| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01347326 ↗ | 310 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 09/02/2026 | Owner STELLAR MANAGEMENT Contractor FOLOR INC | PROPOSED PLUMBING WORK IN CONJUNCTION TO THE ARCH. DESIGNS, PROVIDE INSTALLATION OF FIXTURES AS INDICATED THROUGHOUT THE SET FOR A TENANT FI… |
| M01434935 ↗ | 18 PINE STREET MANHATTAN | Alteration | Permit Issued | 08/14/2026 | 08/31/2026 | Owner 950 SECOND AVE LLC Contractor EDDY'S GENERAL CONSTRUCT | PROPOSED REMOVAL OF NON-LOAD BEARING INTERIOR WORKS FOR EXISITNG COMMERCIALSPACE ACCORDING TO THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPAN… |
| M01422665 ↗ | 444 EAST 52 STREET MANHATTAN | Alteration | Filed — no permit on record | 08/11/2026 | — | — | |
| M01362717 ↗ | 337 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 03/05/2026 | 06/17/2026 | Contractor LTI CONSTRUCTION CORP | PROPOSED PLUMBING WORK IN CONJUNCTION TO ARCH. DESIGNS, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01169300 ↗ | 232 EAST 32 STREET MANHATTAN | Alteration CO | Permit Issued | 02/12/2025 | 05/15/2026 | Owner 232 32ND STREET LLC Contractor LTI CONSTRUCTION CORP | Removal of existing mechanical system. Provide new HVAC system, new gas boiler, hot water for perimeter heating system and domestic water he… |
| M01058347 ↗ | 52 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 06/12/2024 | 05/12/2026 | Contractor LTI CONSTRUCTION CORP | PROPOSE PLUMBING WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Person | Filings | Most recent |
|---|---|---|
| Michael Fahey | 56 | 07/22/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| STARK CONSULTING, LLC | 3 | 08/11/2026 |
| H & O ENGINEERING, DPC | 2 | 06/29/2026 |
| TWIG CONSULTING ENGINEERS PC | 2 | 02/04/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| LTI CONSTRUCTION CORP | 20 | 08/07/2026 |
| ACCURATE MECHANICAL INC | 8 | 03/15/2026 |
| J&M PLUMBING OF WESTCHEST | 8 | 06/29/2026 |
| NEW YORK CONSTRUCTION ASS | 3 | 09/06/2023 |
| AWS MECHANICAL II LLC | 2 | 10/21/2022 |
| COLONIAL CRAFTERS INC | 2 | 07/25/2022 |
| 2M MECHANICAL LLC | 1 | 08/08/2022 |
| CM PLUMBING INC | 1 | 02/04/2026 |
| ECONO AIR HEATING/COOLING | 1 | 08/07/2026 |
| EDDY'S GENERAL CONSTRUCT | 1 | 08/14/2026 |
| EMPIRE STATE PLBG & HTG C | 1 | 03/05/2026 |
| FOLOR INC | 1 | 02/04/2026 |
| FRANCISCO SOSA, INC | 1 | 08/08/2022 |
| GLYNN GROUP LLC | 1 | 08/11/2025 |
| J&M PLBG OF WESTCHESTER I | 1 | 08/07/2026 |
| ROLANDO MECHANICAL OF NY | 1 | 07/19/2022 |
| STRUCTURECRAFT CONTRACTIN | 1 | 01/10/2023 |
| T.S.M. MECHANICAL CORP | 1 | 06/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| EVERYTABLE | 5 | 03/06/2023 |
| 'FC FOLEY SQUARE ASSOC. LLC' | 2 | 07/19/2022 |
| 232 32ND STREET LLC | 2 | 06/29/2026 |
| 261 WEST LLC | 2 | 03/25/2022 |
| CHELSEA ASSOCIATES FEE OWNER LLC | 2 | 07/11/2022 |
| HGOLDSTEINARCHITECT | 2 | 12/27/2023 |
| 205 E78TH ST | 1 | 10/11/2024 |
| 950 SECOND AVE LLC | 1 | 08/14/2026 |
| AMSTERDAM 80 DEVELOPMENT CO. | 1 | 08/08/2019 |
| Building Equity Management LLC | 1 | 03/15/2026 |
| GFP REAL ESTATE LLC | 1 | 08/07/2026 |
| HINES | 1 | 08/11/2025 |
| KJDS REALTY INC | 1 | 02/22/2023 |
| NICHOLAS AGNETA ARCHITECT | 1 | 03/05/2026 |
| STELLAR MANAGEMENT | 1 | 02/04/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BMB BUILDING CONSULTING INC. | 34 | 08/14/2026 |
| RIZZO GROUP | 1 | 08/11/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01347326 ↗ | 310 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 09/02/2026 | Owner STELLAR MANAGEMENT Contractor FOLOR INC | PROPOSED PLUMBING WORK IN CONJUNCTION TO THE ARCH. DESIGNS, PROVIDE INSTALLATION OF FIXTURES AS INDICATED THROUGHOUT THE SET FOR A TENANT FI… |
| M01434935 ↗ | 18 PINE STREET MANHATTAN | Alteration | Permit Issued | 08/14/2026 | 08/31/2026 | Owner 950 SECOND AVE LLC Contractor EDDY'S GENERAL CONSTRUCT | PROPOSED REMOVAL OF NON-LOAD BEARING INTERIOR WORKS FOR EXISITNG COMMERCIALSPACE ACCORDING TO THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPAN… |
| M01422665 ↗ | 444 EAST 52 STREET MANHATTAN | Alteration | Filed — no permit on record | 08/11/2026 | — | — | |
| M01362717 ↗ | 337 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 03/05/2026 | 06/17/2026 | Contractor LTI CONSTRUCTION CORP | PROPOSED PLUMBING WORK IN CONJUNCTION TO ARCH. DESIGNS, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01169300 ↗ | 232 EAST 32 STREET MANHATTAN | Alteration CO | Permit Issued | 02/12/2025 | 05/15/2026 | Owner 232 32ND STREET LLC Contractor LTI CONSTRUCTION CORP | Removal of existing mechanical system. Provide new HVAC system, new gas boiler, hot water for perimeter heating system and domestic water he… |
| M01058347 ↗ | 52 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 06/12/2024 | 05/12/2026 | Contractor LTI CONSTRUCTION CORP | PROPOSE PLUMBING WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01195374 ↗ | 52 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 03/20/2025 | 05/12/2026 | Contractor LTI CONSTRUCTION CORP | PROPOSED STRUCTURAL WORK IN CONJUCTION TO ARCH. DESIGNS, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01365483 ↗ | 40 WORTH ST MANHATTAN | Alteration | Signed-off | 03/11/2026 | 04/21/2026 | Owner GFP REAL ESTATE LLC Contractor J&M PLBG OF WESTCHESTER I | PROPOSED MECHANICAL WORK IN CONJUNCTION TO ARCH. DESIGNS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01309086 ↗ | 426 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 11/07/2025 | 01/14/2026 | Contractor J&M PLUMBING OF WESTCHEST | SUPERSEDING EXPIRED LAA APPLICATIONS AS FOLLOWS: LAA # M01031983-I1-LA, LAA # M01039828-I1-LA, AND LAA #140763378. THERE IS NO CHANGE IN USE… |
| M01288770 ↗ | 35 EAST 12 STREET MANHATTAN | Alteration | Permit Issued | 09/25/2025 | 12/09/2025 | Contractor ANTHONY DISABATO | PROPOSED PLUMBING WORK IN CONJUNCTION TO ARCH. DESIGNS, NO CHANGE IN USE, EGRESS AND OCCUPANCY |
| M01212910 ↗ | 1143 PARK AVENUE MANHATTAN | Alteration CO | Filed — no permit on record | 05/06/2025 | — | — | — |
| M01178158 ↗ | 232 EAST 32 STREET MANHATTAN | Alteration | Signed-off | 02/12/2025 | 04/07/2025 | Owner 232 32ND STREET LLC Contractor LTI CONSTRUCTION CORP | Proposed non-bearing removal works of existing two-family houses as per plan. No change in use, occupancy, or egress. |
| M01109236 ↗ | 435 HUDSON STREET MANHATTAN | Alteration | Signed-off | 09/23/2024 | 01/22/2025 | Owner HINES Contractor GLYNN GROUP LLC Filer RIZZO GROUP | Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per… |
| M01141971 ↗ | 815 5TH AVNENUE MANHATTAN | Alteration | Filed — no permit on record | 11/26/2024 | — | — | — |
| M01122976 ↗ | 205 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 10/11/2024 | 10/17/2024 | Owner 205 E78TH ST Contractor LTI CONSTRUCTION CORP | PROPOSED INTERIOR RENOVATION WORK INCLUDING NON-BEARING PARTITIONS, FINISH WORKS, & MASONRY OPENING FOR PTAC / AC UNITS AS PER PLAN. NO CHAN… |
| B00936827 ↗ | 312 16 STREET BROOKLYN | Alteration | Signed-off | 10/10/2023 | 12/11/2023 | Contractor ANTHONY DISABATO | PROPOSED PLUMBING WORK FOR THE FIRST AND SECOND FLOOR IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00936826 ↗ | 312 16 STREET BROOKLYN | Alteration | Signed-off | 10/10/2023 | 11/21/2023 | Contractor LTI CONSTRUCTION CORP | PROPOSE INTERIOR RENOVATION AT FIRST AND SECOND FLOOR, WORK INCLUDES NON-BEARING PARTITIONS., & FINISH WORK AS PER PLAN. PLUMBING WORK WIL… |
| M00932647 ↗ | 34 LAIGHT STREET MANHATTAN | Alteration | Signed-off | 09/18/2023 | 10/18/2023 | Owner HGOLDSTEINARCHITECT Contractor J&M PLUMBING OF WESTCHEST | PROPOSED PLUMBING WORK FOR THE FIRST FLOOR SUITE IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00932646 ↗ | 34 LAIGHT STREET MANHATTAN | Alteration | Signed-off | 09/18/2023 | 10/02/2023 | Owner HGOLDSTEINARCHITECT Contractor LTI CONSTRUCTION CORP | INTERIOR RENOVATION OF THE FIRST FLOOR SUITE, TO INVOLVE NON-BEARING PARTITIONS WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| X00927806 ↗ | 1400 PELHAM PARKWAY SOUTH BRONX | Alteration | Signed-off | 09/06/2023 | 09/13/2023 | Contractor NEW YORK CONSTRUCTION ASS | PROPOSE INTERIOR RENOVATION OF THE PARTITIONS, CABINETRY, DROPPED CEILINGS, AND ELECTRICAL RE-WIRING PORTIONS OF SPACE FOR RECEPTACLES, OUTL… |
| M00898524 ↗ | 330 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/11/2023 | 07/29/2023 | Contractor J&M PLUMBING OF WESTCHEST | PROPOSED PLUMBING WORK AT APT#PHA IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00898523 ↗ | 330 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/11/2023 | 07/26/2023 | Contractor LTI CONSTRUCTION CORP | INTERIOR RENOVATION AT APT#PHA, MASTER BATHROOM SUITE, WORK INCLUDES, MINOR PARTITIONS AND FINISH WORK AS PER PLAN. PLUMBING WILL FILE SEPAR… |
| M00768490 ↗ | 1143 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/31/2022 | 05/02/2023 | Contractor LTI CONSTRUCTION CORP | PROPOSE MINOR PARTITION WORK AND FLOORING IN EXISTING COMMERCIAL SPACE ON GROUND AND FIRST FL AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCU… |
| M00589456 ↗ | 52 EAST END AVENUE MANHATTAN | Alteration | Signed-off | 11/19/2021 | 02/27/2023 | Contractor ANTHONY DISABATO | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00827513 ↗ | 23-23 BORDEN AVENUE QUEENS | Alteration | Signed-off | 02/22/2023 | 02/27/2023 | Owner KJDS REALTY INC Contractor LTI CONSTRUCTION CORP | PROPOSE MECHANICAL MODIFICATION TO REPLACE EXISTING HVAC ROOF-TOP UNITS TO OBTAIN EQUIPMENT USE PERMITS. STABILITY OF EXISTING STRUCTURE WIL… |
| Q00806706 ↗ | 29-38 30 AVENUE QUEENS | Alteration | Signed-off | 01/10/2023 | 01/19/2023 | Owner EVERYTABLE Contractor STRUCTURECRAFT CONTRACTIN | PROPOSE INTERIOR RENOVATION WITH MINIOR PARTITIONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PL, MS, & SP FILED S… |
| B08034828 ↗ | 100 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 11/18/2022 | 11/22/2022 | Contractor NEW YORK CONSTRUCTION ASS | PROPOSE INTERIOR RENOVATION AT STORE WITH MINIOR PARTITIONS AND FINISH WORK AS PER PLAN. PLUMBING/ SPRINKLER AND MECHANICAL WORK FILED SEPAR… |
| M00764397 ↗ | 111 WORTH STREET MANHATTAN | Alteration | Signed-off | 07/19/2022 | 08/20/2022 | Contractor NEW YORK CONSTRUCTION ASS | PROPOSE INTERIOR RENOVATION AT STORE WITH MINIOR PARTITIONS AND FINISH WORK AS PER PLAN. PLUMBING WORK FILED SEPARATELY. NO CHANGE IN USE, E… |
| M00763969 ↗ | 249 BROOME STREET MANHATTAN | Alteration | Signed-off | 08/08/2022 | 08/14/2022 | Contractor FRANCISCO SOSA, INC | PROPOSE INTERIOR RENOVATIONS ON THE GROUND FLOOR. WORK INCLUDES MINOR PARTITIONS, AND FINISH WORK AS PER PLAN. PL WORK WILL BE FILED UNDER S… |
| M00763970 ↗ | 249 BROOME STREET MANHATTAN | Alteration | Signed-off | 08/08/2022 | 08/12/2022 | Contractor MOHAMED ABDELRAZEK | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00764710 ↗ | 111 WORTH STREET MANHATTAN | Alteration | Signed-off | 07/19/2022 | 08/11/2022 | Contractor FLINT MECHANICAL CORP | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE , EGRESS, OR OCCUPANCY. |
| M00772846 ↗ | 457 WEST 125 STREET MANHATTAN | Alteration | Signed-off | 08/01/2022 | 08/09/2022 | Owner EVERYTABLE Contractor LTI CONSTRUCTION CORP | PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00703276 ↗ | 545 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/07/2022 | 08/05/2022 | Contractor LTI CONSTRUCTION CORP | PROPOSE INTERIOR RENOVATIONS AT 1ST FLOOR WORK INCLUDES MINOR PARTITIONS AND FINISH WORK AS PER PLAN. MS, PL, AND SP WORK WILL BE FILED UNDE… |
| M00764728 ↗ | 457 WEST 125 STREET MANHATTAN | Alteration | Signed-off | 08/01/2022 | 08/05/2022 | Owner EVERYTABLE Contractor LTI CONSTRUCTION CORP | PROPOSE INTERIOR RENOVATION AT STORE WITH MINOR PARRITONS AND FINISH WORK AS PER PLAN. PLUMBING WORK FILED SEPARATELY. NO CHANGE IN USE,EGRE… |
| M00764729 ↗ | 457 WEST 125 STREET MANHATTAN | Alteration | Signed-off | 08/01/2022 | 08/05/2022 | Owner EVERYTABLE Contractor J&M PLUMBING OF WESTCHEST | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00764720 ↗ | 937 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 07/25/2022 | 08/01/2022 | Contractor COLONIAL CRAFTERS INC | PROPOSE INTERIOR RENOVATION WITH MINOR PARTITONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PLUMBING AND MECHANIC… |
| B00764722 ↗ | 937 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 07/25/2022 | 07/27/2022 | Owner EVERYTABLE Contractor ATTENTION TO DETAIL P&H.I | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00685300 ↗ | 261 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 03/25/2022 | 04/08/2022 | Owner 261 WEST LLC Contractor ATTENTION TO DETAIL P&H.I | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00676752 ↗ | 261 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 03/25/2022 | 04/06/2022 | Owner 261 WEST LLC Contractor COLONIAL CRAFTERS INC | PROPOSE INTERIOR RENOVATIONS AT 1ST FLOOR. WORK INCLUDES MINOR PARTITIONS AND FINISH WORK AS PER PLAN. PL AND SP WORK WILL FILE UNDER SEPARA… |
| M00686326 ↗ | 736 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/15/2022 | 03/30/2022 | Contractor J&M PLUMBING OF WESTCHEST | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00680272 ↗ | 736 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/15/2022 | 03/24/2022 | Contractor LTI CONSTRUCTION CORP | PROPOSE INTERIOR RENOVATIONS ON THE FIRST FLOOR GRAB AND GO FOOD ESTABLISHMENT. WORK INCLUDES MINOR PARTITIONS AND FINISH WORK AS PER PLAN. … |
| M00676646 ↗ | 227 AVENUE B MANHATTAN | Alteration | Signed-off | 03/07/2022 | 03/10/2022 | Contractor LTI CONSTRUCTION CORP | PROPOSE INTERIOR RENOVATIONS AT 1ST FLOOR. WORK INCLUDES MINOR PARTITIONS AND FINISH WORK AS PER PLAN. PL AND MS WILL BE FILED UNDER THE SE… |
| M00589366 ↗ | 52 EAST END AVENUE MANHATTAN | Alteration | Signed-off | 11/19/2021 | 01/24/2022 | Contractor LTI CONSTRUCTION CORP | PROPOSE INTERIOR RENOVATION AT APARTMENT #39 AB WITH MINIOR PARTITIONS AND FINISH WORK AS PER PLAN. PLUMBING FILED SEPARATELY ON DOBNOW. NO … |
| M00395035 ↗ | 90 WATER STREET MANHATTAN | Alteration | Signed-off | 07/30/2021 | 12/17/2021 | Contractor J&M PLUMBING OF WESTCHEST | Propose to install one new high-efficiency condensing boiler to serve heating for all floors of the building filed in conjunction with Alt1 … |
| M00194076 ↗ | 180 EAST END AVENUE MANHATTAN | Alteration | Signed-off | 07/22/2019 | 08/17/2021 | Contractor ANTHONY DISABATO | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN, WORK INCLUDES PLUMBING FIXTURES REPLACE(1 DISHWASHER,1 KITCHEN SINK,1 LAV., 1 W.C., … |
| M00393412 ↗ | 215 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 11/20/2020 | 01/19/2021 | Contractor ANTHONY DISABATO | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00198340 ↗ | 22 WEST 15 STREET MANHATTAN | Alteration | Signed-off | 08/13/2019 | 10/27/2020 | Contractor ANTHONY DISABATO | Propose plumbing work in conjunction w. Arch design, work includes, cut & cap 2 cooking range, replace 1 shower, 1 Lav, 1 W.C., relocate 2 s… |
| M00198331 ↗ | 340 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 08/08/2019 | 02/13/2020 | Contractor ANTHONY DISABATO | PROPOSING NEW PLUMBING WORK FOR INTERIOR RENOVATION OF EXISTING APT 18C INCLUDING REPLACEMENT OF 1 SHOWER, 1 LAV & 3 WATER CLOSETS; RELOCAT… |
| B00205301 ↗ | 197 CLIFTON PLACE BROOKLYN | Alteration | Permit Issued | 08/06/2019 | 11/20/2019 | Contractor LTI CONSTRUCTION CORP | Proposing to file temporary construction fence with roof (barricade) enclosure for storefront in conjunction with Alt- ll #322064886. |
| M00200804 ↗ | 186 WEST 80 STREET MANHATTAN | Alteration | Permit Issued | 08/08/2019 | 09/23/2019 | Contractor ANTHONY DISABATO | PROPOSE TO LEGALIZE THE EXISTING DEEP FRYER WITH RELATED GAS PIPING WORKS; PERFORM INTEGRATED TESTING FOR EXISTING GAS RISER, AND REPLACE GA… |