| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00619903 ↗ | 142 EAST 121 STREET MANHATTAN | Alteration | Permit Issued | 10/28/2021 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 128LF OF 8'W X 16'H TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS… |
| M01267783 ↗ | 1230 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/07/2025 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 551 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| Q01186293 ↗ | 80-25 126 STREET QUEENS | Alteration | Permit Issued | 03/06/2025 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 922LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUPA… |
| S01186342 ↗ | 55 STUYVESANT PLACE STATEN ISLAND | Alteration | Permit Issued | 03/06/2025 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 389 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| M01380871 ↗ | 455 WEST 40 STREET MANHATTAN | Alteration | Permit Issued | 03/31/2026 | 07/27/2026 | Design HD GROUP Owner CUNY Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-344 LF - TEMPORARY HEAVY-DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION ON SIDEWALK AND ENTRANCES D… |
| M01398103 ↗ | 1 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 05/11/2026 | 07/27/2026 | Design HD GROUP Owner CUNY Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-900 LF - TEMPORARY HEAVY-DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION ON SIDEWALK AND ENTRANCES D… |
| Person | Filings | Most recent |
|---|---|---|
| ASIF KHAN | 157 | 08/06/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| HD GROUP | 89 | 08/07/2026 |
| H2H GROUP | 50 | 09/06/2024 |
| JOEL PHAGOO P.E. PLLC | 1 | 09/06/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| TREDENT CONTRACTING SERVI | 35 | 06/26/2026 |
| PRIME CONTRACTORS, INC | 33 | 09/06/2024 |
| BHAGHIANA GENERAL CONSTRU | 32 | 08/07/2026 |
| ADP GROUP INC | 13 | 04/09/2026 |
| MNK ENTERPRISES LLC | 8 | 08/07/2026 |
| R.S.N. CONSTRUCTION CO IN | 8 | 12/01/2021 |
| APS CONTRACTORS INC | 5 | 12/21/2017 |
| ZAMAN CONSTRUCTION CORP | 2 | 11/21/2025 |
| J.K.CONSTRUCTION NEW YORK | 1 | 09/06/2024 |
| SHARAN BUILDERS INC | 1 | 08/02/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| NYCHA | 60 | 08/07/2026 |
| DCAS | 13 | 04/09/2026 |
| NYC Housing Authority | 13 | 02/04/2022 |
| DASNY | 10 | 08/14/2023 |
| NYCHA Capital Projects | 10 | 06/17/2026 |
| SOLSTICE RESIDENTIAL GROUP, LLC | 4 | 02/16/2022 |
| CUNY | 3 | 06/26/2026 |
| 248 EAST 32ND STREET LLC | 2 | 09/14/2020 |
| AMAN NEW YORK | 2 | 08/27/2025 |
| DOMINION MANAGEMENT COMPANY LLC | 2 | 07/31/2023 |
| MOTT & PRINCE MANAGEMENT, INC. | 2 | 04/16/2019 |
| NYC HEALTH + HOSPITALS/WOODHULL | 2 | 11/21/2025 |
| TOO MANY NOTES NY ENTERPRISES LLC | 2 | 12/08/2021 |
| 355 WEST 20TH STREET CORPORATION | 1 | 01/15/2021 |
| 371 FTW OWNER'S CORP | 1 | 07/12/2023 |
| CARA MANAGEMENT GROUP LLC | 1 | 12/16/2022 |
| CRESTBEE LLC | 1 | 03/18/2022 |
| Large Marge LLC | 1 | 01/02/2025 |
| MMS | 1 | 01/21/2022 |
| OVERLAND CONSTRUCTION INC | 1 | 11/02/2020 |
| SMD PROJECT MANAGEMENT LLC | 1 | 07/08/2022 |
| THE CHURCHILL SCHOOL | 1 | 06/25/2018 |
| THE HINDU TEMPLE SOCIETY OF NORTH A | 1 | 08/18/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00619903 ↗ | 142 EAST 121 STREET MANHATTAN | Alteration | Permit Issued | 10/28/2021 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 128LF OF 8'W X 16'H TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS… |
| M01267783 ↗ | 1230 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/07/2025 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 551 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| Q01186293 ↗ | 80-25 126 STREET QUEENS | Alteration | Permit Issued | 03/06/2025 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 922LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUPA… |
| S01186342 ↗ | 55 STUYVESANT PLACE STATEN ISLAND | Alteration | Permit Issued | 03/06/2025 | 09/25/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 389 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| M01380871 ↗ | 455 WEST 40 STREET MANHATTAN | Alteration | Permit Issued | 03/31/2026 | 07/27/2026 | Design HD GROUP Owner CUNY Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-344 LF - TEMPORARY HEAVY-DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION ON SIDEWALK AND ENTRANCES D… |
| M01398103 ↗ | 1 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 05/11/2026 | 07/27/2026 | Design HD GROUP Owner CUNY Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-900 LF - TEMPORARY HEAVY-DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION ON SIDEWALK AND ENTRANCES D… |
| Q01374949 ↗ | 222-05 56 AVENUE QUEENS | Alteration | Permit Issued | 04/17/2026 | 07/27/2026 | Design HD GROUP Owner CUNY Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-75LF - 8'W x 14'H TEMPORARY HEAVY-DUTY SIDEWALK SHED AS PER PLANS, AS RECOMENDED BY QEWI FOR LOCAL LAW 11 U… |
| Q01431232 ↗ | 79-01 BROADWAY QUEENS | Alteration | Permit Issued | 07/15/2026 | 07/15/2026 | Design HD GROUP Contractor BHAGHIANA GENERAL CONSTRU | NYC-H+H ELMHURST HOSPITAL - INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLDING AND STAIR TOWERS AT VARIOUS LOCATIONS TO ACCESS VAROUS ROOF LEVE… |
| M01202028 ↗ | 2 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 04/23/2025 | 07/14/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 584 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| M01202061 ↗ | 14 READE STREET MANHATTAN | Alteration | Permit Issued | 04/23/2025 | 07/14/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 286 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| X01202002 ↗ | 1932 ARTHUR AVENUE BRONX | Alteration | Permit Issued | 04/23/2025 | 07/14/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF APPROXIMATELY +/- 216 LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUP… |
| X01411580 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Signed-off | 06/17/2026 | 06/18/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK HOUSES BLD. #7 - INSTALLATION OF APPROXIMATELY +/- 219 LF TEMPORARY HEAVYDUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING RE… |
| X01411593 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Signed-off | 06/17/2026 | 06/18/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK HOUSES BLD. #8 - INSTALLATION OF APPROXIMATELY +/- 125 LF TEMPORARY HEAVYDUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING RE… |
| X01411628 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Permit Issued | 06/17/2026 | 06/18/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK HOUSES BLD. #7 - INSTALLATION OF +/-1140 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING R… |
| X01411632 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Permit Issued | 06/17/2026 | 06/18/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK HOUSES BLD. #8 - INSTALLATION OF +/-920 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING RE… |
| X01411577 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Signed-off | 06/16/2026 | 06/17/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK HOUSES BLD. #2 - INSTALLATION OF APPROXIMATELY +/- 124 LF TEMPORARY HEAVYDUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING RE… |
| X01411619 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Permit Issued | 06/16/2026 | 06/17/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK HOUSES BLD. #2 - INSTALLATION OF +/-875 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING RE… |
| X01411685 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 06/16/2026 | 06/17/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK HOUSES BLD. #19 - INSTALLATION OF +/-1110 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING … |
| X01411692 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 06/16/2026 | 06/17/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK HOUSES BLD. #20 - INSTALLATION OF +/-1265 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING … |
| X01411498 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Signed-off | 06/15/2026 | 06/16/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK HOUSES BLD. #1 - INSTALLATION OF APPROXIMATELY +/- 229 LF TEMPORARY HEAVYDUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING RE… |
| X01411607 ↗ | 2742 DEWEY AVENUE BRONX | Alteration | Permit Issued | 06/15/2026 | 06/16/2026 | Design HD GROUP Owner NYCHA Capital Projects Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK HOUSES BLD. #1 - INSTALLATION OF +/-1105 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING R… |
| M01377721 ↗ | 14 READE STREET MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 03/26/2026 | Design HD GROUP Owner DCAS Contractor ADP GROUP INC | INSTALLATION OF +/-112 FEET HIGH X +/- 16 FEET WIDE TEMPORARY SUPPORTED SCAFFOLDING & STAIR TOWER, AS PER PLANS, FOR EXTERIOR PARTIAL ROOF R… |
| B00005342 ↗ | 360 ADAMS STREET BROOKLYN | Alteration | Permit Issued | 12/19/2017 | 03/19/2026 | Design HD GROUP Owner DCAS Contractor AAA WINDOWS & DOORS CORP | NYC-DCAS - KINGS COUNTY SUPREME COURT - INSTALLATION OF +/- 2430 LF of TEMPORARY (HEAVY-DUTY AND LIGHT DUTY) SIDEWALK SHED, AS PER PLANS, FO… |
| X01351135 ↗ | 2801 RANDALL AVENUE BRONX | Alteration | Permit Issued | 01/27/2026 | 01/28/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #31 - INSTALLATION OF +/-25 FEET HIGH X +/- 163 FEET LONG TEMPORARY SUPPORTED SCAFFOLDING ON THE ROOF LEVE… |
| X01351137 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 01/27/2026 | 01/28/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #33 - INSTALLATION OF +/-25 FEET HIGH X +/-163 FEET LONG TEMPORARY SUPPORTED SCAFFOLDING ON THE ROOF LEVEL… |
| X01299348 ↗ | 2801 RANDALL AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF APPROXIMATELY +/- 427 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFI… |
| X01299352 ↗ | 2801 RANDALL AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK ADDITION, BLD. #31 - INSTALLATION OF APPROXIMATELY +/- 517 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFI… |
| X01299354 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK ADDITION, BLD. #32 - INSTALLATION OF APPROXIMATELY +/- 525 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFI… |
| X01299355 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor MNK ENTERPRISES LLC | NYCHA THROGGS NECK ADDITION, BLD. #33 - INSTALLATION OF APPROXIMATELY +/- 451 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFI… |
| X01299357 ↗ | 2801 RANDALL AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF +/-1489 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| X01299359 ↗ | 2801 RANDALL AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #31 - INSTALLATION OF +/-1633 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| X01351134 ↗ | 2801 RANDALL AVENUE BRONX | Alteration | Permit Issued | 01/27/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF +/-25 FEET HIGH X +/- 163 FEET LONG TEMPORARY SUPPORTED SCAFFOLDING ON THE ROOF LEVE… |
| X01351136 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 01/27/2026 | 01/27/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #32 - INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLDING FROM GROUND LEVEL AND ON THE ROOF LEVELS, AS PER PLA… |
| X01299364 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 01/26/2026 | 01/26/2026 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA THROGGS NECK ADDITION, BLD. #32 - INSTALLATION OF +/-2279 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| M01276524 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/27/2025 | 08/27/2025 | Design HD GROUP Owner AMAN NEW YORK Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF +/-16' W X +/- 78'H (10TH - 16TH FL) & +/-16' W X +/- 108'H (16TH - 23TH FL) TEMP. SUPPORTED SCAFFOLD FOR ACCESS & ENENGINEE… |
| B01103652 ↗ | 760 BROADWAY BROOKLYN | Alteration | Signed-off | 09/04/2024 | 08/15/2025 | Design HD GROUP Contractor ZAMAN CONSTRUCTION CORP | NYC-HHC WOODHULL MEDICAL CENTER - INSTALLATION OF APPROXIMATELY +/- 1852 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING RE… |
| B01103660 ↗ | 760 BROADWAY BROOKLYN | Alteration | Signed-off | 09/04/2024 | 08/15/2025 | Design HD GROUP Contractor ZAMAN CONSTRUCTION CORP | NYC-HHC WOODHULL MEDICAL CENTER - INSTALLATION OF APPROXIMATELY +/- 4,279 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS,… |
| B00452170 ↗ | 121 NORTH PORTLAND AVE BROOKLYN | Alteration | Signed-off | 01/27/2021 | 06/27/2025 | Design JOEL PHAGOO P.E. PLLC Owner NYCHA Contractor PRIME CONTRACTORS, INC | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN… |
| M01063629 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/18/2025 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #13 - INSTALLATION OF APPROXIMATELY +/- 640 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACE… |
| M01223145 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2025 | 05/12/2025 | Design HD GROUP Owner AMAN NEW YORK Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-120LF - 8'W x 14'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR EXTERIOR FACADE REPAIR WORK. NO CHA… |
| B01161440 ↗ | 163 GATES AVENUE BROOKLYN | Alteration | Signed-off | 01/02/2025 | 04/30/2025 | Design HD GROUP Owner Large Marge LLC Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-48LF - 12'W x 10'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR EXTERIOR ROOF REPAIR WORK. NO CHANG… |
| B08000374 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 09/08/2022 | 08/16/2024 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #25 - INSTALLATION OF APPROXIMATELY +/- 465 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00666948 ↗ | 121 NORTH PORTLAND AVE BROOKLYN | Alteration | Signed-off | 02/04/2022 | 08/02/2024 | Design H2H GROUP Owner NYC Housing Authority Contractor PRIME CONTRACTORS, INC | NYCHA WHITMAN HOUSES, BUILDING #6 - INSTALLATION OF +/- 878 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE FOR EXTERIOR RESTORATION, AS… |
| M00903326 ↗ | 371 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 07/12/2023 | 07/18/2024 | Design HD GROUP Owner 371 FTW OWNER'S CORP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF +/- 376 FEET WIDE X +/- 54 FEET HIGH TEMPORARY SUPPORTED SCAFFOLDING AND STAIR TOWER ON TOP OF EXISTING SIDEWALK SHED, AS PE… |
| M01063634 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/21/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #13 - INSTALLATION OF +/- 1,740 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLA… |
| M01063643 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/21/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #13 - INSTALLATION APPROXIMATELY 2,070 SF TEMPORARY SUPPORTED PIPE SCAFFOLD FOR ROOFING REPLACEMENT AND MASONRY REST… |
| M01063632 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #14 - INSTALLATION OF APPROXIMATELY +/- 706 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACE… |
| M01063633 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #15 - INSTALLATION OF APPROXIMATELY +/- 837 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACE… |
| M01063637 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #14 - INSTALLATION OF +/- 2.191 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLA… |
| M01064045 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #1 - INSTALLATION OF APPROXIMATELY +/- 764 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACEM… |
| M01064073 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #2 - INSTALLATION OF APPROXIMATELY +/- 1034 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACE… |
| M01064085 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #3 - INSTALLATION OF APPROXIMATELY +/- 621 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACEM… |
| M01064093 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #1 - INSTALLATION OF +/- 2,165 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLAC… |
| M01064107 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #2 - INSTALLATION OF +/- 2,506 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLAC… |
| M01064114 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 06/19/2024 | 06/20/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA DOUGLASS II, BLD. #3 - INSTALLATION OF +/- 1,040 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLAC… |
| M01064140 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/20/2024 | — | Design HD GROUP Owner NYCHA | — |
| M01064124 ↗ | 865 AMSTERDAM AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/19/2024 | — | Design HD GROUP Owner NYCHA | — |
| M01031659 ↗ | 150 BROOME STREET MANHATTAN | Alteration | Signed-off | 06/03/2024 | 06/04/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA SEWARD PARK EXT., BLD. #2 - INSTALLATION OF APPROXIMATELY +/- 452 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REP… |
| M01031712 ↗ | 62 ESSEX STREET MANHATTAN | Alteration | Signed-off | 06/03/2024 | 06/04/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA SEWARD PARK EXT., BLD. #3 - INSTALLATION APPROXIMATELY 4,020 SF TEMPORARY SUPPORTED PIPE SCAFFOLD FOR ROOFING REPLACEMENT AND MASONRY … |
| M01031675 ↗ | 62 ESSEX STREET MANHATTAN | Alteration | Signed-off | 05/31/2024 | 06/03/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA SEWARD PARK EXT., BLD. #1 - INSTALLATION OF +/- 981 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REP… |
| M01031677 ↗ | 62 ESSEX STREET MANHATTAN | Alteration | Signed-off | 06/03/2024 | 06/03/2024 | Design HD GROUP Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | NYCHA SEWARD PARK EXT., BLD. #3 - INSTALLATION OF +/- 290 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REP… |
| B00776307 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 07/18/2022 | 05/15/2024 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #22 - INSTALLATION OF APPROXIMATELY +/- 525 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00776316 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 07/18/2022 | 05/15/2024 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #22 - INSTALLATION OF +/- 1238 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| B00883230 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 06/02/2023 | 05/15/2024 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #27 - INSTALLATION OF APPROXIMATELY +/- 441 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00883242 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 06/02/2023 | 05/15/2024 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #27 - INSTALLATION OF +/- 1008 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| B00883262 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 06/05/2023 | 05/15/2024 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #28 - INSTALLATION OF +/- 1035 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| B00666974 ↗ | 121 NORTH PORTLAND AVE BROOKLYN | Alteration | Signed-off | 02/04/2022 | 04/18/2024 | Design H2H GROUP Owner NYC Housing Authority Contractor PRIME CONTRACTORS, INC | NYCHA WHITMAN HOUSES, BUILDING #9 - INSTALLATION OF +/-380 LF OF TEMPORARY SIDEWALK SHED FOR PUBLIC PROTECTION FOR EXTERIOR RESTORATION AS P… |
| B00451967 ↗ | 121 NORTH PORTLAND AVE BROOKLYN | Alteration | Signed-off | 01/27/2021 | 04/17/2024 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA WHITMAN HOUSES, BUILDING #8 - INSTALLATION OF +/-409LF OF TEMPORARY SIDEWALK SHED FOR PUBLIC PROTECTION FOR EXTERIOR RESTORATION AS PE… |
| B00452360 ↗ | 121 NORTH PORTLAND AVE BROOKLYN | Alteration | Signed-off | 01/27/2021 | 04/17/2024 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA WHITMAN HOUSES, BUILDING #11 - INSTALLATION OF +/- 2004 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE FOR EXTERIOR RESTORATION, … |
| B00629904 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 11/12/2021 | 04/15/2024 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #19 - INSTALLATION OF APPROXIMATELY +/-483 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE RE… |
| B00666984 ↗ | 121 NORTH PORTLAND AVE BROOKLYN | Alteration | Signed-off | 02/04/2022 | 04/12/2024 | Design H2H GROUP Owner NYC Housing Authority Contractor PRIME CONTRACTORS, INC | NYCHA WHITMAN HOUSES, BUILDING #9 - INSTALLATION OF +/- 884 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE FOR EXTERIOR RESTORATION, AS… |
| M00681980 ↗ | 371 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/16/2022 | 01/26/2024 | Design H2H GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/- 400 LF OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS… |
| B08019297 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2022 | 09/18/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #29 - INSTALLATION OF +/- 1,386 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOF… |
| B00629916 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 11/13/2021 | 09/13/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #30 - INSTALLATION OF APPROXIMATELY 103LF - 6'Wx8'H, 103LF - 8'Wx8'H, 56LF - 10Wx8'H, 16LF - 12'Wx8'H TEMPO… |
| B08000344 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 09/08/2022 | 08/16/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #23 - INSTALLATION OF APPROXIMATELY +/- 550 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B08000387 ↗ | 254 STANLEY AVENUE BROOKLYN | Alteration | Signed-off | 09/08/2022 | 08/16/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #25 - INSTALLATION OF +/- 943 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFIN… |
| S00917167 ↗ | 2800 VICTORY BOULEVARD STATEN ISLAND | Alteration | Signed-off | 08/14/2023 | 08/14/2023 | Design HD GROUP Owner DASNY Contractor TREDENT CONTRACTING SERVI | CUNY COLLEGE OF STATEN ISLAND, BLD. #1A - INSTALLATION OF +/-16'L x 10'W x 8'H TEMPORARY HEVAY DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC P… |
| B00353811 ↗ | 345 ADAMS STREET BROOKLYN | Alteration | Signed-off | 06/04/2020 | 08/08/2023 | Design H2H GROUP Owner DCAS Contractor AAA WINDOWS & DOORS CORP | INSTALLATION OF APPROXIMATELY +/- 556LF OF 8'W X 14'H AND +/- 416LF OF 10'W X 14'H TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECT… |
| M00910825 ↗ | 306 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 07/31/2023 | 07/31/2023 | Design HD GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-40LF - 10'W x 12'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR ROOF REPAIR WORK. NO CHANGE IN USE,… |
| M00910846 ↗ | 306 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 07/31/2023 | 07/31/2023 | Design HD GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF +/-8 FEET WIDE X +/- 60 FEET HIGH TEMPORARY SUPPORTED SCAFFOLDING AND STAIR TOWER AT FRONT OF BUILDING , AS PER PLANS, FOR R… |
| B00776302 ↗ | 10609 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 07/18/2022 | 07/18/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #11 - INSTALLATION OF APPROXIMATELY +/- 218 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00776314 ↗ | 10609 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 07/18/2022 | 07/18/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #11 - INSTALLATION OF +/- 1293 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| B00776298 ↗ | 10609 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 07/18/2022 | 06/29/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #10 - INSTALLATION OF APPROXIMATELY +/- 220 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00776304 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 07/18/2022 | 06/29/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #21 - INSTALLATION OF APPROXIMATELY +/- 497 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00776311 ↗ | 10609 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 07/18/2022 | 06/29/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #10 - INSTALLATION OF +/- 1265 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| B00776315 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 07/18/2022 | 06/29/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #21 - INSTALLATION OF +/- 1101 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFI… |
| B00883276 ↗ | 10609 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 06/07/2023 | 06/07/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #31 - INSTALLATION OF APPROXIMATELY +/- 96 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE RE… |
| B00497460 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 04/30/2021 | 05/30/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #32- INSTALLATION OF +/- 902 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING… |
| B00629911 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 11/12/2021 | 05/30/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #20 - INSTALLATION OF APPROXIMATELY +/- 547 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| B00629914 ↗ | 620 EAST 108 STREET BROOKLYN | Alteration | Signed-off | 11/12/2021 | 05/30/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #20 - INSTALLATION OF +/- 667 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFIN… |
| Q00758849 ↗ | 82-68 164 STREET QUEENS | Alteration | Signed-off | 07/08/2022 | 04/11/2023 | Design HD GROUP Contractor BHAGHIANA GENERAL CONSTRU | INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLDING AT EXTERIOR FACADE (+/-50'H) AND ROOF BULKHEAD (+/-12'H), AS PER PLANS, FOR FACADE REPAIRS A… |
| Q00758815 ↗ | 82-68 164 STREET QUEENS | Alteration | Signed-off | 07/05/2022 | 04/07/2023 | Design HD GROUP Contractor BHAGHIANA GENERAL CONSTRU | INSTALLATION OF APPROXIMATELY +/- 440LF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION FOR FACADE REPAIRS AND ROOF R… |
| B00629890 ↗ | 757 EAST 103 STREET BROOKLYN | Alteration | Signed-off | 11/12/2021 | 04/04/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #8 - INSTALLATION OF APPROXIMATELY +/- 459 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE RE… |
| B00629894 ↗ | 757 EAST 103 STREET BROOKLYN | Alteration | Signed-off | 11/12/2021 | 04/04/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #8 - INSTALLATION OF +/- 1027 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFIN… |
| B00629896 ↗ | 757 EAST 103 STREET BROOKLYN | Alteration | Signed-off | 11/13/2021 | 04/04/2023 | Design H2H GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #9 - INSTALLATION OF APPROXIMATELY +/- 539 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE RE… |
| B00721724 ↗ | 10835 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 04/27/2022 | 04/04/2023 | Design HD GROUP Owner NYCHA Contractor PRIME CONTRACTORS, INC | NYCHA BREUKELEN HOUSES, BUILDING #12 - INSTALLATION OF APPROXIMATELY +/- 220 LF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR EXTERIOR FACADE R… |
| M00119970 ↗ | 18 MURRAY STREET MANHATTAN | Alteration | Signed-off | 04/16/2019 | 02/28/2023 | Design H2H GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF +/-70 FEET HIGH X 25 FEET WIDE TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS FOR EXTERIOR RESTORATION. ALL WORK SHALL BE IN A… |
| M00119972 ↗ | 18 MURRAY STREET MANHATTAN | Alteration | Signed-off | 01/17/2019 | 02/28/2023 | Design H2H GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/- 32LF - 10'W x 16'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR INTERIOR AND EXTERIOR RENOVATION W… |
| B00800158 ↗ | 231 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 12/16/2022 | 12/22/2022 | Design HD GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF +/-8 FEET WIDE X +/- 50 FEET HIGH TEMPORARY SUPPORTED SCAFFOLDING AND STAIR TOWER AT SIDE OF BUILDING , AS PER PLANS, FOR RO… |
| M00640930 ↗ | 313 WEST 77 STREET MANHATTAN | Alteration | Signed-off | 12/08/2021 | 12/01/2022 | Design H2H GROUP Contractor TREDENT CONTRACTING SERVI | INSTALLATION OF APPROXIMATELY +/-32LF - 10'W x 14'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR ROOF REPAIR WORK. NO CHANGE IN USE,… |