| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/02/2026 | Signed-off | PRODIGY CONSTRUCTION INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Price Price FDC Series Fan Powered Terminal Unit
FD-1-3-30
*does not have an efficiency rating in COP/EER/SEER 42,000 BTU · Exhaust Fan ×3 Price FDC Series Fan Powered Terminal Unit FDC-1-3-20 *does not have an efficiency rating in COP/EER/SEER 19,000 BTU · Exhaust Fan ×1 |
| 06/19/2026 | Permit Issued | FOUR STAR AIR CON'D CO LL | Air Conditioning Systems, Ventilation Systems | |
| 06/20/2025 | Signed-off | POWER COOLING INC | Air Conditioning Systems | Cooling Carrier 30MPW0665S-20117 70 tons · Chiller ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | MPS PLUMBING & HEATING IN | 75 heads |
| 06/19/2026 | Permit Issued | DOVAL PLBG & HTG CORP | Sprinkler System |
| 11/26/2025 | — | — | — |
| 11/26/2025 | — | — | 44 heads |
| 11/26/2025 | Permit Issued | ENCORE FIRE PROT SVS INC | 46 heads |
| 11/26/2025 | — | — | — |
| 03/24/2023 | Signed-off | LT FIRE PROTECTION CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | MPS PLUMBING & HEATING INC | Water/Sanitary |
| 06/19/2026 | Permit Issued | DOVAL PLBG & HTG CORP | Water/Sanitary |
| 11/26/2025 | — | — | Water/Sanitary |
| 11/26/2025 | — | — | Water/Sanitary |
| 11/26/2025 | — | — | Water/Sanitary |
| 11/26/2025 | — | — | Water/Sanitary |
| 11/22/2024 | — | — | Water/Sanitary |
| 03/24/2023 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/13/2026 | Complete | A&L ELECTRIC & AUTOMATION | General Wiring |
| 07/15/2026 | Permit Issued | COBRA ELECTRICAL NYC LLC | General Wiring |
| 05/06/2026 | Permit Issued | R & T ELECTRICAL CORP | General Wiring |
| 03/07/2025 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 09/09/2024 | Complete | ELECSERV INC | 5 meters |
| 08/23/2024 | Permit Issued | MEGA ELEC'L CONTR'G, INC | General Wiring |
| 07/24/2024 | Complete | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 10/03/2023 | Complete | CROSSWIRE ELECTRICAL INC | General Wiring |
| 01/13/2023 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 10/24/2022 | Complete | COMMERCIAL ELECT CONT INC | General Wiring |
| 08/26/2022 | Complete | TOP SHELF ELECTRIC CORP | — |
| 08/15/2022 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 12/18/2020 | Complete | FLAG ELECTRIC INC | — |
| 11/12/2020 | Complete | UPDATE SYSTEMS ELECTRICAL | General Wiring |
| 03/31/2020 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | STRUCTUAL PRESV SYSTEM | — |
| Owner | Filings | Most Recent |
|---|---|---|
| COLLIERS TRI-STATE | 34 | 07/08/2026 |
| 693 FIFTH OWNERS LLC C O SAVITT PAR | 4 | 07/08/2026 |
| 693 FIFTH OWNERS | 17 | 03/22/2026 |
| MICHILLI | 5 | 03/22/2026 |
| SCAFFOLDING LLC SPRING | 2 | 03/22/2026 |
| TAKASHINAYU | 1 | 03/22/2026 |
| TAKSHIMAYA CO. | 1 | 03/22/2026 |
| TAKASHIMAYA 5TH AVE CORP | 6 | 03/22/2026 |
| TAKASHIMAYA 5AVE CORP. | 1 | 03/22/2026 |
| THE HARDMAN GROUP LLC | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/10/2016 | $455.0M | — | — → — | $4,491/sf building |
| 06/10/2016 | $68.2M | — | — → — | $673/sf building |
| 06/10/2016 | $1.8M | — | — → — | $17/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| MIHAI RADU ARCHITECTS PLLC | 4 | 07/02/2026 |
| JUDGE ARCHITECTURE PC | 3 | 06/29/2026 |
| NEWTEC ENGINEERING | 3 | 06/19/2026 |
| ELTERMAN FINER ARCHITECTS PC | 1 | 05/21/2026 |
| AZA ENGINEERING LLC | 2 | 05/04/2026 |
| RLM ENGINEERING PLLC | 24 | 11/26/2025 |
| VINCENT J. LIOTTA P.E. | 1 | 06/20/2025 |
| ALAN TANSEY ARCHITECTURE PLLC | 2 | 12/19/2024 |
| JACK GREEN ASSOCIATES | 1 | 11/22/2024 |
| DPM ARCHITECTURE, P.C. | 5 | 11/11/2024 |
| YORKOS ENGINEERING DESIGN CONSULT | 2 | 10/12/2024 |
| ATELIER NEW YORK ARCHITECTURE | 1 | 09/09/2024 |
| 2L ENGINEERING, DPC | 2 | 07/10/2024 |
| ZHENG ENGINEERING PLLC | 1 | 05/06/2024 |
| ROBERT DERECTOR ASSOCIATES | 3 | 07/24/2023 |
| ARIAS ARCHITECTURE | 2 | 06/23/2023 |
| SALVATOR A. CARADONNA JR. | 1 | 04/28/2023 |
| SOCOTEC, INC. | 1 | 02/02/2023 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 09/01/2022 |
| LUKE LICALZI, P.E., P.C. | 1 | 07/06/2022 |
| MERRITT ENGINEERING CONSULTANTS, DPC | 1 | 07/05/2022 |
| LILKER ASSOCIATES CONSULTING ENGINE | 6 | 08/26/2020 |
| SEVERUD ASSOCIATES | 1 | 08/23/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| RETHY ASSOCIATES | 44 | 03/21/2026 |
| SMEP DESIGN & CONSULTATION LLC | 2 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 6 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 7 | 03/21/2026 |
| MERRITT ENGINEERING CONSULTANT DPC | 2 | 03/21/2026 |
| I L CONSULTING | 2 | 03/21/2026 |
| SME PROFESSIONAL DESIGN & CONSULTAN | 2 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ECOSTRUCTION GROUP INC | General Contractor | 8 | 07/08/2026 |
| LT FIRE PROTECTION CORP | Fire Protection | 6 | 07/08/2026 |
| W5 GROUP LLC | General Contractor | 4 | 07/08/2026 |
| STRUCTURAL PRESERV SYSTEM | General Contractor | 4 | 03/21/2026 |
| ABCAT ASSOCIATES INC | General Contractor | 4 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 4 | 03/21/2026 |
| JAMES E FITZGERALD INC | General Contractor | 4 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| MILL BROOK FIRE PROTECTION | Fire Protection | 2 | 07/08/2026 |
| RICKETTS, JOSEPH | Electrical | 2 | 03/21/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 2 | 07/08/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 2 | 07/08/2026 |
| SENTINEL BUILDERS, LLC | General Contractor | 2 | 07/08/2026 |
| ROBERT MARCHISOTTO | Electrical | 2 | 03/21/2026 |
| BOILERMATIC WELDING INDUS | General Contractor | 1 | 07/08/2026 |
| FOUR STAR AIR CON'D CO LL | General Contractor | 1 | 07/01/2026 |
| GREAT INTERIOR RENOVATIONS | General Contractor | 1 | 06/28/2026 |
| HICK HOLDINGS, INC | General Contractor | 1 | 07/08/2026 |
| HNL CONSTRUCTION COMPANY | General Contractor | 1 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 1 | 09/16/2026 |
| POWER COOLING INC | General Contractor | 1 | 04/09/2026 |
| PRODIGY CONSTRUCTION INC | General Contractor | 1 | 04/09/2026 |
| SIGNA DEVELOPMENT CORP | General Contractor | 1 | 06/27/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 1 | 07/08/2026 |
| SUPERIOR HVAC INC | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OUTSOURCE SPECIAL INSPECT | 2827 | 3 | 07/02/2026 |
| JUDGE ARCHITECTURE PC | 748 | 4 | 06/29/2026 |
| OBAID MIAN | 849 | 3 | 06/19/2026 |
| SAM MATHER ARCHITECT | 773 | 1 | 05/21/2026 |
| JMV CONSULTING ENGINEERIN | 804 | 1 | 05/21/2026 |
| AZA ENGINEERING LLC | 7235 | 2 | 05/04/2026 |
| KEYOWNER ENGINEERING, P.C | 4817 | 1 | 02/17/2026 |
| RLM ENGINEERING PLLC | 6913 | 19 | 11/26/2025 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 06/20/2025 |
| JACK GREEN ASSOCIATES | 422 | 1 | 11/22/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | MC SUPERSTRUCTURE INC | 09/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | DOVAL PLBG & HTG CORP | 07/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FOUR STAR AIR CON'D CO LL | 06/29/2026 |
| DOB NOW | Plumbing | Permit Issued | DOVAL PLBG & HTG CORP | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | GREAT INTERIOR RENOVATIONS | 06/26/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTUAL PRESV SYSTEM | 06/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | MPS PLUMBING & HEATING INC | 05/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HNL CONSTRUCTION COMPANY | 05/13/2026 |
| DOB NOW | General Construction | Permit Issued | SIGNA DEVELOPMENT CORP | 05/05/2026 |
| DOB NOW | Plumbing | Permit Issued | MPS PLUMBING & HEATING INC | 04/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | ALLTYPE FIRE PROTECT LLC | 03/05/2026 |
| DOB NOW | Plumbing | Signed-off | ZATOS PLBG AND HTG INC | 03/02/2026 |
| DOB NOW | General Construction | Signed-off | SUPERIOR HVAC INC | 02/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | PRODIGY CONSTRUCTION INC | 02/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | ENCORE FIRE PROT SVS INC | 12/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ECOSTRUCTION GROUP INC | 12/03/2025 |
| DOB NOW | General Construction | Permit Issued | ECOSTRUCTION GROUP INC | 12/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ECOSTRUCTION GROUP INC | 12/03/2025 |
| DOB NOW | General Construction | Permit Issued | ECOSTRUCTION GROUP INC | 12/03/2025 |
| DOB NOW | General Construction | Permit Issued | ECOSTRUCTION GROUP INC | 12/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ECOSTRUCTION GROUP INC | 12/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ECOSTRUCTION GROUP INC | 12/02/2025 |
| DOB NOW | General Construction | Signed-off | ECOSTRUCTION GROUP INC | 12/02/2025 |
| DOB NOW | Sprinklers | Signed-off | RALPH W. LANDOLFI JR. | 06/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | POWER COOLING INC | 06/23/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTUAL PRESV SYSTEM | 03/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SENTINEL BUILDERS, LLC | 11/22/2024 |
| DOB NOW | Plumbing | Signed-off | LEGUCI PIPING&HEATING LLC | 11/08/2024 |
| DOB NOW | Plumbing | Signed-off | PROSTAR PLUMBING AND HEAT | 11/07/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ABCAT ASSOCIATES INC | 10/03/2024 |
| DOB NOW | General Construction | Signed-off | ABCAT ASSOCIATES INC | 10/03/2024 |
| DOB NOW | Plumbing | Signed-off | LT FIRE PROTECTION CORP | 09/26/2024 |
| DOB NOW | Sprinklers | Signed-off | G. C. PLBG & HTG INC | 09/25/2024 |
| DOB NOW | General Construction | Signed-off | SENTINEL BUILDERS, LLC | 09/13/2024 |
| DOB NOW | General Construction | Signed-off | TOROVOLI CONSTRUCTION INC | 09/11/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ABCAT ASSOCIATES INC | 07/30/2024 |
| DOB NOW | Sprinklers | Signed-off | VAND MECHANICAL INC | 07/24/2024 |
| DOB NOW | Plumbing | Signed-off | LT FIRE PROTECTION CORP | 07/17/2024 |
| DOB NOW | General Construction | Signed-off | ABCAT ASSOCIATES INC | 05/24/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 06/26/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/28/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/02/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 06/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/18/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 06/05/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/11/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/05/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/05/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 01/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/14/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/15/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/26/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/25/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/07/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Final | JONAR MADRIAGA | progress |
| 07/07/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 07/07/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 07/07/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 07/07/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 07/07/2026 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Maintenance information | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Metering | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | Maintenance information | JONAR MADRIAGA | energy_progress |
| 06/10/2026 | Final | JONAR MADRIAGA | progress |
| 06/10/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 06/10/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 06/10/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 06/10/2026 | Metering | JONAR MADRIAGA | energy_progress |
| 06/01/2026 | Energy Code Compliance Inspections | Obaid Mian | progress |