← Back
BuildNYC
Elevator apt, fireproof with stores
8 Court Square
27-05 THOMSON AVENUE · BIN 4623812
💬 Discuss this project
2021Year Built
20Stories
D6Building Class
M1-5/R9Zoning
142,088 sfGross Floor Area
159Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator apt, fireproof with stores · Owner of record: 25-34 Jackson Avenue Property Owner · 15,085 sf lot · 9.42 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsWerwaiss & Company, INC.6 filings
RoofWerwaiss & Company, INC.5p · 6 filings · 8 docs
Floor 12Roof protection installation, 12th level1 filing
Floor 11
Floor 10
Floor 9Easy Scale Scaffold Installation1 filing · 4 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Warby Parker3p · 6 filings · 20 docs
CellarWerwaiss & Company, INC.2 filings
Site & exteriorSTY SIGN new illuminated channel letter wall sign11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Werwaiss & Company11407/08/2026
25-34 Jackson Ave Property Owner1003/21/2026
DOB Services603/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hierarch-E1203/21/2026
Metropolis Group4203/21/2026
AE Design Solution3003/21/2026
JD Design Associates1003/21/2026
Lombardo Building Consultants1003/21/2026
Structuretech NY103/21/2026
A1 Expediting Service203/21/2026
Patuxent Engineering803/21/2026
AO Consulting and Drafting603/21/2026
New York Sign Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold2907/08/2026
Vik XS ServicesScaffold803/21/2026
Cauldwell Wingate CoGeneral Contractor707/08/2026
Marine Plumbing & MechanicalPlumbing707/08/2026
Jem ContractingScaffold607/08/2026
Moore GroupScaffold603/21/2026
Horizon Retail ConstructionGeneral Contractor407/08/2026
JD ArchGeneral Contractor403/21/2026
S & J IndustrialFire Protection307/08/2026
VCL ConstructionGeneral Contractor303/21/2026
Structuretech New YorkScaffold203/21/2026
Marine Services GroupFire Protection207/08/2026
XH&RC Plumbing and HeatingPlumbing107/08/2026
Voltron ElectricElectrical103/22/2026
A1 SpecializedSign hanger107/08/2026
Mauceri Sign CoSign hanger107/08/2026
Arco Plumbing and HeatingPlumbing107/08/2026
Full Circle PlumbingPlumbing107/08/2026
SKF ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449706/22/2025
NKM Engineering6244305/23/2025
Yang Engineering8376211/13/2024
Domani Inspection Service8431612/07/2023
DNA Controlled Inspection554409/19/2023
Advanced Engineering &1224203/03/2023
Building Lifecycle
All (253)Filed (69)Permit Issued (54)Signed Off (31)Violation (28)Inspection (25)Objection (16)Special Inspection (30)
01/24/2026
Violation issued (HPD, closed)
C
07/21/2025
Signed off — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY SIGN FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01211746-I1
07/14/2025
Signed off — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00985137-I1
07/08/2025
Signed off — Alteration
INTERIOR RENOVATION COMMERCIAL SPACE WITH PARTITION AND MECHANICAL WORK ON THE CELLAR AND 1ST FLOOR.
Q00985130-I1
07/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/22/2025
Filed — Alteration
INTERIOR RENOVATION COMMERCIAL SPACE WITH PARTITION AND MECHANICAL WORK ON THE CELLAR AND 1ST FLOOR.
Q00985130-P2
06/10/2025
Signed off — Alteration
HEREWITH FILING FOR GENRAL CNSTRUCTION AND MECHANICAL WORK IN THE EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01135535-I1
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
05/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — Lighting controls
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — Final
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
05/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
05/23/2025
Filed — Alteration
INTERIOR RENOVATION COMMERCIAL SPACE WITH PARTITION AND MECHANICAL WORK ON THE CELLAR AND 1ST FLOOR.
Q00985130-P1
05/21/2025
Filed — Alteration
HEREWITH FILING FOR GENRAL CNSTRUCTION AND MECHANICAL WORK IN THE EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01135535-P1
05/08/2025
Signed off — Alteration
HEREWITH FILING EXISTING COMMERCIAL SPACE PLUMBING RENOVATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
Q01135584-I1
04/29/2025
Permit issued — Sign
Q01211746-I1-SG
04/22/2025
Filed — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY SIGN FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01211746-I1
04/17/2025
Special inspection requirement — Final
YUNHO LEE
04/04/2025
Signed off — Alteration
suspended Scaffold installation as per plans filed herewith. No change in use, egress or occupancy.
Q08000866-I1
04/04/2025
Signed off — Alteration
Suspended scaffold installation as per plans filed herewith. No change in use, egress or occupancy.
Q00850202-I1
03/13/2025
Signed off — Alteration
STRUCTURAL WORK ON CEL, 001-020& ROF, AS SHOWN ON PLANS. IN CONJUNCTION WITH NB JOB #420667068.
Q00605311-I1
03/11/2025
Permit issued — Mechanical Systems
Q00985130-I1-GC-CX
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — Final
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — Lighting controls
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
03/03/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
02/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2024
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AND RELATED PIPING, INSTALLATION OF SPRINKLER SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.
Q00348365-I1
12/11/2024
Filed — Alteration
HEREWITH FILING EXISTING COMMERCIAL SPACE PLUMBING RENOVATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
Q01135584-P1
12/11/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/06/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/03/2024
Permit issued — Plumbing
Q01135584-I1-PL
12/03/2024
Permit issued — Mechanical Systems
Q01135535-I1-GC-CX
11/26/2024
Signed off — Alteration
Filed herewith Temporary Manual Dry Standpipe filed in Conjunction with NB # 420667068
Q00364142-I1
11/22/2024
Signed off — Alteration
Q00611402-I1
11/22/2024
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM
Q00345755-I1
11/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2024
Filed — Alteration
HEREWITH FILING FOR GENRAL CNSTRUCTION AND MECHANICAL WORK IN THE EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01135535-I1
11/13/2024
Filed — Alteration
HEREWITH FILING EXISTING COMMERCIAL SPACE PLUMBING RENOVATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
Q01135584-I1
11/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
11/12/2024
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00985137-P1
10/30/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
10/30/2024
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
Latest 60 of 253 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMad Signs04/29/2025
DOB NOWMechanical SystemsSigned-offJD Arch03/11/2025
DOB NOWPlumbingSigned-offFull Circle Plumbing12/03/2024
DOB NOWMechanical SystemsSigned-offVCL Construction12/03/2024
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating10/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services04/18/2024
DOB NOWMechanical SystemsSigned-offJD Arch03/04/2024
DOB NOWPlumbingSigned-offArco Plumbing and Heating03/01/2024
DOB NOWSprinklersSigned-offMarine Services Group02/27/2024
DOB NOWMechanical SystemsSigned-offHorizon Retail Construction02/16/2024
DOB NOWStructuralSigned-offHorizon Retail Construction02/16/2024
DOB NOWSignSigned-offMauceri Sign Co02/16/2024
DOB NOWGeneral ConstructionSigned-offHorizon Retail Construction02/16/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems01/29/2024
DOB NOWConstruction FenceSigned-offCore Scaffold Systems01/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems01/09/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems01/02/2024
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical08/18/2023
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical08/18/2023
DOB NOWConstruction FenceSigned-offCore Scaffold Systems07/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services04/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offJem Contracting03/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offJem Contracting03/22/2023
DOB NOWMechanical SystemsSigned-offCauldwell Wingate Co03/17/2023
DOB NOWStructuralSigned-offCauldwell Wingate Co03/07/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems01/31/2023
DOB NOWConstruction FenceSigned-offCore Scaffold Systems01/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems01/12/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems01/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offJem Contracting12/13/2022
DOB NOWSprinklersSigned-offMarine Services Group10/18/2022
DOB NOWProtection and Mechanical MethodsSigned-offJem Contracting09/30/2022
DOB NOWSupported ScaffoldSigned-offVik XS Services08/31/2022
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical08/31/2022
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical08/31/2022
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services08/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offMoore Group07/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offMoore Group05/06/2022
+ 22 more permits on file
11 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteVoltron Electric—
01/26/2025CompleteCL ElectricalGeneral Wiring
12/26/2024CompleteAL-Lectric Elect'l Contracting1 meters, 1 new_meters
01/19/2024CompleteSKF ElectricalGeneral Wiring
11/10/2023CompleteSKF ElectricalGeneral Wiring
01/11/2023CompleteTransel Elev. & ElectricGeneral Wiring
01/11/2023CompleteTransel Elev. & ElectricGeneral Wiring
09/08/2022CompleteSKF Electrical1 meters, 1 new_meters
01/28/2022CompleteSKF Electrical—
01/27/2022CompleteV. Vass Electric—
01/19/2022CompleteV. Vass Electric—
1 project
Steel Concrete
FiledStatusContractorScope
———Steel, Concrete
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
07/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/16/2023Pass-Final SP - More than 10 Requested FloorsPassView ↗
03/14/2023Pass-Final SD - Fire PumpPassView ↗
03/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/26/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/24/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/10/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/03/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/18/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/05/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/27/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
05/27/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
05/27/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
05/27/2025Lighting controlsMOHAMED MAHMOUDenergy_progress
05/27/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
05/27/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
05/27/2025Tenant Protection Plan ComplianceJian Yangspecial
05/27/2025Mechanical SystemsMOHAMED MAHMOUDspecial
05/27/2025FinalMOHAMED MAHMOUDprogress
05/27/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
04/17/2025FinalYUNHO LEEprogress
03/03/2025Lighting controlsMOHAMED MAHMOUDenergy_progress
03/03/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
03/03/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
03/03/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
03/03/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
03/03/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
03/03/2025FinalMOHAMED MAHMOUDprogress
03/03/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
03/03/2025Mechanical SystemsMOHAMED MAHMOUDspecial
03/03/2025Tenant Protection Plan Compliance—special
12/11/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/11/2024Tenant Protection Plan ComplianceJian Yangspecial
12/11/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/06/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Warby ParkerRetailFloor 1
Project Q00902622 Alteration · LOC Issued · 09/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 535 on file (BIS + DOB NOW)
▸Plans & Drawings94
▸DOB NOWPlans/Sketch54
08/27/2026Q00542265-I1Request digital key ↗
08/27/2026Q00605311-P1Request digital key ↗
08/27/2026Q00611402-I1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWPlans/Sketch - Standpipe7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
08/25/2026Q00345779-I1Request digital key ↗
08/25/2026Q00345779-P3Request digital key ↗
08/25/2026Q00345779-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/29/2026Q00345794-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION27
11/18/2025420667068Open ↗
03/08/2024420667068Open ↗
10/26/2023440810348Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION13
04/09/2025420667068Open ↗
04/08/2025420667068Open ↗
10/11/2023420667068Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM2
01/12/2022420667068Open ↗
12/28/2020420667068Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/26/2025420667068Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
07/26/2021420667068Open ↗
▸BISVERIFY TAX LOT1
08/27/2024420667068Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/22/2023420667068Open ↗
▸Seals & Professional Certifications228
▸DOB NOWProgress Inspector Seal & Signature91
09/20/2026Q00345779-P5Open ↗
09/20/2026Q00345779-P5Open ↗
09/02/2026Q00348365-P6Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature73
08/28/2026Q00364142-I1Open ↗
08/27/2026Q00605311-P1Open ↗
08/27/2026Q00605311-I1Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
09/20/2026Q00345779-P5Open ↗
09/02/2026Q00348365-P6Open ↗
09/02/2026Q00348365-P6Open ↗
Showing 3 of 45 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/26/2023440810348Open ↗
09/07/2023440803212Open ↗
05/08/2023440781977Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/26/2023440810348Open ↗
09/07/2023440803212Open ↗
05/08/2023440781977Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/26/2023440810348Open ↗
09/07/2023440803212Open ↗
05/08/2023440781977Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/20/2021420667068Open ↗
08/20/2021420667068Open ↗
08/20/2021420667068Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
07/18/2023420667068Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/24/2026420667068Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/24/2026420667068Open ↗
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
09/16/2021420667068Open ↗
08/20/2021420667068Open ↗
07/14/2021420667068Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/14/2021420667068Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/14/2021420667068Open ↗
07/14/2021420667068Open ↗
07/14/2021420667068Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/20/2021420667068Open ↗
08/20/2021420667068Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/18/2023420667068Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/18/2023420667068Open ↗
▸BISFENESTRATION AREAS1
07/18/2023420667068Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/18/2023420667068Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/22/2023420667068Open ↗
▸Inspections & Test Reports40
▸BISTECHNICAL REPORT: RESPONSIBILITY12
04/18/2022440712766Open ↗
04/12/2022440712766Open ↗
07/14/2021420667068Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
06/03/2022420667068Open ↗
06/03/2022420667068Open ↗
06/03/2022420667068Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
09/14/2023420667068Open ↗
08/20/2021420667068Open ↗
08/20/2021420667068Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
12/11/2023420667068Open ↗
07/14/2021420667068Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/20/2026420667068Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
06/16/2023420667068Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/24/2023420667068Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/22/2023420667068Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/22/2023420667068Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/22/2023420667068Open ↗
▸BISMASONRY1
07/18/2023420667068Open ↗
▸BISPOST-INSTALLED ANCHORS1
07/18/2023420667068Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/22/2023420667068Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
07/24/2023420667068Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
05/22/2023420667068Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/24/2023420667068Open ↗
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE10
02/13/2026420667068Open ↗
11/18/2025420667068Open ↗
03/08/2024420667068Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER8
10/11/2023420667068Open ↗
06/24/2022420667068Open ↗
06/24/2022420667068Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
06/16/2023420667068Open ↗
11/16/2021420667068Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/19/2024440712766Open ↗
▸BISFAA APPROVAL - HIGH RISE BUILDING_- PRIOR TO NB APPROVAL.1
07/26/2021420667068Open ↗
▸BISFUEL STORAGE (FS) SIGNOFF1
11/17/2025420667068Open ↗
▸BISFINAL1
09/18/2024440712766Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE6
04/09/2025420667068Open ↗
04/08/2025420667068Open ↗
05/25/2022420667068Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT4
10/26/2023440810348Open ↗
09/07/2023440803212Open ↗
05/08/2023440781977Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION17
04/05/2024420667068Open ↗
10/23/2023420667068Open ↗
04/10/2023420667068Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM8
04/09/2025420667068Open ↗
04/08/2025420667068Open ↗
10/11/2023420667068Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/26/2023440810348Open ↗
09/07/2023440803212Open ↗
05/08/2023440781977Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/14/2021420667068Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/24/2023420667068Open ↗
▸BISVESTIBULES1
07/18/2023420667068Open ↗
▸BISDEFERRAL REQUEST AI-1 - REQUIRED ITEM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructural Peer Review Report1
08/29/2026Q00345794-I1Open ↗