| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01465099 | 2644 BROADWAY MANHATTAN | New Job Filing | Job in process | 09/24/2026 | 09/24/2026 | — | Install new Switches, receptacles and lights off existing power in cellar and 1st floor. Power for 2 AC Units |
| S01465414 | 19 NORTH RHETT AVENUE STATEN ISLAND | New Job Filing | Job in process | 09/24/2026 | 09/24/2026 | — | Removal of abandoned Application R038320. It is a 30 Year Old Application that is now obsolete |
| S01444173 | 290 WINCHESTER AVENUE STATEN ISLAND | New Job Filing | Complete | 08/11/2026 | 08/10/2026 | — | Replace (1) 100Amp Meter Pan |
| M01408843 | 666 5 AVENUE MANHATTAN | New Job Filing | Job in process | 05/28/2026 | 05/29/2026 | — | Installing panels, transformers lighting and power in cellar, 1st floor, 2nd floor for Zara Retail Store. Utilizing existing high voltage p… |
| B01408142 | 1150 BRIGHTON BEACH AVE BROOKLYN | New Job Filing | Cancelled | 05/27/2026 | 05/28/2026 | — | Reinstating a bis permit #B207460 for a Construction Guard house that is no longer there. Need to have the permit closed |
| M01340894 | 666 5 AVENUE MANHATTAN | New Job Filing | Job in process | 12/30/2025 | 12/31/2025 | — | Provide Temporary Lights and relocates for Demo of Partial Store |
| Name | Projects together | Most recent |
|---|---|---|
| Queensview Inc. | 9 | — |
| Queensview Inc | 4 | — |
| Redline Construction | 3 | — |
| Karbon Engineering | 2 | — |
| Nordes Us Corp | 2 | — |
| Queensview | 2 | — |
| At&T | 1 | — |
| Ahearn Holtzman | 1 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01465099 | 2644 BROADWAY MANHATTAN | New Job Filing | Job in process | 09/24/2026 | 09/24/2026 | — | Install new Switches, receptacles and lights off existing power in cellar and 1st floor. Power for 2 AC Units |
| S01465414 | 19 NORTH RHETT AVENUE STATEN ISLAND | New Job Filing | Job in process | 09/24/2026 | 09/24/2026 | — | Removal of abandoned Application R038320. It is a 30 Year Old Application that is now obsolete |
| S01444173 | 290 WINCHESTER AVENUE STATEN ISLAND | New Job Filing | Complete | 08/11/2026 | 08/10/2026 | — | Replace (1) 100Amp Meter Pan |
| M01408843 | 666 5 AVENUE MANHATTAN | New Job Filing | Job in process | 05/28/2026 | 05/29/2026 | — | Installing panels, transformers lighting and power in cellar, 1st floor, 2nd floor for Zara Retail Store. Utilizing existing high voltage p… |
| B01408142 | 1150 BRIGHTON BEACH AVE BROOKLYN | New Job Filing | Cancelled | 05/27/2026 | 05/28/2026 | — | Reinstating a bis permit #B207460 for a Construction Guard house that is no longer there. Need to have the permit closed |
| M01340894 | 666 5 AVENUE MANHATTAN | New Job Filing | Job in process | 12/30/2025 | 12/31/2025 | — | Provide Temporary Lights and relocates for Demo of Partial Store |
| S01337883 | 2655 RICHMOND AVENUE STATEN ISLAND | New Job Filing | Job in process | 12/19/2025 | 12/20/2025 | — | Provide power for lighting and outlets for retail store space #1270, Provide power for 2 Rooftop Units |
| Q01325303 | 70-09 PARSONS BOULEVARD QUEENS | New Job Filing | Job in process | 11/26/2025 | 11/27/2025 | — | Install 600Amp Service, 4 panels, 2RTU and General power and lighting for Wonder Restaurant |
| S01310419 | 5516 ARTHUR KILL ROAD STATEN ISLAND | New Job Filing | Job in process | 10/29/2025 | 10/30/2025 | — | Repairing existing 100Amp Service damaged by national grid truck |
| S01285316 | 26 VINCENT AVENUE STATEN ISLAND | New Job Filing | Complete | 09/10/2025 | 09/11/2025 | — | Run new branch circuitry for power and lighting on existing service with 2 HVAC units |
| S01271797 | 17 MAYBERRY PROMENADE STATEN ISLAND | New Job Filing | Complete | 08/14/2025 | 08/15/2025 | — | Replace (1) Defective 100Amp Meter Pan |
| S01246614 | 295 ARDSLEY STREET STATEN ISLAND | New Job Filing | Job in process | 06/25/2025 | 06/26/2025 | — | Install 100Amp Single Family Service with 1 Service Switch |
| S01208355 | 1063 SHELDON AVENUE STATEN ISLAND | New Job Filing | Job in process | 04/09/2025 | 04/10/2025 | — | Replaced Burnt feeder and jaw on existing meter |
| S01205290 | 3981 AMBOY ROAD STATEN ISLAND | New Job Filing | Job in process | 04/03/2025 | 04/04/2025 | — | Replaced Broken H Block in existing meter pan |
| S01205455 | 250 OAK AVENUE STATEN ISLAND | New Job Filing | Complete | 04/03/2025 | 04/04/2025 | — | Provide power and lighting and power for electric heat, AC, cooking |
| B01190536 | 293 13 STREET BROOKLYN | New Job Filing | Job in process | 03/05/2025 | 03/06/2025 | — | Install 4 150Amp Service switches, 4 200amp panels, 4 Rooftop condensers, 12 Air Handlers, 1 feed for Hydrophilic elevator lift. Lighting an… |
| M01190444 | 35 EAST 12 STREET MANHATTAN | New Job Filing | Job in process | 03/05/2025 | 03/06/2025 | — | Filing to Supersede Permit #M00927452 For 1 200Amp switch, 1 200Amp meter, 1 200Amp Panel, 1 3aut feeder, 1 40amp Rooftop Unit, 2 air Handle… |
| S01187199 | 707 WOODROW ROAD STATEN ISLAND | New Job Filing | Complete | 02/26/2025 | 02/26/2025 | — | Install 3 Outlets , 2 Light Fixtures and 1 Switch off existing circuitry. |
| M01161111 | 500 WEST 33 STREET MANHATTAN | New Job Filing | Complete | 12/30/2024 | 12/31/2024 | — | Install Lights and General Outlets for the 4th Floor Stockroom |
| M01139028 | 1344 1 AVENUE MANHATTAN | New Job Filing | Complete | 11/07/2024 | 11/08/2024 | — | Installing 3 new 110V Receptacles and 2 new switches to connect to existing lights in Apt 8H |
| M01135766 | 500 WEST 33 STREET MANHATTAN | New Job Filing | Job in process | 10/31/2024 | 11/01/2024 | — | Renovate existing clothing store. New Lighting, receptacles, HVAC Units and Panels |
| S01105273 | 3981 AMBOY ROAD STATEN ISLAND | New Job Filing | Complete | 09/03/2024 | 09/04/2024 | — | Replacing Old 200Amp 3 Phase meter with New 3 Phase 200Amp Bypass meter. All Other equipment to remain existing |
| S01079612 | 19 NORTH RHETT AVENUE STATEN ISLAND | New Job Filing | Complete | 07/11/2024 | 07/12/2024 | — | Convert single family home to 2 family home. (1) 200Amp service switch and (1) 100 Amp Service Switch. Main house to remain existing provid… |
| B01040361 | 117 81 STREET BROOKLYN | New Job Filing | Job in process | 04/23/2024 | 04/24/2024 | — | Wire new lighting and general power from existing service. Wire (2) AC Units and (2) Air Handlers. Power for Electric Car Charger |
| S01022406 | 73 JOHNSON AVENUE STATEN ISLAND | New Job Filing | Complete | 03/19/2024 | 03/20/2024 | — | New Single phase 400Amp Service. (2) 5 Ton AC Units. Walk In Refrigerator/ Freezer. Appliance Receptacles and Lighting |
| S07996518 | 157 RIDGE AVENUE STATEN ISLAND | Subsequent Filing | Complete | 02/08/2024 | 02/09/2024 | — | 200Amp Service, (3) 3 Ton AC units Lighting and Power for Single Family Home |
| B00976377 | 191 BALTIC STREET BROOKLYN | New Job Filing | Job in process | 12/13/2023 | 12/14/2023 | — | wire 4 ac compressors and 9 blowers. |
| M00963800 | 182 HESTER STREET MANHATTAN | New Job Filing | Job in process | 11/16/2023 | 11/17/2023 | — | re-energize 400Amp Service switch and 200 amp service switch under emergency stabilization Order # 343311 |
| B00910263 | 321 DECATUR STREET BROOKLYN | New Job Filing | Job in process | 07/26/2023 | 07/27/2023 | — | Power Lighting (4) AC Condensers for a 2 Family Home. Existing Service |
| B00885791 | 203 COLUMBIA STREET BROOKLYN | New Job Filing | Complete | 06/28/2023 | 06/29/2023 | — | Removal for Objections attached to Permit Number B072010. |
| Q00894570 | 90-15 QUEENS BOULEVARD QUEENS | New Job Filing | Complete | 06/22/2023 | 06/23/2023 | — | Install (1) 350 480V distribution Panel. (1) 225 KVA Panel. (1) 600Amp 240V Distribution Panel. (12) Panels. Power for Lights, Receptacle… |
| S00824383 | 34 WILBUR STREET STATEN ISLAND | New Job Filing | Job in process | 02/06/2023 | 02/07/2023 | — | Replacing service entrance conductors to the meter |
| Q00810278 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel reconnect existing circuits and install (1) 220V Sub- Meter in 52 Apartments |
| Q00810313 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Job in process | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and install (1) 220V Sub- Meter in 52 Apartments |
| Q00810323 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and install (1) 220V Sub- Meter in 52 Apartments |
| Q00810341 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect exisitng circuits and install (1) 220V Sub- Meter in 52 Apartments |
| Q00810352 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and install (1) 220V Sub Meter in 51 Apartments |
| Q00810591 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and install (1) 220V Sub- Meter in 52 Apartments |
| Q00810610 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 50 Apartments |
| Q00810623 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 52 Apartments |
| Q00810633 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 52 Apartments |
| Q00810643 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 52 Apartments |
| Q00810656 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 52 Apartments |
| Q00810671 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 51 Apartments |
| Q00810691 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 52 Apartments |
| Q00810709 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 01/10/2023 | 01/11/2023 | — | Remove and Replace (1) 120/240V MLO Panel. Reconnect existing circuits and Install (1) 220V Sub- Meter in 52 Apartments |
| B08041853 | 203 COLUMBIA STREET BROOKLYN | New Job Filing | Complete | 11/17/2022 | 11/18/2022 | — | Three Lights for Sidewalk Shed. This is Superseding Application Number B00569013 |
| B08005040 | 729 42 STREET BROOKLYN | New Job Filing | Complete | 09/16/2022 | 09/20/2022 | — | PAA for existing old application B327455. 2 panels and 2 AC receptacles |
| B00767877 | 389 DEGRAW STREET BROOKLYN | New Job Filing | Complete | 06/30/2022 | 07/01/2022 | — | Existing Service, existing work in cellar new branch circuitry all other floors and (4) AC Condensers. This application Supersedes Applicat… |
| B00766534 | 351 HOYT STREET BROOKLYN | New Job Filing | Job in process | 06/29/2022 | 06/30/2022 | — | Power and Lighting Throughout. 2 Ac Condensers |
| Q00763120 | 33-34 CRESCENT STREET QUEENS | New Job Filing | Complete | 06/23/2022 | 06/24/2022 | — | Remove and Replace (1) 120/240V MLO Panel and install (1) 220V Sub- Meter. Apartment 12B |
| B00652921 | 185 ASHLAND PLACE BROOKLYN | New Job Filing | Job in process | 12/23/2021 | 12/24/2021 | — | New 200Amp Service Branch Circuitry and 3 AC Condemsor Units |
| B00652958 | 203 COLUMBIA STREET BROOKLYN | New Job Filing | Complete | 12/23/2021 | 12/24/2021 | — | New wiring on 1st floor and 4th floor. No work on second floor. New Panel and Limited wiring on 3rd floor. 1 Rooftop Condenser |
| M00620257 | 511 BROADWAY MANHATTAN | New Job Filing | Complete | 10/27/2021 | 10/28/2021 | — | Run 30Amp Feeder for Elevator Disconnect. Feed one Exhaust fan Install 2 Pit GFI, 2 Pit Switches and 2 Pit Lights for Elevator. |
| B00512422 | 173 SMITH STREET BROOKLYN | New Job Filing | Complete | 04/28/2021 | 04/29/2021 | — | Apartment 2D. Install New Panel 6 switches 5 outlets 10 Lighting Receptacles |
| B00495177 | 1900 BATH AVENUE BROOKLYN | New Job Filing | Complete | 03/30/2021 | 03/31/2021 | — | Changed 2 switches, 2 lights and 4 outlets in apartment 5 |
| S00469702 | 55 LEONELLO LANE STATEN ISLAND | Subsequent Filing | Complete | 03/11/2021 | 03/12/2021 | — | Light and Power and HVAC Power for Single Family Home |
| B00453597 | 346 43 STREET BROOKLYN | New Job Filing | Job in process | 01/13/2021 | 03/10/2021 | — | Lights Power and Service for 3 family dwelling. PAA FOR Service Switches and AC Unit. See Subsequent Filing for Meters |
| S00480558 | 34 SYCAMORE STREET STATEN ISLAND | New Job Filing | Complete | 03/04/2021 | 03/05/2021 | — | Install Service Disconnect and combiner box for solar panels |
| M00476224 | 795 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 02/25/2021 | 02/26/2021 | — | Upgrade 1200Amp service switch to 1600Amp Service Switch Install 4 sets 600MCM feeders. Electrical Plan Review Approval #MN00901A1 Dated 5… |
| M00454504 | 279 1 AVENUE MANHATTAN | New Job Filing | Job in process | 01/14/2021 | 01/15/2021 | — | Replaced service end box and feeders to main disconnect |
| M00451495 | 666 5 AVENUE MANHATTAN | New Job Filing | Job in process | 01/11/2021 | 01/12/2021 | — | Installation of Light Fixtures and Receptacles |
| M00442479 | 795 COLUMBUS AVENUE MANHATTAN | New Job Filing | Complete | 12/18/2020 | 12/18/2020 | — | Lighting and General Power for Outlets AC Units and refrigeration |
| S00435002 | 806 LAMONT AVENUE STATEN ISLAND | New Job Filing | Complete | 12/02/2020 | 12/03/2020 | — | Install disconnect combiner box and number 10 feeders for solar |
| S00433029 | 202 HAWTHORNE AVENUE STATEN ISLAND | New Job Filing | Complete | 11/25/2020 | 11/28/2020 | — | Install Combiner box and10 Feeders for Solar |
| S00433041 | 802 LAMONT AVENUE STATEN ISLAND | New Job Filing | Complete | 11/25/2020 | 11/28/2020 | — | Install Disconnect combiner box and number 10 feeders for solar |
| S00414074 | SCRIBNER AVENUE STATEN ISLAND | New Job Filing | Complete | 10/15/2020 | 10/16/2020 | — | 10 wire feeders on 15amp breaker and 1 switch |
| B00399790 | 175 ADAMS STREET BROOKLYN | New Job Filing | Job in process | 09/16/2020 | 09/17/2020 | — | Change Apartment Sub panel on existing feeder |
| B00390709 | 377 12 STREET BROOKLYN | New Job Filing | Job in process | 08/26/2020 | 08/27/2020 | — | 2 Family 200amp service power and lighting and 3 AC units |
| B00381401 | 175 ADAMS STREET BROOKLYN | New Job Filing | Complete | 08/06/2020 | 08/07/2020 | — | Install 4 new fixture outlets and fixtures |
| B00381436 | 175 ADAMS STREET BROOKLYN | New Job Filing | Complete | 08/06/2020 | 08/07/2020 | — | Install 4 new fixture outlets and fixtures |
| M00380918 | 143 EAST 34 STREET MANHATTAN | New Job Filing | Job in process | 08/05/2020 | 08/06/2020 | — | Power lighting and HVAC for 17th and 18th floor penthouse 2 3 ton AC units on roof deck |
| M00345767 | 182 HESTER STREET MANHATTAN | New Job Filing | Complete | 04/30/2020 | 05/01/2020 | — | removal of ECB violation 35460866X installed 2 GFIonpatio |
| M00327438 | 330 WEST 34 STREET MANHATTAN | New Job Filing | Job in process | 03/05/2020 | 03/06/2020 | — | Power and Lighting for a Just Salads Restaurant |
| M00327480 | 1680 BROADWAY MANHATTAN | New Job Filing | Complete | 03/05/2020 | 03/06/2020 | — | Power and Lighting for office Kitchen on the 22nd floor. Pulled new feeder from 15th Floor to the 22nd floor panel |
| X00327522 | 1167 THROGMORTON AVENUE BRONX | New Job Filing | Complete | 03/05/2020 | 03/06/2020 | — | Converting a Single Family to a two family dwelling. New service feeders and panels. All new lighting and power. 2 AC Condensors. |
| B00289977 | 175 ADAMS STREET BROOKLYN | New Job Filing | Complete | 01/02/2020 | 01/03/2020 | — | Power and Lighting for Apartment 8C |
| B00289993 | 175 ADAMS STREET BROOKLYN | New Job Filing | Job in process | 01/02/2020 | 01/03/2020 | — | Lighting and Power for Apartment 9G-H |
| S00263991 | BIN 5130243 | New Job Filing | Complete | 11/13/2019 | 11/14/2019 | — | Certifying original meter is suitable to be re energized by Con Edison |
| S00264034 | 586 RATHBUN AVENUE STATEN ISLAND | New Job Filing | Complete | 11/13/2019 | 11/14/2019 | — | Power and Lighting for 2nd floor roof raise with 1 sub panel |
| B00206785 | 247 6TH AVE. BROOKLYN | New Job Filing | Job in process | 08/07/2019 | 08/08/2019 | — | Power and lighting for 3 Family Home wire for rooftop AC Condensers Replaced existing 3 family meter and added 1 owners meter |
| X00176627 | 1167 THROGMORTON AVENUE BRONX | New Job Filing | Cancelled | 06/05/2019 | 06/06/2019 | — | Installing power for switches, outlets and lights |
| B00152698 | 175 ADAMS STREET BROOKLYN | New Job Filing | Job in process | 04/09/2019 | 04/10/2019 | — | Device Replacement only. No New wiring, All Existing |
| B00149546 | 175 ADAMS STREET BROOKLYN | New Job Filing | Complete | 04/02/2019 | 04/03/2019 | — | Minor Work |
| S00136395 | 4355 HYLAN BLVD. STATEN ISLAND | New Job Filing | Complete | 02/28/2019 | 03/01/2019 | — | Install new lights and Outlets throughout |
| S00116502 | 2900 VETERANS ROAD WEST STATEN ISLAND | New Job Filing | Job in process | 01/07/2019 | 01/07/2019 | — | Install new lights outlets for existing Target renovation. Install(1) 100 amp MB Panel |
| B00111805 | 148 7 AVENUE BROOKLYN | New Job Filing | Job in process | 12/19/2018 | 12/20/2018 | — | As per Con Edison Request We replaced the service End Box . All other service work is existing |
| Q00107870 | 242-02 61 AVENUE QUEENS | New Job Filing | Job in process | 12/07/2018 | 12/15/2018 | — | Install 4000 amp electrical service including 27kv feeders. Con Ed vault wiring and (2) 4000amp swtitchboars |
| B00109335 | 187 DEAN STREET BROOKLYN | New Job Filing | Complete | 12/12/2018 | 12/13/2018 | — | Install 3 Family Service and 1 owners meter. Provide Light and power for basement, 1st floor and 2nd floor |
| B00109377 | 553 73RD STREET BROOKLYN | New Job Filing | Job in process | 12/12/2018 | 12/13/2018 | — | Install 200Amp 2 Family Service . Provide Light and power for Cellar Ground floor 1st and 2nd floor |
| M00096754 | 200 VESEY STREET MANHATTAN | New Job Filing | Job in process | 11/06/2018 | 11/07/2018 | — | Provide power for lights, general outlets, kitchen equipment, HVAC units, Elevator, Panels, 1 75kva transformer and 1 150kva transformer on… |
| M00089549 | 811 10 AVENUE MANHATTAN | New Job Filing | Complete | 10/18/2018 | 10/19/2018 | — | Run Power for 2 Panels, (1) 15KVA transformer and feed for fire smoke dampers and fans on the 1st, 2nd and 3rd floor |
| S00086211 | 63 GORDON STREET STATEN ISLAND | New Job Filing | Complete | 10/09/2018 | 10/10/2018 | — | New 2 Family Service with separate Owners meter |
| S00086250 | 89 FREMONT AVENUE STATEN ISLAND | New Job Filing | Job in process | 10/09/2018 | 10/10/2018 | — | Replace damaged mast |
| S00083320 | 175 GARRETSON AVENUE STATEN ISLAND | New Job Filing | Complete | 09/27/2018 | 09/28/2018 | — | Repairing single phase 200Amp Con Edison Meter |
| S00073100 | 249 MAIN STREET STATEN ISLAND | New Job Filing | Complete | 08/22/2018 | 08/23/2018 | — | Repairing and Replacing Damaged H Blocks Inside Con Edison Meter |
| S00073109 | 3981 AMBOY ROAD STATEN ISLAND | New Job Filing | Complete | 08/22/2018 | 08/23/2018 | — | Repairing and Replacing Damaged H Blocks inside Con Edison Meter |
| S00072822 | 249 MAIN STREET STATEN ISLAND | New Job Filing | Complete | 08/21/2018 | 08/22/2018 | — | Repairing Con Edison Meter |
| S00072837 | 3981 AMBOY ROAD STATEN ISLAND | New Job Filing | Complete | 08/21/2018 | 08/22/2018 | — | Repairing and Replacing 2 damaged H Blocks inside Con Edison Meter |
| M00070828 | 521 5 AVENUE MANHATTAN | New Job Filing | Complete | 08/14/2018 | 08/15/2018 | — | 32nd floor Renovation to existing space |