| Owner | Filings | Most Recent |
|---|---|---|
| CBRE | 27 | 07/08/2026 |
| STARR INDUSTRIES | 14 | 07/08/2026 |
| FOSUN | 13 | 07/08/2026 |
| EQUINITI | 20 | 07/08/2026 |
| YORK SCAFFOLD EQUIPMENT CORP. | 7 | 03/22/2026 |
| SUMMIT GLORY PROPERTY LLC | 4 | 03/22/2026 |
| CHASE MANHATTAN BANK NA | 203 | 03/22/2026 |
| HAKS ENGINEERS ARCHITECTS | 1 | 03/22/2026 |
| ELI AQUISITION LLC | 5 | 03/22/2026 |
| ELI ACQUISTION LLC | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/17/2013 | $725.0M | — | — → — | $326/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 79 | 08/25/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 46 | 08/25/2026 |
| URBAN INTEGRATIONS | 1 | 08/25/2026 |
| GENSLER | 11 | 06/25/2026 |
| KEVIN GALLEN PE LLC | 4 | 06/05/2026 |
| MG ENGINEERING D.P.C. | 2 | 05/19/2026 |
| SHMERYKOWSKY CONSULTING ENGINEERS | 2 | 05/07/2026 |
| ENV ARCHITECTS, DPC | 1 | 04/09/2026 |
| NEWTEC ENGINEERING | 1 | 02/27/2026 |
| EAB ARCHITECTURAL DESIGNS, PLLC | 4 | 12/31/2025 |
| BACKFORTY ARCHITECTURE, LLC | 2 | 12/09/2025 |
| WSP | 10 | 11/19/2025 |
| ACTIVE DESIGN GROUP ENGINEERING | 4 | 11/19/2025 |
| ENVIRONETICS GROUP ARCHITECTS | 4 | 10/09/2025 |
| CFS ENGINEERING, DPC | 8 | 10/08/2025 |
| COUGHLIN ARCHITECTURE PLLC | 1 | 10/02/2025 |
| MPS ENGINEERING PLLC | 1 | 09/24/2025 |
| JACK GREEN ASSOCIATES | 27 | 08/07/2025 |
| HNY CONSULTING ENGINEERS LLC | 1 | 07/29/2025 |
| EJC ENGINEERING, PLLC | 4 | 07/24/2025 |
| TED MOUDIS ASSOCIATES | 6 | 04/03/2025 |
| COSENTINI ASSOCIATES | 58 | 03/19/2025 |
| BAM ARCHITECTURE STUDIO, DPC | 1 | 03/19/2025 |
| HGT STUDIO ENGINEERING, PLLC | 1 | 03/19/2025 |
| LU NING ARCHITECTURE, PLLC | 1 | 01/16/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 320 | 03/21/2026 |
| JMV ASSOCIATES | 8 | 03/21/2026 |
| LU NING ARCHITECTURE, PLLC | 8 | 03/21/2026 |
| SKYLINE ACCESS | 1 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 2 | 03/21/2026 |
| CAESAR BUSTAMANTE AIA | 8 | 03/21/2026 |
| M HASHAS | 4 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 3 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| CAESAR BUSTAMANTE, AIA | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JOHN GALLIN & SON, INC | General Contractor | 93 | 08/30/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 27 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 25 | 07/10/2026 |
| ELYSIUM CONSTRUCTION INC | General Contractor | 12 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 10 | 07/08/2026 |
| S.B.A. PLUMBING CORP | Plumbing | 9 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 9 | 07/08/2026 |
| STARR INDUSTRIES LLC | General Contractor | 8 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 8 | 07/08/2026 |
| LUCIANO, ANTHONY | Electrical | 6 | 03/21/2026 |
| PAR PLUMBING CO., INC | Plumbing | 6 | 07/15/2026 |
| ANTHONY LUCIANO | Electrical | 6 | 03/21/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 6 | 07/16/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 5 | 07/08/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 5 | 07/08/2026 |
| VERUS INC | General Contractor | 5 | 07/08/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 5 | 07/08/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 4 | 07/08/2026 |
| YORK SCAFFOLD EQUIPMENT CORP. | General Contractor | 4 | 03/21/2026 |
| ACCURATE MECH INDSTRS INC | Plumbing | 3 | 07/08/2026 |
| JEFFREY VULPIS PLMBNG LLC | Plumbing | 3 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 3 | 07/08/2026 |
| AMI AND ASSOCIATES INC | Fire Protection | 3 | 08/20/2026 |
| BROADTRADE SERVICE GROUP | General Contractor | 3 | 03/21/2026 |
| VULPIS & VULPIS PLBG INC | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 59 | 08/25/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 26 | 06/25/2026 |
| MG ENGINEERING D.P.C. | 8546 | 1 | 05/19/2026 |
| AK ENGINEERING PC | 678 | 29 | 05/15/2026 |
| OBAID MIAN | 849 | 1 | 02/27/2026 |
| DNA CONTROLLED INSPECTION | 554 | 91 | 01/14/2026 |
| ARCHITECTURAL ENGINEERING | 6111 | 2 | 12/31/2025 |
| PRUDIGM ENGINEERING LLCU | 4304 | 16 | 10/24/2025 |
| M/P/S ENGINEERING PLLC | 1588 | 1 | 09/24/2025 |
| EJC ENGINEERING, PLLC | 4502 | 3 | 07/24/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | RRP PLUMBING CORP | 09/10/2026 |
| DOB NOW | Plumbing | Permit Issued | RRP PLUMBING CORP | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 08/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JOHN GALLIN & SON, INC | 08/27/2026 |
| DOB NOW | General Construction | Permit Issued | JOHN GALLIN & SON, INC | 08/27/2026 |
| DOB NOW | General Construction | Permit Issued | JOHN GALLIN & SON, INC | 08/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JOHN GALLIN & SON, INC | 08/26/2026 |
| DOB NOW | Standpipe | Signed-off | AMI AND ASSOCIATES INC | 08/18/2026 |
| DOB NOW | Structural | Permit Issued | JOHN GALLIN & SON, INC | 07/15/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR FIRE PROTECTION LLC | 07/15/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 07/14/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 07/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 07/09/2026 |
| DOB NOW | Standpipe | Permit Issued | PLUMBING WORKS CORP | 06/22/2026 |
| DOB NOW | Sprinklers | Signed-off | PAR FIRE PROTECTION LLC | 06/01/2026 |
| DOB NOW | Mechanical Systems | Signed-off | PENGUIN AIR CONDITIONING | 05/28/2026 |
| DOB NOW | Structural | Signed-off | JOHN GALLIN & SON, INC | 05/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | PRECISION SPKLR SVCS LLC | 05/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | PLUMBING WORKS CORP | 05/04/2026 |
| DOB NOW | Plumbing | Permit Issued | BLUEWATER PLBG& HTG INC | 05/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JOHN GALLIN & SON, INC | 04/24/2026 |
| DOB NOW | General Construction | Permit Issued | JOHN GALLIN & SON, INC | 04/24/2026 |
| DOB NOW | Plumbing | Permit Issued | AQUEDUCT MECHANICAL CORP | 04/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MORELAND CONSTRUCTION GR* | 04/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | PRECISION SPKLR SVCS LLC | 04/15/2026 |
| DOB NOW | General Construction | Permit Issued | JOHN GALLIN & SON, INC | 04/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JOHN GALLIN & SON, INC | 04/14/2026 |
| DOB NOW | General Construction | Permit Issued | MORELAND CONSTRUCTION GR* | 04/13/2026 |
| DOB NOW | General Construction | Signed-off | CONCEPT CONSTRUCTION SERV | 03/26/2026 |
| DOB NOW | Sprinklers | Signed-off | AMI AND ASSOCIATES INC | 03/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | ALLSTATE SPRINKLER LLC | 03/23/2026 |
| DOB NOW | Plumbing | Signed-off | ACCURATE MECH INDSTRS INC | 03/23/2026 |
| DOB NOW | Standpipe | Permit Issued | ALLSTATE SPRINKLER LLC | 03/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JOHN GALLIN SON | 03/10/2026 |
| DOB NOW | General Construction | Permit Issued | JOHN GALLIN SON | 03/10/2026 |
| DOB NOW | Plumbing | Signed-off | JVR PLBG AND HEATING INC | 03/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JDP MECHANICAL INC | 02/27/2026 |
| DOB NOW | General Construction | Signed-off | PLESCIA CONSTR & DEV LLC | 02/13/2026 |
| DOB NOW | Standpipe | Permit Issued | MORA FIRE PROTECTION LLC | 01/27/2026 |
| DOB NOW | General Construction | Signed-off | GALCON ENTERPRISES INC | 01/15/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/10/2026 | Permit Issued | JOHN GALLIN & SON, INC | Heating and Air Conditioning Systems | Heat / Cool Water Furnace VS018 17,600 BTU · Wshp ×7 |
| 06/24/2026 | Permit Issued | JT MAGEN & COMPANY INC | Air Conditioning Systems | Cooling Bosch CL036 1,150 CFM · Wshp ×1 |
| 06/24/2026 | Permit Issued | VANGUARD CONSTRUCTION AND | Air Conditioning Systems | Cooling |
| 06/23/2026 | Signed-off | JOHN GALLIN & SON, INC | Air Conditioning Systems | Cooling |
| 06/05/2026 | Permit Issued | GALCON ENTERPRISES INC | Heating and Air Conditioning Systems | Heat / Cool Climatemaster SB-096 8 tons · Wshp ×2 |
| 05/19/2026 | Signed-off | PENGUIN AIR CONDITIONING | Air Conditioning Systems, Heating Systems | Cooling Water Furnace V7AH048 47,530 BTU · Wshp ×1 Heating Water Furnace V7AH048 62,130 BTU · Wshp ×1 |
| 12/31/2025 | Signed-off | DEZIER AIR LLC | Air Conditioning Systems, Ventilation Systems | |
| 10/24/2025 | Signed-off | PLESCIA CONSTR & DEV LLC | Heating Systems, Ventilation Systems | Heating Florida Heat Pump CL042 32,200 BTU · Pump ×2 Ventilation Greenheck CSP-A700 600 BTU · Exhaust Fan ×4 |
| 11/24/2021 | — | — | Air Conditioning Systems | Cooling Compu-Aire CMW-1.5 2 tons ×1 |
| 03/04/2020 | — | — | Air Conditioning Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | RRP PLUMBING CORP | — |
| 08/24/2026 | — | — | 24 heads |
| 07/10/2026 | Permit Issued | BLUEWATER P&H, INC | 541 heads |
| 06/24/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 38 heads |
| 06/05/2026 | Signed-off | AMI AND ASSOCIATES INC | 101 heads |
| 04/08/2026 | Permit Issued | PRECISION SPKLR SVCS LLC | 137 heads |
| 02/20/2026 | Permit Issued | ALLSTATE SPRINKLER LLC | 158 heads |
| 10/24/2025 | Permit Issued | PARAMOUNT SERVICES, LLC | Sprinkler System |
| 10/08/2025 | Signed-off | PAR FIRE PROTECTION LLC | 58 heads |
| 10/02/2025 | Permit Issued | PSI PARTNERS, LLC | 1 outlets |
| 10/02/2025 | Signed-off | PSI PARTNERS, LLC | 109 heads |
| 09/09/2025 | Permit Issued | REAL PLUMBING CORP | 155 heads |
| 03/19/2025 | Signed-off | PAR FIRE PROTECTION LLC | — |
| 11/24/2021 | — | — | — |
| 03/04/2020 | Permit Issued | ASHLAR MECHANICAL CORP | 129 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | RRP PLUMBING CORP | Water/Sanitary |
| 08/24/2026 | — | — | Water/Sanitary |
| 07/10/2026 | Permit Issued | BLUEWATER PLBG& HTG INC | Water/Sanitary |
| 06/24/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 06/05/2026 | — | — | — |
| 04/08/2026 | Permit Issued | PEGASUS P&H CORP | Water/Sanitary |
| 02/20/2026 | Signed-off | ACCURATE MECH INDSTRS INC | Water/Sanitary |
| 10/24/2025 | Permit Issued | AMERIFLO PLUMBING AND HEA | Water/Sanitary |
| 10/08/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 10/02/2025 | Signed-off | ACCURATE MECH INDSTRS INC | Water/Sanitary |
| 10/02/2025 | — | — | — |
| 10/02/2025 | — | — | — |
| 09/09/2025 | — | — | — |
| 01/28/2025 | Signed-off | PLUMB-IT MECHANICAL INC | Water/Sanitary |
| 11/24/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/20/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 04/28/2026 | Permit Issued | ALLSTATE ELECTRIC CORP | General Wiring |
| 04/10/2026 | Permit Issued | ALLSTATE ELEC'L CONT INC | General Wiring |
| 02/12/2026 | Permit Issued | JAY UNITED ELECL CONTNG C | General Wiring |
| 12/16/2025 | Complete | ELECTRICIAN NYC LLC | General Wiring |
| 10/16/2025 | Complete | BRIGHT ELECTRIC CORP | General Wiring |
| 10/14/2025 | Complete | UNITY ELECTRIC CO. INC | General Wiring |
| 09/26/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 08/26/2025 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 08/12/2025 | Permit Issued | FREEDOM ELECTRIC & DATA | General Wiring |
| 06/04/2025 | Permit Issued | JRD ELECTRIC CORP. | General Wiring |
| 04/17/2025 | Complete | STANCO SYSTEM ELEC'L CONT | General Wiring |
| 04/15/2025 | Permit Issued | REDGRAVE ELECTL MAINTNCE | General Wiring |
| 04/08/2025 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 03/14/2025 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2026 | Signed-off | JOHN GALLIN & SON, INC | Steel |
| 01/15/2025 | Signed-off | JT MAGEN & COMPANY INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/03/2025 | Permit Issued | SKYLINE ACCESS LLC | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/20/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/23/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/26/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/23/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/04/2026 | Final | DANNY TRUJILLO | progress |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 08/05/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/05/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 08/05/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 08/05/2026 | Lighting controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/05/2026 | Interior lighting power | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/05/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 08/05/2026 | Duct leakage testing, insulation and design | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/04/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 08/04/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/17/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/17/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 07/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/17/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/09/2026 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 07/09/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/09/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/09/2026 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 06/26/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Stripe | Office | Floors 30, 45–48 | Project M01409072 Project M01409077 Project M01409082 Project M01252112 Project M01155308 Project M01155307 Project M01157859 Project M01155303 Project M01133576 Project M01133602 Project M01134380 Project M01133537 |
| Collibra | Office | Floor 40 | Project M01390740 Project M01326429 Project M01326450 Project M01331820 |
| Socceroof | Fitness / Recreation | Sub-cellar | Project M01326681 Project M01204490 Project M01087282 |
| Court 16 | Fitness / Recreation | Sub-cellar | Project M01276462 Project M01276471 |
| Urban Soccerroof | Fitness / Recreation | — | Project M01283102 |
| Wolters Kluwer | Office | Floor 44 | Project M01190220 |
| Starbucks | Restaurant / Food Service | Cellar | Project M01145352 |
| Grandfield & Dodd | Office | Floor 59 | Project M01101586 Project M01101603 Project M01101624 |
| JPMorganChase | Office | — | Project M00993853 |
| SCOR | Office | Floors 53, 54 | Project M00298935 |
| Alamo Drafthouse Cinema | Restaurant / Food Service | — | Project M00159514 |
| Frankfurt Kurnit Klein + Selz | Office | Floor 35 | Project M00149049 |
| Market Place | Retail | Floor 1 | Project M00048431 |