| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368406 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 10/13/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner TISHMAN SPEYER Contractor DEPENDABLE MECHANICAL COR Filer DESARNO ASSOCIATES, INC. | SPRINKLER HEAD CHANGES; INCLUDING THE INSTALLATION OF CODE COMPLIANT SPRINKLER SYSTEM INCLUDING ALL SPRINKLER HEADS, PIPING, HANGERS, AND EQ… |
| M01046925 ↗ | 600 5TH AVENUE MANHATTAN | Alteration | Signed-off | 05/14/2024 | 11/14/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor CORE FOUR CONSTRUCTION IN Filer DESARNO ASSOCIATES, INC. | Sprinkler modifications as per plans |
| M01082244 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/31/2024 | 09/04/2024 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor DB COLLABORATIVE LLC Filer WALTER T. GORMAN, PE, PC | Alterations to mechanical system on 21st floor as per plans. No change to use, egress or occupancy. |
| M01082253 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/31/2024 | 08/15/2024 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor S. TIEGER PLBG. CO., INC Filer WALTER T. GORMAN, PE, PC | Alterations to sprinkler system on 21st floor as per plans. No change to use, egress or occupancy. |
| M01082256 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/31/2024 | 08/14/2024 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor RRP PLUMBING CORP Filer WALTER T. GORMAN, PE, PC | Alterations to plumbing system on 21st floor as per plans. No change to use, egress or occupancy. |
| M01082239 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/30/2024 | 08/08/2024 | Contractor INTEGRAL CONSTRUCTION OF | Demolition work on 21st floor as per plans. No change to use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| Robert Derector Associates | 15 | 07/31/2024 |
| AMA Consulting Engineers | 11 | 08/31/2022 |
| Patti & Anthes Consulting Engineers | 7 | 09/05/2023 |
| Fogarty Finger Architecture | 4 | 12/09/2022 |
| Clifford Dias, PE | 3 | 11/08/2023 |
| JFK & M Consulting Engineers | 3 | 08/25/2022 |
| Stantec | 3 | 01/12/2021 |
| Active Design Group Engineering | 2 | 12/04/2023 |
| Spectorgroup Architecture | 2 | 03/26/2026 |
| Advantage Architecture | 1 | 08/24/2022 |
| Gensler | 1 | 08/03/2022 |
| Goldman Copeland Associates | 1 | 03/26/2026 |
| Kahn Architecture & Design | 1 | 07/30/2024 |
| Loffredo Brooks Architects | 1 | 11/19/2021 |
| TPG Architecture | 1 | 09/01/2022 |
| Verderame-Cale Architecture | 1 | 10/19/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Core Four Construction | 5 | 05/15/2024 |
| A&A Plumbing | 4 | 03/26/2026 |
| Enobrac Plumbing | 4 | 12/15/2022 |
| Denko Mechanical | 3 | 07/31/2024 |
| JT Magen & Company | 3 | 11/08/2023 |
| Reidy Contracting Group | 3 | 09/01/2022 |
| A + Sprinkler | 2 | 05/15/2024 |
| Ashland Plumbing | 2 | 09/28/2023 |
| Bedrock Plumbing & Heating | 2 | 01/26/2023 |
| Build NYC Group | 2 | 10/24/2022 |
| Clune Construction Co | 2 | 01/12/2021 |
| Finaly General Contracting | 2 | 08/03/2022 |
| First Cnstrction Zone | 2 | 08/25/2022 |
| JRM Construction Management | 2 | 05/17/2021 |
| Miter Construction | 2 | 11/22/2021 |
| Sean Coakley P & H | 2 | 08/31/2022 |
| Versatile Services | 2 | 01/04/2022 |
| A Plus Plumbing | 1 | 05/17/2021 |
| Aggressive Fire Protection | 1 | 11/22/2021 |
| Amok | 1 | 08/25/2022 |
| CJS Industries | 1 | 09/26/2019 |
| Coyle Contracting | 1 | 11/18/2019 |
| DB Collaborative | 1 | 07/31/2024 |
| Dependable Mechanical | 1 | 03/26/2026 |
| Geoffrey A. Lagas & Associates | 1 | 08/25/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Tishman Speyer Properties | 31 | 03/26/2026 |
| 300 Park Avenue | 7 | 09/05/2023 |
| Rcpi Landmark Properties | 2 | 05/15/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Jerome S. Gillman Consulting Architects | 11 | 09/05/2023 |
| KM Associates of New York | 8 | 11/08/2023 |
| Walter T. Gorman, PE | 7 | 07/31/2024 |
| Desarno Associates | 5 | 03/26/2026 |
| Brookbridge Consulting Services | 3 | 09/01/2022 |
| Rizzo Group | 2 | 05/17/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368406 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 10/13/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner TISHMAN SPEYER Contractor DEPENDABLE MECHANICAL COR Filer DESARNO ASSOCIATES, INC. | SPRINKLER HEAD CHANGES; INCLUDING THE INSTALLATION OF CODE COMPLIANT SPRINKLER SYSTEM INCLUDING ALL SPRINKLER HEADS, PIPING, HANGERS, AND EQ… |
| M01046925 ↗ | 600 5TH AVENUE MANHATTAN | Alteration | Signed-off | 05/14/2024 | 11/14/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor CORE FOUR CONSTRUCTION IN Filer DESARNO ASSOCIATES, INC. | Sprinkler modifications as per plans |
| M01082244 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/31/2024 | 09/04/2024 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor DB COLLABORATIVE LLC Filer WALTER T. GORMAN, PE, PC | Alterations to mechanical system on 21st floor as per plans. No change to use, egress or occupancy. |
| M01082253 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/31/2024 | 08/15/2024 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor S. TIEGER PLBG. CO., INC Filer WALTER T. GORMAN, PE, PC | Alterations to sprinkler system on 21st floor as per plans. No change to use, egress or occupancy. |
| M01082256 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/31/2024 | 08/14/2024 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor RRP PLUMBING CORP Filer WALTER T. GORMAN, PE, PC | Alterations to plumbing system on 21st floor as per plans. No change to use, egress or occupancy. |
| M01082239 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 07/30/2024 | 08/08/2024 | Contractor INTEGRAL CONSTRUCTION OF | Demolition work on 21st floor as per plans. No change to use, egress or occupancy. |
| M00960035 ↗ | 600 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/16/2024 | 03/29/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor A&A PLUMBING CORP Filer DESARNO ASSOCIATES, INC. | Sprinkler head and Temp Loop changes as indicated on plans. |
| M00959674 ↗ | 45 ROCKEFELLER PLAZA MANHATTAN | Alteration | Filed — no permit on record | 12/04/2023 | — | — | |
| M00814548 ↗ | 1 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 04/20/2023 | 09/25/2023 | Design VERDERAME-CALE ARCHITECTURE Owner TISHMAN SPEYER Contractor JT MAGEN & COMPANY INC | FILING FOR RENOVATION OF CORRIDORS & BATHROOMS AND INTERIOR OFFICE SPACE ON THE 21ST FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN… |
| M00814574 ↗ | 1 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 04/18/2023 | 09/25/2023 | Design CLIFFORD DIAS, PE, PC Owner TISHMAN SPEYER Contractor JT MAGEN & COMPANY INC | FILING FOR ASSOCIATED DUCT AND PIPING AS SHOWN ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00814587 ↗ | 1 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 04/20/2023 | 04/28/2023 | Design CLIFFORD DIAS, PE, PC Owner TISHMAN SPEYER Contractor ASHLAND PLUMBING CORP | PLUMBING WORK WORK IN CONJUCTION WITH RENOVATION OF CORRIDORS & BATHROOMS AND MODIFICATION TO EXITISTING PLUMBING SYSTEM ON THE 21ST FLOOR A… |
| M00814581 ↗ | 1 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 04/18/2023 | 04/25/2023 | Design CLIFFORD DIAS, PE, PC Owner TISHMAN SPEYER Contractor MORA FIRE PROTECTION LLC | SPRINKLER WORK IN CONJUCTION WITH RENOVATION OF CORRIDORS & BATHROOMS AND MODIFICATION TO EXITISTING SPRINKLER SYSTEM ON THE 21ST FLOOR AS S… |
| M00801475 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 01/26/2023 | 03/22/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor S. TIEGER PLBG. CO., INC | Sprinkler Head changes as indicated on plans. |
| M00801468 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 01/26/2023 | 03/16/2023 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor BEDROCK PLBG. & HTG., INC Filer DESARNO ASSOCIATES, INC. | Plumbing Fixture changes as indicated on plans. |
| M00801457 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 01/24/2023 | 02/03/2023 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor CORE FOUR CONSTRUCTION IN Filer DESARNO ASSOCIATES, INC. | Mechanical changes as indicated on plans. |
| M08040496 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2022 | 01/19/2023 | Owner 300 PARK AVENUE Contractor S. TIEGER PLBG. CO., INC | Modify sprinkler heads and related piping as shown on plans filed herewith. No change in use, egress or occupancy. |
| M08040483 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2022 | 01/18/2023 | Contractor A&A PLUMBING CORP | Modify plumbing fixtures and related piping as shown on plans filed herewith. No change in use, egress or occupancy. |
| M08040242 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2022 | 01/06/2023 | Contractor CORE FOUR CONSTRUCTION IN | Installation of non-load bearing partitions, doors, ceilings and related finishes as per plans filed herewith. No change in use, egress or … |
| M08040270 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2022 | 01/06/2023 | Owner 300 PARK AVENUE INC. Contractor CORE FOUR CONSTRUCTION IN | Modify mechanical ductwork and associated piping as shown on drawings filed herewith. No change in use, egress or occupancy. |
| M08014971 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/24/2022 | 11/10/2022 | Owner 300 PARK AVENUE Contractor BUILD NYC GROUP | Interior demolition of existing ductwork, piping, equipment, accessories and controls as per plans. No change in use, egress or occupancy. |
| M08015024 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/12/2022 | 11/10/2022 | Contractor BUILD NYC GROUP | Interior removal work to include partition, ceiling, and door removals as per plans. No change in use, egress or occupancy. |
| M00780035 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 08/25/2022 | 09/28/2022 | Design JFK&M CONSULTING ENGINEERS Owner TISHMAN SPEYER Contractor AMOK INC Filer WALTER T. GORMAN, PE, PC | Modifications to sprinkler system as per plans. No change to use, egress or occupancy. |
| M07994657 ↗ | 666 3RD AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2022 | 09/26/2022 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor SEAN COAKLEY P & H INC | Installation of (180) new sprinkler heads and associated sprinkler piping; Relocate (1) Fire hose cabinet and associated Standpipe piping on… |
| M00790363 ↗ | 666 3RD AVENUE MANHATTAN | Alteration | Signed-off | 09/01/2022 | 09/08/2022 | Design TPG ARCHITECTURE, LLP Owner TISHMAN SPEYER Contractor REIDY CONTRACTING GROUP | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 22nd Floor as pe… |
| M00790418 ↗ | 666 3RD AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2022 | 09/05/2022 | Design AMA CONSULTING ENGINEERS, PC Contractor REIDY CONTRACTING GROUP | Modifications to the existing HVAC System: Installation of two (2) new AC Units and associated ductwork and accessories on the 22nd Floor as… |
| M00790396 ↗ | 666 3RD AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2022 | 09/03/2022 | Contractor REIDY CONTRACTING GROUP | Structural Modifications; Installation of new beams and structural steel and existing slab opening to be infilled with new lightweight concr… |
| M00790431 ↗ | 666 3RD AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2022 | 09/02/2022 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor SEAN COAKLEY P & H INC | Remove: (6) WCs, (4) Lavs and (2) URs; Install NEW: (4) HWH, (7) WCs, (5) Lavs, (2) UR, (4) sinks, (3) DW, (3) Chillers with IM, (2) CM, (2)… |
| M00779998 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 08/25/2022 | 08/31/2022 | Design JFK&M CONSULTING ENGINEERS Owner TISHMAN SPEYER Contractor GEOFFREY A. LAGAS & ASSOC Filer WALTER T. GORMAN, PE, PC | Removal of plumbing fixtures in cellar as per plans. No change to use, egress or occupancy. |
| M00780011 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Permit Issued | 08/25/2022 | 08/31/2022 | Design JFK&M CONSULTING ENGINEERS Owner TISHMAN SPEYER Contractor FIRST CNSTRCTION ZONE Filer WALTER T. GORMAN, PE, PC | Alterations to mechanical system as per plans. No change to use, egress or occupancy. |
| M00779881 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 08/24/2022 | 08/30/2022 | Design ADVANTAGE ARCHITECTURE PLLC Owner TISHMAN SPEYER Contractor FIRST CNSTRCTION ZONE Filer WALTER T. GORMAN, PE, PC | Demolition and construction work on cellar as per plans. No change to use, egress or occupancy. |
| M00765150 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/03/2022 | 08/11/2022 | Design ROBERT DERECTOR ASSOCIATES Contractor ENOBRAC PLUMBING, INC | Installation of Plumbing fixtures & Installation of Sprinkler heads and piping as shown on drawings filed herewith. |
| M00762644 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/03/2022 | 08/08/2022 | Design ROBERT DERECTOR ASSOCIATES Contractor FINALY GENL CONTR | Mechanical work including HVAC piping, ductwork grilles, diffusers and exhausts |
| M00762611 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/03/2022 | 08/04/2022 | Design GENSLER Owner TISHMAN SPEYER Contractor FINALY GENL CONTR | Interior renovation consisting of rearrangement of non-load bearing partitions, finishes & doors as shown on drawings filed herewith. |
| M00682070 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 03/18/2022 | 05/31/2022 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor ENOBRAC PLUMBING, INC | SUITE 212: PLUMBING/SPRINKLER MODIFICATIONS ASSOCIATED WITH THE INTERIOR OFFICE RENOVATIONS |
| M00611830 ↗ | 1230 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 11/22/2021 | 05/05/2022 | Design AMA CONSULTING ENGINEERS, PC Contractor AGGRESSIVE FIRE PROT LLC | Removal of plumbing piping and fixtures. Sprinkler removal of sprinkler heads and installation of temp core piping and upright sprinkler hea… |
| M00682046 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 03/18/2022 | 03/22/2022 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor JT MAGEN & COMPANY INC | FILING FOR MECHANICAL WORK ASSOCIATED WITH THE INTERIOR OFFICE RENOVATIONS |
| M00651399 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 01/04/2022 | 01/12/2022 | Owner 300 PARK AVENUE Contractor VERSATILE SERVICES LLC | Removal and installation of interior non-load bearing partitions, doors, ceilings and related finishes as per plans filed herewith. No chan… |
| M00651417 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 01/04/2022 | 01/12/2022 | Owner 300 PARK AVENUE Contractor VERSATILE SERVICES LLC | Modification/Additions to existing HVAC ductwork and piping as per plans filed herewith. No change in use, egress or occupancy. |
| M00651444 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 01/04/2022 | 01/11/2022 | Owner 300 PARK AVENUE Contractor ENOBRAC PLUMBING, INC | MODIFICATION TO EXISTING PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00651473 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 01/04/2022 | 01/11/2022 | Owner 300 PARK AVENUE Contractor ENOBRAC PLUMBING, INC | MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00611817 ↗ | 1230 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 11/19/2021 | 12/14/2021 | Contractor MITER CONSTRUCTION CORP | General Construction removal of interior non load bearing partitions, doors and finishes as shown on drawings filed herewith. No change in u… |
| M00611826 ↗ | 1230 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 11/22/2021 | 12/14/2021 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor MITER CONSTRUCTION CORP | Mechanical Systems new installation & demo work, including removal of air handlers, hvac units, ductwork, grilles, diffusers and exhausts |
| M00516144 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 05/17/2021 | 08/25/2021 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor A PLUS PLUMBING CORP Filer RIZZO GROUP | plumbing modifications taking place in the Cellar construction (Concourse Marketing ) as per plans filed herewith. No change in use, egress… |
| M00516148 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 05/17/2021 | 05/20/2021 | Design ROBERT DERECTOR ASSOCIATES Contractor A + SPRINKLER CORP | Sprinkler modifications taking place in the Cellar construction (Concourse Marketing ) as per plans filed herewith. No change in use, egres… |
| M00516136 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 05/17/2021 | 05/19/2021 | Contractor JRM CONSTRUCTION MGMT LLC | General construction modifications taking place in the Cellar construction (Concourse Marketing ) as per plans filed herewith. No change in… |
| M00516141 ↗ | 50 ROCKEFELLER PLAZA MANHATTAN | Alteration | Signed-off | 05/17/2021 | 05/19/2021 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | Mechanical modifications taking place in the Cellar construction (Concourse Marketing ) as per plans filed herewith. No change in use, egre… |
| M00448052 ↗ | 200 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/12/2021 | 01/19/2021 | Owner TISHMAN SPEYER Contractor CLUNE CONSTRUCTION CO LP | Demolition on interior partitions, finishes, ceilings, doors and restrooms as shown on drawings filed herewith. No change in use, egress or… |
| M00448276 ↗ | 200 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/12/2021 | 01/13/2021 | Design STANTEC Owner TISHMAN SPEYER Contractor CLUNE CONSTRUCTION CO LP | Modify mechanical ductwork as shown on drawings filed herewith. No change in use, egress or occupancy. |
| M00448307 ↗ | 200 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/12/2021 | 01/13/2021 | Design STANTEC Owner TISHMAN SPEYER Contractor PAR PLUMBING CO., INC | Modify plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. |
| M00448345 ↗ | 200 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/12/2021 | 01/13/2021 | Design STANTEC Owner TISHMAN SPEYER Contractor LAWRENCE J. LEVINE | Removal of sprinkler heads, installation of temporary sprinkler heads and associated piping as shown on drawings filed herewith. No change … |
| M00218140 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 09/26/2019 | 01/28/2020 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor TRISTATE PLBG SVCS CORP | SPRINKLER WORK IN THE EXISTING OFFICE SPACE. . NO CHANGE IN USE, EGRESS OR OCCPANCNY. |
| M00256131 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 11/18/2019 | 12/16/2019 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor COYLE CONTRACTING CORP | Mechanical modifications as per plans. No change in use, egress of occupancy |
| M00256162 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 11/18/2019 | 12/07/2019 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor MITIE PLUMBING & HTG CORP | Plumbing modifications as per plans. No change in use egress or occupancy. |
| M00256512 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 11/18/2019 | 12/06/2019 | Design AMA CONSULTING ENGINEERS, PC Contractor JULIAN PLBG & HTG CORP | Sprinkler modifications as per plans. No change in use, egress or occupancy. |
| M00217834 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 09/26/2019 | 10/18/2019 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor CJS INDUSTRIES INC | MECHANICAL WORK AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00218094 ↗ | 1270 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 09/26/2019 | 09/30/2019 | Design AMA CONSULTING ENGINEERS, PC Contractor BEDROCK PLBG. & HTG., INC | Plumbing work as indicated herewith. no change to use egress or occupancy |
| Building | Filings | Most Recent |
|---|---|---|
| 45 ROCKEFELLER PLAZA ↗ | 6 | 03/26/2026 |
| 600 5TH AVENUE ↗ | 2 | 05/15/2024 |
| 1 ROCKEFELLER PLAZA ↗ | 4 | 11/08/2023 |
| 300 PARK AVENUE ↗ | 10 | 09/05/2023 |
| 1270 AVENUE OF THE AMERICAS ↗ | 14 | 01/26/2023 |
| 666 3RD AVENUE ↗ | 5 | 09/01/2022 |
| 50 ROCKEFELLER PLAZA ↗ | 8 | 08/25/2022 |
| 1230 AVENUE OF THE AMERICAS ↗ | 3 | 11/22/2021 |
| 200 PARK AVENUE ↗ | 4 | 01/12/2021 |