| Owner | Filings | Most Recent |
|---|---|---|
| MOUNT SINAI HOSPITAL | 8 | 07/08/2026 |
| ST LUKES ROOSEVELT HOSPITAL CT | 119 | 03/22/2026 |
| 1000 10 AVE ENGINEERING S | 1 | 03/22/2026 |
| 400 W 59TH ST LLC | 1 | 03/22/2026 |
| 400 WEST 59 ST | 1 | 03/22/2026 |
| GIAMBOI BROS. INC | 2 | 03/22/2026 |
| HERITAGE AIR SYSTEMS | 1 | 03/22/2026 |
| MCNALLY & MCNALLY INC | 1 | 03/22/2026 |
| MARINE CONTRACTORS | 3 | 03/22/2026 |
| MCNALLY INC. | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| AKF ENGINEERS, LLP | 38 | 08/21/2026 |
| PERKINS EASTMAN | 10 | 08/12/2026 |
| SYSKA HENNESSY GROUP | 9 | 07/29/2026 |
| BURNS ENGINEERING, PC | 10 | 05/07/2026 |
| STUDIO A+T ARCHITECTS | 6 | 04/09/2026 |
| LORING CONSULTING ENGINEERS, INC. | 37 | 03/30/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 01/29/2026 |
| RICHARD PUSWALD PE | 1 | 11/07/2025 |
| ARCHITECTURAL PRESERVATION STUDIO, | 4 | 07/29/2025 |
| WELLWORTH CONSULTING LLC | 1 | 06/23/2025 |
| EP ENGINEERING LLC | 3 | 06/16/2025 |
| SIMPLE ARCHITECTURE PC | 5 | 05/27/2025 |
| FRANCIS CAUFFMAN ARCHITECTS | 4 | 10/11/2024 |
| SEVERUD ASSOCIATES | 3 | 09/16/2024 |
| LILKER ASSOCIATES CONSULTING ENGINE | 9 | 05/15/2024 |
| TIMOTHY E. KRAWETZ | 27 | 03/19/2024 |
| THINK DESIGN ARCHITECTURE | 1 | 10/20/2023 |
| ZGF ARCHITECTS | 1 | 07/28/2023 |
| S. REJEILI ARCHITECT, PLLC | 3 | 05/11/2023 |
| MOHAMMAD AHEAD, PE | 2 | 09/01/2022 |
| BRAND ACCESS SOLUTIONS | 1 | 08/01/2022 |
| SAFWAY ATLANTIC LLC | 3 | 07/28/2022 |
| REUTHER BOWEN | 2 | 07/19/2022 |
| POSEN ARCHITECTS | 1 | 07/14/2022 |
| TPG ARCHITECTURE, LLP | 1 | 01/28/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 211 | 03/21/2026 |
| AE DESIGN SOLUTION | 12 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 1 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 10 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| THINK DESIGN ARCHITECTURE | 1 | 03/21/2026 |
| METROPOLIS GROUP INC | 6 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| UNITY CONSTR. SVCS INC | General Contractor | 42 | 07/08/2026 |
| NELSON AIR DEVICE CORP | General Contractor | 19 | 07/08/2026 |
| CARDOZA PLUMBING CORP | Plumbing | 17 | 07/08/2026 |
| KING ROSE OF NY, INC | General Contractor | 15 | 07/08/2026 |
| CURRENT FIRE PROTECTION INC | Fire Protection | 15 | 07/08/2026 |
| LENDLEASE(US)CONSTRUCTION | General Contractor | 12 | 07/08/2026 |
| DNP BUILDERS LLC | General Contractor | 11 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 11 | 08/20/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 11 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 8 | 07/08/2026 |
| CAPITAL CONTR P&H CORP | Plumbing | 7 | 09/23/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 7 | 07/08/2026 |
| PAUL M MAINTENANCE INC | General Contractor | 7 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 6 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 6 | 07/08/2026 |
| E-J ELEC. INSTALLATION CO | Electrical | 5 | 03/22/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 5 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 5 | 08/07/2026 |
| MED-TEK CONTRACTING INC | General Contractor | 4 | 03/21/2026 |
| CENTRAL CONSULTING & CONT | General Contractor | 4 | 03/21/2026 |
| CONSIGLI CONSTRUCTION CO | General Contractor | 4 | 07/08/2026 |
| EMPIRE GENERAL CONTRACTIN | General Contractor | 4 | 07/08/2026 |
| PSI PLUMBING INC | Plumbing | 3 | 07/08/2026 |
| B & A RESTORATION CONTRA | General Contractor | 3 | 07/31/2026 |
| B.R. FRIES & ASSOCIATES LLC | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OUTSOURCE SPECIAL INSPECT | 2827 | 62 | 08/14/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 76 | 07/29/2026 |
| MOHAMMAD AHEAD - PROFESSI | 9286 | 2 | 07/14/2026 |
| LEO Y LEE ASSOCIATES | 2481 | 3 | 12/19/2025 |
| SCHERER DESIGN GROUP | 7921 | 2 | 06/06/2022 |
| AKF ENGINEERS, LLP | 2751 | 8 | 08/31/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 09/22/2026 |
| DOB NOW | Plumbing | Signed-off | CAPITAL CONTR P&H CORP | 08/27/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 08/18/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 08/06/2026 |
| DOB NOW | Structural | Permit Issued | B & A RESTORATION CONTRA | 07/30/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 07/14/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 07/06/2026 |
| DOB NOW | Plumbing | Permit Issued | ALLIANCE PLUMBING CORP | 06/03/2026 |
| DOB NOW | Plumbing | Permit Issued | PSI PLUMBING INC | 05/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/26/2026 |
| DOB NOW | Standpipe | Permit Issued | FULL CAPACITY FIRE CORP | 05/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | UNITY CONSTR. SVCS INC | 05/26/2026 |
| DOB NOW | General Construction | Signed-off | UNITY CONSTR. SVCS INC | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 05/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 05/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 05/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/19/2026 |
| DOB NOW | Structural | Permit Issued | UNITY CONSTR. SVCS INC | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 05/12/2026 |
| DOB NOW | Structural | Permit Issued | UNITY CONSTR. SVCS INC | 05/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 04/27/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 04/27/2026 |
| DOB NOW | Plumbing | Signed-off | CAPITAL CONTR P&H CORP | 04/27/2026 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 04/13/2026 |
| DOB NOW | General Construction | Signed-off | UNITY CONSTR. SVCS INC | 03/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITAL CONTR P & H CORP | 03/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 03/06/2026 |
| DOB NOW | Plumbing | Signed-off | CAPITAL CONTR P&H CORP | 03/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 02/18/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 02/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 02/12/2026 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 02/12/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 02/06/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 02/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/23/2026 |
| DOB NOW | General Construction | Signed-off | UNITY CONSTR. SVCS INC | 12/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | UNITY CONSTR. SVCS INC | 12/17/2025 |
| DOB NOW | General Construction | Signed-off | UNITY CONSTR. SVCS INC | 12/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | UNITY CONSTR. SVCS INC | 12/10/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/29/2026 | Permit Issued | UNITY CONSTR. SVCS INC | Ventilation Systems | Ventilation Price ×4 |
| 07/16/2026 | Permit Issued | UNITY CONSTR. SVCS INC | Air Conditioning Systems, Ventilation Systems | Cooling |
| 07/16/2026 | Signed-off | UNITY CONSTR. SVCS INC | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric PKA-AK36NL 37,000 BTU · Vrf Indoor ×2 PUY-AK36NL 37,000 BTU · Heat Pump Outdoor ×2 Heating Precision Coils HW58S01A08-9x12-RH 9,500 BTU · Ductwork ×6 HW58S01A07-7.5x12-RH 6,800 BTU · Ductwork ×4 HW58S01A07-9x12-RH 9,500 BTU · Ductwork ×4 HW58S01A06-12x16-RH 15,200 BTU · Ductwork ×2 HW58S01A06-9x12-RH 7,500 BTU · Ductwork ×2 HW58S01A06-9x14-RH 9,900 BTU ×2 HW58S01A06-9x18-RH 14,900 BTU · Ductwork ×2 HW58S01A06-9x20-RH 14,400 BTU · Ductwork ×2 HW58S01A06-9x22-RH 15,800 BTU · Ductwork ×2 HW58S01A07-9x14-RH 9,300 BTU · Ductwork ×2 HW58S01B06-12x24-RH 20,900 BTU · Ductwork ×2 |
| 03/30/2026 | Permit Issued | UNITY CONSTR. SVCS INC | Ventilation Systems | Ventilation Greenheck USF-04-B7 500 CFM · Exhaust Fan ×1 |
| 02/13/2026 | Permit Issued | UNITY CONSTR. SVCS INC | Heating Systems, Ventilation Systems | |
| 12/03/2025 | — | — | Ventilation Systems | Ventilation |
| 07/08/2025 | Permit Issued | J T & T AIR CONDITIONING | Ventilation Systems | Ventilation |
| 11/22/2024 | Signed-off | UNITY CONSTR. SVCS INC | Ventilation Systems | Ventilation Anemostat n/a 1,250 CFM · Exhaust Fan ×4 |
| 07/27/2023 | Permit Issued | KING ROSE OF NY, INC | Ventilation Systems | — |
| 01/28/2020 | Permit Issued | MARLIN MECHANICAL INC | Air Conditioning Systems, Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | — | — | 36 heads |
| 07/29/2026 | Signed-off | FULL CAPACITY FIRE CORP | 9 heads |
| 07/16/2026 | Signed-off | FULL CAPACITY FIRE CORP | 288 heads |
| 07/16/2026 | Permit Issued | FULL CAPACITY FIRE CORP | 39 heads |
| 06/25/2026 | — | — | 16 heads |
| 05/07/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 152 heads, 1 outlets |
| 05/07/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 3,959 heads, 10 outlets |
| 03/30/2026 | Permit Issued | FULL CAPACITY FIRE CORP | 85 heads |
| 12/03/2025 | — | — | — |
| 11/06/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 80 heads |
| 11/22/2024 | — | — | — |
| 07/27/2023 | — | — | 6 heads |
| 03/11/2020 | — | — | 4 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | — | — | Water/Sanitary |
| 07/29/2026 | Signed-off | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 07/16/2026 | Signed-off | CAPITAL CONTR P&H CORP | Medical Gas, Water/Sanitary |
| 07/16/2026 | Signed-off | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 05/07/2026 | Permit Issued | PAR PLUMBING CO., INC | Storm, Water/Sanitary |
| 05/07/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/30/2026 | Permit Issued | CARDOZA PLUMBING CORP | Water/Sanitary |
| 12/03/2025 | Permit Issued | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 11/06/2025 | Permit Issued | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 07/08/2025 | Permit Issued | CARDOZA PLUMBING CORP | Medical Gas |
| 11/26/2024 | Permit Issued | PAR PLUMBING CO., INC | Medical Gas, Water/Sanitary |
| 11/22/2024 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 08/24/2026 | Permit Issued | HATZEL AND BUEHLER, INC | General Wiring |
| 07/10/2026 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 06/08/2026 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 05/27/2026 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 05/27/2026 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 05/19/2026 | Permit Issued | HATZEL AND BUEHLER, INC | General Wiring |
| 04/21/2026 | Permit Issued | OFF SHORE ELECTRIC CORP | General Wiring |
| 02/17/2026 | Permit Issued | HATZEL AND BUEHLER, INC | General Wiring |
| 02/17/2026 | Permit Issued | HATZEL AND BUEHLER, INC | General Wiring |
| 12/23/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | — |
| 12/19/2025 | Permit Issued | ALBIN GUSTAFSON COMPANY | HVAC Wiring |
| 12/18/2025 | Permit Issued | RIGID ELECTRIC, INC. | General Wiring |
| 11/12/2025 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 09/12/2025 | Permit Issued | ALBIN GUSTAFSON COMPANY | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2026 | Permit Issued | CARDOZA PLUMBING CORP | Steel |
| 07/29/2025 | Permit Issued | B & A RESTORATION CONTRA | Masonry |
| 04/24/2025 | Permit Issued | B & A RESTORATION CONTRA | Masonry |
| 07/25/2023 | Permit Issued | KING ROSE OF NY, INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/07/2025 | Permit Issued | EAGLE SCAFFOLDING SVCS IN | Sidewalk Shed |
| 06/23/2025 | Signed-off | SPRING SCAFFOLDING LLC | Sidewalk Shed |
| 08/01/2022 | Permit Issued | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| 03/22/2018 | Permit Issued | PHOENIX SUTTON STR INC | Scaffold |
| 11/22/2017 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | B&A RESTORATION CONTR.INC | Suspended Scaffold (SC) |
| 12/19/2025 | Permit Issued | B&A RESTORATION CONTR.INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2026 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 08/28/2026 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 08/28/2026 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 08/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/24/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 06/04/2026 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 06/04/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 06/01/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 05/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/04/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/09/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 01/20/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 01/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/05/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Duct leakage testing, insulation and design | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Exhaust and Vent Systems in Plenums and Ducts | JONAR MADRIAGA | special |
| 08/14/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 08/14/2026 | Heating Systems | JONAR MADRIAGA | special |
| 08/14/2026 | High Temperature Hot Water Piping (Welding) | JONAR MADRIAGA | special |
| 08/14/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 08/14/2026 | Ventilation and air distribution system | JONAR MADRIAGA | energy_progress |
| 08/09/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 08/09/2026 | Post-installed Anchors | Young Suh | special |
| 08/09/2026 | Sprinkler Systems | Young Suh | special |
| 07/31/2026 | Sprinkler Systems | Young Suh | special |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/31/2026 | Post-installed Anchors | Young Suh | special |
| 07/27/2026 | Alternative Materials - OTCR Buildings Bulletin Number | MOHAMMAD AHEAD | special |
| 07/27/2026 | Post-installed Anchors | MOHAMMAD AHEAD | special |
| 07/24/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 07/24/2026 | Fire-Resistance Rated Construction | — | progress |
| 07/24/2026 | Final | — | progress |
| 07/24/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/24/2026 | Final | JONAR MADRIAGA | progress |
| 07/24/2026 | Energy Code Compliance Inspections | — | progress |
| 07/24/2026 | Interior lighting power | — | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Mount Sinai West | Medical / Healthcare | Cellar, Basement, Lobby, Floors 1–4, 8, 10–12, 14 | Project M01436118 Project M01222974 Project M00989484 Project M00905670 Project M00899107 Project M00863890 Project M00864530 Project M00864532 Project M00863873 Project M00810446 Project M00798524 Project M00771133 |
| Mount Sinai West Campus | Medical / Healthcare | Cellar, Sub-basement, Basement, Floors 1–11, Roof | Project M01300369 Project M01301210 |
| Mount Sinai MOUNT SINAI WEST | Medical / Healthcare | Floors 2, 14 | Project M00905712 |
| MT. Sinal West | Medical / Healthcare | — | Project M00789914 Project M00689435 |
| Mount Sinalwest | Medical / Healthcare | Floor 4 | Project M00771120 |
| Mount ASinai | Medical / Healthcare | Cellar | Project M00532998 |