Office, 20+ stories, with or without commercial
475 Park Avenue South
471 PARK AVENUE SOUTH · Murray Hill-Kips Bay · BIN 1018471
💬 Discuss this project
1970Year Built
34Stories
O4Building Class
C6-4AZoning
449,437 sfGross Floor Area
78Units
LL97 Covered6 Open Violations 4 unresolved · 2 paperwork only ▸FISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: 475 PARK AVENUE SOUTH · 21,558 sf lot · 20.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof1p · 1 filing · 2 docs
Floor 2918p · 3 filings · 9 docs
Floor 282p · 1 filing · 5 docs
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 2114p · 1 filing · 18 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 114p · 2 filings · 7 docs
Floor 10
Floor 9
Floor 8
Floor 728p · 4 filings · 20 docs
Floor 6
Floor 55p · 1 filing · 6 docs
Floor 45p · 1 filing · 6 docs
Floor 3
Floor 25p · 2 filings · 6 docs
Floor 120p · 3 filings · 20 docs
Cellar2p · 1 filing · 15 docs
Filed — no permit issued16p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COHEN BROTHERS REALTY CORP33307/08/2026
475 BUILDINGS COMPANY24303/21/2026
475 PARK AVENUE SOUTH6303/22/2026
COHEN BROTHER REALTY AS AGENT FOR4007/08/2026
475 PARK AVE SO2803/21/2026
475 PARK A303/21/2026
475 PARK AVE SOUTH COMP303/21/2026
475 BUILDING COMPANY C O COHEN203/21/2026
375 PARK AVENUE SO203/21/2026
Solil Management103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS303/21/2026
RIGGINING CONSULTANTS103/21/2026
PILSOO KIM ARCHITECT603/21/2026
LMS-ACE SERVICES303/21/2026
METROPOLIS GROUP INC803/21/2026
EXPEDIENT CONSULTING603/21/2026
BMB BUILDING CONSULTING203/21/2026
JAM CONSULTANTS, INC.103/21/2026
ZHENG & ASSOCIATES LLC203/21/2026
RIZZO GROUP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALBA GROUP INCGeneral Contractor1007/08/2026
FEDER, IRVINGElectrical303/21/2026
VIVIANO, PAULElectrical303/21/2026
NOBLE CONSTRUCTION GR LLCGeneral Contractor303/21/2026
PSI PARTNERS, LLCFire Protection307/08/2026
A&A PLUMBING CORPPlumbing307/08/2026
CAPITOL FIRE SPRINKLER COFire Protection207/08/2026
ATMOS ELECTRIC SVCE CORPElectrical203/22/2026
KING ROSE OF NY, INCGeneral Contractor207/08/2026
NEXTCOM CONSTRUCTION, INC.General Contractor207/08/2026
FULL CAPACITY FIRE CORPFire Protection207/08/2026
MARINE PLUMBING & MECH INPlumbing207/08/2026
RAMNARINE JAGNARINEElectrical203/21/2026
REEM PLBG & HTG CORPFire Protection107/08/2026
LAKE CONTRACTING LLCGeneral Contractor107/08/2026
HP SERVICES INCPlumbing107/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
POWER PLUMBING & HEATINGPlumbing107/08/2026
REEM PLBG & HTG CORPPlumbing107/08/2026
UNITECH DESIGNScaffold107/08/2026
BRIAN FLANAGANElectrical103/21/2026
CARMINE LIPPOLISElectrical103/21/2026
FLANAGAN BRIANElectrical103/21/2026
JEFFREY LIUElectrical103/21/2026
LINVAL BROWNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROSPEC SIA6420205/20/2025
CHONG ENGINEERING P.C.7411303/04/2025
EDG2578304/05/2022
PSI AGENCY INC.254103/15/2022
LILKER ASSOCIATES CONSULT816403/15/2022
AK ENGINEERING PC678112/14/2020
ZHENG & ASSOCIATES LLC7330106/15/2020
TROLYDIA TESTING & INSPEC4422303/02/2020
JACK GREEN ASSOCIATES422210/08/2019
PROJECT TACTICAL SOLUTION5859209/10/2019
Building Lifecycle
All (240)Filed (28)Permit Issued (35)Signed Off (15)Facade (FISP) (18)Violation (60)Inspection (16)Objection (38)Special Inspection (30)
08/03/2026
Objection resolved — Addressed
07/29/2026
Objection raised — Other
07/21/2026
Filed — Alteration
Building inspection, water testing, caulking replacement, small crack repairs, coatings and sealants
M01434277-I1
07/16/2026
Signed off — Alteration
inspect windows and frames
M01287862-I1
05/08/2026
Violation issued (ECB, open)
Zoning
03/26/2026
Cycle 9 facade inspection completed
03/19/2026
Cycle 9 facade report signed — SWARMP
02/11/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2026
Cycle 9 facade report submitted
01/06/2026
Signed off — Alteration
MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01204762-S2
01/05/2026
Signed off — Alteration
MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01204762-I1
12/30/2025
Signed off — Alteration
MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01204762-S1
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2025
Permit issued — Suspended Scaffold
M01287862-I1-SC
09/22/2025
Filed — Alteration
inspect windows and frames
M01287862-I1
08/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/29/2025
Permit issued — Sprinklers
M01204762-S1-EW-SP
07/07/2025
Permit issued — Mechanical Systems
M01204762-S2-MS
06/10/2025
Permit issued — General Construction
M01204762-I1-GC
05/29/2025
Signed off — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-S2
05/28/2025
Signed off — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-I1
05/28/2025
Signed off — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-S1
05/20/2025
Filed — Alteration
MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01204762-S2
05/20/2025
Filed — Alteration
MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01204762-S1
05/09/2025
Filed — Alteration
MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01204762-I1
05/08/2025
Special inspection requirement — Interior lighting power
James Vira
05/08/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
05/08/2025
Special inspection requirement — Maintenance information
James Vira
05/08/2025
Special inspection requirement — Lighting controls
James Vira
05/06/2025
Signed off — Alteration
PROPOSED 4 NEW INSTALLATION OF ILLUMINATED NON-FLASHING SIGNS, TWO FACING PARK AVENUE AND TWO FACING EAST 32ND STREET, WORDING "Shinhan Bank America" "Shinhan Bank America" "Shinhan Bank America | Manhattan" "Shinhan Bank America"
M01189566-I1
05/02/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
04/02/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2025
Special inspection requirement — Final
JOSEPH YOUNG
04/02/2025
Special inspection requirement — Interior lighting power
James Vira
04/02/2025
Special inspection requirement — Final
James Vira
04/02/2025
Special inspection requirement — Maintenance information
James Vira
04/02/2025
Special inspection requirement — Lighting controls
James Vira
04/02/2025
Special inspection requirement — Mechanical Systems
JOSEPH YOUNG
04/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2025
Filed — Alteration
PROPOSED 4 NEW INSTALLATION OF ILLUMINATED NON-FLASHING SIGNS, TWO FACING PARK AVENUE AND TWO FACING EAST 32ND STREET, WORDING "Shinhan Bank America" "Shinhan Bank America" "Shinhan Bank America | Manhattan" "Shinhan Bank America"
M01189566-I1
03/24/2025
Permit issued — Sign
M01189566-I1-SG
03/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
03/11/2025
Special inspection requirement — Sprinkler Systems
Tae Chong
03/04/2025
Filed — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-P1
03/04/2025
Special inspection requirement — Final
JUSTIN KIM
02/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
02/08/2025
Special inspection requirement — Sprinkler Systems
Tae Chong
01/22/2025
Permit issued — Plumbing
M01130535-S2-EW-SP
01/16/2025
Permit issued — Mechanical Systems
M01130535-S1-MS
01/16/2025
Permit issued — Sprinklers
M01130535-S2-PL
11/13/2024
Permit issued — General Construction
M01130535-I1-GC
11/05/2024
Filed — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-S2
11/05/2024
Filed — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-I1
11/05/2024
Filed — Alteration
Heating & Cooling VRF and Ventilation Systems for New Fit-out
M01130535-S1
09/19/2024
Cycle 9 facade report signed — SWARMP
08/26/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
M01002261-I1
Latest 60 of 240 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offUNIVERSAL STEEPLEJACK INC09/29/2025
DOB NOWSprinklersSigned-offFIREQUEST CORP07/29/2025
DOB NOWMechanical SystemsSigned-offKING ROSE OF NY, INC07/07/2025
DOB NOWGeneral ConstructionSigned-offKING ROSE OF NY, INC06/10/2025
DOB NOWSignSigned-offUNITECH DESIGN INC03/24/2025
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC01/22/2025
DOB NOWMechanical SystemsSigned-offNEXTCOM CONSTRUCTION, INC01/16/2025
DOB NOWSprinklersSigned-offPOWER PLUMBING & HEATING01/16/2025
DOB NOWGeneral ConstructionSigned-offNEXTCOM CONSTRUCTION, INC11/13/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM03/13/2024
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP04/24/2023
DOB NOWPlumbingSigned-offA&A PLUMBING CORP12/06/2022
DOB NOWPlumbingSigned-offA&A PLUMBING CORP04/20/2022
DOB NOWGeneral ConstructionPermit IssuedALBA GROUP INC04/08/2022
DOB NOWMechanical SystemsPermit IssuedALBA GROUP INC04/08/2022
DOB NOWGeneral ConstructionPermit IssuedALBA GROUP INC03/29/2022
DOB NOWMechanical SystemsPermit IssuedALBA GROUP INC03/29/2022
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP03/24/2022
DOB NOWMechanical SystemsPermit IssuedALBA GROUP INC03/22/2022
DOB NOWGeneral ConstructionPermit IssuedALBA GROUP INC03/18/2022
DOB NOWStructuralSigned-offLAKE CONTRACTING LLC02/02/2022
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN09/09/2021
DOB NOWPlumbingSigned-offMORA FIRE PROTECTION LLC06/15/2021
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO06/04/2021
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC05/27/2021
DOB NOWPlumbingSigned-offMORA FIRE PROTECTION LLC02/18/2021
DOB NOWPlumbingSigned-offA&A PLUMBING CORP02/05/2021
DOB NOWPlumbingSigned-offHP SERVICES INC07/01/2020
DOB NOWMechanical SystemsSigned-offNOBLE CONSTRUCTION GR LLC06/15/2020
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN06/12/2020
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO06/03/2020
DOB NOWSprinklersPermit IssuedREEM PLBG & HTG CORP11/19/2019
DOB NOWSprinklersPermit IssuedREEM PLBG & HTG CORP11/15/2019
DOB NOWSprinklersPermit IssuedPATRIOT FIRE SUPPRESSION,11/07/2019
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC11/07/2019
BISOTISSUEDSTROYBAT INC07/30/2021
BISOTISSUEDSTROYBAT INC06/11/2021
BISOTISSUEDFINALY GENL CONTR CORP03/03/2021
BISOTISSUEDFINALY GENL CONTR CORP12/17/2020
BISOTISSUEDNEXTCOM CONSTRUCTION, INC.10/15/2020
+ 45 more permits on file
1 project · most recent 03/10/2022
Air Conditioning Systems Associated Ducts and Piping Heating Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
03/10/2022Permit IssuedALBA GROUP INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Refrigeration Systems
Cooling
Lg ARWB096BAS4/ARNU363SVA4/ARNU48M3A4 94,379 BTU · Vrf Outdoor ×3
Heating
Tecspec Atmosphere 7,400 BTU ×2
Ventilation
__Junk__ None 1 BTU ×1
Refrigeration
__Junk__ None 1 BTU · Vrf Outdoor ×1
Ducts & Piping
__Junk__ None 1 BTU · Exhaust Fan ×1
2 projects · most recent 10/08/2019
FiledStatusContractorScope
10/08/2019Permit IssuedREEM PLBG & HTG CORP263 heads
09/10/2019Permit IssuedPATRIOT FIRE SUPPRESSION,—
2 projects · most recent 03/10/2022
Water/Sanitary
FiledStatusContractorScope
03/10/2022Signed-offA&A PLUMBING CORPWater/Sanitary
10/08/2019Permit IssuedREEM PLBG & HTG CORPWater/Sanitary
14 projects · most recent 11/21/2025
General Wiring Lighting
FiledStatusContractorScope
11/21/2025CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
03/25/2025CompleteATMOS ELECTRIC SVCE CORP—
03/25/2025CompleteATMOS ELECTRIC SVCE CORP—
03/25/2025CompleteATMOS ELECTRIC SVCE CORP—
03/25/2025CompleteATMOS ELECTRIC SVCE CORP—
01/17/2025CompletePOWER ELECTRICAL CONTS INGeneral Wiring
04/25/2022Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
03/04/2021CompleteMRD ELEC'L SERVICES, INCGeneral Wiring
12/30/2020CompleteCENTRIFUGAL ELECTRIC LLCGeneral Wiring, Lighting
07/15/2020CompleteHI-RITE ELECTRIC CORPGeneral Wiring
11/01/2019CompleteBIGMAN BROS., INC.General Wiring
08/05/2019Permit IssuedUNITED ELEC & LIGHTING COGeneral Wiring
05/15/2018CompleteASK ELECTL CONTRTNG CORPGeneral Wiring, Lighting
01/17/2018CompleteLINPHILL ELEC'L CONTR.General Wiring
2 projects · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026———
09/22/2025Signed-offCOLE NYC LLC—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/02/2025Pass-Final Sign Permit InspectionPassView ↗
04/02/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/10/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/02/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
05/08/2025Interior lighting powerJames Viraenergy_progress
05/08/2025Energy Code Compliance InspectionsJOSEPH YOUNGprogress
05/08/2025Maintenance informationJames Viraenergy_progress
05/08/2025Lighting controlsJames Viraenergy_progress
04/02/2025FinalJOSEPH YOUNGprogress
04/02/2025Interior lighting powerJames Viraenergy_progress
04/02/2025FinalJames Viraprogress
04/02/2025Maintenance informationJames Viraenergy_progress
04/02/2025Lighting controlsJames Viraenergy_progress
04/02/2025Mechanical SystemsJOSEPH YOUNGspecial
03/11/2025Fire-Resistant Penetrations and JointsTae Chongspecial
03/11/2025Sprinkler SystemsTae Chongspecial
03/04/2025FinalJUSTIN KIMprogress
02/08/2025Fire-Resistant Penetrations and JointsTae Chongspecial
02/08/2025Sprinkler SystemsTae Chongspecial
04/07/2022Concrete - Cast-In-PlaceAnthony Stasiospecial
04/07/2022FinalAnthony Stasioprogress
04/07/2022Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
03/24/2022Maintenance informationSERGE BUDZYNenergy_progress
02/28/2022Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
02/28/2022FinalAnthony Stasioprogress
02/28/2022Concrete - Cast-In-PlaceAnthony Stasiospecial
12/27/2021Aluminum ConstructionMAURICIO ANDRADEspecial
12/07/2021Post-installed AnchorsSERGE BUDZYNspecial
12/07/2021Lighting controlsSERGE BUDZYNenergy_progress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shinhan Bank AmericaOfficeFloor 1
Project M01189566 Alteration · LOC Issued · 03/24/2025
Shinhan BankOfficeFloors 1, 4, 5
Project M01130535 Alteration · LOC Issued · 11/05/2024
Project M00199570 Alteration · Permit Entire · 10/08/2019
Project M00199582 Alteration · Approved · 10/08/2019
MindGymFitness / RecreationFloor 2
Project M00431174 Alteration · LOC Issued · 12/14/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 2,045 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch18
09/02/2026M00622932-I1Request digital key ↗
09/02/2026M00622917-I1Request digital key ↗
09/02/2026M00622903-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00207781-I1Request digital key ↗
09/05/2026M00199570-I1Request digital key ↗
09/04/2026M00357127-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00213904-I1Request digital key ↗
09/05/2026M00199570-I1Request digital key ↗
08/15/2026M00431174-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00207639-I1Request digital key ↗
09/05/2026M00199582-I1Request digital key ↗
08/15/2026M00317581-I1Request digital key ↗
▸Applications & Permits507
▸BISPLAN / WORK APPROVAL APPLICATION274
11/24/2020140960663Open ↗
11/04/2020140960663Open ↗
07/14/2020140923927Open ↗
Showing 3 of 274 on file for this type
▸BISWORK PERMIT APPLICATION232
12/17/2020140960663Open ↗
08/17/2020123843056Open ↗
07/17/2020140923927Open ↗
Showing 3 of 232 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications459
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION258
03/09/2020121113865Open ↗
03/09/2020123573622Open ↗
03/02/2020121113865Open ↗
Showing 3 of 258 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST52
11/29/2019123740951Open ↗
10/21/2019123787768Open ↗
09/06/2019123782889Open ↗
Showing 3 of 52 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT33
11/29/2019123740951Open ↗
10/21/2019123787768Open ↗
09/06/2019123782889Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/05/2026M00207781-I1Open ↗
09/05/2026M00213904-I1Open ↗
09/05/2026M00199582-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/01/2026M00431174-I1Open ↗
09/01/2026M00431174-I1Open ↗
09/01/2026M01204762-S2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M01204762-S2Open ↗
09/01/2026M01204762-S2Open ↗
09/01/2026M01204762-S2Open ↗
Showing 3 of 19 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
11/04/2020140960663Open ↗
07/14/2020140923927Open ↗
04/01/2020140883845Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment97
▸BISSCHEDULE B - PLUMBING35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE25
08/09/2019123450318Open ↗
08/09/2019123450318Open ↗
06/17/2019123464394Open ↗
Showing 3 of 25 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
12/04/2019122933442Open ↗
11/15/2019122933442Open ↗
Showing 2 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos192
▸BISASBESTOS: CERTIFICATION (DEP ACP5)78
12/16/2020140960663Open ↗
07/15/2020140923927Open ↗
07/14/2020140923927Open ↗
Showing 3 of 78 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'69
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 69 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/05/2026M00207781-I1Open ↗
09/05/2026M00213904-I1Open ↗
09/05/2026M00199582-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00622932-I1Open ↗
08/13/2026M00622925-I1Open ↗
08/13/2026M00622917-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance79
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS51
03/09/2020123573622Open ↗
02/28/2020123843056Open ↗
11/29/2019123740951Open ↗
Showing 3 of 51 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
07/21/2021140883845Open ↗
12/14/2020140923927Open ↗
12/07/2020140960663Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/21/2021140883845Open ↗
10/13/2020123573622Open ↗
03/07/2019123359043Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/29/2021140960663Open ↗
12/14/2020140923927Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/15/2020140923927Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY19
07/21/2021140883845Open ↗
06/29/2021140960663Open ↗
12/16/2020140960663Open ↗
Showing 3 of 19 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
07/15/2020140923927Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs177
▸BISADMINISTRATIVE OBJECTIONS97
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 97 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
07/22/2021140883845Open ↗
06/29/2021140960663Open ↗
12/14/2020140923927Open ↗
Showing 3 of 49 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION28
03/09/2020121113865Open ↗
02/07/2020123450318Open ↗
12/12/2019120416807Open ↗
Showing 3 of 28 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
02/10/2020123450318Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership200
▸BISCOST AFFIDAVIT196
07/21/2021140883845Open ↗
12/07/2020140960663Open ↗
10/13/2020123573622Open ↗
Showing 3 of 196 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/29/2021140960663Open ↗
12/14/2020140923927Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/15/2020140923927Open ↗
▸BISCARBON MONOXIDE AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms264
▸BISEFILING COVER SHEET170
03/09/2020123573622Open ↗
02/28/2020123843056Open ↗
11/29/2019123740951Open ↗
Showing 3 of 170 on file for this type
▸BISADDITIONAL INFORMATION59
12/07/2020140960663Open ↗
04/01/2020140883845Open ↗
04/01/2020140883845Open ↗
Showing 3 of 59 on file for this type
▸BISBOROUGH INTAKE FORM23
03/09/2020121113865Open ↗
02/10/2020123450318Open ↗
02/07/2020123450318Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
11/04/2020140960663Open ↗
07/14/2020140923927Open ↗
02/07/2020140883845Open ↗
Showing 3 of 12 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
07/22/2021140883845Open ↗
04/01/2020140883845Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWIRA Certification3
08/15/2026M01434277-I1Open ↗
08/13/2026M01287862-I1Open ↗
08/13/2026M01002261-I1Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type