1 ROCKEFELLER PLAZA · Name © OpenStreetMap contributors · BIN 1077286
💬 Discuss this project
1939Year Built
22Stories
O9Building Class
C5-2.5Zoning
1,898,155 sfGross Floor Area
230Units
LL97 Covered1 Active Violation 1 old, status unconfirmed ▸FISP: SAFE
Miscellaneous and old-style bank buildings · Owner of record: Rcpi Holdco LCC Attn: Kelley Marbury · 142,087 sf lot · 13.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsStudio By Tishman Speyer2 filings
Roof10th floor roof replacement3p · 3 filings · 14 docs
Floor 34Verderame CaleUnder Construction8p · 7 filings · 20 docs
Floor 33Verderame CaleUnder Construction8p · 10 filings · 20 docs
Floor 32Atalaya1p · 3 filings · 12 docs
Floor 31The Clark EstatesUnder Construction14p · 4 filings · 18 docs
Floor 30Barabino & Partners9p · 4 filings · 20 docs
Floor 29
Floor 28Verderame Cale7p · 4 filings · 20 docs
Floor 27Interior demolition of partitions, doors, and ceilings1 filing · 4 docs
Floor 26Government of Quebec9p · 3 filings · 20 docs
Floor 25
Floor 24Verderame Cale16p · 10 filings · 20 docs
Floor 23Plumbing, sprinkler, and office renovations, 23rd floor6p · 4 filings · 12 docs
Floor 22Rcpi Landmark Properties, LLC19p · 7 filings · 20 docs
Floor 21Tishman Speye8p · 4 filings · 20 docs
Floor 20Ryan17p · 8 filings · 20 docs
Floor 19Sprinkler buildout, 19th floor3p · 9 filings · 20 docs
Floor 18Rcpi Landmark Properties, LLC2p · 8 filings · 20 docs
Floor 17Veteran Advisers7p · 6 filings · 20 docs
Floor 16
Floor 15Avi<>spl13p · 13 filings · 20 docs
Floor 14Tishman SpeyerUnder Construction8p · 8 filings · 20 docs
Floor 13
Floor 12Nielsen8 filings · 20 docs
Floor 11Rcpi Landmark Properties, LLC4p · 4 filings · 20 docs
Floor 10Tishman Speyer5p · 6 filings · 20 docs
Floor 99th floor mechanicalUnder Construction8p · 5 filings · 20 docs
Floor 8Rcpi Landmark Properties, LLC9p · 6 filings
Floor 7Ingalls & Snyder6p · 5 filings
Floor 6Ingalls & Snyder13p · 8 filings
Floor 5Rcpi Landmark Properties, LLC6p · 6 filings
Floor 4Sprinkler head changesUnder Construction5p · 2 filings · 19 docs
Floor 3
Floor 2Rcpi Landmark Properties, LLCUnder Construction16p · 9 filings · 20 docs
Floor 1Lodi Cafe, Alex Mill +1Under Construction22p · 23 filings · 20 docs
MezzanineRockefeller Bookstore, Lodi Cafe15p · 10 filings
Cellar1 filing
BasementSprinkler system installation1 filing
Sub-BasementSprinkler system installation1 filing · 20 docs
Site & exteriorWorld Cup Telemundo Fan Village, Rockefeller Bookstore +14 filings · 20 docs
Filed — no permit issuedCondition assessment1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rcpi Landmark Propertiesllc1,29307/08/2026
Tishman Speyer Properties33210/14/2026
Rcpi Trust8403/21/2026
Rockefeller Center Properties4803/21/2026
Meriwether Capital the Green1503/21/2026
Rcpi803/21/2026
Rcpi Landmark403/21/2026
Citispire103/22/2026
Quantum Design103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Walter T Gorman PE11503/21/2026
Desarno Associates10403/21/2026
Code1203/21/2026
Beam Living203/21/2026
Milrose Consultants1203/21/2026
Angela Rivera803/21/2026
KM Associates of New York1903/21/2026
Codegreen1503/21/2026
Gillman Consulting2003/21/2026
Metropolis Group603/21/2026
Empire City Consultants203/21/2026
K & M Associates2303/21/2026
EDG203/21/2026
Bridge Expediting403/21/2026
Walter T Gorman Pepc3503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Four ConstructionGeneral Contractor2208/14/2026
VerusGeneral Contractor2107/08/2026
BH Drywall & Paintingspecialty_contractor2007/08/2026
A&A PlumbingPlumbing1810/09/2026
W.J. Regan & CompanyGeneral Contractor1807/08/2026
JT Magen & CompanyGeneral Contractor1409/26/2026
Finaly General ContractingGeneral Contractor1204/09/2026
Coyle ContractingGeneral Contractor1207/08/2026
Dependable MechanicalFire Protection1010/14/2026
Evergreen Builders & Con*General Contractor907/08/2026
Miter ConstructionGeneral Contractor807/08/2026
PSI PartnersFire Protection707/08/2026
Vanguard Construction andGeneral Contractor707/08/2026
Reidy Contracting GroupGeneral Contractor710/04/2026
Asg Construction GroupGeneral Contractor707/08/2026
Inor Builders GroupGeneral Contractor507/08/2026
DK Construction OneGeneral Contractor407/08/2026
A + SprinklerFire Protection407/08/2026
J.A. JenningsGeneral Contractor404/09/2026
Tristate Plumbing ServicesFire Protection407/08/2026
Tower Fire ProtectionFire Protection307/08/2026
William C. Gerakaris P&HPlumbing307/08/2026
Dormasa ConstructionGeneral Contractor303/21/2026
Skyline Windowsspecialty_contractor307/08/2026
Bedrock Plumbing & HeatingPlumbing307/08/2026
Unispace of BostonGeneral Contractor303/21/2026
Central Construction ManagementGeneral Contractor307/08/2026
Mackler Master FireFire Protection307/08/2026
A&H Express Plumbing & HeatingPlumbing307/08/2026
Ashlar MechanicalFire Protection307/08/2026
Full Capacity FireFire Protection307/08/2026
Tristate Plumbing ServicesPlumbing307/08/2026
Atlas-Acon Electric ServiceElectrical203/21/2026
Citiline Restorationspecialty_contractor203/21/2026
Bluewater Plumbing & HeatingPlumbing207/08/2026
Denko MechanicalFire Protection207/08/2026
Geoffrey A. Lagas & AssociatesPlumbing207/08/2026
DGC Capital ContractingGeneral Contractor204/11/2026
Jam Service CoPlumbing207/08/2026
Jam Service CoFire Protection207/08/2026
Miller Plumbing & HeatingPlumbing207/08/2026
Miller Plumbing & HeatingFire Protection207/08/2026
Gannon ContractingGeneral Contractor203/21/2026
JRM Construction ManagementGeneral Contractor207/08/2026
SKH MechanicalFire Protection207/08/2026
Standard Fire ProtectionFire Protection207/08/2026
L&K PartnersGeneral Contractor207/08/2026
OsmanGeneral Contractor203/21/2026
Par Plumbing Co., Inc.oFire Protection203/21/2026
Erne Valley ElectricElectrical203/22/2026
BP Mechanicalspecialty_contractor203/21/2026
A.W. & S. Construction CoGeneral Contractor207/08/2026
Aggressive Fire ProtectionFire Protection209/15/2026
Jam ElectricalElectrical203/21/2026
W & M Sprinkler - NYCFire Protection107/08/2026
Anco Electl ContctngElectrical103/22/2026
Atlas-Acon Electric ServiceElectrical103/22/2026
Campbell & Dawes Ltd ElectricElectrical103/22/2026
JRD ElectricElectrical103/21/2026
Absolute Electrical Contracting ofElectrical103/21/2026
Power-Tech Installation ElectricElectrical103/22/2026
Adco ElectricalElectrical103/21/2026
Reliable Electric of NYCElectrical103/22/2026
Titan Electrical & Elev ContractingElectrical103/22/2026
G.F. SheridanFire Protection103/21/2026
Ask ContractingGeneral Contractor107/08/2026
Tristate Air Conditioningspecialty_contractor107/08/2026
Versatile ServicesGeneral Contractor107/08/2026
Whitenight New YorkGeneral Contractor107/08/2026
Winick ProductionsGeneral Contractor106/28/2026
Spring ScaffoldingScaffold104/09/2026
Abco-Peerless SprinklerFire Protection107/08/2026
A Plus PlumbingPlumbing107/08/2026
A Plus PlumbingFire Protection109/30/2026
Ashland PlumbingPlumbing107/08/2026
Bedrock MechanicalFire Protection110/09/2026
Enobrac PlumbingFire Protection107/08/2026
George Breslaw PlumbingPlumbing107/08/2026
Hydronic Concepts NY P&HPlumbing107/08/2026
Ignite Plumbing & HeatingPlumbing107/08/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
J. Caiazzo Plumbing & HeatingFire Protection107/08/2026
Nationwide MechanicalPlumbing107/08/2026
Par Plumbing CoPlumbing107/10/2026
RRP PlumbingPlumbing107/08/2026
Sean Coakley P & HFire Protection107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4236209/30/2026
Walter T. Gorman, P.E., P2685808/03/2026
AK Engineering678304/29/2026
Concessi Engineering540311/25/2024
20/20 Inspections1471905/28/2024
Engineering Building Service73031302/27/2024
Prudigm Engineering Llcu4304602/13/2023
Future Tech Consultants O589210/31/2022
DNA Controlled Inspection5541105/26/2021
Skyline Engineering267505/12/2021
Codegreen510612/17/2020
Coastal Construction Service3827203/26/2020
Architectural Engineering6111208/22/2019
Building Lifecycle
All (300)Filed (75)Permit Issued (80)Signed Off (42)Violation (1)Inspection (60)Objection (12)Special Inspection (30)
10/13/2026
Permit issued — Sprinklers
M01350058-S2-EW-SP
10/09/2026
Filed — Alteration
Interior demolition of partitions, doors and ceilings as per plans.
M01397380-I1
10/08/2026
Permit issued — Plumbing
M01412983-S1-PL
10/08/2026
Permit issued — Plumbing
M01390628-S1-PL
10/07/2026
Permit issued — Sprinklers
M01412983-S2-EW-SP
09/30/2026
Filed — Alteration
Sprinkler Modifications are per plans.
M01412983-S1
09/30/2026
Filed — Alteration
Sprinkler Modifications are per plans.
M01412983-S2
09/29/2026
Permit issued — Sprinklers
M01390628-S2-EW-SP
09/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/28/2026
Signed off — Alteration
removal of pre-action sprinkler and associated panel.
M01372499-I1
09/25/2026
Permit issued — General Construction
M01412916-I1-GC
09/25/2026
Permit issued — Mechanical Systems
M01412983-I1-MS
09/16/2026
Violation issued (ECB, open)
Elevators
09/14/2026
Permit issued — Sprinklers
M01385241-I1-EW-SP
09/09/2026
Signed off — Alteration
Sprinkler Head and Temp Loop changes as indicated on plans.
M01362333-S2
09/02/2026
Signed off — Alteration
Sprinkler Head and Temp Loop changes as indicated on plans.
M01362333-I1
08/31/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/25/2026
Signed off — Alteration
Sprinkler head changes as indicated on plans.
M01288061-S2
08/25/2026
Signed off — Alteration
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
M01367996-I1
08/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2026
Signed off — Alteration
Alterations to plumbing system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
M01368008-I1
08/20/2026
Signed off — Alteration
Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy.
M01367771-I1
08/17/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/13/2026
Permit issued — Mechanical Systems
M01390628-I1-MS
08/05/2026
Signed off — Alteration
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
M01339408-I1
08/03/2026
Filed — Alteration
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
M01367996-P1
08/03/2026
Special inspection requirement — Mechanical Systems
Walter Gorman
08/03/2026
Special inspection requirement — Final
Walter Gorman
07/31/2026
Special inspection requirement — Final
Walter Gorman
07/31/2026
Special inspection requirement — Mechanical Systems
Walter Gorman
07/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/23/2026
Signed off — Alteration
Sprinkler head changes as indicated on plans.
M01288061-S1
07/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2026
Signed off — Alteration
Sprinkler head changes as indicated on plans.
M01288061-I1
07/22/2026
Filed — Alteration
Plumbing Fixture changes as indicated on plans.
M01390628-S2
07/22/2026
Signed off — Alteration
Interior demo & reno of non-load bearing partitions, walls, ceiling, doors and finishes as indicated on plans.
M01287915-I1
07/22/2026
Filed — Alteration
Plumbing Fixture changes as indicated on plans.
M01390628-I1
07/22/2026
Filed — Alteration
Plumbing Fixture changes as indicated on plans.
M01390628-S1
07/21/2026
Signed off — Alteration
Structural changes as indicated on plans; including framing for new partition wall door.
M01355565-I1
07/21/2026
Filed — Alteration
Sprinkler head changes as indicated on plans.
M01288061-P3
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/21/2026
Special inspection requirement — Final
Young Suh
07/21/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/21/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/16/2026
Permit issued — General Construction
M01390581-I1-GC
07/15/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/15/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/08/2026
Permit issued — Plumbing
M01387135-I1-PL
07/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/06/2026
Filed — Alteration
Sprinkler Modifications are per plans.
M01412983-I1
07/06/2026
Permit issued — General Construction
M01412916-I1-GC
07/06/2026
Special inspection requirement — Sprinkler Systems
Young Suh
06/26/2026
Permit issued — General Construction
M01416336-I1-GC
06/25/2026
Filed — Alteration
Interior reno of non-load bearing partitions, walls, door, ceiling and finishes as indicated on plans.
M01412916-I1
06/22/2026
Filed — Alteration
Install of temp retail kiosk, truss, production equip. no alt to exist struc. for World Cup Telemundo Fan Village. A TPA permit not req. Prod is responsibe to monitor site safety & implement HWAP. All prod equip removed upon event complete
M01416336-I1
06/18/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/18/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Special inspection requirement — Post-installed Anchors
Young Suh
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDependable Mechanical10/13/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing10/08/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing10/08/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical10/07/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing09/29/2026
DOB NOWMechanical SystemsPermit IssuedJT Magen & Company09/25/2026
DOB NOWGeneral ConstructionPermit IssuedJT Magen & Company09/25/2026
DOB NOWSprinklersPermit IssuedAggressive Fire Protection09/14/2026
DOB NOWMechanical SystemsPermit IssuedCore Four Construction08/13/2026
DOB NOWGeneral ConstructionPermit IssuedCore Four Construction07/16/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co07/08/2026
DOB NOWGeneral ConstructionPermit IssuedJT Magen & Company07/06/2026
DOB NOWGeneral ConstructionPermit IssuedWinick Productions06/26/2026
DOB NOWSprinklersPermit IssuedFull Capacity Fire05/12/2026
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management05/06/2026
DOB NOWMechanical SystemsPermit IssuedJRM Construction Management05/06/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing04/29/2026
DOB NOWSprinklersPermit IssuedDependable Mechanical04/17/2026
DOB NOWPlumbingSigned-offIgnite Plumbing & Heating04/14/2026
DOB NOWGeneral ConstructionSigned-offDGC Capital Contracting04/09/2026
DOB NOWMechanical SystemsSigned-offDGC Capital Contracting04/09/2026
DOB NOWMechanical SystemsPermit IssuedFinaly General Contracting04/07/2026
DOB NOWGeneral ConstructionPermit IssuedFinaly General Contracting04/03/2026
DOB NOWSprinklersSigned-offDependable Mechanical03/19/2026
DOB NOWSprinklersSigned-offDependable Mechanical03/19/2026
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating03/16/2026
DOB NOWMechanical SystemsSigned-offDK Construction One03/16/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating03/11/2026
DOB NOWSprinklersPermit IssuedDependable Mechanical03/11/2026
DOB NOWGeneral ConstructionPermit IssuedDK Construction One03/10/2026
DOB NOWMechanical SystemsPermit IssuedDK Construction One03/10/2026
DOB NOWStructuralSigned-offJ.A. Jennings03/09/2026
DOB NOWGeneral ConstructionSigned-offDK Construction One02/13/2026
DOB NOWSprinklersPermit IssuedJam Service Co12/15/2025
DOB NOWPlumbingPermit IssuedJam Service Co12/15/2025
DOB NOWPlumbingSigned-offA&A Plumbing11/19/2025
DOB NOWSprinklersSigned-offMora Fire Protection11/19/2025
DOB NOWGeneral ConstructionSigned-offJ.A. Jennings11/13/2025
DOB NOWMechanical SystemsSigned-offJ.A. Jennings11/13/2025
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding09/11/2025
+ 60 more permits on file
4 projects · most recent 09/30/2026
Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/30/2026Permit IssuedJT Magen & CompanyVentilation Systems
Ventilation
Iec HPY-10 725 CFM · Fan Coil Indoor ×2
HPY-08 550 CFM · Fan Coil Indoor ×1
HPY-12 900 CFM · Fan Coil Indoor ×1
HPY-16 1,250 CFM · Fan Coil Indoor ×1
HPY-18 1,450 CFM · Fan Coil Indoor ×1
07/22/2026Permit IssuedCore Four ConstructionVentilation Systems
Ventilation
Greenheck CSP-A390-VG 300 CFM · Exhaust Fan ×1
12/18/2020Signed-offCoyle ContractingAir Conditioning Systems
Cooling
Liebert DME044C 3 tons · Crac Unit ×6
08/22/2019Permit IssuedBP MechanicalVentilation Systems
Ventilation
Titus ×2
16 projects · most recent 09/30/2026
FiledStatusContractorScope
09/30/2026Permit IssuedBedrock Mechanical233 heads
07/22/2026Permit IssuedA Plus Plumbing—
07/21/2026Signed-offPSI Partners168 heads
04/28/2026Permit IssuedAggressive Fire Protection—
03/30/2026Permit IssuedA&H Express Plumbing & Heating8 heads
03/24/2026Permit IssuedFull Capacity Fire83 heads
03/18/2026Signed-offA&H Express Plumbing & Heating61 heads
03/18/2026Signed-offA&H Express Plumbing & Heating2 heads
03/03/2026Permit IssuedA&H Express Plumbing & Heating39 heads
10/28/2024Signed-offPSI Partners451 heads, 2 outlets
03/28/2022——20 heads
12/08/2021Permit IssuedAggressive Fire Protection163 heads
05/12/2021Permit IssuedSean Coakley P & H—
04/02/2021Permit IssuedAshlar Mechanical—
02/06/2020——24 heads
16 projects · most recent 09/30/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/30/2026Permit IssuedA&A PlumbingWater/Sanitary
07/22/2026Permit IssuedA&A PlumbingWater/Sanitary
07/21/2026Signed-offA&A PlumbingWater/Sanitary
04/28/2026Permit IssuedPar Plumbing CoWater/Sanitary
03/30/2026Permit IssuedA&A PlumbingWater/Sanitary
03/27/2026Signed-offIgnite Plumbing & HeatingGas, Water/Sanitary
03/24/2026———
03/18/2026Signed-offDependable Mechanical—
03/03/2026Permit IssuedDependable MechanicalWater/Sanitary
03/28/2022Permit IssuedGeoffrey A. Lagas & AssociatesWater/Sanitary
12/08/2021Signed-offWilliam C. Gerakaris P&HWater/Sanitary
05/12/2021Signed-offBedrock Plumbing & HeatingWater/Sanitary
04/02/2021Permit IssuedGeoffrey A. Lagas & AssociatesWater/Sanitary
02/19/2020Permit IssuedMiller Plumbing & HeatingWater/Sanitary
02/06/2020———
25 projects · most recent 10/19/2026
General Wiring
FiledStatusContractorScope
10/19/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
08/05/2026Permit IssuedUni-Lite ElectricGeneral Wiring
04/17/2026Permit IssuedMaximum ElectricGeneral Wiring
03/31/2026Permit IssuedReiter ElectricGeneral Wiring
12/05/2025CompleteAllstate ElectricGeneral Wiring
09/26/2025CompleteTitan Electrical & Elev ContractingGeneral Wiring
09/26/2025CompleteTitan Electrical & Elev ContractingGeneral Wiring
04/08/2025Permit IssuedA2K ElectricGeneral Wiring
02/24/2025CompleteAgir Electrical Ltd D/B/AGeneral Wiring
02/15/2025CompletePower-Tech Installation ElectricGeneral Wiring
02/13/2025CompleteMRD Electrical ServicesGeneral Wiring
01/17/2025CompleteAgir Electrical Ltd D/B/AGeneral Wiring
12/03/2024Permit IssuedA2K ElectricGeneral Wiring
09/17/2024Permit IssuedCresco ElectricalGeneral Wiring
08/21/2024Permit IssuedRX ElectricGeneral Wiring
2 projects · most recent 06/22/2026
Steel
FiledStatusContractorScope
06/22/2026Permit IssuedWinick Productions1 scope_items
02/26/2026Signed-offJ.A. JenningsSteel
1 project · most recent 05/12/2026
FiledStatusContractorScope
05/12/2026———
▾Field Inspections (DOB CAP) — 136
DateTypeResultReport
09/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2026Pass-Final SD - Fire PumpPassView ↗
07/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/18/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/18/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/26/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 136.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/03/2026FinalWalter Gormanprogress
08/03/2026Mechanical SystemsWalter Gormanspecial
07/31/2026FinalWalter Gormanprogress
07/31/2026Mechanical SystemsWalter Gormanspecial
07/21/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
07/21/2026Mechanical SystemsYoung Suhspecial
07/21/2026Post-installed AnchorsYoung Suhspecial
07/21/2026FinalYoung Suhprogress
07/15/2026Post-installed AnchorsYoung Suhspecial
07/15/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
07/15/2026Post-installed AnchorsYoung Suhspecial
07/15/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
07/06/2026Sprinkler SystemsYoung Suhspecial
06/18/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
06/18/2026Energy Code Compliance InspectionsYoung Suhprogress
06/18/2026Maintenance informationYoung Suhenergy_progress
06/18/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/18/2026Duct leakage testing, insulation and designYoung Suhenergy_progress
06/18/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
06/18/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
06/18/2026Interior lighting powerYoung Suhenergy_progress
06/18/2026Lighting controlsYoung Suhenergy_progress
06/18/2026Post-installed AnchorsYoung Suhspecial
06/05/2026FinalFrank Loffredoprogress
06/05/2026Mechanical SystemsYoung Suhspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
World Cup Telemundo Fan VillageEvents & gatherings—
Project M01416336 Alteration · Permit Entire · 06/22/2026
The Clark EstatesOfficeFloor 31
Project M01385225 Alteration · Permit Entire · 04/29/2026
Project M01385218 Alteration · Permit Entire · 04/28/2026
Project M01385241 Alteration · Permit Entire · 04/28/2026
Project M01387135 Alteration · Permit Entire · 04/28/2026
Government of QuebecOfficeFloor 26
Project M01355565 Alteration · LOC Issued · 02/26/2026
Project M01288061 Alteration · LOC Issued · 11/10/2025
Project M01287915 Alteration · LOC Issued · 11/07/2025
RyanOfficeFloor 20
Project M01095021 Alteration · LOC Issued · 10/31/2024
Alex MillRetailFloor 1
Project M01089495 Alteration · LOC Issued · 09/03/2024
Lodi CafeRestaurant / Food ServiceFloor 1, Mezzanine
Project M00930405 Alteration · LOC Issued · 08/23/2024
Project M00968362 Alteration · Filing Withdrawn · 08/14/2024
Project M00930435 Alteration · Permit Entire · 08/06/2024
Project M00968369 Alteration · Permit Entire · 08/06/2024
Project M00447233 Alteration · LOC Issued · 01/29/2021
Project M00455860 Alteration · LOC Issued · 01/28/2021
Project M00455872 Alteration · LOC Issued · 01/28/2021
Verderame CaleOfficeFloors 24, 28, 33, 34
Project M01035126 Alteration · LOC Issued · 05/30/2024
Project M00679305 Alteration · LOC Issued · 07/20/2022
Project M00679314 Alteration · LOC Issued · 07/20/2022
Project M00679319 Alteration · LOC Issued · 07/20/2022
Project M00679322 Alteration · LOC Issued · 07/20/2022
Project M00730222 Alteration · LOC Issued · 06/15/2022
Project M00730249 Alteration · LOC Issued · 06/13/2022
Project M00730272 Alteration · LOC Issued · 06/13/2022
Project M00730281 Alteration · LOC Issued · 06/13/2022
Ingalls & SnyderOfficeFloors 6, 7
Project M00958361 Alteration · LOC Issued · 12/18/2023
Project M00958624 Alteration · LOC Issued · 12/18/2023
Barabino & PartnersOfficeFloor 30
Project M00906654 Alteration · LOC Issued · 08/15/2023
NielsenOfficeFloor 12
Project M00826435 Alteration · LOC Issued · 02/21/2023
Project M00826438 Alteration · LOC Issued · 02/21/2023
Project M00826441 Alteration · LOC Issued · 02/21/2023
Rockefeller BookstoreRetailFloor 1, Mezzanine
Project M08008410 Alteration · LOC Issued · 10/04/2022
Project M08008419 Alteration · LOC Issued · 10/04/2022
Project M08008423 Alteration · LOC Issued · 10/04/2022
Project M00761562 Alteration · Permit Entire · 09/09/2022
Project M00793131 Alteration · LOC Issued · 09/07/2022
Odi CafRestaurant / Food Service—
Project M00583460 Alteration · LOC Issued · 08/26/2021
Avi<>splOfficeFloor 15
Project M00346765 Alteration · LOC Issued · 07/09/2020
Project M00346768 Alteration · LOC Issued · 07/09/2020
Project M00346771 Alteration · LOC Issued · 07/09/2020
AtalayaOfficeFloor 32
Project M00319098 Alteration · LOC Issued · 03/26/2020
Project M00319127 Alteration · LOC Issued · 03/26/2020
Veteran AdvisersOfficeFloor 17
Project M00303145 Alteration · Permit Entire · 02/10/2020
Project M00303362 Alteration · Approved · 02/06/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 5,372 on file (BIS + DOB NOW)
▸Plans & Drawings242
▸DOB NOWPlans/Sketch190
09/04/2026M00482902-P1Request digital key ↗
09/04/2026M00482902-I1Request digital key ↗
09/03/2026M00501412-I1Request digital key ↗
Showing 3 of 190 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler19
09/05/2026M00196092-I1Request digital key ↗
09/05/2026M00303362-I1Request digital key ↗
09/05/2026M00306797-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems13
09/05/2026M00196092-S1Request digital key ↗
09/05/2026M00281643-I1Request digital key ↗
09/05/2026M00303145-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/05/2026M00196092-I1Request digital key ↗
09/05/2026M00262609-I1Request digital key ↗
09/05/2026M00306784-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly6
09/05/2026M00181815-I1Request digital key ↗
09/05/2026M00271588-I1Request digital key ↗
Showing 2 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00447233-I1Request digital key ↗
▸Applications & Permits989
▸BISPLAN / WORK APPROVAL APPLICATION460
12/15/2025103299306Open ↗
04/26/2023123708657Open ↗
04/17/2023123708657Open ↗
Showing 3 of 460 on file for this type
▸BISWORK PERMIT APPLICATION353
05/23/2022123829232Open ↗
07/21/2021123869590Open ↗
09/30/2020140906367Open ↗
Showing 3 of 353 on file for this type
▸DOB NOWLPC Approval/Permit176
10/14/2026M01397380-I1Open ↗
09/04/2026M00340811-I1Open ↗
09/04/2026M00340935-P1Open ↗
Showing 3 of 176 on file for this type
▸Seals & Professional Certifications1,579
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION711
04/24/2020123305379Open ↗
04/24/2020123305379Open ↗
04/17/2020122649964Open ↗
Showing 3 of 711 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature237
10/14/2026M01397380-I1Open ↗
09/05/2026M00303362-I1Open ↗
09/05/2026M00303145-I1Open ↗
Showing 3 of 237 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature182
10/03/2026M00324084-I1Open ↗
10/03/2026M00281643-I1Open ↗
10/03/2026M00730222-I1Open ↗
Showing 3 of 182 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST129
03/27/2020123829232Open ↗
03/12/2020123830168Open ↗
Showing 2 of 129 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT118
07/22/2020140906367Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
Showing 3 of 118 on file for this type
▸DOB NOWProgress Inspector Seal & Signature113
10/14/2026M01397380-I1Open ↗
10/09/2026M08040380-I1Open ↗
10/05/2026M01390581-I1Open ↗
Showing 3 of 113 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/22/2020140906367Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/22/2020140906367Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment443
▸BISSELF-CERT PLUMBING NOTICE137
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 137 on file for this type
▸BISSCHEDULE B - PLUMBING111
10/13/2020123552976Open ↗
10/07/2020123552976Open ↗
09/22/2020123552976Open ↗
Showing 3 of 111 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE86
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 86 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA71
04/02/2021123299073Open ↗
03/15/2021123373027Open ↗
Showing 2 of 71 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8522
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER SYSTEMS2
01/06/2021123435265Open ↗
11/12/2020123464973Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos506
▸DOB NOWDEP ACP-5: Asbestos Assessment Report222
10/14/2026M01397380-I1Open ↗
09/05/2026M00303362-I1Open ↗
09/05/2026M00303145-I1Open ↗
Showing 3 of 222 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)150
08/03/2020123829232Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
Showing 3 of 150 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'113
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 113 on file for this type
▸BISASBESTOS INSPECTION REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/04/2026M00340811-I1Open ↗
09/04/2026M00340935-I1Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS: WORK UNDER 1000 SQFT (DEP ACP7)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance90
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
03/12/2020123830168Open ↗
Showing 1 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
11/25/2020123405779Open ↗
Showing 1 of 19 on file for this type
▸BISTR8: Energy Code Progress Inspections9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISNYCECC EXEMPTION3
07/22/2020140906367Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/10/2023123830168Open ↗
04/20/2023123708657Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/04/2026M00340811-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY30
04/20/2023123708657Open ↗
11/16/2022123829232Open ↗
03/31/2022123455117Open ↗
Showing 3 of 30 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
10/03/2023123830168Open ↗
04/20/2023123708657Open ↗
04/07/2022140906367Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS3
04/20/2023123708657Open ↗
04/07/2022140906367Open ↗
05/14/2021123324312Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs486
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST191
05/03/2023123708657Open ↗
11/18/2022123829232Open ↗
04/04/2022123455117Open ↗
Showing 3 of 191 on file for this type
▸BISLANDMARKS APPROVAL144
07/22/2020140906367Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
Showing 3 of 144 on file for this type
▸BISADMINISTRATIVE OBJECTIONS99
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 99 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISLANDMARKS SIGNOFF11
04/21/2023123708657Open ↗
04/06/2022140906367Open ↗
06/01/2021123373027Open ↗
Showing 3 of 11 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION7
12/18/2020140904323Open ↗
12/11/2020140904314Open ↗
Showing 2 of 7 on file for this type
▸BISFINAL6
06/05/2024140906367Open ↗
04/20/2023123708657Open ↗
05/14/2021123324312Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLandmark Approval4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership495
▸BISCOST AFFIDAVIT486
03/08/2024123435265Open ↗
11/17/2022123829232Open ↗
04/01/2022123455117Open ↗
Showing 3 of 486 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
04/20/2023123708657Open ↗
11/22/2021140906367Open ↗
07/13/2021123435265Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms424
▸BISEFILING COVER SHEET276
03/27/2020123829232Open ↗
Showing 1 of 276 on file for this type
▸BISBOROUGH INTAKE FORM72
04/17/2020122649964Open ↗
04/17/2020121226681Open ↗
03/13/2020123656445Open ↗
Showing 3 of 72 on file for this type
▸BISADDITIONAL INFORMATION65
07/22/2021123869590Open ↗
12/03/2020140904323Open ↗
12/03/2020140904314Open ↗
Showing 3 of 65 on file for this type
▸BISeFiling Job Application Cover Sheet11
07/22/2020140906367Open ↗
07/10/2020140904323Open ↗
06/19/2020140904314Open ↗
Showing 3 of 11 on file for this type
▸Other Documents55
▸DOB NOWProof of Historic Building45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type