| Owner | Filings | Most Recent |
|---|---|---|
| 345 PAS HOLDINGS | 543 | 09/15/2026 |
| ROCK GROUP NY | 59 | 07/08/2026 |
| 345 PAS OWNER LLC C O RFR REALTY | 20 | 07/08/2026 |
| 345 PAS OWNER | 75 | 03/22/2026 |
| NEWGRANGE CONSTRUCTION CO | 12 | 03/22/2026 |
| 345 PAS OWNER LLC RFR REA | 2 | 03/22/2026 |
| BORDONE CONTRACTING | 5 | 03/22/2026 |
| CORDONE CONTRACTING LLC | 1 | 03/22/2026 |
| NEW SRANGE CONSTRUCTION C | 1 | 03/22/2026 |
| BENJAMIN GROUP ENTER IN | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/05/2019 | $344.5M | — | — → — | $1,411/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| JAROS BAUM & BOLLES | 116 | 09/01/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 13 | 07/15/2026 |
| ASDA ARCHITECTURE + DESIGN | 2 | 02/06/2026 |
| PATUXENT ENGINEERING LLC | 1 | 10/13/2025 |
| TPG ARCHITECTURE, LLP | 2 | 09/18/2025 |
| GENSLER | 35 | 03/28/2025 |
| THORNTON TOMASETTI | 2 | 11/14/2024 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 03/22/2024 |
| STONEFIELD ENGINEERING & DESIGN | 2 | 06/22/2022 |
| MOHAMMAD AHEAD, PE | 18 | 02/04/2022 |
| BECKER ENGINEERING, P.C. | 4 | 01/25/2022 |
| LANGAN ENGINEERING | 1 | 10/11/2021 |
| TOHFAZ UDDIN PE PC | 10 | 07/30/2021 |
| HC ARCHITECT, PC | 2 | 05/25/2021 |
| WAVIC ENGINEERING PLLC | 2 | 08/14/2020 |
| LEON SKVIRSKY PE | 3 | 03/22/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 316 | 03/21/2026 |
| DIRECT ACCESS EXPEDITING, INC. | 16 | 03/21/2026 |
| GREEN STUDIO | 28 | 03/21/2026 |
| Rigid Structural Design, LLC | 20 | 03/21/2026 |
| BUILDING BROTHERS | 6 | 03/21/2026 |
| LEWSAN CONSULTING | 8 | 03/21/2026 |
| PROJECT EXPEDITERS | 4 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 2 | 03/21/2026 |
| JP EXPEDITE | 4 | 03/21/2026 |
| PATUXENT ENGINEERING | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L&K PARTNERS, INC | General Contractor | 45 | 07/08/2026 |
| NEWGRANGE CONSTRUCTION CO | General Contractor | 29 | 09/10/2026 |
| NOVA CONSTRUCTION SERVICE | General Contractor | 18 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 14 | 07/08/2026 |
| KING HOIST & SCAFFOLDING | General Contractor | 13 | 07/08/2026 |
| ROCK GROUP NY CORP | General Contractor | 13 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 9 | 07/08/2026 |
| NORTHEAST PLBG & HTG CORP | Plumbing | 7 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 6 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 5 | 07/08/2026 |
| URBAN INTELLIGENCE, INC | General Contractor | 5 | 08/13/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 07/08/2026 |
| VARIANT SERVICES INC | General Contractor | 3 | 03/21/2026 |
| GOING SIGN SVCNG | Scaffold | 3 | 07/08/2026 |
| PHILIP GOEHRING | Electrical | 3 | 03/21/2026 |
| SIGNS CAD | Scaffold | 2 | 07/08/2026 |
| AVALON ELECTRIC CORP. | Electrical | 2 | 03/22/2026 |
| EXTERIOR WALL & BUILDING | General Contractor | 2 | 07/08/2026 |
| UNITY CONSTRUCTION GROUP | General Contractor | 2 | 07/08/2026 |
| SYSTEMS 2000 PLBG SVCS LL | Plumbing | 2 | 07/08/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 2 | 07/08/2026 |
| A.S.K. ELECTRICAL CORP | Electrical | 2 | 03/22/2026 |
| PENGUIN MAINTENANCE & SER | General Contractor | 1 | 07/08/2026 |
| RX ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| ROBERT COLOMBO | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JAROS, BAUM & BOLLES | 1092 | 1 | 09/01/2026 |
| URBAN INTEGRATIONS LLC | 7993 | 3 | 07/08/2026 |
| MEP INSPECTIONS, INC | 1102 | 95 | 11/04/2025 |
| METRIC CONSULTING AND INS | 1803 | 7 | 11/14/2024 |
| CFS ENGINEERING, PC | 615 | 119 | 10/22/2024 |
| ALAN MARGOLIN & ASSOC | 423 | 1 | 08/12/2024 |
| BECKER ENGINEERING, PC | 633 | 4 | 01/25/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | NEWGRANGE CONSTRUCTION CO | 09/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NEWGRANGE CONSTRUCTION CO | 09/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | URBAN INTELLIGENCE, INC | 08/12/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | URBAN INTELLIGENCE, INC | 05/20/2026 |
| DOB NOW | General Construction | Permit Issued | NEWGRANGE CONSTRUCTION CO | 04/20/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 04/14/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | NOVA RESTORATION LLC | 02/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EXTERIOR WALL & BUILDING | 12/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 12/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 12/22/2025 |
| DOB NOW | General Construction | Permit Issued | NOVA CONSTRUCTION SERVICE | 12/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 12/22/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | NOVA CONSTRUCTION SERVICE | 11/18/2025 |
| DOB NOW | Sprinklers | Signed-off | AMI AND ASSOCIATES INC | 08/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | UNITY CONSTRUCTION GROUP | 08/18/2025 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTRUCTION GROUP | 08/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 04/28/2025 |
| DOB NOW | General Construction | Signed-off | NEWGRANGE CONSTRUCTION CO | 04/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | NEWGRANGE CONSTRUCTION CO | 03/25/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | NOVA RESTORATION LLC | 02/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 02/03/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 01/24/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 01/23/2025 |
| DOB NOW | General Construction | Permit Issued | NOVA CONSTRUCTION SERVICE | 01/21/2025 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 01/08/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | EXTERIOR WALL & BUILDING | 12/27/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | NOVA CONSTRUCTION SERVICE | 11/27/2024 |
| DOB NOW | Curb Cut | Permit Issued | NEWGRANGE CONSTRUCTION CO | 09/12/2024 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 08/13/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | NEWGRANGE CONSTRUCTION CO | 05/28/2024 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 04/19/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | PENGUIN MAINTENANCE & SER | 04/16/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | URBAN INTELLIGENCE, INC | 03/25/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | NEWGRANGE CONSTRUCTION CO | 03/15/2024 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 02/27/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 01/10/2024 |
| DOB NOW | General Construction | Permit Issued | NEWGRANGE CONSTRUCTION CO | 10/18/2023 |
| DOB NOW | Plumbing | Signed-off | PACE PLUMBING CORP | 06/29/2023 |
| DOB NOW | Mechanical Systems | Signed-off | NEWGRANGE CONSTRUCTION CO | 04/17/2023 |
| DOB NOW | General Construction | Signed-off | NEWGRANGE CONSTRUCTION CO | 04/11/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/01/2026 | Permit Issued | NEWGRANGE CONSTRUCTION CO | Air Conditioning Systems, Ventilation Systems | |
| 10/22/2024 | — | — | Air Conditioning Systems | Cooling Liebert DME044C 15 BTU · Crac Unit ×1 |
| 08/12/2024 | Signed-off | NEWGRANGE CONSTRUCTION CO | Air Conditioning Systems | |
| 07/02/2024 | — | — | Associated Ducts and Piping | Ducts & Piping __Junk__ 0 |
| 02/15/2024 | Permit Issued | NEWGRANGE CONSTRUCTION CO | Air Conditioning Systems, Associated Ducts and Piping | |
| 12/20/2023 | — | — | Associated Ducts and Piping | Ducts & Piping |
| 12/14/2023 | Permit Issued | NEWGRANGE CONSTRUCTION CO | Air Conditioning Systems, Associated Ducts and Piping |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | — | — | 104 heads |
| 08/15/2025 | Signed-off | AMI AND ASSOCIATES INC | Sprinkler System |
| 12/20/2023 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 02/11/2023 | — | — | 184 heads, 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | — | — | Water/Sanitary |
| 08/15/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2025 | Permit Issued | AVALON ELECTRIC CORP. | — |
| 05/07/2025 | Complete | AVALON ELECTRIC CORP. | General Wiring |
| 07/18/2024 | Permit Issued | RX ELECTRIC INC | General Wiring |
| 03/26/2024 | Permit Issued | 5 J'S ELECTL CONTS CORP | — |
| 06/28/2023 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 01/31/2023 | Permit Issued | A.S.K. ELECTRICAL CORP | General Wiring |
| 11/28/2022 | Complete | RX ELECTRIC INC | — |
| 11/28/2022 | Permit Issued | RX ELECTRIC INC | General Wiring |
| 03/08/2022 | Complete | RX ELECTRIC INC | General Wiring |
| 10/18/2021 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 10/11/2021 | Permit Issued | RX ELECTRIC INC | General Wiring |
| 10/11/2021 | Permit Issued | RX ELECTRIC INC | — |
| 10/01/2021 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 09/24/2021 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 08/24/2021 | Complete | T. DIRUSSO ELEC'L CONT IN | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | Permit Issued | NOVA CONSTRUCTION SERVICE | Scaffold |
| 10/13/2025 | Permit Issued | URBAN INTELLIGENCE, INC | Sidewalk Shed |
| 03/16/2021 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| 12/04/2020 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| 02/19/2020 | Permit Issued | KING HOIST & SCAFFOLDING | Sidewalk Shed |
| 05/16/2019 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Permit Issued | NOVA RESTORATION LLC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/22/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/05/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/09/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/04/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/29/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/11/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 03/07/2024 | No Access-Final Boiler Equipment Inspection | No Access | View ↗ |
| 10/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/28/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/25/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/13/2023 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 09/13/2023 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 09/13/2023 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 09/12/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/11/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/07/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/07/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/07/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/09/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/01/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/30/2026 | Post-installed Anchors | RYAN LEAN | special |
| 07/30/2026 | HVAC-R and service water piping design and insulation | RYAN LEAN | energy_progress |
| 07/30/2026 | Energy Code Compliance Inspections | RYAN LEAN | progress |
| 07/30/2026 | HVAC-R and service water heating system controls | RYAN LEAN | energy_progress |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | RYAN LEAN | special |
| 07/30/2026 | HVAC-R and service water heating equipment | RYAN LEAN | energy_progress |
| 07/08/2026 | Structural Stability – Alterations of existing buildings | DANNY TRUJILLO | special |
| 07/08/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Amal Hassan Hassan | special |
| 07/08/2026 | Post-installed Anchors | DANNY TRUJILLO | special |
| 01/27/2026 | Final | Nicolas Crosetto | progress |
| 11/04/2025 | Fire-Resistance Rated Construction | Nicolas Crosetto | progress |
| 11/04/2025 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 10/23/2025 | Structural Stability – Alterations of existing buildings | DANNY TRUJILLO | special |
| 10/23/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Amal Hassan Hassan | special |
| 10/23/2025 | Post-installed Anchors | DANNY TRUJILLO | special |
| 10/22/2025 | Final | Nicolas Crosetto | progress |
| 07/18/2025 | Post-installed Anchors | Nicolas Crosetto | special |
| 07/10/2025 | Final | Thomas Hughes | progress |
| 07/10/2025 | Sprinkler Systems | Nicolas Crosetto | special |
| 07/22/2024 | Electrical motors and elevators | Young Suh | energy_progress |
| 07/17/2024 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 07/17/2024 | Exhaust and Vent Systems in Plenums and Ducts | Young Suh | special |
| 07/17/2024 | Post-installed Anchors | Young Suh | special |
| 07/17/2024 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 07/17/2024 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Deerfield | Office | Floors 11, 12 | Project M01351933 Project M01253879 Project M00938828 Project M00907102 |
| Apertura | Office | Floor 6 | Project M00834571 Project M00834572 Project M00733800 Project M00733782 |
| Helaina | Office | Floor 5 | Project M00574055 |
| Addison PHS | Unknown | — | Project M00580148 |
| Coridea | Office | Floor 3 | Project M00558491 Project M00554507 |