Office, 20+ stories, with or without commercial
McGraw-Hill
1221 AVENUE OF THE AMER · BIN 1022693
💬 Discuss this project
1971Year Built
51Stories
O4Building Class
C6-5.5Zoning
2,636,182 sfGross Floor Area
71Units
LL97 Covered0 Open ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 1221 AVENUE HOLDINGS LLC · 102,452 sf lot · 25.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Floor 508p · 1 filing · 8 docs
Floor 498p · 1 filing · 8 docs
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 421p · 1 filing · 8 docs
Floor 4111p · 6 filings · 20 docs
Floor 40
Floor 39
Floor 38
Floor 378p · 2 filings · 12 docs
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26Under Construction20p · 3 filings · 20 docs
Floor 25Under Construction25p · 5 filings · 20 docs
Floor 24Under Construction55p · 6 filings · 20 docs
Floor 23Under Construction57p · 8 filings · 20 docs
Floor 221p · 1 filing · 6 docs
Floor 21Under Construction37p · 11 filings · 20 docs
Floor 20Under Construction48p · 9 filings · 20 docs
Floor 19Under Construction26p · 3 filings · 20 docs
Floor 182p · 2 filings · 20 docs
Floor 17Under Construction13p · 6 filings · 20 docs
Floor 16Under Construction105p · 11 filings · 20 docs
Floor 159p · 5 filings · 20 docs
Floor 1437p · 5 filings · 20 docs
Floor 13Under Construction1p · 2 filings · 10 docs
Floor 12Under Construction1p · 3 filings · 19 docs
Floor 11Under Construction1p · 2 filings · 10 docs
Floor 107p · 5 filings · 20 docs
Floor 990p · 13 filings · 20 docs
Floor 833p · 3 filings · 20 docs
Floor 73p · 2 filings · 20 docs
Floor 614p · 4 filings · 20 docs
Floor 5Under Construction38p · 6 filings · 20 docs
Floor 4Under Construction49p · 8 filings · 20 docs
Floor 3Under Construction71p · 8 filings · 20 docs
Floor 253p · 10 filings · 20 docs
Floor 1Under Construction106p · 12 filings · 20 docs
MezzanineUnder Construction30p · 3 filings · 19 docs
Cellar119p · 30 filings · 20 docs
Sub-CellarUnder Construction87p · 18 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKERFELLER GROUP63709/26/2026
ROCKEFELLER CENTER NORTH INC.12607/08/2026
1221 AVENUE HOLDINGS3703/22/2026
1221 6TH AVENUE HOLDINGS103/22/2026
CLUNE CONSTRUCTION103/22/2026
ROCKERFELLER GROUP DEVELOPMENT1,14203/22/2026
ROCKEFELLER MGT CORP103/22/2026
ROCKEFELLER GROUP MC GRAW203/22/2026
ROCK MC GRAW INC TAX DEPT103/22/2026
P. ROCK RESTURANT CORP103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP17803/21/2026
A1 EXPEDITING SERVICE CORP.5203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
JAM CONSULTANTS, INC.403/21/2026
BUILDING BROTHERS1403/21/2026
OUTSOURCE CONSULTANTS, INC.403/21/2026
EXPEDITER303/21/2026
CODE203/21/2026
A1 EXPEDITING SERVICE603/21/2026
METROPOLIS GROUP INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURE TONE, LLCGeneral Contractor2607/08/2026
CROSS MANAGEMENT CORPGeneral Contractor1507/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor1507/08/2026
M & S MECHANICAL SERVICESGeneral Contractor1409/12/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor1207/08/2026
JAMES E FITZGERALD INCGeneral Contractor1209/03/2026
ABCO-PEERLESS SPRKLR CORPFire Protection1107/25/2026
PAR FIRE PROTECTION LLCFire Protection1109/25/2026
BRENNAN OPERATING INCGeneral Contractor1007/02/2026
TRULINE CONSTRUCTION SERVGeneral Contractor1007/08/2026
LAB PLBG & HTG CO INCPlumbing908/26/2026
WOLF CONSTRUCTION CORP 20General Contractor903/21/2026
ICON INTERIORS INCGeneral Contractor907/08/2026
N Y SIGN ARTScaffold807/08/2026
JT MAGEN & COMPANY INCGeneral Contractor807/08/2026
TRI-STAR CONSTRUCTION CORPGeneral Contractor803/21/2026
W.J. REGAN & COMPANY LLCGeneral Contractor704/09/2026
O'KANE JOHNElectrical403/21/2026
JOHN O'KANEElectrical403/21/2026
BREEZE NATIONAL INCGeneral Contractor407/08/2026
STANDARD FIRE PROTECT LLCFire Protection407/08/2026
W5 GROUP LLCGeneral Contractor407/08/2026
MANENGEERING BUREAU INCFire Protection407/08/2026
WALDORF EXTERIORS, LLCGeneral Contractor403/21/2026
MURRAY, DEVONElectrical303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN5104408/12/2026
SHAHRISH SHUVO ENGINEERIN8524606/02/2026
COASTAL CONSTRUCTION SERV3827604/08/2026
AKF ENGINEERS, LLP27511303/25/2026
AMARACON TESTING & INSPEC58423602/18/2026
PROJECT TACTICAL SOLUTION58591211/09/2025
ATLAS ATC ENGINEERING INC80112611/05/2025
DNA CONTROLLED INSPECTION5542707/15/2024
MILROSE CONSULTANTS LLC2003106/25/2024
ATLANTIC ENGINEERINGLABOR13812304/25/2024
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (29)Facade (FISP) (3)Inspection (60)Objection (18)Special Inspection (30)
09/25/2026
Permit issued — Sprinklers
M01434890-S1-EW-SP
09/24/2026
Permit issued — Sprinklers
M01378856-I1-EW-SP
09/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH FREGLETTE
09/04/2026
Special inspection requirement — Sprinkler Systems
JOSEPH FREGLETTE
09/04/2026
Special inspection requirement — Standpipe Systems
JOSEPH FREGLETTE
09/04/2026
Special inspection requirement — Post-installed Anchors
JOSEPH FREGLETTE
09/03/2026
Permit issued — Mechanical Systems
M01103558-I1-MS
09/03/2026
Permit issued — General Construction
M01103404-I1-GC
09/03/2026
Permit issued — Structural
M01103509-I1-ST
09/02/2026
Permit issued — Mechanical Systems
M01378845-I1-MS
09/01/2026
Permit issued — General Construction
M01434890-I1-GC
08/20/2026
Signed off — Alteration
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
M01286485-I1
08/20/2026
Permit issued — Plumbing
M01390360-I1-PL
08/12/2026
Filed — Alteration
Modification to the existing plumbing system and associated piping as per plans. No change to use, egress or occupancy.
M01390360-I1
08/12/2026
Inspection — Fail Curb Cut Non-Directive 14
Fail
View inspection ↗
08/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Permit issued — Plumbing
M01378851-I1-PL
08/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/06/2026
Signed off — Alteration
Structural modification to the 25th floor (Dentons) as per plans. No change to use egress or occupancy.
M01144073-I1
08/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2026
Permit issued — General Construction
M01378839-I1-GC
08/03/2026
Permit issued — Mechanical Systems
M01405378-I1-MS
07/30/2026
Filed — Alteration
Install (12) new sprinkler heads, Remove (5) and Relocate (28) existing sprinkler heads and Install (1) temporary head and associated sprinkler piping on the Sub-cellar (CO)/ C2 (Mktg) Floor as per plans (MUFG Renovations.)
M01378856-I1
07/30/2026
Filed — Alteration
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the Subcellar (CO)/ C2 (Mktg) Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
M01378845-I1
07/30/2026
Filed — Alteration
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the Subcellar (CO)/ C2 (Mktg) as per plans (MUFG Renovations.) No change to use, egress or occupancy.
M01378839-I1
07/30/2026
Filed — Alteration
Install Plumbing Fixtures: (1) new CM, (1) IM/WD, (1) Funnel drain and associated CW/sanitary piping on the Subcellar (CO)/ C2 (Mktg) Floor as per plans (MUFG Renovations.)
M01378851-I1
07/30/2026
Signed off — Alteration
Remove (14) Lavatories, (12) WCs, (4) UR and piping. Install (1) HWH, (1) Floor drain, (13) Lavatories, (13) WCs, (4) Urinals and associated CW/sanitary piping on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
M01286494-I1
07/24/2026
Filed — Alteration
Modifications to the existing HVAC System: Remove existing AC Unit and Install new unit and associated equipment and ductwork on the SC2 (CO)/ C3 (Mktg) and SC3 (CO)/ C4 (Mktg) Levels as per plans (Truck Lift Modernization.)
M01405378-I1
07/24/2026
Permit issued — Sprinklers
M01254377-I1-EW-SP
07/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/14/2026
Signed off — Alteration
Relocate (15) sprinkler heads and Install (13) new sprinkler heads and associated piping on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
M01286504-I1
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Special inspection requirement — Shutoff dampers
James Sullivan Jr
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
James Sullivan Jr
07/06/2026
Special inspection requirement — Electrical motors and elevators
James Sullivan Jr
07/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
James Sullivan Jr
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Sullivan Jr
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Sullivan Jr
07/06/2026
Special inspection requirement — Maintenance information
James Sullivan Jr
07/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2026
Permit issued — General Construction
M01266974-I1-GC
06/30/2026
Permit issued — Mechanical Systems
M01266995-I1-MS
06/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01359665-I1
06/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/03/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
06/02/2026
Filed — Alteration
Modifications to the existing plumbing system on the 20th floor (and connection to existing piping on 19th fl) as per plans filed herewith. No changes in use, egress or occupancy.
M01330945-P1
05/29/2026
Permit issued — Sidewalk Shed
M01359665-I1-SH
05/29/2026
Permit issued — Sprinklers
M01103587-I1-EW-SP
05/28/2026
Permit issued — Sprinklers
M01342903-I1-EW-SP
05/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
James Sullivan Jr
05/20/2026
Special inspection requirement — Mechanical Systems
James Sullivan Jr
05/20/2026
Special inspection requirement — Final
James Sullivan Jr
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTRISTATE FIRE SPRINK INC09/25/2026
DOB NOWSprinklersPermit IssuedPAR FIRE PROTECTION LLC09/24/2026
DOB NOWStructuralPermit IssuedM & S MECHANICAL SERVICES09/03/2026
DOB NOWGeneral ConstructionPermit IssuedM & S MECHANICAL SERVICES09/03/2026
DOB NOWMechanical SystemsPermit IssuedM & S MECHANICAL SERVICES09/03/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC09/02/2026
DOB NOWGeneral ConstructionPermit IssuedCROSS CONSULTING INC09/01/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC08/20/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC08/07/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC08/04/2026
DOB NOWMechanical SystemsPermit IssuedM & S MECHANICAL SERVICES08/03/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP07/24/2026
DOB NOWMechanical SystemsPermit IssuedBRENNAN OPERATING INC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedBRENNAN OPERATING INC06/30/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/29/2026
DOB NOWSprinklersPermit IssuedBEST PLBG HTG & COOLING05/29/2026
DOB NOWSprinklersSigned-offSTANDARD FIRE PROTECT LLC05/28/2026
DOB NOWStandpipePermit IssuedPAR FIRE PROTECTION LLC04/20/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC04/17/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC04/17/2026
DOB NOWSprinklersPermit IssuedM & S BUILDINGS SERVICES04/14/2026
DOB NOWSprinklersPermit IssuedLAWRENCE J. LEVINE03/27/2026
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC03/20/2026
DOB NOWStructuralPermit IssuedM & S MECHANICAL SERVICES03/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedM & S MECHANICAL SERVICES03/06/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2026
DOB NOWSprinklersPermit IssuedLAWRENCE J. LEVINE03/02/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC02/27/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC02/27/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC02/26/2026
DOB NOWBoiler EquipmentPermit IssuedAMERICAN BOILER & WELDING02/20/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC02/13/2026
DOB NOWPlumbingPermit IssuedMAC FELDER INC02/10/2026
DOB NOWStructuralPermit IssuedICON INTERIORS INC02/09/2026
DOB NOWGeneral ConstructionPermit IssuedICON INTERIORS INC02/09/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP02/06/2026
DOB NOWMechanical SystemsPermit IssuedICON INTERIORS INC02/05/2026
DOB NOWPlumbingPermit IssuedPREFERRED MECHANICAL INC02/05/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC02/03/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC02/03/2026
+ 60 more permits on file
8 projects · most recent 07/24/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026Permit IssuedM & S MECHANICAL SERVICESAir Conditioning Systems
Cooling
02/25/2026Permit IssuedJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Vertiv PX011UW 46,100 BTU · Wshp ×4
01/26/2026Permit IssuedJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Iec VEY12 37,300 BTU · Fan Coil Indoor ×2
Johnson Controls AMI-SFM-VCM-VFM 127,130 BTU · Fan Coil Indoor ×2
Mammoth 30-TON Vcube 30 tons · Wshp ×1
12/31/2025Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Iec CPY-10 1,000 CFM ×2
CPY-08 750 CFM ×1
11/21/2025Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems
Cooling
Above Air MCC-009X-4-00000-EC-00-UF3-XS 28,300 BTU · Crac Unit ×1
MCC-009X-4-00000-ED-00-UF3-XS 28,300 BTU · Crac Unit ×1
10/06/2025Signed-offJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Iec HPY18 1,000 CFM · Fan Coil Indoor ×2
03/14/2025Permit IssuedJDP MECHANICAL INCAir Conditioning Systems
Cooling
Nortek TEMTROL ITF 1,977,300 BTU · Fan Coil Indoor ×3
Temtrol ITF 767,400 BTU · Fan Coil Indoor ×1
05/11/2020——Air Conditioning Systems—
10 projects · most recent 07/30/2026
FiledStatusContractorScope
07/30/2026Permit IssuedPAR FIRE PROTECTION LLC—
02/25/2026Permit IssuedPAR FIRE PROTECTION LLC639 heads
02/05/2026Permit IssuedABCO-PEERLESS SPRKLR CORP299 heads
01/26/2026Permit IssuedPAR FIRE PROTECTION LLC—
11/25/2025Permit IssuedPAR FIRE PROTECTION LLC552 heads
11/21/2025Permit IssuedPAR FIRE PROTECTION LLC1,653 heads, 8 outlets
10/06/2025Signed-offSOH PAR SPRINKLER LLC28 heads
03/14/2025Permit IssuedARCHER CONSULTANTS GROUP216 heads
05/28/2024——51 heads
12/02/2020———
17 projects · most recent 08/12/2026
Water/Sanitary
FiledStatusContractorScope
08/12/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
07/30/2026———
07/30/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
06/02/2026Permit IssuedPREFERRED MECHANICAL INCWater/Sanitary
04/08/2026Signed-offTRISTATE PLBG SVCS CORPWater/Sanitary
02/05/2026———
11/25/2025———
11/21/2025———
10/09/2025Signed-offHYDRONIC CONCEPTS NY P&HWater/Sanitary
10/06/2025———
10/06/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
09/12/2025Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
09/12/2025Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
09/02/2025Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
08/15/2025Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
25 projects · most recent 09/24/2026
General Wiring
FiledStatusContractorScope
09/24/2026Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
09/14/2026Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
08/18/2026CompleteNEAD ELECTRIC INC.General Wiring
03/16/2026Permit IssuedUNITY ELECTRIC CO., IncGeneral Wiring
02/20/2026Permit IssuedUNITY ELECTRIC CO. INC—
02/17/2026Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
01/30/2026Permit IssuedPOLO ELECTRIC CORP. D/B/AGeneral Wiring
01/23/2026CompleteTOP SHELF ELECTRIC CORP—
01/20/2026Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
01/05/2026Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
12/02/2025Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
10/01/2025CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
09/10/2025Permit IssuedOFF SHORE ELECTRIC CORPGeneral Wiring
03/21/2025Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
02/21/2025Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
11 projects · most recent 02/04/2026
Steel Concrete Wood
FiledStatusContractorScope
02/04/2026Permit IssuedICON INTERIORS INCSteel, Concrete
12/30/2025Signed-offW.J. REGAN & COMPANY LLC1 scope_items
11/21/2025Permit IssuedSTRUCTURE TONE, LLCSteel
10/03/2025Signed-offW.J. REGAN & COMPANY LLCSteel, Concrete
08/18/2025Permit IssuedMASS CONTRACTING CORPSteel
03/14/2025Permit IssuedJDP MECHANICAL INCConcrete
12/10/2024Signed-offSTRUCTURE TONE, LLCSteel, Concrete
10/02/2024Permit IssuedM & S MECHANICAL SERVICESSteel
05/28/2024——Steel
01/24/2023Permit IssuedJRM CONSTRUCTION MGMT LLC2 scope_items
08/31/2021Permit IssuedBREEZE NATIONAL INCSteel, Wood
2 projects · most recent 03/03/2026
Sidewalk Shed Sign
FiledStatusContractorScope
03/03/2026Signed-offSPRING SCAFFOLDING LLCSidewalk Shed
03/30/2023Signed-offN.Y. SIGN ART INCSign
▾Field Inspections (DOB CAP) — 152
DateTypeResultReport
09/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2026Fail Curb Cut Non-Directive 14FailView ↗
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2026Pass-Final PL - UndergroundPassView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/17/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 152.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/04/2026Sprinkler SystemsJOSEPH FREGLETTEspecial
09/04/2026Post-installed AnchorsJOSEPH FREGLETTEspecial
09/04/2026Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
09/04/2026Standpipe SystemsJOSEPH FREGLETTEspecial
07/06/2026HVAC-R and service water heating system controlsJames Sullivan Jrenergy_progress
07/06/2026Maintenance informationJames Sullivan Jrenergy_progress
07/06/2026Electrical motors and elevatorsJames Sullivan Jrenergy_progress
07/06/2026Duct leakage testing, insulation and designJames Sullivan Jrenergy_progress
07/06/2026Shutoff dampersJames Sullivan Jrenergy_progress
07/06/2026HVAC-R and service water heating equipmentJames Sullivan Jrenergy_progress
07/06/2026HVAC-R and service water piping design and insulationJames Sullivan Jrenergy_progress
06/03/2026Post-installed AnchorsShahrish Shuvospecial
06/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/20/2026Post-installed AnchorsShahrish Shuvospecial
05/20/2026Mechanical SystemsJames Sullivan Jrspecial
05/20/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/20/2026FinalJames Sullivan Jrprogress
05/20/2026Energy Code Compliance InspectionsJames Sullivan Jrprogress
04/01/2026Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
03/26/2026Maintenance informationJames Sullivan Jrenergy_progress
03/26/2026Post-installed AnchorsJames Sullivan Jrspecial
03/26/2026Duct leakage testing, insulation and designJames Sullivan Jrenergy_progress
03/26/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
03/26/2026Interior lighting powerJames Sullivan Jrenergy_progress
03/26/2026Lighting controlsJames Sullivan Jrenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DentonsOfficeFloors 25, 26
Project M01390360 Alteration · Permit Entire · 08/12/2026
Project M01179026 Alteration CO · Permit Entire · 02/25/2025
Project M01179550 No Work · PA Certificate of Operation Issued · 02/24/2025
Project M01144060 Alteration · Permit Entire · 12/10/2024
Project M01144133 Alteration · Permit Entire · 12/10/2024
SompoOfficeFloors 17–20
Project M01330971 Alteration · Permit Entire · 02/05/2026
Project M01330935 Alteration · Permit Entire · 02/04/2026
Project M01330888 Alteration · Permit Entire · 02/03/2026
Project M01330945 Alteration · Permit Entire · 02/03/2026
Project M00281322 Alteration · LOC Issued · 02/18/2020
Rockefeller GroupOfficeFloor 21
Project M01320982 Alteration · Permit Entire · 12/31/2025
Project M01321029 Alteration · Permit Entire · 12/31/2025
Project M01321038 Alteration · Permit Entire · 12/31/2025
Mayer BrownOfficeFloors 14, 23, 24
Project M01306125 Alteration · Permit Entire · 11/24/2025
Project M01306191 Alteration · Permit Entire · 11/21/2025
Project M01306234 Alteration · Permit Entire · 11/21/2025
Project M01306339 Alteration · Permit Entire · 11/21/2025
Project M01306358 Alteration · Permit Entire · 11/21/2025
Project M00878011 Alteration · LOC Issued · 06/09/2023
Project M00878121 Alteration · LOC Issued · 06/09/2023
SiriusXM Satellite RadioOfficeFloors 36, 37
Project M00943862 Alteration · Permit Entire · 12/12/2023
MUFGOfficeFloors 6–9
Project M00900067 Alteration · LOC Issued · 07/26/2023
Mitsubishi Ufj Trust Bank And Banking CorporationOfficeFloors 9, 10
Project M00892268 Alteration · LOC Issued · 07/13/2023
Project M00892272 Alteration · LOC Issued · 07/13/2023
Project M00857190 Alteration · LOC Issued · 05/25/2023
Project M00857136 Alteration · LOC Issued · 05/12/2023
Sirius XMOfficeFloor 37
Project M00809093 Alteration · Permit Entire · 01/13/2023
Project M00808336 Alteration · Permit Entire · 01/11/2023
White & CaseOfficeFloors 1, 2
Project M08008572 Alteration · LOC Issued · 09/30/2022
Project M00687443 No Work · PA Certificate of Operation Issued · 04/11/2022
Project M00585813 Alteration · LOC Issued · 11/11/2021
Project M00581381 Alteration · LOC Issued · 11/06/2021
Project M00582038 Alteration · LOC Issued · 11/05/2021
Project M00582098 Alteration · LOC Issued · 11/05/2021
Project M00582116 Alteration · LOC Issued · 11/05/2021
Endurance Ltd. SompoOfficeFloor 17
Project M00281308 Alteration · LOC Issued · 02/13/2020
Project M00281343 Alteration · LOC Issued · 02/11/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 7,074 on file (BIS + DOB NOW)
▸Plans & Drawings239
▸DOB NOWPlans/Sketch186
09/06/2026M00061710-I1Request digital key ↗
09/04/2026M00469036-I1Request digital key ↗
09/04/2026M00469036-P1Request digital key ↗
Showing 3 of 186 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler16
09/05/2026M00219523-I1Request digital key ↗
09/05/2026M00281343-I1Request digital key ↗
09/04/2026M00404105-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems12
09/05/2026M00216354-I1Request digital key ↗
09/05/2026M00244084-P1Request digital key ↗
09/05/2026M00244084-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing10
09/05/2026M00218783-I1Request digital key ↗
09/05/2026M00281343-I1Request digital key ↗
09/05/2026M00281343-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/05/2026M00311480-I1Request digital key ↗
09/04/2026M00413759-I1Request digital key ↗
09/04/2026M00413759-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/02/2026M00687443-I1Request digital key ↗
09/02/2026M00694491-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/05/2026M00281322-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00469989-P1Request digital key ↗
09/04/2026M00469989-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits1,209
▸BISPLAN / WORK APPROVAL APPLICATION697
03/03/2026120060879Open ↗
12/04/2025141001831Open ↗
12/04/2025141001831Open ↗
Showing 3 of 697 on file for this type
▸BISWORK PERMIT APPLICATION473
01/27/2023122266886Open ↗
07/13/2022123907175Open ↗
Showing 2 of 473 on file for this type
▸BISPLACE OF ASSEMBLY27
02/24/2026120060879Open ↗
02/23/2026120060879Open ↗
11/03/2025120060879Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION12
10/04/2022123907175Open ↗
Showing 1 of 12 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications2,060
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION879
04/14/2025123201613Open ↗
04/14/2025123201613Open ↗
04/14/2025123201613Open ↗
Showing 3 of 879 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST232
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 232 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature232
09/06/2026M00061710-I1Open ↗
09/05/2026M00244084-I1Open ↗
09/05/2026M00244084-P1Open ↗
Showing 3 of 232 on file for this type
▸DOB NOWProgress Inspector Seal & Signature192
09/28/2026M01196236-I1Open ↗
09/28/2026M01047420-P1Open ↗
09/28/2026M01047420-P1Open ↗
Showing 3 of 192 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature191
09/29/2026M08043524-P1Open ↗
09/28/2026M01196236-I1Open ↗
09/28/2026M01047420-P1Open ↗
Showing 3 of 191 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT186
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 186 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM114
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 114 on file for this type
▸BISPC FULL REPORT13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
12/04/2025141001831Open ↗
Showing 1 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment537
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE149
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 149 on file for this type
▸BISSELF-CERT PLUMBING NOTICE138
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 138 on file for this type
▸BISSCHEDULE B - PLUMBING90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA82
05/18/2023122266868Open ↗
Showing 1 of 82 on file for this type
▸BISEQUIPMENT USE PERMITS30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8526
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸Safety & Tenant Protection14
▸BISSTREET TREE CHECKLIST9
06/11/2021123907175Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos569
▸BISASBESTOS: CERTIFICATION (DEP ACP5)218
07/12/2021140972810Open ↗
Showing 1 of 218 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report194
09/06/2026M00061710-I1Open ↗
09/05/2026M00244084-I1Open ↗
09/05/2026M00244084-P1Open ↗
Showing 3 of 194 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'113
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 113 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS INSPECTION REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Energy Compliance315
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS191
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 191 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS77
07/29/2024123494147Open ↗
07/03/2024123494147Open ↗
06/27/2024123494147Open ↗
Showing 3 of 77 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY17
12/04/2025141001831Open ↗
06/26/2023123571526Open ↗
07/14/2021123715747Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
08/20/2025123388896Open ↗
07/29/2024123494147Open ↗
06/14/2024123494156Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS5
08/20/2025123388896Open ↗
12/01/2023140972810Open ↗
09/20/2023123796507Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/04/2026M00469989-I1Open ↗
Showing 1 of 4 on file for this type
▸Inspections & Test Reports67
▸BISTECHNICAL REPORT: RESPONSIBILITY43
12/04/2025141001831Open ↗
08/08/2025123388896Open ↗
12/07/2023140972810Open ↗
Showing 3 of 43 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
07/03/2024123494147Open ↗
06/14/2024123494156Open ↗
12/01/2023140972810Open ↗
Showing 3 of 5 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS5
03/25/2025122731080Open ↗
06/27/2024123494147Open ↗
06/14/2024123494156Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs567
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST364
11/10/2025122275395Open ↗
11/06/2025122275402Open ↗
10/03/2025123388896Open ↗
Showing 3 of 364 on file for this type
▸BISADMINISTRATIVE OBJECTIONS130
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 130 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION23
04/14/2025123201613Open ↗
04/14/2025123201613Open ↗
01/27/2023122266886Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
08/18/2025122223076Open ↗
07/09/2025123907175Open ↗
05/02/2024123907175Open ↗
Showing 3 of 21 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION14
08/21/2023122053302Open ↗
Showing 1 of 14 on file for this type
▸BISFINAL10
10/03/2025123388896Open ↗
06/09/2025123388887Open ↗
03/25/2025122731080Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Variance (V5) letter5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership723
▸BISCOST AFFIDAVIT708
12/04/2025141001831Open ↗
09/30/2025123388896Open ↗
04/18/2025120279171Open ↗
Showing 3 of 708 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW315
10/01/2025123388896Open ↗
09/29/2025122275395Open ↗
09/29/2025122275402Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms664
▸BISEFILING COVER SHEET371
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 371 on file for this type
▸BISBOROUGH INTAKE FORM150
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 150 on file for this type
▸BISADDITIONAL INFORMATION124
03/04/2026120060879Open ↗
02/24/2026120060879Open ↗
11/05/2025120060879Open ↗
Showing 3 of 124 on file for this type
▸BISeFiling Job Application Cover Sheet19
12/04/2025141001831Open ↗
Showing 1 of 19 on file for this type
▸Other Documents37
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPLOT DIAGRAM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS4
10/08/2025122275395Open ↗
05/09/2023122266886Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type