| Owner | Filings | Most Recent |
|---|---|---|
| 345 Pas Holding | 546 | 10/13/2026 |
| 345 Park Avenue South Partners | 268 | 03/21/2026 |
| 345 Pas Owner | 93 | 07/08/2026 |
| 345 Pas Holding LLC C Odeerfield | 27 | 03/21/2026 |
| RFR Realty | 20 | 03/22/2026 |
| Montrose Realty Corp As Agents | 3 | 03/21/2026 |
| Upland Development | 2 | 03/21/2026 |
| Staples | 1 | 03/21/2026 |
| Manzanilla | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/05/2019 | $344.5M | — | — → — | $1,411/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Rigid Structural Design | 14 | 09/14/2026 |
| Jaros Baum & Bolles | 118 | 09/04/2026 |
| Asda Architecture + Design | 3 | 08/28/2026 |
| Patuxent Engineering | 1 | 10/13/2025 |
| TPG Architecture | 2 | 09/18/2025 |
| Gensler | 35 | 03/28/2025 |
| Thornton Tomasetti | 2 | 11/14/2024 |
| FL&M Engineering Design & Inspection | 1 | 03/22/2024 |
| Stonefield Engineering & Design | 2 | 06/22/2022 |
| Mohammad Ahead, PE | 18 | 02/04/2022 |
| Becker Engineering | 4 | 01/25/2022 |
| Langan Engineering | 1 | 10/11/2021 |
| Tohfaz Uddin PE | 10 | 07/30/2021 |
| HC Engineering | 2 | 05/25/2021 |
| Wavic Engineering | 2 | 08/14/2020 |
| Leon Skvirsky PE | 3 | 03/22/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Metropolis Group | 316 | 03/21/2026 |
| Direct Access Expediting | 16 | 03/21/2026 |
| Green Studio | 28 | 03/21/2026 |
| Rigid Structural Design | 20 | 03/21/2026 |
| Building Brothers | 6 | 03/21/2026 |
| Lewsan Consulting | 8 | 03/21/2026 |
| Project Expediters | 4 | 03/21/2026 |
| Outsource Consultants | 2 | 03/21/2026 |
| JP Expedite | 4 | 03/21/2026 |
| Patuxent Engineering | 4 | 03/21/2026 |
| Riggining Consultants | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L&K Partners | General Contractor | 43 | 07/08/2026 |
| Newgrange Construction Co | General Contractor | 29 | 09/10/2026 |
| Full Capacity Fire | Fire Protection | 14 | 07/08/2026 |
| Nova Construction Service | Scaffold | 14 | 07/08/2026 |
| King Hoist & Scaffolding | Scaffold | 13 | 07/08/2026 |
| Rock Group NY | Scaffold | 13 | 07/08/2026 |
| Accurate Mechanical | Fire Protection | 9 | 07/08/2026 |
| Northeast Plumbing & Heating | Plumbing | 7 | 07/08/2026 |
| Pace Plumbing | Plumbing | 6 | 07/08/2026 |
| Platinum Services NY | Scaffold | 5 | 07/08/2026 |
| Urban Intelligence | Scaffold | 5 | 08/13/2026 |
| Nova Construction Service | General Contractor | 4 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 3 | 07/08/2026 |
| Elemco Testing Co Inc Dba | Electrical | 3 | 03/21/2026 |
| Going Sign & Servicing Co | Sign hanger | 3 | 07/08/2026 |
| Variant Services | General Contractor | 3 | 03/21/2026 |
| William C. Gerakaris P&H | Plumbing | 2 | 07/08/2026 |
| Avalon Electric | Electrical | 2 | 03/22/2026 |
| Unity Construction Group | General Contractor | 2 | 07/08/2026 |
| Exterior Wall & Building | Scaffold | 2 | 07/08/2026 |
| L&K Partners | Scaffold | 2 | 03/21/2026 |
| Signs Cad | Sign hanger | 2 | 07/08/2026 |
| Systems 2000 Plumbing Services | Plumbing | 2 | 07/08/2026 |
| A.S.K. Electrical | Electrical | 2 | 03/22/2026 |
| RX Electric | Electrical | 1 | 03/22/2026 |
| S & D Electrical/Mechanical | Electrical | 1 | 03/21/2026 |
| Allstate Electric | Electrical | 1 | 03/21/2026 |
| Ami and Associates | Fire Protection | 1 | 07/08/2026 |
| P.L. Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Metro Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/21/2026 |
| Lintech Electric | Electrical | 1 | 03/22/2026 |
| Penguin Maintenance & Services | General Contractor | 1 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 1 | 03/21/2026 |
| T. Dirusso Electrical Cont | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Jaros, Baum & Bolles | 1092 | 3 | 09/04/2026 |
| Asda Architecture + Desig | 2015 | 1 | 08/28/2026 |
| MEP Inspections | 1102 | 96 | 08/28/2026 |
| Urban Integrations | 7993 | 3 | 07/08/2026 |
| Metric Consulting and Ins | 1803 | 7 | 11/14/2024 |
| CFS Engineering | 615 | 119 | 10/22/2024 |
| Alan Margolin & Associates | 423 | 1 | 08/12/2024 |
| Becker Engineering | 633 | 4 | 01/25/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Newgrange Construction Co | 09/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Newgrange Construction Co | 09/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Urban Intelligence | 08/12/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Urban Intelligence | 05/20/2026 |
| DOB NOW | General Construction | Permit Issued | Newgrange Construction Co | 04/20/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Nova Construction Service | 04/14/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Nova Restoration | 02/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Exterior Wall & Building | 12/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Nova Construction Service | 12/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Nova Construction Service | 12/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Nova Construction Service | 12/22/2025 |
| DOB NOW | General Construction | Permit Issued | Nova Construction Service | 12/22/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Nova Construction Service | 11/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Group | 08/18/2025 |
| DOB NOW | Sprinklers | Signed-off | Ami and Associates | 08/18/2025 |
| DOB NOW | General Construction | Permit Issued | Unity Construction Group | 08/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Nova Construction Service | 04/28/2025 |
| DOB NOW | General Construction | Signed-off | Newgrange Construction Co | 04/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Newgrange Construction Co | 03/25/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Nova Restoration | 02/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Nova Construction Service | 02/03/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Nova Construction Service | 01/24/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Nova Construction Service | 01/23/2025 |
| DOB NOW | General Construction | Permit Issued | Nova Construction Service | 01/21/2025 |
| DOB NOW | General Construction | Permit Issued | L&K Partners | 01/08/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Exterior Wall & Building | 12/27/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | Nova Construction Service | 11/27/2024 |
| DOB NOW | Curb Cut | Permit Issued | Newgrange Construction Co | 09/12/2024 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 08/13/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Newgrange Construction Co | 05/28/2024 |
| DOB NOW | General Construction | Signed-off | L&K Partners | 04/19/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Penguin Maintenance & Services | 04/16/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | Urban Intelligence | 03/25/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Newgrange Construction Co | 03/15/2024 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 02/27/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Structural Preservation System | 01/10/2024 |
| DOB NOW | General Construction | Permit Issued | Newgrange Construction Co | 10/18/2023 |
| DOB NOW | Plumbing | Signed-off | Pace Plumbing | 06/29/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Newgrange Construction Co | 04/17/2023 |
| DOB NOW | General Construction | Signed-off | Newgrange Construction Co | 04/11/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/04/2026 | Permit Issued | Newgrange Construction Co | Air Conditioning Systems, Ventilation Systems | |
| 10/22/2024 | — | — | Air Conditioning Systems | Cooling Liebert DME044C 15 BTU · Crac Unit ×1 |
| 08/12/2024 | Signed-off | Newgrange Construction Co | Air Conditioning Systems | |
| 07/02/2024 | — | — | Associated Ducts and Piping | Ducts & Piping __Junk__ 0 |
| 02/15/2024 | Permit Issued | Newgrange Construction Co | Air Conditioning Systems, Associated Ducts and Piping | |
| 12/20/2023 | — | — | Associated Ducts and Piping | Ducts & Piping |
| 12/14/2023 | Permit Issued | Newgrange Construction Co | Air Conditioning Systems, Associated Ducts and Piping |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/04/2026 | — | — | 104 heads |
| 08/15/2025 | Signed-off | Ami and Associates | Sprinkler System |
| 12/20/2023 | Permit Issued | Full Capacity Fire | — |
| 02/11/2023 | — | — | 184 heads, 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/04/2026 | — | — | Water/Sanitary |
| 08/15/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2025 | Permit Issued | Avalon Electric | — |
| 05/07/2025 | Complete | Avalon Electric | General Wiring |
| 07/18/2024 | Permit Issued | RX Electric | General Wiring |
| 03/26/2024 | Permit Issued | 5 J'S Electl Conts | — |
| 06/28/2023 | Complete | A.S.K. Electrical | General Wiring |
| 01/31/2023 | Permit Issued | A.S.K. Electrical | General Wiring |
| 11/28/2022 | Permit Issued | RX Electric | General Wiring |
| 11/28/2022 | Complete | RX Electric | — |
| 03/08/2022 | Complete | RX Electric | General Wiring |
| 10/18/2021 | Permit Issued | Nee Electrical | — |
| 10/11/2021 | Permit Issued | RX Electric | General Wiring |
| 10/11/2021 | Permit Issued | RX Electric | — |
| 10/01/2021 | Complete | A.S.K. Electrical | General Wiring |
| 09/24/2021 | Complete | A.S.K. Electrical | General Wiring |
| 08/24/2021 | Complete | T. Dirusso Electrical Cont | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/14/2026 | Permit Issued | Nova Construction Service | Scaffold |
| 10/13/2025 | Permit Issued | Urban Intelligence | Sidewalk Shed |
| 03/16/2021 | Permit Issued | King Hoist & Scaffolding | Scaffold |
| 12/04/2020 | Permit Issued | King Hoist & Scaffolding | Scaffold |
| 02/19/2020 | Permit Issued | King Hoist & Scaffolding | Sidewalk Shed |
| 05/16/2019 | Permit Issued | King Hoist & Scaffolding | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Permit Issued | Nova Restoration | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/05/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/11/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 03/07/2024 | No Access-Final Boiler Equipment Inspection | No Access | View ↗ |
| 10/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/28/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/25/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/13/2023 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 09/13/2023 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 09/13/2023 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 09/12/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/11/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/07/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/07/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/07/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/09/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/01/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/28/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/27/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/28/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/24/2023 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 01/24/2023 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/19/2026 | Fire-Resistance Rated Construction | Alfonso DElia | progress |
| 08/19/2026 | Post-installed Anchors | Nicolas Crosetto | special |
| 08/03/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Amal Hassan Hassan | special |
| 08/03/2026 | Structural Stability – Alterations of existing buildings | DANNY TRUJILLO | special |
| 08/03/2026 | Post-installed Anchors | DANNY TRUJILLO | special |
| 07/30/2026 | Post-installed Anchors | RYAN LEAN | special |
| 07/30/2026 | HVAC-R and service water piping design and insulation | RYAN LEAN | energy_progress |
| 07/30/2026 | HVAC-R and service water heating equipment | RYAN LEAN | energy_progress |
| 07/30/2026 | Energy Code Compliance Inspections | RYAN LEAN | progress |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | Alfonso DElia | special |
| 07/30/2026 | Post-installed Anchors | RYAN LEAN | special |
| 07/30/2026 | HVAC-R and service water heating system controls | RYAN LEAN | energy_progress |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | RYAN LEAN | special |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | RYAN LEAN | special |
| 07/28/2026 | Maintenance information | RYAN LEAN | energy_progress |
| 07/28/2026 | Lighting controls | RYAN LEAN | energy_progress |
| 07/28/2026 | Interior lighting power | RYAN LEAN | energy_progress |
| 07/28/2026 | HVAC-R and service water piping design and insulation | RYAN LEAN | energy_progress |
| 07/28/2026 | Metering | RYAN LEAN | energy_progress |
| 07/28/2026 | HVAC-R and service water heating system controls | RYAN LEAN | energy_progress |
| 07/28/2026 | Duct leakage testing, insulation and design | RYAN LEAN | energy_progress |
| 07/28/2026 | Energy Code Compliance Inspections | RYAN LEAN | progress |
| 07/08/2026 | Post-installed Anchors | DANNY TRUJILLO | special |
| 07/08/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Amal Hassan Hassan | special |
| 07/08/2026 | Structural Stability – Alterations of existing buildings | DANNY TRUJILLO | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Deerfield | Office | Floors 1, 2, 5, 8–12, Penthouse, Roof | Project M01415584 Project M01351933 Project M01306701 Project M01253879 Project M00907104 Project M00938830 Project M00938833 Project M00938835 Project M00938828 Project M00907103 Project M00907102 Project M00623342 |
| Advancium - Frankel Labs | Laboratory | Floor 4 | Project M01083693 Project M01083691 Project M01083692 Project M00968265 Project M08023549 Project M08023550 Project M08023551 Project M08023552 |
| NYU Langone Health | Medical / Healthcare | Floors 8, 9 | Project M01081844 |
| Helaina | Office | Floor 5 | Project M01015749 Project M00574689 Project M00574055 Project M00574060 Project M00574705 |
| NYU Labs | Laboratory | Floors 7–9 | Project M00968266 Project M08006646 Project M08006645 Project M08006643 Project M08006644 |
| Apertura | Laboratory | Floor 6 | Project M00834571 Project M00834572 Project M00733800 Project M00733813 Project M00733782 Project M00733795 |
| Lexeo Millipore | Laboratory | Floor 6 | Project M00705320 Project M00705329 Project M00728874 Project M00705323 Project M00705326 |
| Addison PHS | Office | Floor 9 | Project M00580148 |
| Coridea | Office | Floors 2, 3, Roof | Project M00555315 Project M00558000 Project M00558003 Project M00558491 Project M00554507 |
| Bank of America | Bank / Financial branch | Floor 1 | Project M00450256 |