| Owner | Filings | Most Recent |
|---|---|---|
| 630 Third Avenue Associates | 136 | 07/08/2026 |
| 630 3rd Avenue | 42 | 03/21/2026 |
| 630 3rd Avenue Associates by Atco | 21 | 03/21/2026 |
| Atco Properties and Management | 15 | 03/21/2026 |
| 373-381 Pas Associates | 3 | 03/21/2026 |
| 630 3rd Ave Asso | 2 | 03/21/2026 |
| Tribeca Investment Group | 1 | 04/21/2026 |
| 630 Associates | 1 | 03/22/2026 |
| Atco Properties | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/10/2025 | $66.2M | — | 630 ASSOCIATES, LLC → 630 THIRD AVENUE DEVELOPMENT OWNER, LLC | $314/sf building |
| 11/18/2022 | $97.8M | — | 630 THIRD AVENUE ASSOCIATES, LP → 630 ASSOCIATES, LLC | $464/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Cosentini Associates | 19 | 08/12/2026 |
| Studios Architecture | 7 | 08/11/2026 |
| G. Blinn Consulting | 2 | 06/24/2026 |
| Kiefer & Schuster Engineering | 2 | 03/27/2026 |
| Loring Consulting Engineers | 15 | 02/20/2026 |
| Goldman Copeland Associates | 17 | 01/24/2024 |
| Jack Green Associates | 18 | 07/13/2023 |
| HKC Engineering | 2 | 03/10/2023 |
| Asda Architecture + Design | 9 | 02/20/2023 |
| Jae Chung Architect | 1 | 12/22/2022 |
| Paul Perdek, Prof. Engineering | 2 | 10/19/2022 |
| Archetype Consultants | 2 | 01/05/2022 |
| Accardo Engineering | 1 | 10/19/2021 |
| Enthink Engineers | 1 | 10/06/2021 |
| Spivak Architects | 1 | 02/03/2021 |
| Sargenti Architects | 1 | 09/17/2020 |
| Adal Engineering | 1 | 09/14/2020 |
| Hallberg Engineering | 2 | 07/17/2020 |
| Alnour Consulting | 1 | 02/28/2020 |
| French & Parrello Associates | 1 | 12/23/2019 |
| Armour Unsderfer Engineering Inc, P | 1 | 11/26/2019 |
| KH Engineering Services | 1 | 03/01/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Archetype Consultants | 120 | 03/21/2026 |
| Codegreen | 13 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| Perotto Consulting Management | 20 | 03/21/2026 |
| Jae Chung Architect P | 4 | 03/21/2026 |
| Construction Permit Services | 1 | 03/21/2026 |
| D D Expeditors | 2 | 03/21/2026 |
| CCM Services Group | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Essential Design & Builders | General Contractor | 34 | 07/08/2026 |
| JRM Construction Management | General Contractor | 14 | 08/20/2026 |
| Allstate Sprinkler | Fire Protection | 8 | 07/08/2026 |
| Mega Plumbing | Fire Protection | 6 | 08/21/2026 |
| Atlantic Construction Services | General Contractor | 6 | 07/08/2026 |
| Jacobs Telecommun | General Contractor | 5 | 07/08/2026 |
| Mega Plumbing | Plumbing | 5 | 07/22/2026 |
| Schnellbacher-Sendon Group* | Scaffold | 4 | 07/08/2026 |
| Schnellbacher-Sendon Group* | General Contractor | 4 | 07/08/2026 |
| Current Fire Protection | Fire Protection | 3 | 07/08/2026 |
| S&E Bridge & Scaffold | Scaffold | 2 | 06/27/2026 |
| Accurate Mechanical | Plumbing | 2 | 07/08/2026 |
| Accurate Mechanical | Fire Protection | 2 | 07/08/2026 |
| Arcon Plumbing Solutions | Plumbing | 2 | 07/08/2026 |
| Authentic Plumbing | Plumbing | 2 | 07/08/2026 |
| City/Suburban Plumbing | Plumbing | 2 | 07/08/2026 |
| KG Sprinkler | Fire Protection | 2 | 07/08/2026 |
| M&G Plumbing and Heating | Plumbing | 2 | 07/08/2026 |
| LW Interior Remodeling | General Contractor | 2 | 07/08/2026 |
| Squan Construction Services | General Contractor | 2 | 07/08/2026 |
| Andamio Scaffolding | Scaffold | 2 | 07/08/2026 |
| GMJ Electric | Electrical | 2 | 03/22/2026 |
| Plumbing P & H | Plumbing | 1 | 07/08/2026 |
| Millennium Maintenance & Electrical | Electrical | 1 | 03/21/2026 |
| Borowide Elect'l Contractors | Electrical | 1 | 03/22/2026 |
| Accu-Glo Electric of N.y.inc | Electrical | 1 | 03/21/2026 |
| Montgomery Electrical Contracting | Electrical | 1 | 03/22/2026 |
| Deboccia Electric Construction | Electrical | 1 | 03/21/2026 |
| CDS Design and Consulting | General Contractor | 1 | 07/08/2026 |
| The Sweet Construction GR | General Contractor | 1 | 07/08/2026 |
| Essential Design & Builders | Scaffold | 1 | 04/09/2026 |
| Advanced Plumbing, Mechanical & Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Advanced Plumbing Mechanical | Plumbing | 1 | 07/08/2026 |
| Avon Plumbing & Heating | Fire Protection | 1 | 07/08/2026 |
| P & D Mechanical | Fire Protection | 1 | 07/08/2026 |
| Bestco General Electric Maintenance | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Sag Engineering & Consulting | 608 | 15 | 08/12/2026 |
| Socotec Engineering | 4983 | 3 | 02/20/2026 |
| Becker Engineering | 633 | 7 | 01/24/2024 |
| Jack Green Associates | 422 | 15 | 07/13/2023 |
| Chong Engineering | 7411 | 3 | 03/10/2023 |
| Asda Architecture + Desig | 2015 | 6 | 02/20/2023 |
| Goldman Copeland Associates | 2826 | 3 | 02/23/2022 |
| Alan D Marcus, PE | 1761 | 8 | 01/05/2022 |
| DNA Controlled Inspection | 554 | 3 | 12/03/2021 |
| Clarke Engineering Services | 3795 | 1 | 10/19/2021 |
| Accardo Engineering | 1247 | 1 | 10/19/2021 |
| MEP Inspections | 1102 | 1 | 02/03/2021 |
| Adal Engineering | 4205 | 1 | 09/14/2020 |
| Catalpa Special Inspectio | 2004 | 2 | 07/17/2020 |
| French & Parrello Associates | 1271 | 1 | 12/23/2019 |
| Aeis | 280 | 1 | 12/23/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 08/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 08/18/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 08/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 07/10/2026 |
| DOB NOW | Plumbing | Permit Issued | Mega Plumbing | 07/10/2026 |
| DOB NOW | Construction Fence | Permit Issued | S&E Bridge & Scaffold | 06/25/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | S&E Bridge & Scaffold | 06/25/2026 |
| DOB NOW | Structural | Permit Issued | JRM Construction Management | 06/05/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 06/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 06/05/2026 |
| DOB NOW | Plumbing | Signed-off | Mega Plumbing | 04/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 04/09/2026 |
| DOB NOW | Plumbing | Signed-off | Mega Plumbing | 04/09/2026 |
| DOB NOW | Plumbing | Signed-off | Mega Plumbing | 04/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 04/09/2026 |
| DOB NOW | Plumbing | Signed-off | Mega Plumbing | 04/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Real Plumbing | 04/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 04/09/2026 |
| DOB NOW | Structural | Permit Issued | JRM Construction Management | 03/23/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 03/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 03/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 03/23/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 03/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 03/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 03/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | Allstate Sprinkler | 12/03/2025 |
| DOB NOW | Plumbing | Signed-off | City/Suburban Plumbing | 07/08/2025 |
| DOB NOW | Sprinklers | Signed-off | Current Fire Protection I | 07/20/2023 |
| DOB NOW | General Construction | Signed-off | Essential Design & Builders | 02/22/2023 |
| DOB NOW | General Construction | Signed-off | Essential Design & Builders | 02/14/2023 |
| DOB NOW | Sprinklers | Signed-off | Avon Plumbing & Heating | 02/09/2023 |
| DOB NOW | General Construction | Signed-off | CDS Design and Consulting | 12/27/2022 |
| DOB NOW | Construction Fence | Signed-off | Schnellbacher-Sendon Group* | 10/19/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 09/27/2022 |
| DOB NOW | Supported Scaffold | Signed-off | Schnellbacher-Sendon Group* | 05/20/2022 |
| DOB NOW | General Construction | Signed-off | Schnellbacher-Sendon Group* | 05/20/2022 |
| DOB NOW | General Construction | Signed-off | Schnellbacher-Sendon Group* | 05/20/2022 |
| DOB NOW | Sprinklers | Signed-off | Allstate Sprinkler | 02/28/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/02/2026 | Permit Issued | JRM Construction Management | Air Conditioning Systems | Cooling Climatemaster TC015-ECM 1 tons · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | Permit Issued | Real Plumbing | 21 heads |
| 07/02/2026 | Permit Issued | Real Plumbing | 214 heads |
| 03/19/2026 | Permit Issued | Real Plumbing | 117 heads |
| 03/13/2026 | Permit Issued | Real Plumbing | — |
| 03/13/2026 | Permit Issued | Real Plumbing | 116 heads |
| — | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | — | — | — |
| 07/02/2026 | Permit Issued | Real Plumbing | Storm, Water/Sanitary |
| 03/19/2026 | Signed-off | Real Plumbing | Water/Sanitary |
| 03/13/2026 | Signed-off | Real Plumbing | Water/Sanitary |
| 03/13/2026 | Signed-off | Real Plumbing | Water/Sanitary |
| 03/13/2026 | Signed-off | Real Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/13/2026 | Permit Issued | Empire State Electric Maintenance | General Wiring |
| 08/02/2026 | Permit Issued | Twintech Electric | General Wiring |
| 07/17/2026 | Permit Issued | Empire State Electric Maintenance | — |
| 07/17/2026 | Permit Issued | Empire State Electric Maintenance | General Wiring |
| 06/14/2026 | Complete | Green Apple Electrical Services | — |
| 05/12/2026 | Complete | Green Apple Electrical Services | — |
| 04/07/2026 | Permit Issued | Empire State Electric Maintenance | — |
| 04/14/2023 | Permit Issued | GMJ Electric | General Wiring |
| 02/21/2023 | Complete | GMJ Electric | General Wiring |
| 04/01/2022 | Complete | Montgomery Electrical Contracting | General Wiring |
| 03/22/2022 | Permit Issued | Robert Chimenti | 5 meters, 1 new_meters |
| 01/25/2022 | Permit Issued | GMJ Electric | General Wiring |
| 10/25/2021 | Permit Issued | GMJ Electric | General Wiring |
| 10/12/2021 | Complete | Borowide Elect'l Contractors | — |
| 09/28/2021 | Complete | GMJ Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | Real Plumbing | Steel |
| 03/13/2026 | Signed-off | Real Plumbing | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/18/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/17/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/14/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/09/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/09/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/25/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/03/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/27/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/25/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/20/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/06/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/17/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/11/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/09/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/08/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/23/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/27/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/26/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/21/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/19/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/03/2021 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/26/2021 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/06/2021 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/29/2021 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/14/2021 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/11/2026 | Interior lighting power | Chester Kowalski | energy_progress |
| 08/11/2026 | Lighting controls | Chester Kowalski | energy_progress |
| 08/03/2026 | Sprinkler Systems | Chester Kowalski | special |
| 08/03/2026 | Mechanical Systems | Chester Kowalski | special |
| 08/03/2026 | Final | Chester Kowalski | progress |
| 07/01/2026 | Sprinkler Systems | Chester Kowalski | special |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 07/01/2026 | Post-installed Anchors | Chester Kowalski | special |
| 05/18/2026 | Fenestration and door U-factor and product ratings | Chester Kowalski | energy_progress |
| 05/18/2026 | Final | Chester Kowalski | progress |
| 05/18/2026 | Fire-Resistance Rated Construction | Chester Kowalski | progress |
| 05/18/2026 | Energy Code Compliance Inspections | Chester Kowalski | progress |
| 05/18/2026 | Air barrier - visual inspection | Chester Kowalski | energy_progress |
| 05/18/2026 | Insulation placement and R values | Chester Kowalski | energy_progress |
| 05/14/2026 | Insulation placement and R values | — | energy_progress |
| 05/14/2026 | Energy Code Compliance Inspections | — | progress |
| 05/14/2026 | Air barrier - visual inspection | — | energy_progress |
| 05/14/2026 | Final | — | progress |
| 05/14/2026 | Fire-Resistance Rated Construction | — | progress |
| 05/14/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 03/26/2026 | Structural Steel - Details | Chester Kowalski | special |
| 03/26/2026 | Structural Steel - Welding | Chester Kowalski | special |
| 03/26/2026 | Post-installed Anchors | Chester Kowalski | special |
| 03/26/2026 | Structural Steel - High Strength Bolting | Chester Kowalski | special |
| 03/26/2026 | Structural Stability – Alterations of existing buildings | Chester Kowalski | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Parlux | Office | Floor 6 | Project M01440108 |
| Spear Grand Central | Medical / Healthcare | Cellar, Floor 1 | Project M00453539 Project M00453601 Project M00453617 Project M00453628 |
| P.F. Chang's | Restaurant / Food Service | Floor 1 | Project M00394735 Project M00387409 Project M00353797 Project M00364320 |
| Ldman Peland | Office | Floor 21 | Project M00354913 |
| Ruben Companies | Office | Floors 1, 22 | Project M00354870 Project M00354922 Project M00223706 |
| Dig Inn | Restaurant / Food Service | Cellar, Floor 1 | Project M00266410 Project M00260372 Project M00266399 Project M00266407 |