2022Year Built
9Stories
D7Building Class
R7AZoning
158,893 sfGross Floor Area
198Units
LL97 Covered1 Active Violation ▸
Elevator apt, semi-fireproof with stores · Owner of record: SB Gerard Avenue · 31,200 sf lot · 5.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1 filing
RoofRoof protection and OHP2p · 2 filings
Floor 4Unit 4U
Floor 3
Floor 2
Floor 1Unit 1C5p · 3 filings · 2 docs
CellarSb Gerard 580 LLC3p · 3 filings
Site & exteriorTemporarily supported scaffold installation10 filings
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/02/2020$16.9M—NR PROPERTY 2 LLC → SB GERARD AVENUE, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning4103/21/2026
Milrose Consultants1703/21/2026
Celtic Services NYC203/21/2026
A1 Expediting Service603/21/2026
Rigid Structural Design503/21/2026
Rigging Consultants403/21/2026
Lombardo Building Consultants103/21/2026
Sandeep Kaur103/21/2026
Hierarch-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Omnibuild ConstructionGeneral Contractor5107/08/2026
Skyline Scaffolding GroupScaffold2507/08/2026
Manhattan Concretespecialty_contractor1104/09/2026
Lis Piping SolutionFire Protection807/08/2026
Celtic Services NYCScaffold707/08/2026
Ener-Con Technical ServicesGeneral Contractor604/09/2026
Moore GroupScaffold603/21/2026
Bayport ConstructionScaffold504/09/2026
Stream PlumbingPlumbing307/08/2026
A & M Warshaw Plumbing & HeatingPlumbing307/08/2026
Omnibuild ConstructionScaffold207/08/2026
Lumos ElectricElectrical203/22/2026
Pro-H DevelopmentScaffold104/09/2026
Right Away ElectricElectrical103/22/2026
Kwong Ming ElectricElectrical103/22/2026
Alpha ScaffoldingScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Trolydia Testing & Inspec44224206/23/2026
MT Group798311/24/2025
PCS Engineering3745210/30/2025
McNamara/Salvia of New YO4970503/05/2025
AZ Professional Engineering766105/14/2024
Ancora Engineering6818108/31/2022
Geotechnical Engineering734108/31/2022
Building Lifecycle
All (300)Filed (60)Permit Issued (80)Signed Off (23)Violation (14)Inspection (23)Objection (67)Special Inspection (30)Tax Incentive (3)
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/23/2026
Objection resolved — Resolved
08/23/2026
Objection resolved — Resolved
08/23/2026
Objection resolved — Resolved
08/23/2026
Objection resolved — Resolved
08/23/2026
Objection resolved — Resolved
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Cost
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Cost
08/04/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF RETAIL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIATION.
X01438702-S1
08/04/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF RETAIL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIATION.
X01438702-S2
08/04/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF RETAIL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIATION.
X01438702-I1
08/03/2026
Signed off — New Building
Mechanical work as per plans filed.
X00588660-S6
08/03/2026
Signed off — New Building
Mechanical work as per plans filed.
X00588660-S9
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/30/2026
Special inspection requirement — Mechanical Systems
07/30/2026
Special inspection requirement — Final
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2026
Special inspection requirement — Interior lighting power
07/30/2026
Special inspection requirement — Maintenance information
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Signed off — New Building
Mechanical work as per plans filed.
X00588660-S8
06/23/2026
Filed — New Building
Mechanical work as per plans filed.
X00588660-C3
06/02/2026
Signed off — New Building
Mechanical work as per plans filed.
X00588660-S5
05/22/2026
Permit issued — General Construction
X00588660-I1-GC
05/20/2026
Signed off — New Building
Mechanical work as per plans filed.
X00588660-S4
05/01/2026
Objection resolved — Resolved
04/29/2026
Objection raised — Other
04/20/2026
Filed — New Building
Mechanical work as per plans filed.
X00588660-C2
04/15/2026
Special inspection requirement — Fenestration air leakage
JAIME MOYA
04/15/2026
Special inspection requirement — Exterior lighting power
JAIME MOYA
04/15/2026
Special inspection requirement — Lighting in dwelling units
JAIME MOYA
04/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAIME MOYA
04/15/2026
Special inspection requirement — Interior lighting power
JAIME MOYA
04/15/2026
Special inspection requirement — Fenestration areas
JAIME MOYA
04/15/2026
Special inspection requirement — Protection of exposed foundation insulation
JAIME MOYA
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWARD TOROSSIAN
04/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWARD TOROSSIAN
04/15/2026
Special inspection requirement — Air barrier — testing
JAIME MOYA
04/15/2026
Special inspection requirement — Maintenance information
JAIME MOYA
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction05/22/2026
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction03/20/2026
DOB NOWMechanical SystemsSigned-offEner-Con Technical Services01/28/2026
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction01/21/2026
DOB NOWStandpipeSigned-offLis Piping Solution11/18/2025
DOB NOWPlumbingSigned-offStream Plumbing10/14/2025
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating10/03/2025
DOB NOWSuspended ScaffoldPermit IssuedPro-H Development10/02/2025
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction09/22/2025
DOB NOWSupport of ExcavationSigned-offOmnibuild Construction09/09/2025
DOB NOWSprinklersSigned-offLis Piping Solution09/08/2025
DOB NOWSupported ScaffoldSigned-offBayport Construction08/06/2025
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction07/03/2025
DOB NOWMechanical SystemsSigned-offEner-Con Technical Services05/23/2025
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group05/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offSkyline Scaffolding Group05/15/2025
DOB NOWConstruction FenceSigned-offSkyline Scaffolding Group05/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offSkyline Scaffolding Group05/08/2025
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group04/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offSkyline Scaffolding Group04/30/2025
DOB NOWMechanical SystemsSigned-offEner-Con Technical Services03/28/2025
DOB NOWFoundationSigned-offOmnibuild Construction03/17/2025
DOB NOWSupport of ExcavationSigned-offOmnibuild Construction02/26/2025
DOB NOWGeneral ConstructionSigned-offOmnibuild Construction02/26/2025
DOB NOWSupported ScaffoldSigned-offBayport Construction12/31/2024
DOB NOWSupported ScaffoldSigned-offAlpha Scaffolding12/02/2024
DOB NOWStandpipeSigned-offLis Piping Solution11/29/2024
DOB NOWFoundationSigned-offOmnibuild Construction11/21/2024
DOB NOWPlumbingSigned-offStream Plumbing10/18/2024
DOB NOWSupported ScaffoldSigned-offBayport Construction10/07/2024
DOB NOWSprinklersSigned-offLis Piping Solution09/23/2024
DOB NOWStandpipeSigned-offLis Piping Solution09/23/2024
DOB NOWSupport of ExcavationSigned-offOmnibuild Construction09/11/2024
DOB NOWStructuralSigned-offOmnibuild Construction09/10/2024
DOB NOWFoundationSigned-offOmnibuild Construction09/06/2024
DOB NOWSupported ScaffoldSigned-offBayport Construction07/25/2024
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction07/23/2024
DOB NOWStructuralSigned-offOmnibuild Construction07/03/2024
DOB NOWSupported ScaffoldSigned-offBayport Construction05/20/2024
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group05/16/2024
+ 13 more permits on file
2 projects · most recent 08/04/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Copeland XFAM-060Z-TFC-081 55,500 BTU · Condensing Unit ×4
XJAL-020Z-CFV 12,700 BTU · Condensing Unit ×1
Heat / Cool
Mitsubishi Electric MXZ-SM120TAM-U1 120,000 BTU · Condensing Unit ×2
Ventilation
Captiveaire INLINE2-20Z 3,750 BTU · Makeup Air ×1
SIF18DD 4,000 CFM · Exhaust Fan ×1
Broan AE50110DC 50 CFM · Exhaust Fan ×1
Mitsubishi Electric LGH-F940RVX2-E 940 CFM · Erv ×1
06/23/2026Permit IssuedOmnibuild ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
N/A N/A 14,000 BTU · Ptac ×451
Daikin RXYQ96AATJB 96,000 BTU · Vrf Outdoor ×6
FXMQ72MVJU 96,000 BTU · Vrf Indoor ×2
FXSQ48TAVJU 143,000 BTU · Vrf Indoor ×2
RXYQ120AATJB 120,000 BTU · Vrf Outdoor ×2
RXYQ144AATJB 144,000 BTU · Vrf Outdoor ×2
— N/A 9,000 BTU · Ptac ×252
Heating
Daikin FXMG72MVJU 20,000 BTU · Vrf Indoor ×2
FXMG96MVJU 80,000 BTU · Vrf Indoor ×2
FXMQ96MVJU 119,000 BTU · Vrf Indoor ×2
FXSQ48TAVJU 20,000 BTU · Vrf Indoor ×2
Ventilation
Greenheck AX-03-300-400-0615-A200-HT 20,000 CFM · Exhaust Fan ×4
USF-16-3-B6-00-02-02 2,310 CFM · Exhaust Fan ×4
USF-06-3-B6-00-02-02 320 CFM · Exhaust Fan ×2
Aaon RN-006-8-0EB09-14A 1,600 CFM · Makeup Air ×2
RN-010-8-0-EB09-16A 2,400 CFM · Makeup Air ×2
1 project · most recent 06/23/2026
Sprinkler System
FiledStatusContractorScope
06/23/2026Signed-offLis Piping SolutionSprinkler System
2 projects · most recent 08/04/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/04/2026——Water/Sanitary
06/23/2026Signed-offStream PlumbingStorm, Water/Sanitary
10 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026CompleteKwong Ming ElectricGeneral Wiring
07/31/2026CompleteKwong Ming ElectricGeneral Wiring
09/10/2025Permit IssuedLumos ElectricGeneral Wiring
03/20/2023CompleteLumos Electric—
03/17/2023CompleteLumos Electric—
03/17/2023CompleteLumos Electric1 meters, 1 new_meters
12/29/2022Permit IssuedRight Away Electric—
12/22/2022CompleteTop Shelf Electric—
11/22/2022CancelledRight Away Electric—
11/22/2022Permit IssuedRight Away Electric1 meters, 1 new_meters
1 project · most recent 06/23/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/23/2026Permit IssuedOmnibuild ConstructionSteel, Concrete, Masonry
1 project · most recent 01/25/2022
Fence
FiledStatusContractorScope
01/25/2022Permit IssuedOmnibuild ConstructionFence
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
04/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/17/2026Pass-Final SD - More than 10 Requested FloorsPassView ↗
02/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/18/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/04/2026Pass-Final SD - More than 10 Requested FloorsPassView ↗
02/04/2026Pass-Final SP - More than 10 Requested FloorsPassView ↗
01/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/26/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/16/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/14/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/14/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/17/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/17/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/03/2026Fire-Resistance Rated Construction—progress
07/30/2026Interior lighting power—energy_progress
07/30/2026Energy Code Compliance Inspections—progress
07/30/2026Fire-Resistant Penetrations and Joints—special
07/30/2026Fire-Resistant Penetrations and Joints—special
07/30/2026HVAC-R and service water piping design and insulation—energy_progress
07/30/2026Maintenance information—energy_progress
07/30/2026HVAC-R and service water heating system controls—energy_progress
07/30/2026HVAC-R and service water heating equipment—energy_progress
07/30/2026Final—progress
07/30/2026Energy Code Compliance Inspections—progress
07/30/2026Mechanical Systems—special
07/30/2026Fire-Resistant Penetrations and Joints—special
04/15/2026Fenestration areasJAIME MOYAenergy_progress
04/15/2026HVAC-R and service water piping design and insulationJAIME MOYAenergy_progress
04/15/2026Interior lighting powerJAIME MOYAenergy_progress
04/15/2026Maintenance informationJAIME MOYAenergy_progress
04/15/2026Fire-Resistance Rated ConstructionEDWARD TOROSSIANprogress
04/15/2026Protection of exposed foundation insulationJAIME MOYAenergy_progress
04/15/2026Air barrier - visual inspectionJAIME MOYAenergy_progress
04/15/2026Lighting controlsJAIME MOYAenergy_progress
04/15/2026Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
04/15/2026Exterior Insulation and Finish Systems (EIFS)EDWARD TOROSSIANspecial
04/15/2026Fenestration air leakageJAIME MOYAenergy_progress
04/15/2026Exterior lighting powerJAIME MOYAenergy_progress
Latest 25 of 150.
▾Documents — 552 on file (BIS + DOB NOW)
▸Plans & Drawings65
▸DOB NOWPlans/Sketch65
08/24/2026X00666323-I1Request digital key ↗
08/24/2026X00666543-I1Request digital key ↗
08/24/2026X00671237-I1Request digital key ↗
Showing 3 of 65 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
11/06/2024240310748Open ↗
03/01/2023240310748Open ↗
01/18/2023240310748Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
06/17/2022220680895Open ↗
05/19/2022220680895Open ↗
05/19/2022220680895Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/07/2022240310748Open ↗
▸Zoning, Tax Lot & Property Records27
▸DOB NOWZD1: DOB Zoning Diagram14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWZoning Exhibit form (1-5)12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications293
▸DOB NOWProgress Inspector Seal & Signature148
09/22/2026X00790452-P2Open ↗
09/22/2026X00790452-P2Open ↗
09/12/2026X00588660-A2Open ↗
Showing 3 of 148 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature77
09/12/2026X00588660-A2Open ↗
09/02/2026X00588660-S1Open ↗
09/02/2026X00588660-S1Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature65
08/24/2026X00666323-I1Open ↗
08/24/2026X00666543-I1Open ↗
08/24/2026X00671237-I1Open ↗
Showing 3 of 65 on file for this type
▸BISPC FULL REPORT1
02/08/2008210033783Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2021240310748Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/19/2022220680895Open ↗
▸Trade Schedules & Equipment13
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISGAS CUT-OFF1
05/19/2022220680895Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
05/19/2022220680895Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸DOB NOWStreet Tree Checklist12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/19/2022220680895Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/19/2022220680895Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/06/2022240310748Open ↗
▸BISSTREET TREE CHECKLIST1
12/06/2022240310748Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/19/2022220680895Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos43
▸DOB NOWOER: Notice to Proceed27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWOER: Notice of Satisfaction11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/07/2022240310748Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/08/2008210033783Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/19/2022220680895Open ↗
▸BISRODENT CONTROL1
05/19/2022220680895Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026X00671237-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/07/2022240310748Open ↗
12/07/2022240310748Open ↗
05/19/2022220680895Open ↗
Showing 3 of 5 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
05/19/2022220680895Open ↗
05/19/2022220680895Open ↗
▸BISSUPERSEDING LETTER1
06/17/2022220680895Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/08/2008210033783Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/19/2022220680895Open ↗
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM4
06/17/2022220680895Open ↗
05/19/2022220680895Open ↗
01/05/2022220680895Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
11/06/2024240310748Open ↗
01/31/2023240310748Open ↗
12/07/2022240310748Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
01/05/2022220680895Open ↗
08/18/2021220680895Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/21/2021240310748Open ↗
▸Other Documents54
▸DOB NOWProperty Ownership Certification21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸DOB NOWSite Survey: Initial12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
05/19/2022220680895Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type