 BTU · Fan Coil Indoor ×8 HPY20 53,900 BTU · Fan Coil Indoor ×2 HPY16 45,300 BTU · Fan Coil Indoor ×1 Ventilation |
| 07/13/2026 | Permit Issued | SHAWMUT WOODWORKING & SUP | Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 06/01/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems, Ventilation Systems | |
| 05/28/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems, Ventilation Systems | |
| 05/28/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems, Ventilation Systems | |
| 03/16/2026 | Signed-off | L&K PARTNERS, INC | Air Conditioning Systems, Ventilation Systems | Ventilation Loren Cook N/A 7,000 CFM · Exhaust Fan ×4 N/A N/A 850 CFM · Exhaust Fan ×1 |
| 12/12/2025 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems, Ventilation Systems | — |
| 07/23/2024 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating and Air Conditioning Systems | |
| 03/11/2020 | — | — | Air Conditioning Systems | — |
| 02/27/2020 | Signed-off | TULLA CONTRACTING CORP | Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/20/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 07/15/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 455 heads |
| 07/14/2026 | Permit Issued | PREFERRED SPKLR AND MECH | 1,092 heads, 10 outlets |
| 07/13/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 457 heads, 3 outlets |
| 07/13/2026 | Permit Issued | PREFERRED SPKLR AND MECH | — |
| 06/11/2026 | Permit Issued | PREFERRED SPKLR AND MECH | 2,698 heads, 6 outlets |
| 06/01/2026 | Permit Issued | PREFERRED SPKLR AND MECH | 555 heads |
| 03/16/2026 | Signed-off | PAR FIRE PROTECTION LLC | Sprinkler System |
| 12/12/2025 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 11/12/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 29 heads |
| 09/19/2025 | Signed-off | PAR FIRE PROTECTION LLC | Sprinkler System |
| 09/19/2025 | Signed-off | PAR FIRE PROTECTION LLC | Sprinkler System |
| 07/23/2024 | Signed-off | PREFERRED SPKLR AND MECH | Sprinkler System |
| 02/27/2020 | Signed-off | PREMIER FIRE SPRNKLR CO | 14 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/20/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 07/15/2026 | Permit Issued | MAC FELDER INC | Water/Sanitary |
| 07/14/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Gas, Water/Sanitary |
| 07/13/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 07/13/2026 | Permit Issued | MAC FELDER INC | Water/Sanitary |
| 06/11/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 06/01/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 05/28/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 05/28/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 03/16/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 12/12/2025 | Permit Issued | PAR PLUMBING CO., INC | — |
| 11/12/2025 | — | — | — |
| 11/12/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 09/19/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 09/19/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/23/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 06/08/2026 | Permit Issued | HUGH O'KANE ELEC. CO. INC | General Wiring |
| 03/26/2026 | Pending Payment Verification | JAM ELECTRICAL CORP | — |
| 03/17/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 01/28/2026 | Complete | STEADFAST ELECTL CONT COR | General Wiring |
| 11/24/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 08/21/2025 | Complete | SOLAS ELECTRICAL CORP | — |
| 08/08/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 08/07/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | — |
| 03/05/2025 | Complete | STRIANO ELECTRIC CO., INC | General Wiring |
| 10/29/2024 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 09/17/2024 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 07/24/2024 | Permit Issued | UNI-LITE ELECTRIC, LLC | General Wiring |
| 07/22/2024 | Complete | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 07/16/2024 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/20/2026 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| 07/15/2026 | Permit Issued | MAC FELDER INC | Steel |
| 07/14/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Steel, Concrete |
| 07/13/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Steel, Concrete |
| 07/13/2026 | Permit Issued | MAC FELDER INC | Steel |
| 06/11/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Steel, Concrete |
| 06/01/2026 | Permit Issued | PREFERRED MECHANICAL INC | Steel, Concrete |
| 05/28/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Steel, Concrete |
| 05/28/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Steel, Concrete |
| 03/16/2026 | Signed-off | PAR PLUMBING CO., INC | Steel, Concrete |
| 12/12/2025 | Permit Issued | PAR FIRE PROTECTION LLC | Steel, Concrete |
| 07/08/2025 | Permit Issued | CITILINE RESTORATION LLC | Steel, Concrete |
| 07/23/2024 | Signed-off | PREFERRED SPKLR AND MECH | Steel |
| 05/08/2024 | — | — | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2025 | Signed-off | PLATFORM SOLUTIONS, INC | Fence |
| 08/05/2025 | Signed-off | PLATFORM SOLUTIONS, INC | Sidewalk Shed |
| 06/25/2025 | Permit Issued | PLATINUM SERVICES NY LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/01/2026 | Fail-Final PL - Up to 9 Requested Floors | Fail | View ↗ |
| 08/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/21/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/06/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 07/20/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/15/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/10/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/06/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 06/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/25/2026 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 06/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/25/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/24/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 08/12/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 08/06/2026 | Public Assembly Emergency Lighting | ALEXIS SCHLESSINGERMAN | progress |
| 07/21/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/21/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 07/17/2026 | Ventilation and air distribution system | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Metering | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Duct leakage testing, insulation and design | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Interior lighting power | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Permanent certificate | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Lighting controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/17/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/15/2026 | Standpipe Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/15/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/15/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/15/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/15/2026 | Mastic and Intumescent Fire-resistant Coatings | ALEXIS SCHLESSINGERMAN | special |
| 07/15/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 07/14/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Jane Street | Office | Floors 2–14, 17, 18 | Project M01400288 Project M01402870 Project M01328032 Project M01270585 Project M01270923 Project M01239597 Project M01201479 Project M01204909 Project M00959306 Project M00946063 Project M00946047 Project M00946051 |
| Vox Media | Office | Floor 20 | Project M01296699 |
| Warby Parker | Retail | Floor 1 | Project M01164987 |
| Delfriscos | Restaurant / Food Service | Floor 1 | Project M01034318 |
| Scotiabank | Office | Floor 21 | Project M00965766 |
| Walden Macht & Haran | Office | Floor 27 | Project M00931860 |
| PJ's on the Hudson | Restaurant / Food Service | Floor 1 | Project M00826776 Project M00826782 Project M00826824 Project M00827358 |
| PJ's on the Hudson New Oyster Bar | Restaurant / Food Service | Floor 1 | Project M00826813 |
| Saksworks | Office | Floor 2 | Project M00835660 |
| Arc'teryx | Retail | Floor 1 | Project M00831161 Project M00833789 |
| One Street Capital | Office | Floors 9, 10 | Project M08026279 |
| Saks | Office | Floor 21 | Project M00674173 |
| lululemon | Retail | Floor 1 | Project M00671706 |
| Seamore's | Restaurant / Food Service | Floor 1 | Project M00590334 |
| Jones Day | Office | Floor 27 | Project M00422458 |