← Back
Railroad, private ownership
Two Penn Plaza/Madison Square Garden
392 7 AVENUE · BIN 1083026
💬 Discuss this project
0Year Built
—Stories
U6Building Class
C6-6Zoning
0 sfGross Floor Area
0Units
6 Open Violations ▸FISP: SWARMP
Railroad, private ownership · Owner of record: NATIONAL RAILROAD PASSENGER CORP · 113,695 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Roof5p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Penthouse1p · 1 filing · 13 docs
Floor 3118p · 3 filings · 20 docs
Floor 306p · 4 filings · 20 docs
Floor 299p · 5 filings · 20 docs
Floor 2811p · 5 filings · 20 docs
Floor 277p · 4 filings · 20 docs
Floor 2637p · 11 filings · 20 docs
Floor 25Under Construction30p · 4 filings · 20 docs
Floor 2417p · 9 filings · 20 docs
Floor 23Under Construction13p · 4 filings · 20 docs
Floor 22Under Construction89p · 5 filings · 20 docs
Floor 214p · 2 filings · 8 docs
Floor 208p · 4 filings · 15 docs
Floor 1957p · 3 filings · 20 docs
Floor 1813p · 4 filings · 20 docs
Floor 17Under Construction108p · 10 filings · 20 docs
Floor 16Under Construction71p · 4 filings · 20 docs
Floor 1517p · 4 filings · 20 docs
Floor 1417p · 6 filings · 20 docs
Floor 136p · 3 filings · 20 docs
Floor 12Under Construction85p · 4 filings · 20 docs
Floor 115p · 3 filings · 18 docs
Floor 104p · 2 filings · 15 docs
Floor 95p · 3 filings · 18 docs
Floor 85p · 3 filings · 18 docs
Floor 7Under Construction18p · 5 filings · 20 docs
Floor 6Under Construction27p · 7 filings · 20 docs
Floor 5Under Construction18p · 6 filings · 20 docs
Floor 4Under Construction18p · 5 filings · 20 docs
Floor 315p · 12 filings · 20 docs
Floor 212p · 10 filings · 20 docs
Floor 177p · 20 filings · 20 docs
Cellar1p · 1 filing · 3 docs
Basement5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VORNADO REALTY TRUST67309/30/2026
AMTRAK1507/08/2026
VORNADO2104/08/2026
JP MORGAN CHASE BANK NA803/22/2026
TURNER CONSTRUCTION2703/22/2026
JRM CONSTRUCTION MGMT303/22/2026
COMPA TURNER CONSTRUCTION203/22/2026
MSG HOLDINGS, L.P.303/22/2026
METROPOLITAN WALTERS LLC103/22/2026
VORNADO REAL ESTATE TRUST103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILLMAN CONSULTING32003/21/2026
ARCHETYPE CONSULTANTS7603/21/2026
HOWARD I SHAPIRO ASSOCIATES1003/21/2026
BUILDING BROTHERS3003/21/2026
PROJECT EXPEDITERS CONSULTING CO.1803/21/2026
A1 EXPEDITING SERVICE1203/21/2026
JAM CONSULTANTS, INC.603/21/2026
EXPEDITER203/21/2026
SIGNS CAD203/21/2026
CHERICO KING ARCHITECT P.C.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURNER CONSTRUCTION COMPANYGeneral Contractor6507/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor3607/31/2026
SPRING SCAFFOLDING LLCGeneral Contractor2609/17/2026
BALATON CONSULTING LLCScaffold1607/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor1507/08/2026
PSI PARTNERS, LLCFire Protection1209/02/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor1107/23/2026
JOHN GALLIN & SON, INCGeneral Contractor1109/16/2026
JT MAGEN & COMPANY INCGeneral Contractor1109/30/2026
SAFWAY ATLANTIC, LLCGeneral Contractor1008/25/2026
NEPTUNE MECHANICAL INCFire Protection1007/08/2026
AMBASSADOR CONSTRUCTION CGeneral Contractor907/08/2026
EMPIRE ECS, LLCGeneral Contractor807/08/2026
SIRINA FIRE PROT CORPFire Protection807/08/2026
NORTH SHORE NEON SIGN LLCGeneral Contractor707/08/2026
A PLUS PLUMBING CORPPlumbing709/03/2026
STARR INDUSTRIES LLCGeneral Contractor707/08/2026
VERICON CONSTRUCTION COGeneral Contractor607/08/2026
CAPITAL IMPROVEMENT SERVICESGeneral Contractor607/08/2026
ACTIVE SIGNSScaffold508/26/2026
ALMAR PLUMBING & HTG CORPPlumbing507/08/2026
CONSIGLI CONSTRUCTION COGeneral Contractor404/09/2026
LEVINE, GEORGEFire Protection403/21/2026
W & W GLASS LLCGeneral Contractor407/08/2026
BREEZE NATIONAL INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING498314908/18/2026
CODEGREEN5101308/07/2026
G. BLINN CONSULTING, LLC2894508/04/2026
HANSEN ENGINEERING PC81742207/27/2026
ALAN D MARCUS, PE17611302/19/2026
B2 ENGINEERING D.P.C.5433805/08/2025
CHERICO KING ARCHITECT PC5674103/20/2024
JOSEPH MARTINES PE, PLLC1428905/10/2023
DNA CONTROLLED INSPECTION554704/27/2021
BECKER ENGINEERING, PC633504/22/2021
Building Lifecycle
All (300)Filed (77)Permit Issued (80)Signed Off (16)Violation (5)Inspection (60)Objection (32)Special Inspection (30)
09/30/2026
Permit issued — Plumbing
M01449257-S2-PL
09/30/2026
Permit issued — Sprinklers
M01430967-S3-EW-SP
09/29/2026
Permit issued — General Construction
M01417361-I1-GC
09/25/2026
Permit issued — Structural
M01371338-I1-ST
09/25/2026
Permit issued — General Construction
M01391473-I1-GC
09/16/2026
Permit issued — Sidewalk Shed
M01370321-I1-SH
09/15/2026
Signed off — Alteration
Hereby filing to install mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
M01343448-S1
09/15/2026
Permit issued — Mechanical Systems
M01449257-S1-MS
09/15/2026
Permit issued — General Construction
M01449257-I1-GC
09/10/2026
Filed — Alteration
Hereby filing to install sprinkler heads with related piping for suite renovation as shown on plans filed herewith. No change to use, occupancy or egress.
M01449257-S1
09/10/2026
Filed — Alteration
Hereby filing to install sprinkler heads with related piping for suite renovation as shown on plans filed herewith. No change to use, occupancy or egress.
M01449257-S2
09/10/2026
Permit issued — Protection and Mechanical Methods
M01282822-I1-PMM
09/10/2026
Permit issued — Protection and Mechanical Methods
M01282822-S1-PMM
09/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/02/2026
Permit issued — General Construction
M01430967-I1-GC
09/02/2026
Permit issued — Mechanical Systems
M01430967-S1-MS
09/02/2026
Permit issued — Plumbing
M01401897-S3-PL
09/01/2026
Permit issued — Sprinklers
M01401897-S4-EW-SP
08/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/24/2026
Permit issued — Supported Scaffold
M01387312-S5-SF
08/21/2026
Filed — Alteration
TEMPORARY SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01387312-S5
08/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
08/20/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/19/2026
Objection resolved — Resolved
08/19/2026
Objection resolved — Resolved
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/19/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/19/2026
Special inspection requirement — Sprayed fire-resistant materials
ALEXIS SCHLESSINGERMAN
08/19/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEXIS SCHLESSINGERMAN
08/19/2026
Special inspection requirement — Luminous Exit Path Markings
ALEXIS SCHLESSINGERMAN
08/18/2026
Filed — Alteration
Hereby filing reinforcement of the framing for new PA space, new staircase opening and supports.as shown on plans filed herewith. No change to use, occupancy or egress.
M01401897-P2
08/18/2026
Permit issued — Standpipe
M01420460-S3-EW-SD
08/17/2026
Permit issued — Sprinklers
M01420460-S3-EW-SP
08/17/2026
Objection raised — Inspections
08/17/2026
Objection raised — Scope
08/14/2026
Objection resolved — Resolved
08/13/2026
Permit issued — Sprinklers
M01406667-S3-EW-SP
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
08/10/2026
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
08/10/2026
Special inspection requirement — Sprinkler Systems
HATIM ELSAID
08/10/2026
Special inspection requirement — Final
HATIM ELSAID
08/10/2026
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC09/30/2026
DOB NOWPlumbingPermit IssuedS.B.A. PLUMBING CORP09/30/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC09/29/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC09/25/2026
DOB NOWStructuralPermit IssuedJT MAGEN & COMPANY INC09/25/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC09/16/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN GALLIN & SON, INC09/15/2026
DOB NOWMechanical SystemsPermit IssuedJOHN GALLIN & SON, INC09/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC09/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN GALLIN & SON, INC09/02/2026
DOB NOWMechanical SystemsPermit IssuedJOHN GALLIN & SON, INC09/02/2026
DOB NOWPlumbingPermit IssuedA PLUS PLUMBING CORP09/02/2026
DOB NOWSprinklersPermit IssuedPSI PARTNERS, LLC09/01/2026
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC08/24/2026
DOB NOWStandpipePermit IssuedABCO-PEERLESS SPRKLR CORP08/18/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP08/17/2026
DOB NOWSprinklersPermit IssuedPSI PARTNERS, LLC08/13/2026
DOB NOWPlumbingPermit IssuedASHLAND PLUMBING CORP08/07/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC08/04/2026
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC08/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC07/31/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC07/30/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP07/29/2026
DOB NOWMechanical SystemsPermit IssuedCLUNE CONSTRUCTION CO LP07/22/2026
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP07/22/2026
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC07/16/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC07/15/2026
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC07/13/2026
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC07/02/2026
DOB NOWMechanical SystemsSigned-offAINSWORTH INC06/29/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC06/26/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP06/25/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC06/25/2026
DOB NOWSprinklersPermit IssuedPSI PARTNERS, LLC06/22/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP06/18/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC06/10/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC06/10/2026
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC06/09/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP06/08/2026
+ 60 more permits on file
13 projects · most recent 08/18/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems—
08/07/2026Permit IssuedBENCHMARK BUILDERS LLCHeating and Air Conditioning Systems
Heat / Cool
Bosch CL018-2HZC-LLEAUA 18,200 BTU ×3
CL018-2HZC-AREAUA 18,200 BTU ×2
CL024-2HZC-AREAUA 2 tons ×2
CL024-2HZC-LLEAUA 2 tons ×2
CL024-2VTC-LLTAUA 2 tons ×2
CL024-2VTC-ARTAUA 2 tons ×1
CL036-2HZC-AREAUA 3 tons ×1
Cl0182h2c 18,200 BTU ×1
Cl0242hzc LLEAUA 2 tons ×1
Clo242vtc ARTAUA 2 tons ×1
Clo24ARTAUA 2 tons ×1
07/02/2026Permit IssuedJT MAGEN & COMPANY INCAir Conditioning Systems—
06/05/2026Permit IssuedJRM CONSTRUCTION MGMT LLCHeating and Air Conditioning Systems—
03/12/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems—
03/12/2026Signed-offREIDY CONTRACTING GROUPHeating and Air Conditioning Systems
Heat / Cool
Florida Heat Pump V5AH018BR2AB1DERBENN012SSS 18,900 BTU · Wshp ×8
V5AH030BS4AB1DERBENN012SSS 47,200 BTU · Wshp ×6
V5AH018BR2AB1DELBENN012SSS 18,900 BTU · Wshp ×2
V5AH030BS4AB1DELBENN012SSS 29,200 BTU · Wshp ×2
V5AH036BS4AB1DERBENN012SSS 38,500 BTU · Wshp ×2
V5AH060BS4AB1DELBENW012SSS 59,000 BTU · Wshp ×2
v5AH024BS4AB7DERBENN012SSS 24,200 BTU · Wshp ×2
Above Air MCW-018S1-4-00000-EC-00-UF1-1A 5 tons · Wshp ×6
MCW-014S1-4-00000-EC-00-UF1-1A 4 tons · Wshp ×4
MCW-011S1-4-00000-EC-00-UF1-XS 3 tons · Wshp ×2
02/26/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems—
03/21/2025Permit IssuedCAPITAL IMPROVEMENT SERVIHeating and Air Conditioning Systems—
10/16/2024Signed-offJRM CONSTRUCTION MGMT LLCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Above Air MCW-042S-4 165,400 BTU · Crac Unit ×4
Heat / Cool
Mitsubishi Electric TPKFYP030 25,900 BTU · Vrf Indoor ×8
TPEFYP006 4,900 BTU · Vrf Indoor ×6
TPEFYP096 78,500 BTU · Vrf Indoor ×4
TPKFYP024 20,700 BTU · Vrf Indoor ×4
TPEFYP015 12,300 BTU · Vrf Indoor ×2
TPEFYP024 19,600 BTU · Vrf Indoor ×2
TPEFYP027 23,300 BTU · Vrf Indoor ×2
TPEFYP030 24,500 BTU · Vrf Indoor ×2
TPKFYP012 9,800 BTU · Vrf Indoor ×2
TPKFYPO24 19,600 BTU · Vrf Outdoor ×2
Climatemaster TCV-192 167,700 BTU · Wshp ×2
04/24/2024Signed-offJRM CONSTRUCTION MGMT LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TPKFYPO24 19,500 BTU · Wshp ×4
05/10/2023Permit IssuedVERICON CONSTRUCTION COHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
— DESV 700 CFM · Vav Box ×2
02/28/2023——Heating and Air Conditioning Systems—
04/13/2022Permit IssuedVERICON CONSTRUCTION COAir Conditioning Systems
Cooling
Carrier 50PCH 595 CFM · Wshp ×2
50BVJ 9,000 CFM · Ahu ×1
50PEC 300 CFM ×1
17 projects · most recent 09/10/2026
Sprinkler System
FiledStatusContractorScope
09/10/2026——Sprinkler System
08/18/2026Permit IssuedPSI PARTNERS, LLCSprinkler System
08/07/2026Signed-offABCO-PEERLESS SPRKLR CORPSprinkler System
07/27/2026Signed-offKG SPRINKLER CORP—
07/20/2026Permit IssuedPSI PARTNERS, LLCSprinkler System
07/02/2026Permit IssuedABCO-PEERLESS SPRKLR CORPSprinkler System
06/05/2026Permit IssuedPSI PARTNERS, LLCSprinkler System
06/04/2026Permit IssuedSIRINA FIRE PROT CORPSprinkler System
06/01/2026Permit IssuedABCO-PEERLESS SPRKLR CORPSprinkler System
05/21/2026Permit IssuedPSI PARTNERS, LLCSprinkler System
03/27/2026Permit IssuedPSI PARTNERS, LLC—
03/12/2026Permit IssuedPSI PARTNERS, LLCSprinkler System
03/12/2026Signed-offSEAN COAKLEY P & H INCSprinkler System
12/16/2025Permit IssuedMAGIC MECHANICAL INCSprinkler System
10/16/2024Signed-offPSI PARTNERS, LLCSprinkler System
12 projects · most recent 09/10/2026
Water/Sanitary
FiledStatusContractorScope
09/10/2026Permit IssuedS.B.A. PLUMBING CORPWater/Sanitary
08/18/2026Permit IssuedA PLUS PLUMBING CORPWater/Sanitary
08/07/2026Signed-offMAC FELDER INCWater/Sanitary
07/20/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
07/02/2026Permit IssuedASHLAND PLUMBING CORPWater/Sanitary
06/05/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
03/12/2026Signed-offSEAN COAKLEY P & H INCWater/Sanitary
03/12/2026Permit IssuedA PLUS PLUMBING CORPWater/Sanitary
02/26/2026Permit IssuedA PLUS PLUMBING CORPWater/Sanitary
12/16/2025Signed-offMAGIC MECHANICAL INCWater/Sanitary
10/16/2024Signed-offA PLUS PLUMBING CORPWater/Sanitary
04/24/2024Signed-offA PLUS PLUMBING CORPWater/Sanitary
25 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedOne Three electric inc.General Wiring
09/29/2026Permit IssuedOne Three electric inc.General Wiring
09/18/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
09/15/2026CompleteALLRAN ELECTRIC OF NY LLCGeneral Wiring
09/08/2026Permit IssuedJSP ELECTL CNTNG CORPGeneral Wiring
09/08/2026Permit IssuedENNELL GRP ELECTRIC CORPGeneral Wiring
08/31/2026Permit IssuedROBERT B SAMUELS, INC—
08/19/2026Permit IssuedROBERT B SAMUELS, INCGeneral Wiring
07/30/2026Permit IssuedCORPORATE ELEC. GROUP INC—
07/13/2026CompleteROBERT B SAMUELS, INCGeneral Wiring
06/30/2026Permit IssuedENNELL GRP ELECTRIC CORPGeneral Wiring
06/22/2026Permit IssuedEPIC ELECTRIC INCGeneral Wiring
05/15/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
05/01/2026Permit IssuedEPIC ELECTRIC INCGeneral Wiring
04/14/2026Permit IssuedROBERT B SAMUELS, INCGeneral Wiring
12 projects · most recent 08/18/2026
Steel Concrete
FiledStatusContractorScope
08/18/2026Permit IssuedA PLUS PLUMBING CORPSteel, Concrete
08/07/2026Permit IssuedBENCHMARK BUILDERS LLCSteel
06/05/2026Permit IssuedJRM CONSTRUCTION MGMT LLCSteel
04/17/2026Permit IssuedJT MAGEN & COMPANY INCSteel, Concrete
03/12/2026Signed-offSEAN COAKLEY P & H INCSteel, Concrete
12/16/2025Signed-offCONSIGLI CONSTRUCTION COSteel
08/20/2025Signed-offCLUNE CONSTRUCTION CO LP1 scope_items
10/16/2024Signed-offPSI PARTNERS, LLCSteel
04/24/2024Signed-offPSI PARTNERS, LLCSteel
03/20/2024Permit IssuedMAR DESIGN SERVICES INC1 scope_items
06/09/2023——Steel
06/14/2021——1 scope_items
6 projects · most recent 08/21/2026
Sign Scaffold Sidewalk Shed
FiledStatusContractorScope
08/21/2026Permit IssuedSAFWAY ATLANTIC, LLCScaffold
03/26/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
08/25/2025Permit IssuedS&E BRIDGE & SCAFFOLD LLCScaffold
05/08/2023——Sign
05/08/2023——Sign
05/08/2023Permit IssuedACTIVE SIGNS INCSign
1 project · most recent 04/15/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/15/2026Signed-offSKYTRAC ACCESS GROUP, LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 107
DateTypeResultReport
09/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/24/2026Pass Boiler Equipment InspectionPassView ↗
07/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 107.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/20/2026FinalALEXIS SCHLESSINGERMANprogress
08/20/2026HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/20/2026Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
08/20/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
08/20/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/20/2026Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
08/20/2026HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
08/20/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
08/20/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
08/20/2026Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
08/20/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
08/20/2026Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/19/2026Mastic and Intumescent Fire-resistant CoatingsALEXIS SCHLESSINGERMANspecial
08/19/2026FinalALEXIS SCHLESSINGERMANprogress
08/19/2026Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
08/19/2026Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
08/19/2026Luminous Exit Path MarkingsALEXIS SCHLESSINGERMANspecial
08/19/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/10/2026Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
08/10/2026Sprinkler SystemsHATIM ELSAIDspecial
08/10/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
08/10/2026FinalHATIM ELSAIDprogress
08/10/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
08/10/2026Post-installed AnchorsHATIM ELSAIDspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Penn Plaza Restaurant LLCRestaurant / Food ServiceBasement, Floor 1
Project M01019004 Alteration · LOC Issued · 03/15/2024
Msg ExecutiveOfficeFloor 26
Project M00354023 Alteration · LOC Issued · 04/15/2021
Msg Executive WingOffice—
Project M00354038 Alteration · LOC Issued · 04/15/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 6,360 on file (BIS + DOB NOW)
▸Plans & Drawings353
▸DOB NOWPlans/Sketch299
09/15/2026M01449257-I1Request digital key ↗
09/15/2026M01449257-S2Request digital key ↗
09/15/2026M01449257-S3Request digital key ↗
Showing 3 of 299 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler11
09/05/2026M00255084-I1Request digital key ↗
09/05/2026M00287583-I1Request digital key ↗
09/05/2026M00339914-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems10
09/05/2026M00227442-I1Request digital key ↗
09/05/2026M00224157-I1Request digital key ↗
09/05/2026M00254863-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00224160-I1Request digital key ↗
09/05/2026M00255078-I1Request digital key ↗
09/05/2026M00340006-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/05/2026M00130872-I1Request digital key ↗
09/05/2026M00309981-I1Request digital key ↗
09/05/2026M00309981-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence5
09/05/2026M00130923-I1Request digital key ↗
09/05/2026M00333683-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
09/04/2026M00393563-I1Request digital key ↗
09/04/2026M00393563-P1Request digital key ↗
09/04/2026M00393563-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00227475-I1Request digital key ↗
09/05/2026M00301046-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00187374-I1Request digital key ↗
▸Applications & Permits914
▸BISPLAN / WORK APPROVAL APPLICATION517
03/02/2026140999695Open ↗
02/20/2026123833218Open ↗
11/12/2025104860660Open ↗
Showing 3 of 517 on file for this type
▸BISWORK PERMIT APPLICATION389
02/23/2026123857095Open ↗
11/25/2025121189356Open ↗
02/04/2025121189356Open ↗
Showing 3 of 389 on file for this type
▸BISPLACE OF ASSEMBLY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM4
11/13/2024121189356Open ↗
12/29/2023121189356Open ↗
Showing 2 of 4 on file for this type
▸Seals & Professional Certifications1,928
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION705
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 705 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature351
09/15/2026M01449257-S1Open ↗
09/15/2026M01449257-S3Open ↗
09/15/2026M01449257-S2Open ↗
Showing 3 of 351 on file for this type
▸DOB NOWProgress Inspector Seal & Signature240
09/29/2026M00667345-I1Open ↗
09/29/2026M00667345-I1Open ↗
09/29/2026M00667345-I1Open ↗
Showing 3 of 240 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature197
09/29/2026M00667345-I1Open ↗
09/29/2026M00667345-I1Open ↗
09/27/2026M01343448-P1Open ↗
Showing 3 of 197 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST170
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 170 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT130
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 130 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM111
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 111 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment505
▸BISSELF-CERT PLUMBING NOTICE156
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 156 on file for this type
▸BISSCHEDULE B - PLUMBING107
03/01/2024121189356Open ↗
02/29/2024121189356Open ↗
Showing 2 of 107 on file for this type
▸BISEQUIPMENT USE PERMITS71
12/29/2023121189356Open ↗
12/29/2023121189356Open ↗
12/29/2023121189356Open ↗
Showing 3 of 71 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8534
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT24
12/29/2023121189356Open ↗
12/29/2023121189356Open ↗
12/29/2023121189356Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWFDNY: Letter of No Objection7
09/04/2026M00393563-I1Open ↗
09/04/2026M00393563-P1Open ↗
09/04/2026M00393563-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection117
▸BISANTI-HARASSMENT CHECKLIST88
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 88 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
09/05/2026M00130923-I1Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos480
▸DOB NOWDEP ACP-5: Asbestos Assessment Report231
09/15/2026M01449257-S1Open ↗
09/15/2026M01449257-I1Open ↗
09/15/2026M01449257-S3Open ↗
Showing 3 of 231 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)136
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 136 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'108
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 108 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/05/2026M00300945-I1Open ↗
09/05/2026M00301046-I1Open ↗
09/03/2026M00531070-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance264
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS151
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 151 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISTECHNICAL REPORT: ENERGY22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY20
02/13/2026123857095Open ↗
09/23/2025121189356Open ↗
Showing 2 of 20 on file for this type
▸BISTR8: Energy Code Progress Inspections14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00496523-I1Open ↗
Showing 1 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
02/11/2026140928218Open ↗
02/06/2026123857095Open ↗
04/09/2024122988286Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING CONTROLS3
02/13/2026123857095Open ↗
06/12/2024121189356Open ↗
04/09/2024122988286Open ↗
▸DOB NOWPreliminary Commissioning Report Certification3
09/05/2026M00300945-I1Open ↗
Showing 1 of 3 on file for this type
▸Inspections & Test Reports41
▸BISTECHNICAL REPORT: RESPONSIBILITY41
03/06/2024141004366Open ↗
Showing 1 of 41 on file for this type
▸Approvals, Objections & Sign-offs571
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST200
03/02/2026123526256Open ↗
02/17/2026140928218Open ↗
10/15/2024122988286Open ↗
Showing 3 of 200 on file for this type
▸BISADMINISTRATIVE OBJECTIONS126
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 126 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION80
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 80 on file for this type
▸DOB NOWTransit Authority Approval66
09/10/2026M01387312-S5Open ↗
09/05/2026M00130923-I1Open ↗
09/05/2026M00187374-I1Open ↗
Showing 3 of 66 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE32
03/18/2025121189356Open ↗
02/20/2025121189356Open ↗
04/29/2024121189356Open ↗
Showing 3 of 32 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSUPERSEDING LETTER11
09/23/2024121189356Open ↗
09/20/2024123857095Open ↗
02/01/2024121189356Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
09/05/2026M00309981-P3Open ↗
09/05/2026M00309981-I1Open ↗
09/05/2026M00309981-P2Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFINAL4
02/11/2026140928218Open ↗
11/17/2025123857095Open ↗
04/09/2024122988286Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
09/05/2026M00300945-I1Open ↗
09/05/2026M00301046-I1Open ↗
09/04/2026M00380212-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership506
▸BISCOST AFFIDAVIT484
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 484 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE9
09/23/2024121189356Open ↗
10/31/2023121189356Open ↗
Showing 2 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
02/20/2026123337870Open ↗
02/20/2026140999668Open ↗
02/17/2026140928218Open ↗
Showing 3 of 9 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Filing & Intake Forms478
▸BISEFILING COVER SHEET299
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 299 on file for this type
▸BISADDITIONAL INFORMATION102
11/12/2025104860660Open ↗
11/13/2024121189356Open ↗
08/12/2024140884309Open ↗
Showing 3 of 102 on file for this type
▸BISBOROUGH INTAKE FORM63
01/31/2025121189356Open ↗
03/12/2024121189356Open ↗
Showing 2 of 63 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸Other Documents79
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWAlternate Plan 14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 83
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 63
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
09/05/2026M00130923-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
09/05/2026M00130923-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type