| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01215377 | 175-02 UNION TURNPIKE QUEENS | New Building | Permit Issued | 06/03/2025 | 09/01/2026 | Design ME ENGINEERS Owner ST JOHNS UNIVERSITY Contractor AXIS CONSTRUCTION CORP Filer DESIGN 2147, LTD | FILING HEREWITH STRUCTURAL WORK FOR NEW BUILDING AS PER PLANS. |
| Q00940333 | 81-60 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 10/06/2023 | 08/14/2026 | Design BURNS ENGINEERING, PC Owner ST JOHNS UNIVERSITY Contractor ARCO PLBG AND HTG INC Filer DESIGN 2147, LTD | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| Q01380891 | 81-06 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 04/01/2026 | 07/06/2026 | Design ASHRAF CORP Owner ST. JOHN'S UNIVERSITY Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF PIPE SCAFFOLDIN, HEAVY DUTY SIDEWALK SHED, AND PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #3… |
| Q01396342 | 81-45 170TH STREET QUEENS | Alteration | Signed-off | 05/15/2026 | 05/15/2026 | Design Always Fast Services Corp Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHAL… |
| Q01297164 | 81-06 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 01/12/2026 | 04/09/2026 | Design AR CONSULTING ENGINEER Owner ST. JOHN'S UNIVERSITY Contractor JOREICH RESTORATION GROUP | EXTERIOR FACADE REPAIRS INCLUDES REPLACEMENT OF PARAPET ALONG EXPOSURES 1, 2, 3 & 4. SHELF ANGLE REPLACEMENT AS PER PLANS. NO CHANGE IN USE,… |
| Q01380881 | 81-06 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 03/31/2026 | 04/01/2026 | Design ASHRAF CORP Owner ST. JOHN'S UNIVERSITY Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF TEMPORARY DEBRIS CHUTE AND ASSOCIATED SCAFFOLD AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CHUT… |
| Name | Projects together | Most recent |
|---|---|---|
| KZ Engineering | 5 | 03/20/2025 |
| Burns Engineering | 4 | 09/15/2026 |
| AR Consulting Engineer | 3 | 01/12/2026 |
| Ashraf | 3 | 04/01/2026 |
| Cannon Design | 2 | 11/08/2023 |
| NY Restoration Technology | 2 | 10/23/2025 |
| Polise Consulting Engineers | 2 | 11/22/2023 |
| Ramboll | 2 | 11/06/2020 |
| Tectonic Engineering | 2 | 10/05/2020 |
| Thornton Tomasetti | 2 | 09/08/2026 |
| Azimuth Engineering | 1 | 10/14/2022 |
| Always Fast Services | 1 | 05/15/2026 |
| Etrecte | 1 | 12/04/2024 |
| Gensler | 1 | 09/08/2026 |
| Gilsanz Murray Steficek | 1 | 05/24/2023 |
| KM Consulting Engineers | 1 | 10/19/2022 |
| Langan Engineering | 1 | 09/08/2026 |
| Me Engineers | 1 | 09/08/2026 |
| Mje Professional Services | 1 | 07/18/2024 |
| Odc Design | 1 | 06/11/2019 |
| Otj Architects | 1 | 05/23/2023 |
| Patuxent Engineering | 1 | 08/03/2023 |
| Paul Perdek, Prof. Engineering | 1 | 05/18/2023 |
| The Switzer Group | 1 | 11/16/2022 |
| Urban Design Engineering | 1 | 05/18/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Arsenal Scaffold | 9 | 04/01/2026 |
| Med-Tek Contracting | 5 | 11/22/2023 |
| Eagle Vision Construction | 3 | 10/23/2025 |
| Concept Air Conditioning | 2 | 09/15/2026 |
| Joreich Restoration Group | 2 | 01/12/2026 |
| Kordun Construction | 2 | 11/06/2020 |
| Arco Plumbing and Heating | 1 | 01/17/2024 |
| Axis Construction | 1 | 09/08/2026 |
| Bancker Plumbing | 1 | 09/08/2026 |
| BP Mechanical | 1 | 01/14/2022 |
| Champion Combustion | 1 | 11/06/2020 |
| Evro Group | 1 | 04/17/2024 |
| Fisher Installations | 1 | 05/18/2023 |
| Jacobs Telecommun | 1 | 10/05/2020 |
| KMM Telecommunications | 1 | 12/20/2017 |
| L&T Consultants | 1 | 12/04/2024 |
| Liquid Tech Plumbing & Heating | 1 | 06/21/2023 |
| Marathon Solutions | 1 | 03/21/2024 |
| NB Builders | 1 | 01/20/2022 |
| Odyssia Global Commercial | 1 | 10/14/2022 |
| Phoenix Sutton STR | 1 | 05/15/2026 |
| Power Cooling | 1 | 04/05/2023 |
| Safeline Group | 1 | 07/18/2024 |
| Shawmut Woodworking & Sup | 1 | 05/18/2023 |
| Titan Industrial Service | 1 | 05/18/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| St John's University | 26 | 09/15/2026 |
| Safeline Group | 1 | 07/18/2024 |
| T-Mobile | 1 | 06/11/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Design 2147 | 8 | 09/08/2026 |
| Synergy Building Consultants | 5 | 03/20/2025 |
| KD Designs | 2 | 04/01/2026 |
| AE Design Solution | 1 | 05/18/2023 |
| Construction Lab | 1 | 05/18/2023 |
| Construction Permit Services | 1 | 10/14/2022 |
| GC1 Expediting | 1 | 06/11/2019 |
| KM Associates of New York | 1 | 04/17/2024 |
| SNR Expediting & Design | 1 | 07/18/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01215377 | 175-02 UNION TURNPIKE QUEENS | New Building | Permit Issued | 06/03/2025 | 09/01/2026 | Design ME ENGINEERS Owner ST JOHNS UNIVERSITY Contractor AXIS CONSTRUCTION CORP Filer DESIGN 2147, LTD | FILING HEREWITH STRUCTURAL WORK FOR NEW BUILDING AS PER PLANS. |
| Q00940333 | 81-60 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 10/06/2023 | 08/14/2026 | Design BURNS ENGINEERING, PC Owner ST JOHNS UNIVERSITY Contractor ARCO PLBG AND HTG INC Filer DESIGN 2147, LTD | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| Q01380891 | 81-06 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 04/01/2026 | 07/06/2026 | Design ASHRAF CORP Owner ST. JOHN'S UNIVERSITY Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF PIPE SCAFFOLDIN, HEAVY DUTY SIDEWALK SHED, AND PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #3… |
| Q01396342 | 81-45 170TH STREET QUEENS | Alteration | Signed-off | 05/15/2026 | 05/15/2026 | Design Always Fast Services Corp Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHAL… |
| Q01297164 | 81-06 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 01/12/2026 | 04/09/2026 | Design AR CONSULTING ENGINEER Owner ST. JOHN'S UNIVERSITY Contractor JOREICH RESTORATION GROUP | EXTERIOR FACADE REPAIRS INCLUDES REPLACEMENT OF PARAPET ALONG EXPOSURES 1, 2, 3 & 4. SHELF ANGLE REPLACEMENT AS PER PLANS. NO CHANGE IN USE,… |
| Q01380881 | 81-06 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 03/31/2026 | 04/01/2026 | Design ASHRAF CORP Owner ST. JOHN'S UNIVERSITY Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF TEMPORARY DEBRIS CHUTE AND ASSOCIATED SCAFFOLD AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CHUT… |
| Q01307109 | 81-90 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 10/23/2025 | 12/11/2025 | Owner ST. JOHN'S UNIVERSITY Contractor EAGLE VISION CONSTRUCTION | Facade repairs as per plans; no change to egress, use, or occupancy. |
| Q01188777 | 170-02 UNION TURNPIKE QUEENS | Alteration | Signed-off | 03/18/2025 | 08/05/2025 | Owner ST. JOHN'S UNIVERSITY Contractor EAGLE VISION CONSTRUCTION | Garage repairs per plans at all floors of parking structure. No change to design criteria; no proposed structural additions. Isolated restor… |
| Q01165595 | 81-26 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 02/17/2025 | 04/11/2025 | Design AR CONSULTING ENGINEER Contractor JOREICH RESTORATION GROUP | Replacement of existing parapet wall along exposures 2, 3 & 4. Replacement of 4th floor window lintels along exposure 2, 3 & 4. Repair work … |
| Q01190661 | 81-26 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 03/20/2025 | 03/20/2025 | Design KZ ENGINEERING, P.C Owner ST. JOHN'S UNIVERSITY Contractor ARSENAL SCAFFOLD INC | Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes cha… |
| Q01149530 | 8000 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 12/04/2024 | 12/11/2024 | Design ETRECTE LLC Contractor L&T CONSULTANTS LLC | INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY. |
| Q01105136 | 600 ST JOHNS UNIVERSITY QUEENS | Alteration | Signed-off | 09/12/2024 | 10/18/2024 | Design AR CONSULTING ENGINEER Contractor EAGLE VISION CONSTRUCTION | Facade repair work. Grinding and pointing of brick masonry, Lintel, and window sill repair. |
| Q00848958 | 81-80 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 04/05/2023 | 09/05/2024 | Design BURNS ENGINEERING, PC Contractor POWER COOLING INC | FILING HEREWITH CHILLER PLANT EQUIPMENT AND PIPING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01075957 | 81-50 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 07/18/2024 | 07/18/2024 | Design MJE PROFESSIONAL SERVICES Owner SAFELINE GROUP INC. Contractor SAFELINE GROUP INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| Q01004830 | 81-42 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 03/21/2024 | 07/05/2024 | Contractor MARATHON SOLUTIONS LLC | FILING HEREWITH INSTALLATION OF EMERGENCY GENERATOR IN CONJUNCTION WITH NEW BUILDING APPLICATION Q00678476-I1 AS PER PLANS. NO CHANGE IN USE… |
| Q01031198 | 172-14 HENLEY ROAD QUEENS | Alteration | Signed-off | 04/17/2024 | 05/30/2024 | Design THORNTON TOMASETTI Owner ST. JOHN'S UNIVERSITY Contractor EVRO GROUP CORP | Facade work, replace displaced, cracked face bricks, repair of deteriorated EIFS area, and installation of new waterproofing membrane with s… |
| Q01026671 | 8000 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 03/29/2024 | 04/01/2024 | Design ASHRAF CORP Contractor ARSENAL SCAFFOLD INC | INSTALLATION OF PIPE SCAFFOLDING, PLYWOOD FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #3… |
| Q00680241 | 81-42 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 02/15/2022 | 01/09/2024 | Design KZ ENGINEERING, P.C Owner ST JOHNS UNIVERSITY Contractor ARSENAL SCAFFOLD INC | Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in u… |
| Q00958579 | 81-80 UTOPIA PARKWAY QUEENS | Alteration | Filed — no permit on record | 11/08/2023 | — | Design CANNON DESIGN Owner ST JOHNS UNIVERSITY Filer DESIGN 2147, LTD | — |
| Q00647813 | 81-42 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 12/17/2021 | 09/04/2023 | Design PAUL PERDEK, PROF. ENG. PLLC Owner ST JOHNS UNIVERSITY Contractor FISHER INSTALLATIONS Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00913214 | 8000 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 08/03/2023 | 08/03/2023 | Design PATUXENT ENGINEERING LLC Contractor ARSENAL SCAFFOLD INC | INSTALLATION OF SCAFFOLDING IN ACCORDANCE WITH NYC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| Q00868824 | 81-34 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 05/24/2023 | 06/28/2023 | Design GILSANZ MURRAY STEFICEK LLP Owner ST JOHNS UNIVERSITY Contractor MED-TEK CONTRACTING INC Filer DESIGN 2147, LTD | FILING HEREWITH FOR ST WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| Q00869923 | 81-34 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 06/20/2023 | 06/28/2023 | Owner ST JOHNS UNIVERSITY Contractor MED-TEK CONTRACTING INC Filer DESIGN 2147, LTD | FILING HEREWITH FOR MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| Q00869925 | 81-34 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 06/21/2023 | 06/26/2023 | Owner ST JOHNS UNIVERSITY Contractor LIQUID TECH PLBG&HTG,INC Filer DESIGN 2147, LTD | FILING HEREWITH FOR PL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| Q00868815 | 81-34 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 05/23/2023 | 05/25/2023 | Design OTJ ARCHITECTS Contractor MED-TEK CONTRACTING INC | FILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| Q00776782 | 81-10 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 10/10/2022 | 11/23/2022 | Design BURNS ENGINEERING, PC Owner ST JOHNS UNIVERSITY Contractor MED-TEK CONTRACTING INC | ST work as per plans filed herewith. No change to use, egress or occupancy. |
| Q08016134 | 81-50 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 10/14/2022 | 10/21/2022 | Design AZIMUTH ENGINEERING Owner ST JOHNS UNIVERSITY Contractor ODYSSIA GLOBAL COMM. CORP | Modification of existing eligible facility. Installing 3 new DISH antenna sectors with associated parts, 6 RRH units, 1 GPS antenna, and 1 p… |
| Q08018262 | 170-02 UNION TURNPIKE QUEENS | Alteration | Filed — no permit on record | 10/19/2022 | — | — | |
| Q00759070 | 81-10 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 07/12/2022 | 07/28/2022 | Design BURNS ENGINEERING, PC Owner ST JOHNS UNIVERSITY Contractor CONCEPT AIR CONDITIONING | HEREWITH FILING FOR MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER DETAILS ON PLANS. NO CHANGE IN USE , EGRESS OR OCCUPANCY. |
| Q00734816 | 81-10 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 06/01/2022 | 06/16/2022 | Design THE SWITZER GROUP Owner ST JOHNS UNIVERSITY Contractor MED-TEK CONTRACTING INC | GC work as per plans filed herewith. No change to use, egress or occupancy. |
| Q00618517 | 81-38 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 01/14/2022 | 03/25/2022 | Design CANNON DESIGN Owner ST JOHNS UNIVERSITY Contractor BP MECHANICAL CORP Filer DESIGN 2147, LTD | Mechanical steam distribution system between Mongoris Hall [81-80 Utopia Parkway] to St. Alberts Hall [81-38 Utopia Parkway]. |
| Q00618524 | 81-38 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 11/18/2021 | 03/18/2022 | Design VHB Owner ST JOHNS UNIVERSITY Contractor NB BUILDERS CORP Filer DESIGN 2147, LTD | Civil work for new utility tunnel St. Alberts Hall (81-38 Utopia Parkway) as per plans. |
| Q00680248 | 81-42 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 02/15/2022 | 02/15/2022 | Design KZ ENGINEERING, P.C Owner ST JOHNS UNIVERSITY Contractor ARSENAL SCAFFOLD INC | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| Q00653127 | 81-98 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 01/06/2022 | 01/07/2022 | Design KZ ENGINEERING, P.C Owner ST JOHNS UNIVERSITY Contractor ARSENAL SCAFFOLD INC | Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in u… |
| Q00653134 | 81-98 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 01/06/2022 | 01/07/2022 | Design KZ ENGINEERING, P.C Owner ST JOHNS UNIVERSITY Contractor ARSENAL SCAFFOLD INC | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| Q00336062 | 81-38 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 04/08/2020 | 09/29/2021 | Design RAMBOLL Owner ST. JOHN'S UNIVERSITY Contractor KORDUN CONSTRUCTION CORP Filer NYMS CONSULTING, LLC | INSTALLATION OF NEW PLUMBING PIPING IN THE BOILER ROOM FOR THE EXISTING BOILER PLANT UPGRADE IN THE BOILER ROOM. NO CHANGE IN USE, EGRESS OR… |
| Q00407667 | 81-50 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 10/05/2020 | 10/19/2020 | Design TECTONIC ENGINEERING Contractor ARMENTUM DIGITAL INFRASTR | MODIFICATION TO AT&T SITE. REPLACE (3) ANTENNAS, INSTALL (3) RRH UNITS AND INSTALL (1) EQUIPMENT CABINET, RETROFIT (1) CABINET. ALL IN CONFO… |
| Q00296124 | 81-38 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 02/21/2020 | 03/18/2020 | Design RAMBOLL Owner ST JOHNS UNIVERSITY Contractor KORDUN CONSTRUCTION CORP Filer NYMS CONSULTING, LLC | INSTALLATION OF TEMPORARY STEAM, CONDENSATE AND MAKE UP WATER PIPINGS TO CONNECT TWO TEMPORARY BOILERS IN THE PARKING LOT WITH EXISTING HEAT… |
| Q00163420 | 170-02 UNION TURNPIKE QUEENS | Alteration | Filed — no permit on record | 06/11/2019 | — | Design ODC DESIGN Owner T-MOBILE Filer GC1 EXPEDITING LLC | — |
| Q00001372 | 81-50 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 12/20/2017 | 07/18/2018 | Design TECTONIC ENGINEERING Contractor KMM TELECOMMUNICATIONS | AT&T - Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Removal, installation, and r… |
| Building | Filings | Most Recent |
|---|---|---|
| 81-10 UTOPIA PARKWAY ↗ | 3 | 09/15/2026 |
| 175-02 UNION TURNPIKE ↗ | 1 | 09/08/2026 |
| 81-45 170TH STREET ↗ | 1 | 05/15/2026 |
| 81-06 UTOPIA PARKWAY ↗ | 3 | 04/01/2026 |
| 81-90 UTOPIA PARKWAY ↗ | 1 | 10/23/2025 |
| 81-26 UTOPIA PARKWAY ↗ | 2 | 03/20/2025 |
| 170-02 UNION TURNPIKE ↗ | 3 | 03/18/2025 |
| 8000 UTOPIA PARKWAY ↗ | 3 | 12/04/2024 |
| 600 ST JOHNS UNIVERSITY ↗ | 1 | 09/12/2024 |
| 81-50 UTOPIA PARKWAY ↗ | 4 | 07/18/2024 |
| 172-14 HENLEY ROAD ↗ | 1 | 04/17/2024 |
| 81-42 UTOPIA PARKWAY ↗ | 4 | 03/21/2024 |
| 81-60 UTOPIA PARKWAY ↗ | 1 | 01/17/2024 |
| 81-34 UTOPIA PARKWAY ↗ | 4 | 11/22/2023 |
| 81-80 UTOPIA PARKWAY ↗ | 2 | 11/08/2023 |
| 81-38 UTOPIA PARKWAY ↗ | 4 | 01/20/2022 |
| 81-98 UTOPIA PARKWAY ↗ | 2 | 01/06/2022 |