| Owner | Filings | Most Recent |
|---|---|---|
| Two Fulton Square | 74 | 03/21/2026 |
| F and T Group | 52 | 07/08/2026 |
| 39 Prince Realty | 10 | 03/21/2026 |
| 2FS SCG Retail | 7 | 10/13/2026 |
| Fulton SCG Development | 3 | 03/22/2026 |
| Taier 37Ave | 1 | 03/22/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Mei Architect | 30 | 03/21/2026 |
| Indesign Studio | 24 | 03/21/2026 |
| Modern Building Consultant | 41 | 03/21/2026 |
| JD Arch | 12 | 03/21/2026 |
| Lam & Lam Designs | 4 | 03/21/2026 |
| Youber Design | 2 | 03/21/2026 |
| HT Associates | 1 | 03/21/2026 |
| Ibuild Consulting | 80 | 03/21/2026 |
| JD Design Associates | 28 | 03/21/2026 |
| Perotto Consulting Management | 26 | 03/21/2026 |
| Louis Striar | 18 | 03/21/2026 |
| Brooklyn Root Design | 3 | 03/21/2026 |
| AE Design Solution | 20 | 03/21/2026 |
| Domani Consulting | 14 | 03/21/2026 |
| Kazam Consultants | 12 | 03/21/2026 |
| Project Entry | 7 | 03/21/2026 |
| JP Expedite | 6 | 03/21/2026 |
| Lu Ning Architecture | 2 | 03/21/2026 |
| PCS Engineering | 1 | 03/21/2026 |
| Conapac Services Dba | 1 | 03/21/2026 |
| H&Z Building NY | 8 | 03/21/2026 |
| Fultonex Management | 1 | 03/21/2026 |
| Prise Partners | 2 | 03/21/2026 |
| J.A.M. Associates | 2 | 03/21/2026 |
| Conapac Services | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Tri Borough Scaffolding | Scaffold | 44 | 07/08/2026 |
| L&L Construction Development | General Contractor | 29 | 07/08/2026 |
| Green City Box Trans | General Contractor | 26 | 07/08/2026 |
| DHC Contracting | General Contractor | 15 | 07/08/2026 |
| RRP Plumbing | Fire Protection | 11 | 07/08/2026 |
| Vand Mechanical | Plumbing | 10 | 07/08/2026 |
| Top 8 Construction | General Contractor | 10 | 07/08/2026 |
| Z-Car-D | Sign hanger | 9 | 07/08/2026 |
| JD Arch | General Contractor | 8 | 03/21/2026 |
| JKT Construction | General Contractor | 7 | 07/08/2026 |
| Crown Plumbing | Plumbing | 6 | 07/08/2026 |
| North Shore Neon Sign | specialty_contractor | 6 | 03/21/2026 |
| Tristar Developing | General Contractor | 6 | 03/21/2026 |
| LCNY Construction | General Contractor | 5 | 07/08/2026 |
| New York Standard Mechanical Co | Fire Protection | 5 | 07/08/2026 |
| XH&RC Plumbing and Heating | Plumbing | 5 | 07/08/2026 |
| TT&T Construction | General Contractor | 4 | 03/21/2026 |
| Jem Electrical Contracting | Electrical | 4 | 03/22/2026 |
| Village P & H NY | Plumbing | 3 | 07/08/2026 |
| Signs Cad | Sign hanger | 3 | 07/08/2026 |
| Island Electric | Electrical | 3 | 03/22/2026 |
| Balaton Consulting | Sign hanger | 3 | 07/08/2026 |
| Primrose Service | General Contractor | 3 | 03/21/2026 |
| Ark Design & Build | General Contractor | 3 | 03/21/2026 |
| CS Renovation | General Contractor | 3 | 03/21/2026 |
| Zaq Construction | General Contractor | 3 | 07/08/2026 |
| King's USA Group | General Contractor | 2 | 03/21/2026 |
| New York Standard Mechanical | Plumbing | 2 | 07/08/2026 |
| V. Vass Electric | Electrical | 2 | 03/21/2026 |
| Homepro General Contracting | General Contractor | 2 | 07/08/2026 |
| Tristar Developing | Scaffold | 2 | 03/21/2026 |
| A Plus Plumbing | Plumbing | 2 | 07/08/2026 |
| KJK Electric | Electrical | 2 | 03/22/2026 |
| Watson's Plumbing, Heating, & Building | Plumbing | 2 | 07/08/2026 |
| MXP | General Contractor | 2 | 07/08/2026 |
| SCG America Construction | General Contractor | 2 | 07/08/2026 |
| XH&RC Plumbing and Heating | Fire Protection | 1 | 07/08/2026 |
| Ecny Electrical Contractors | Electrical | 1 | 03/22/2026 |
| Nash Electric Services | Electrical | 1 | 03/22/2026 |
| Wiretech Electric | Electrical | 1 | 03/22/2026 |
| Darby Construction Service | General Contractor | 1 | 04/09/2026 |
| John Evan Contracting | General Contractor | 1 | 07/08/2026 |
| Kale Construction | General Contractor | 1 | 07/08/2026 |
| Prosperity Construction* | General Contractor | 1 | 07/08/2026 |
| Twin Shores Management | General Contractor | 1 | 04/09/2026 |
| Unity Construction Services | General Contractor | 1 | 07/08/2026 |
| Top 8 Construction | Scaffold | 1 | 07/08/2026 |
| A1 Specialized | Sign hanger | 1 | 07/08/2026 |
| American Standard P&H Cororp | Plumbing | 1 | 07/08/2026 |
| Ariana Contracting | Fire Protection | 1 | 07/08/2026 |
| Ariana Contracting | Plumbing | 1 | 07/08/2026 |
| Crossfield Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Dynamic Plumbing & Sprinkler | Fire Protection | 1 | 07/08/2026 |
| K.M.D. Mechanical 1443 | Fire Protection | 1 | 07/08/2026 |
| Paramount Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Rock E Small Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Stream Plumbing | Plumbing | 1 | 07/08/2026 |
| Village P & H NY | Fire Protection | 1 | 07/08/2026 |
| Wasoff Plumbing & Utility Co | Plumbing | 1 | 07/08/2026 |
| Waterworks Plumbing Mechanical | Plumbing | 1 | 07/08/2026 |
| City Electrical Sign Erectors | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Building Consulting Engineering | 1034 | 1 | 05/22/2026 |
| Z & T Engineering | 591 | 7 | 05/20/2026 |
| You Gao | 9407 | 2 | 02/10/2026 |
| Mehdi Ghazi, P.E | 7129 | 40 | 10/23/2025 |
| All City Engineering | 7115 | 23 | 08/01/2025 |
| Lu Ning Architecture, PLL | 1155 | 10 | 07/22/2025 |
| Fang Architect | 5513 | 9 | 04/23/2025 |
| MSM Engineering Services | 8449 | 4 | 03/13/2025 |
| Lam & Lam Designs | 3563 | 8 | 12/20/2024 |
| Special Testing & Consulting | 1688 | 3 | 12/20/2024 |
| NKM Engineering | 6244 | 7 | 11/12/2024 |
| Flushing Engineering Service | 4373 | 4 | 11/07/2024 |
| Halo Architecture | 8021 | 6 | 11/06/2024 |
| Yan Gao | 6619 | 2 | 10/08/2024 |
| Catalpa Special Inspectio | 2004 | 1 | 10/04/2024 |
| Mei Architect | 8095 | 15 | 09/26/2024 |
| Yao W Guo Architect | 1754 | 3 | 03/13/2024 |
| WW Engineering | 7502 | 3 | 01/03/2024 |
| Gregory V. Perotto, P.E | 947 | 3 | 07/11/2023 |
| Just Consulting Engineering | 5865 | 1 | 05/09/2023 |
| Arc Consulting Engineers | 4083 | 4 | 02/17/2023 |
| Allen Shinfeld, P.E | 1305 | 3 | 10/24/2022 |
| Ejc Engineering | 4502 | 3 | 06/03/2022 |
| Great Wall Consultant P.E | 5633 | 1 | 07/12/2021 |
| PCS Engineering | 3745 | 1 | 05/20/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | Kale Construction | 06/09/2026 |
| DOB NOW | Sprinklers | Signed-off | Ralph W. Landolfi JR | 03/09/2026 |
| DOB NOW | Plumbing | Signed-off | Vand Mechanical | 03/09/2026 |
| DOB NOW | General Construction | Signed-off | Darby Construction Service | 02/23/2026 |
| DOB NOW | General Construction | Signed-off | Top 8 Construction | 02/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Top 8 Construction | 01/22/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Green City Box Trans | 12/19/2025 |
| DOB NOW | General Construction | Permit Issued | Twin Shores Management | 12/05/2025 |
| DOB NOW | General Construction | Signed-off | L&L Construction Development | 10/31/2025 |
| DOB NOW | General Construction | Permit Issued | SCG America Construction | 10/29/2025 |
| DOB NOW | Sprinklers | Signed-off | Ralph W. Landolfi JR | 10/10/2025 |
| DOB NOW | Sprinklers | Signed-off | Ralph W. Landolfi JR | 10/07/2025 |
| DOB NOW | Plumbing | Signed-off | Vand Mechanical | 10/06/2025 |
| DOB NOW | Plumbing | Signed-off | XH&RC Plumbing and Heating | 10/02/2025 |
| DOB NOW | Sprinklers | Signed-off | Ralph W. Landolfi JR | 07/21/2025 |
| DOB NOW | Sprinklers | Signed-off | Ralph W. Landolfi JR | 07/21/2025 |
| DOB NOW | General Construction | Signed-off | SCG America Construction | 07/18/2025 |
| DOB NOW | General Construction | Signed-off | Top 8 Construction | 07/03/2025 |
| DOB NOW | General Construction | Signed-off | Top 8 Construction | 05/21/2025 |
| DOB NOW | General Construction | Signed-off | Green City Box Trans | 05/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | John Evan Contracting | 02/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | King's USA Group | 02/21/2025 |
| DOB NOW | Sprinklers | Signed-off | Ralph W. Landolfi JR | 02/18/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ralph W. Landolfi JR | 02/13/2025 |
| DOB NOW | General Construction | Signed-off | Green City Box Trans | 02/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Green City Box Trans | 02/03/2025 |
| DOB NOW | Plumbing | Signed-off | Vand Mechanical | 01/07/2025 |
| DOB NOW | Plumbing | Signed-off | Vand Mechanical | 12/24/2024 |
| DOB NOW | Plumbing | Signed-off | Vand Mechanical | 12/24/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Zaq Construction | 12/12/2024 |
| DOB NOW | General Construction | Signed-off | Green City Box Trans | 12/11/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Green City Box Trans | 12/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Green City Box Trans | 12/06/2024 |
| DOB NOW | Plumbing | Signed-off | Vand Mechanical | 12/04/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Green City Box Trans | 11/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Top 8 Construction | 11/19/2024 |
| DOB NOW | Sprinklers | Signed-off | Citywide Plumbing, Heating & Sprinkler | 11/19/2024 |
| DOB NOW | General Construction | Signed-off | Top 8 Construction | 11/04/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Green City Box Trans | 09/25/2024 |
| DOB NOW | Plumbing | Signed-off | Wasoff Plumbing & Utility Co | 09/20/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/20/2026 | Signed-off | Top 8 Construction | Heating and Air Conditioning Systems | Heat / Cool Comfort Aire MBR120BKC30C01S 156,000 BTU ×5 |
| 03/27/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool |
| 12/20/2024 | Signed-off | Unity Construction Services | Heating and Air Conditioning Systems, Ventilation Systems | |
| 10/11/2024 | Signed-off | Green City Box Trans | Heating and Air Conditioning Systems | Heat / Cool Daikin WCCH030 305,000 BTU · Wshp ×1 |
| 10/08/2024 | Signed-off | Top 8 Construction | Air Conditioning Systems | Cooling Mammoth MSH1060G 60,000 BTU ×1 |
| 01/03/2024 | Permit Issued | LCNY Construction | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Carrier 50PCH070ZCC3ECC1 2,200 CFM · Wshp ×4 50PCH024ZCC3ECC1 850 CFM · Wshp ×2 50PCH024ZCC3ECJ8 850 CFM · Wshp ×2 50PCH036ZCC3ECC1 1,200 CFM · Wshp ×2 50PCH048NCCNACC1 1,600 CFM · Wshp ×2 50PCH060NCC5ACC1 1,600 CFM · Wshp ×2 Task Applied Products TGU053WSHP-PHL 60,200 BTU · Wshp ×2 Heat / Cool Carrier 50PCH060NCC3ACA1 2,000 CFM · Wshp ×2 |
| 08/16/2023 | — | — | Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems | Cooling Comfort Aire HBH 120 4,000 CFM · Fan Coil Indoor ×3 |
| 06/22/2023 | Signed-off | L&L Construction Development | Air Conditioning Systems | Cooling Climatemaster TC-048 1,382 CFM · Wshp ×1 |
| 10/25/2022 | Signed-off | DHC Contracting | Others | — |
| 07/08/2021 | Permit Issued | DHC Contracting | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Geocomfort GZS036 36,000 BTU · Heat Pump Outdoor ×1 Heating Geocomfort GZS024 38,000 BTU · Heat Pump Outdoor ×1 Ventilation Geocomfort GZS024 1,200 CFM · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2026 | Signed-off | RRP Plumbing | 54 heads |
| 03/27/2026 | — | — | Sprinkler System |
| 10/11/2024 | Signed-off | Dynamic Plumbing & Sprinkler | — |
| 10/08/2024 | Permit Issued | RRP Plumbing | 17 heads |
| 11/14/2022 | Permit Issued | Ariana Contracting | 12 heads |
| 07/08/2021 | Permit Issued | New York Standard Mechanical Co | 12 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2026 | Signed-off | Vand Mechanical | Water/Sanitary |
| 03/27/2026 | — | — | Gas, Water/Sanitary |
| 10/11/2024 | Signed-off | Wasoff Plumbing & Utility Co | Water/Sanitary |
| 08/16/2023 | — | — | Gas, Water/Sanitary |
| 02/17/2023 | Signed-off | New York Standard Mechanical Co | Gas, Water/Sanitary |
| 11/14/2022 | Permit Issued | Ariana Contracting | Water/Sanitary |
| 09/27/2022 | Signed-off | Village P & H NY | Water/Sanitary |
| 08/16/2022 | Signed-off | Crown Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Complete | AL-Lectric Elect'l Contracting | General Wiring |
| 06/23/2026 | Complete | Voltron Electric | General Wiring |
| 08/25/2025 | Complete | Jem Electrical Contracting | General Wiring |
| 03/06/2025 | Complete | Jem Electrical Contracting | General Wiring |
| 01/23/2025 | Complete | Jem Electrical Contracting | General Wiring |
| 09/13/2024 | Complete | Jem Electrical Contracting | General Wiring |
| 07/09/2024 | Complete | Jem Electrical Contracting | General Wiring |
| 10/24/2023 | Complete | KJK Electric | General Wiring |
| 10/02/2023 | Complete | Goodall Electric | General Wiring |
| 04/29/2023 | Complete | R & T Electrical | General Wiring |
| 03/16/2023 | Complete | Janon Electric | General Wiring |
| 03/15/2023 | Complete | Jem Electrical Contracting | General Wiring |
| 12/12/2022 | Permit Issued | Island Electric | — |
| 12/06/2022 | Complete | AL-Lectric Elect'l Contracting | General Wiring |
| 10/19/2022 | Complete | KJK Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/26/2025 | Permit Issued | Twin Shores Management | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/25/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/03/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 01/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/31/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/23/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 10/22/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 10/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 06/12/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 06/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/28/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/22/2026 | Sprinkler Systems | Fei Zeng | special |
| 05/22/2026 | Post-installed Anchors | Fei Zeng | special |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | Fei Zeng | special |
| 05/22/2026 | Tenant Protection Plan Compliance | Fei Zeng | special |
| 05/22/2026 | Tenant Protection Plan Compliance | Fei Zeng | special |
| 05/12/2026 | Tenant Protection Plan Compliance | — | special |
| 05/12/2026 | Sprinkler Systems | Fei Zeng | special |
| 05/12/2026 | Post-installed Anchors | Fei Zeng | special |
| 05/06/2026 | Tenant Protection Plan Compliance | — | special |
| 03/19/2026 | Fire-Resistant Penetrations and Joints | TONY ONYEAGORO | special |
| 03/19/2026 | Final | TONY ONYEAGORO | progress |
| 03/19/2026 | Interior lighting power | TONY ONYEAGORO | energy_progress |
| 03/19/2026 | Tenant Protection Plan Compliance | TONY ONYEAGORO | special |
| 02/10/2026 | Tenant Protection Plan Compliance | You Gao | special |
| 02/10/2026 | Interior lighting power | You Gao | energy_progress |
| 02/10/2026 | Fire-Resistant Penetrations and Joints | You Gao | special |
| 02/10/2026 | Energy Code Compliance Inspections | You Gao | progress |
| 01/30/2026 | Energy Code Compliance Inspections | Fei Zeng | progress |
| 01/30/2026 | Post-installed Anchors | Fei Zeng | special |
| 01/30/2026 | Fire-Resistant Penetrations and Joints | Fei Zeng | special |
| 01/27/2026 | Tenant Protection Plan Compliance | You Gao | special |
| 01/27/2026 | Interior lighting power | You Gao | energy_progress |
| 01/27/2026 | Final | You Gao | progress |
| 01/27/2026 | Energy Code Compliance Inspections | You Gao | progress |
| 01/27/2026 | Fire-Resistant Penetrations and Joints | You Gao | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Hello Kit TY and Friends | Retail | Cellar | Project Q01358021 |
| Muji | Retail | Cellar | Project Q01347676 |
| Kajiken Ramen | Restaurant / Food Service | Sub-cellar, Floor 1 | Project Q01270005 |
| Bao's Wok | Restaurant / Food Service | Floor 1 | Project Q01307717 |
| Mayco | Retail | Floor 1 | Project Q01156503 |
| Hwashooshoo | Restaurant / Food Service | Floor 1 | Project Q01134257 Project Q01133710 |
| Kokoro Cat Cafe | Restaurant / Food Service | Cellar | Project Q01114994 Project Q01114998 |
| POP MART | Retail | Floor 1 | Project Q01120737 |
| Tangram - Birria Landia | Restaurant / Food Service | Floor 1 | Project Q01066596 Project Q01065939 Project Q01041120 |
| Money Cake | Restaurant / Food Service | Floor 1 | Project Q00978086 |
| Gatcha | Restaurant / Food Service | Floor 1 | Project Q00923423 Project Q00923383 Project Q00923427 Project Q00923442 Project Q00904676 |
| Regal Tangram | Arts / Culture / Entertainment | Floor 2, Mezzanine, Roof | Project Q00249844 |
| Tangram - Akiba House | Retail | Floor 1 | Project Q00823638 Project Q00841852 |
| Kura Sushi | Restaurant / Food Service | Sub-cellar, Cellar, Floor 1 | Project Q00808953 Project Q00808941 Project Q00808960 Project Q00807658 |
| Tangram - Sin Choi Kee | Restaurant / Food Service | Floor 1 | Project Q08049535 |
| Tangram - JOJU | Restaurant / Food Service | Floor 1 | Project Q00796749 |
| Soft Swerve Ice Cream | Restaurant / Food Service | Floor 1 | Project Q00792663 Project Q00792666 |
| Xi'an Famous Foods | Restaurant / Food Service | Cellar | Project Q00791842 Project Q00658545 Project Q00658543 |
| I' Milky | Restaurant / Food Service | Floor 1 | Project Q00782215 Project Q00782223 |
| Tangram - Qing shu | Restaurant / Food Service | Floor 1 | Project Q00753971 Project Q00771527 |
| Tangram - da wei mei shi | Restaurant / Food Service | Floor 1 | Project Q00728573 |
| Na Tart | Restaurant / Food Service | Sub-cellar, Cellar, Floor 1 | Project Q00727986 Project Q00728026 |
| Hoi Polloi | Retail | Floors 1–5 | Project Q00705574 |
| MINISO | Retail | Cellar | Project Q00694278 Project Q00694282 |
| Machi-machi Bubble | Restaurant / Food Service | Cellar, Floor 1, Mezzanine | Project Q00634568 Project Q00635299 Project Q00639738 Project Q00639763 Project Q00639777 |
| Tangram - Machi-Machi | Restaurant / Food Service | Cellar | Project Q00623944 |
| Tangram - Noon Vision | Mixed Use | Cellar | Project Q00589341 Project Q00589356 |
| Renaissance Hotel | Hotel / Lodging | Floors 1–5 | Project Q00572319 Project Q00572320 Project Q00572321 |
| Regal Cinemas | Arts / Culture / Entertainment | Floor 2 | Project Q00537779 Project Q00537827 Project Q00571480 |
| Tangram Center | Retail | Floors 1–5 | Project Q00556652 |
| Meet Fresh | Restaurant / Food Service | Floor 1 | Project Q00534470 Project Q00536123 Project Q00536196 |