| Owner | Filings | Most Recent |
|---|---|---|
| Rcpi Landmark Properties | 1,775 | 03/21/2026 |
| Tishman Speyer Properties | 685 | 10/14/2026 |
| Rcpi Trust | 200 | 03/21/2026 |
| Rockefeller Center Properties | 35 | 03/21/2026 |
| Rcpi | 6 | 03/21/2026 |
| R & S Associates | 4 | 03/21/2026 |
| Roperties | 3 | 03/21/2026 |
| Armen Partners | 2 | 03/21/2026 |
| Equinox | 1 | 03/21/2026 |
| Bessemer Trust | 1 | 03/21/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Walter T. Gorman, PE | 137 | 03/21/2026 |
| Gillman Consulting | 68 | 03/21/2026 |
| Codegreen | 56 | 03/21/2026 |
| K & M Associates | 46 | 03/21/2026 |
| Metropolis Group | 36 | 03/21/2026 |
| Angela Rivera | 9 | 03/21/2026 |
| Yao W Guo Architect | 4 | 03/21/2026 |
| Desarno Associates | 16 | 03/21/2026 |
| EA Design Group | 14 | 03/21/2026 |
| KM Associates of New York | 17 | 03/21/2026 |
| HTX Building Consulting | 2 | 03/21/2026 |
| Doreen A. Rizzi, Consultant | 4 | 03/21/2026 |
| Municipal Building Consultants | 4 | 03/21/2026 |
| Louis Striar | 8 | 03/21/2026 |
| Outsource Consultants | 18 | 03/21/2026 |
| Custodio Consulting | 4 | 03/21/2026 |
| A1 Expediting Service | 10 | 03/21/2026 |
| Walter T Gorman Pepc | 69 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Coyle Contracting | General Contractor | 45 | 07/08/2026 |
| JT Magen & Company | General Contractor | 33 | 09/26/2026 |
| Mass Contracting | General Contractor | 25 | 07/08/2026 |
| JRM Construction Management | General Contractor | 23 | 07/08/2026 |
| Reidy Contracting Group | General Contractor | 22 | 07/08/2026 |
| Shawmut Woodworking & Supply | General Contractor | 15 | 07/08/2026 |
| A&A Plumbing | Plumbing | 14 | 09/01/2026 |
| Rinnovo Construction | General Contractor | 13 | 07/08/2026 |
| Reem Plumbing & Heating | Plumbing | 11 | 07/08/2026 |
| P & D Mechanical | Fire Protection | 11 | 07/08/2026 |
| Geoffrey A. Lagas & Associates | Plumbing | 10 | 07/08/2026 |
| Dependable Mechanical | Fire Protection | 10 | 10/14/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 10 | 07/08/2026 |
| James E Fitzgerald | General Contractor | 8 | 03/21/2026 |
| Safway Atlantic | Scaffold | 8 | 07/08/2026 |
| Black Bull Bulders | General Contractor | 8 | 07/08/2026 |
| Finaly General Contracting | General Contractor | 7 | 07/08/2026 |
| Interstate Mechanical Services | General Contractor | 7 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 7 | 10/04/2026 |
| PSI Partners | Fire Protection | 6 | 09/12/2026 |
| Reem Plumbing & Heating | Fire Protection | 6 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 6 | 07/08/2026 |
| CM Plumbing | Plumbing | 6 | 07/08/2026 |
| Aggressive Fire Protection | Fire Protection | 5 | 09/30/2026 |
| Folor | General Contractor | 5 | 04/09/2026 |
| Theodore Williams Construction | General Contractor | 5 | 07/08/2026 |
| Core Four Construction | General Contractor | 5 | 04/10/2026 |
| J.A. Jennings | General Contractor | 5 | 07/08/2026 |
| Osman | General Contractor | 5 | 07/08/2026 |
| SKH Mechanical | Fire Protection | 4 | 07/08/2026 |
| Bluewater Plumbing & Heating | Plumbing | 4 | 07/08/2026 |
| Interboro Sign & Electrical Maintenance | Sign hanger | 4 | 07/08/2026 |
| Skyline Windows | specialty_contractor | 4 | 06/02/2026 |
| L & Z Restoration | specialty_contractor | 4 | 03/21/2026 |
| Schimenti Construction Co | General Contractor | 3 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 3 | 07/08/2026 |
| DB Collaborative | General Contractor | 3 | 03/21/2026 |
| Adco Electrical | Electrical | 3 | 03/21/2026 |
| Pace Plumbing | Fire Protection | 3 | 07/08/2026 |
| Tristate Plumbing Services | Plumbing | 3 | 07/08/2026 |
| Roughouse GV | General Contractor | 3 | 03/21/2026 |
| Standard Fire Supp | Fire Protection | 2 | 07/08/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 2 | 03/21/2026 |
| Jads Productions | General Contractor | 2 | 03/21/2026 |
| Benchmark Builders | General Contractor | 2 | 03/21/2026 |
| Plumbing Works | Fire Protection | 2 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Ashland Plumbing | Plumbing | 2 | 07/08/2026 |
| Allstate Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Integral Construction of | General Contractor | 2 | 03/21/2026 |
| Enobrac Plumbing | Fire Protection | 2 | 07/08/2026 |
| Structure Tone | General Contractor | 2 | 07/08/2026 |
| Enobrac Plumbing | Plumbing | 2 | 07/08/2026 |
| Winick Productions | General Contractor | 2 | 07/08/2026 |
| DV Plumbing | Plumbing | 2 | 07/08/2026 |
| CJS Industries | General Contractor | 2 | 03/21/2026 |
| Ennell Group Electric | Electrical | 2 | 03/22/2026 |
| MRD Electrical Services | Electrical | 2 | 03/22/2026 |
| Connelly & Sons Plumbing | Plumbing | 2 | 09/29/2026 |
| Bedrock Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 2 | 07/08/2026 |
| A + Sprinkler | Fire Protection | 2 | 07/08/2026 |
| JMJ General Contracting G | General Contractor | 2 | 09/18/2026 |
| Wasoff Plumbing & Utility Co | Plumbing | 1 | 09/18/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/22/2026 |
| Difazio Electric NY | Electrical | 1 | 03/22/2026 |
| Freedom Electl & Data | Electrical | 1 | 03/22/2026 |
| Stemco Electric LLC Dba | Electrical | 1 | 03/21/2026 |
| Horsepower Electric | Electrical | 1 | 03/22/2026 |
| Nead Electric | Electrical | 1 | 03/21/2026 |
| Joseph Weinstein Electric | Electrical | 1 | 03/22/2026 |
| Transform Electl Contractors I | Electrical | 1 | 03/21/2026 |
| Lenox, JR, Joseph | Electrical | 1 | 03/21/2026 |
| Lliguichushca Jose | Electrical | 1 | 03/21/2026 |
| Corporate Electric Group | Electrical | 1 | 03/21/2026 |
| Dobs Elevator Company | Electrical | 1 | 03/21/2026 |
| P&H Electric D/B/A Mage Electric | Electrical | 1 | 03/22/2026 |
| Schlesinger Elect'l Contracting | Electrical | 1 | 03/22/2026 |
| S & D Electric NY | Electrical | 1 | 03/22/2026 |
| Thompson Michael | Electrical | 1 | 03/21/2026 |
| Clune Construction Co | General Contractor | 1 | 07/08/2026 |
| DK Construction One | General Contractor | 1 | 04/11/2026 |
| DNJ Industries | General Contractor | 1 | 07/08/2026 |
| Millstone Construc | General Contractor | 1 | 07/08/2026 |
| Principal Builders Soluti | General Contractor | 1 | 07/08/2026 |
| W.J. Regan & Company | General Contractor | 1 | 07/08/2026 |
| Delorenzo Alfred | Scaffold | 1 | 03/21/2026 |
| Midnight Express Mechanical CRP | Scaffold | 1 | 03/21/2026 |
| A&H Express Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 1 | 07/08/2026 |
| Denko Mechanical | Fire Protection | 1 | 07/08/2026 |
| DNA Plumbing Contractors | Plumbing | 1 | 07/08/2026 |
| Expert Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Express PL SWR & WTR A | Plumbing | 1 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| NYC Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| Rael Automatic Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| RRP Plumbing | Plumbing | 1 | 07/08/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Walter T. Gorman, P.E., P | 268 | 76 | 10/12/2026 |
| Future Tech Consultants O | 589 | 8 | 09/17/2026 |
| AK Engineering | 678 | 7 | 09/09/2026 |
| Xiao Engineering | 6634 | 1 | 08/14/2026 |
| Alan Margolin & Associates | 423 | 30 | 05/20/2026 |
| Outsource Special Inspection | 2827 | 5 | 03/27/2026 |
| Codegreen | 510 | 37 | 01/29/2026 |
| James JH Chai & Associate | 6481 | 2 | 08/20/2025 |
| Milrose Consultants | 2003 | 4 | 05/14/2025 |
| Engineering Building Service | 7303 | 6 | 03/19/2025 |
| Cthree Architecture + Des | 1124 | 2 | 01/20/2025 |
| Crosscheck Inspection Services | 544 | 11 | 01/20/2025 |
| Socotec Engineering | 4983 | 11 | 10/23/2024 |
| Metric Consulting and Ins | 1803 | 1 | 05/21/2024 |
| Richard B. Kornblau, AIA | 3208 | 3 | 05/16/2024 |
| Valjato Engineering | 2486 | 1 | 01/24/2024 |
| 20/20 Inspections | 1471 | 36 | 12/02/2022 |
| PSI Agency | 254 | 3 | 06/16/2022 |
| Skyline Engineering | 267 | 9 | 04/28/2022 |
| DNA Controlled Inspection | 554 | 10 | 04/28/2022 |
| Joseph Martines PE | 1428 | 9 | 03/08/2022 |
| M/P/S Engineering | 1588 | 2 | 02/04/2021 |
| Yao W Guo Architect | 1754 | 2 | 10/29/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | W.J. Regan & Company | 10/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 10/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 10/13/2026 |
| DOB NOW | Standpipe | Permit Issued | Dependable Mechanical | 10/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Aggressive Fire Protection | 09/29/2026 |
| DOB NOW | Standpipe | Permit Issued | Aggressive Fire Protection | 09/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | Aggressive Fire Protection | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | Connelly & Sons Plumbing | 09/28/2026 |
| DOB NOW | Standpipe | Permit Issued | Aggressive Fire Protection | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | Connelly & Sons Plumbing | 09/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JMJ General Contracting G | 09/17/2026 |
| DOB NOW | Plumbing | Permit Issued | Wasoff Plumbing & Utility Co | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI Partners | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/10/2026 |
| DOB NOW | Structural | Permit Issued | JT Magen & Company | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/10/2026 |
| DOB NOW | Standpipe | Permit Issued | PSI Partners | 09/03/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | JMJ General Contracting G | 08/26/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 07/08/2026 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 06/25/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 05/29/2026 |
| DOB NOW | Mechanical Systems | Signed-off | J.A. Jennings | 05/27/2026 |
| DOB NOW | General Construction | Signed-off | J.A. Jennings | 05/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 05/26/2026 |
| DOB NOW | Standpipe | Permit Issued | Dependable Mechanical | 05/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | J.A. Jennings | 05/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J.A. Jennings | 05/14/2026 |
| DOB NOW | General Construction | Permit Issued | J.A. Jennings | 05/12/2026 |
| DOB NOW | General Construction | Permit Issued | Millstone Construc | 05/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 04/21/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 04/13/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 04/10/2026 |
| DOB NOW | General Construction | Permit Issued | DK Construction One | 04/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 03/30/2026 |
| DOB NOW | General Construction | Permit Issued | Skyline Windows | 03/16/2026 |
| DOB NOW | Plumbing | Signed-off | Express Plumbing SWR & WTR Ma | 02/17/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/20/2026 | Permit Issued | JT Magen & Company | Air Conditioning Systems | Cooling Climatecraft CAH75X132 25,500 CFM · Ahu ×2 |
| 11/13/2025 | Signed-off | Schimenti Construction Co | Heating and Air Conditioning Systems | Heat / Cool Aaon H3-BRB-8-0-26HA-7BS 72 BTU · Fan Coil Indoor ×4 |
| 02/28/2022 | Permit Issued | Coyle Contracting | Others | Other Nortek 55T-CW-628597 20,000 CFM · Ahu ×2 |
| 06/14/2021 | Permit Issued | Coyle Contracting | Air Conditioning Systems | Cooling Nortek 55T-CW-628597 55 tons · Ahu ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | Aggressive Fire Protection | 354 heads, 1 outlets |
| 08/26/2026 | Permit Issued | Aggressive Fire Protection | — |
| 07/10/2026 | Permit Issued | PSI Partners | 94 heads, 1 outlets |
| 05/20/2026 | Signed-off | A&H Express Plumbing & Heating | 495 heads |
| 04/28/2026 | Signed-off | A&H Express Plumbing & Heating | 107 heads |
| 03/27/2026 | Permit Issued | A&H Express Plumbing & Heating | 100 heads |
| 03/09/2026 | Permit Issued | Full Capacity Fire | 72 heads |
| 11/14/2025 | Signed-off | Allstate Sprinkler | 130 heads |
| 05/14/2025 | Permit Issued | PSI Partners | — |
| 04/28/2022 | Permit Issued | Capitol Fire Sprinkler Co | 166 heads |
| 02/28/2022 | Permit Issued | Reem Plumbing & Heating | 10 heads |
| 10/29/2020 | Signed-off | Abco Peerless Sprinkler | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | Connelly & Sons Plumbing | Water/Sanitary |
| 08/26/2026 | Permit Issued | Connelly & Sons Plumbing | Water/Sanitary |
| 08/14/2026 | Permit Issued | Wasoff Plumbing & Utility Co | Water/Sanitary |
| 07/22/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 06/15/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 05/20/2026 | Permit Issued | Dependable Mechanical | Water/Sanitary |
| 04/28/2026 | Signed-off | A&A Plumbing | — |
| 03/27/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 03/26/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 03/10/2026 | Signed-off | A&A Plumbing | Water/Sanitary |
| 03/09/2026 | — | — | — |
| 01/14/2026 | Signed-off | A&A Plumbing | Water/Sanitary |
| 11/14/2025 | — | — | — |
| 08/20/2025 | Signed-off | Express PL SWR & WTR A | Water/Sanitary |
| 10/23/2024 | Signed-off | A&A Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/01/2026 | Permit Issued | Matros Automated Electrical | General Wiring |
| 09/24/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/09/2026 | Permit Issued | IQ Electrical Contracting | General Wiring |
| 09/08/2026 | Permit Issued | Unity Electric Co | General Wiring |
| 06/03/2026 | Permit Issued | S & D Electric NY | General Wiring |
| 06/03/2026 | Permit Issued | S & D Electric NY | General Wiring |
| 06/03/2026 | Permit Issued | S & D Electric NY | General Wiring |
| 05/11/2026 | Permit Issued | KJK Electric | General Wiring |
| 04/22/2026 | Complete | Reiter Electric | General Wiring |
| 04/15/2026 | Permit Issued | M.C. Electrical NY | General Wiring |
| 02/18/2026 | Complete | Transform Electl Contractors I | General Wiring |
| 01/08/2026 | Complete | Allstate Electrical Cont | General Wiring |
| 12/22/2025 | Complete | Allstate Electrical Cont | General Wiring |
| 08/05/2025 | Complete | Ennell Group Electric | General Wiring |
| 04/04/2025 | Permit Issued | MRD Electrical Services | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/12/2026 | Permit Issued | W.J. Regan & Company | Steel, Concrete |
| 09/09/2026 | Permit Issued | Connelly & Sons Plumbing | Steel |
| 06/22/2026 | Permit Issued | Winick Productions | 1 scope_items |
| 05/20/2026 | Permit Issued | Dependable Mechanical | Steel, Concrete |
| 02/08/2022 | — | — | Steel, Concrete |
| 09/25/2020 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/17/2021 | Permit Issued | Safway Atlantic | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/02/2026 | Pass PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/05/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/02/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/12/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/08/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/20/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/21/2026 | Final | MARISA HARTE | progress |
| 09/21/2026 | Mechanical Systems | MARISA HARTE | special |
| 08/28/2026 | Fire-Resistance Rated Construction | — | progress |
| 08/14/2026 | Structural Steel - Welding | — | special |
| 08/14/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/14/2026 | Structural Steel - Details | — | special |
| 08/14/2026 | Structural Steel - High Strength Bolting | — | special |
| 08/14/2026 | Concrete - Cast-In-Place | — | special |
| 08/12/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/12/2026 | Energy Code Compliance Inspections | — | progress |
| 08/12/2026 | Structural Steel - Welding | Ari Kamo | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/12/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/12/2026 | Structural Steel - High Strength Bolting | Ari Kamo | special |
| 08/12/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/12/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/12/2026 | Maintenance information | — | energy_progress |
| 08/12/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 08/11/2026 | Final | — | progress |
| 08/07/2026 | Sprinkler Systems | Ari Kamo | special |
| 08/07/2026 | Standpipe Systems | Ari Kamo | special |
| 08/07/2026 | Sprinkler Systems | Ari Kamo | special |
| 08/07/2026 | Standpipe Systems | Ari Kamo | special |
| 08/05/2026 | Ventilation and air distribution system | Ari Kamo | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Baker Hostetler | Office | Floors 10–12, 14 | Project M01435064 Project M01436058 Project M01436052 |
| World Cup Telemundo | Events & gatherings | — | Project M01416353 |
| Tishman Speyer | Office | Floors 6, 35 | Project M01368406 Project M00965597 Project M00965606 Project M00965624 Project M00965631 Project M00959674 |
| Escapology | Arts / Culture / Entertainment | Sub-cellar, Sub-basement | Project M01290979 Project M01317744 Project M01290969 Project M01290990 Project M01290960 |
| Palistar Capital | Office | Floor 25 | Project M01260893 |
| One Endo | Medical / Healthcare | Floor 18 | Project M01270089 |
| The Riverside Company | Office | Floor 4 | Project M01198099 Project M01198086 Project M01198087 Project M01198093 |
| Rockefeller Capital Management | Office | Floor 9 | Project M01176441 Project M01176444 Project M01176450 Project M01176428 |
| Axinn | Office | Floors 32, 33 | Project M01090630 Project M01048348 Project M01048353 Project M01048357 Project M01048376 |
| Hudson Housing Capital | Office | Floor 28 | Project M01065567 Project M01065318 |
| Verderame Cale | Office | Floor 25 | Project M01033812 Project M01033817 Project M01033832 Project M01033839 |
| Tish0an | Office | Floor 6 | Project M00951747 |
| Staples | Retail | Floor 18 | Project M00916906 Project M00919731 Project M00919741 Project M00919746 |
| Puig | Office | Sub-cellar, Basement, Floors 1–3, 31 | Project M00886686 Project M00886717 Project M00886844 Project M00886252 |
| Optum Workplace Well-being | Office | Floors 33, 34 | Project M00839673 Project M00839650 Project M00839666 |
| Ruane Cunniff & Goldfarb | Office | Floors 33, 34 | Project M00839662 Project M00839669 Project M00839656 |
| Teleperformance | Office | Floor 19 | Project M00816111 |
| Central Securities | Office | Floor 8 | Project M08017019 Project M08017046 Project M08017080 |
| Campbell Lutyens | Office | Floor 36 | Project M00765273 Project M00765279 Project M00765281 Project M00765284 |
| Alfred P. Sloan Foundation | Office | Floor 22 | Project M00737779 Project M00737808 Project M00737817 Project M00737827 |
| One Rock Capital | Office | Floors 37, 38 | Project M00695893 Project M00695983 Project M00695911 Project M00695919 Project M00695945 |
| Lindsay Goldberg | Office | Floors 29, 37, 38 | Project M00705782 Project M00705830 Project M00715703 Project M00715723 Project M00715746 Project M00715685 Project M00715753 Project M00671175 Project M00671186 Project M00671193 Project M00671147 Project M00662315 |
| Frenchette | Restaurant / Food Service | Cellar, Sub-basement, Floors 1, 2, Mezzanine | Project M00517957 Project M00494279 Project M00469238 Project M00469239 Project M00469240 |
| Rhone Group | Office | Floor 31 | Project M00495923 Project M00496186 Project M00486589 Project M00486562 Project M00486605 |
| Brasserie Ruhlmann | Restaurant / Food Service | Sub-basement, Floor 1, Mezzanine | Project M00359264 |
| Optimum | Retail | Floor 34 | Project M00455257 Project M00455316 Project M00455318 Project M00455333 |
| Rockefeller Dental Group | Medical / Healthcare | Floor 18 | Project M00425233 |
| LEGO Systems | Retail | Floor 1, Mezzanine | Project M00377922 Project M00363314 Project M00374567 |
| All Saints | Retail | Floors 1–5 | Project M00003201 Project M00003202 Project M00003206 Project M00003208 |