| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01067910 ↗ | 255 HAVEMEYER STREET BROOKLYN | Alteration | Permit Issued | 09/10/2024 | 09/10/2026 | Design O&S ASSOCIATES Filer O&S ASSOCIATES | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR REPAIR WORKS AT 253 HAVEMEYER STREET, BROOKLYN, NY 11211 |
| M01094107 ↗ | 509 WEST 121ST STREET MANHATTAN | Alteration | Permit Issued | 08/22/2024 | 09/10/2026 | Design SULLIVAN ENGINEERING | FACADE RESTORATION |
| M01328928 ↗ | 275 PLEASANT AVENUE MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 07/23/2026 | Design JAMES H. FAHEY Owner SAHARA CONTRACTING CORP | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #… |
| B01215555 ↗ | 705 BRIGHTON BEACH AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/24/2025 | 07/20/2026 | Design MZ ARCHITECTURE PLLC Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | INSTALL CONCRETE FOOTINGS AS PER PLANS |
| B01253408 ↗ | 703 BRIGHTON BEACH AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2025 | 07/20/2026 | Design BGM ENGINEERING Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | Support of excavation drawings for the installation of the new foundation system for the rear extension |
| B01256094 ↗ | 705 BRIGHTON BEACH AVENUE BROOKLYN | Alteration | Signed-off | 07/17/2025 | 07/20/2026 | Design BGM ENGINEERING Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | RREMOVE EXISTING WALLS TO CREATE OPENINGS TO THE ADJACENT BUILDING |
| Name | Projects together | Most recent |
|---|---|---|
| Zenesis Engineering Architecture | 19 | 05/11/2026 |
| Ashraf | 5 | 03/30/2023 |
| Bryce Taylor, Architect | 5 | 07/19/2025 |
| BGM Engineering | 4 | 08/19/2026 |
| David Silberman, P.E | 3 | 01/26/2021 |
| SRS Architect | 3 | 02/13/2023 |
| David Hotson Architect | 2 | 11/11/2025 |
| Future Made Architecture | 2 | 03/26/2026 |
| Gace | 2 | 11/17/2022 |
| Howard L Zimmerman Arch & Engineering | 2 | 04/10/2024 |
| Madsen Consulting Engineering | 2 | 10/23/2025 |
| MZ Architecture | 2 | 08/19/2026 |
| Mumtaz Enterprises | 2 | 03/14/2026 |
| Tarek M. Zeid, PE | 2 | 08/14/2023 |
| AK Consulting Services | 1 | 01/21/2025 |
| Asr Engineering | 1 | 03/31/2023 |
| Agile Design Engineering | 1 | 12/02/2025 |
| Backforty Architecture | 1 | 05/31/2024 |
| BFS Architect | 1 | 08/05/2025 |
| Citiscape Consulting | 1 | 08/05/2026 |
| E4P Consulting Engineering | 1 | 03/26/2026 |
| Edward C. Hicks RA | 1 | 12/06/2024 |
| Engineered Building Inspections, P | 1 | 11/04/2022 |
| Engineering Solutions | 1 | 08/05/2021 |
| Eoc-NY | 1 | 06/30/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Paradise Construction NYC | 7 | 08/19/2026 |
| A&H Express Plumbing & Heating | 3 | 03/26/2026 |
| EH Plumbing & Heating | 3 | 09/23/2023 |
| Skyline Builders Group | 3 | 05/02/2025 |
| Ahmad Wazne | 2 | 05/09/2022 |
| A & C Heating Services | 1 | 05/09/2022 |
| Alma Design | 1 | 07/31/2025 |
| Avalanche Builder | 1 | 05/12/2026 |
| Black Hammer Construction | 1 | 03/23/2022 |
| Custombuilt Homes | 1 | 05/12/2026 |
| Ebm Plumbing | 1 | 05/11/2026 |
| H.t.lyons | 1 | 12/07/2020 |
| Kings Group NY | 1 | 10/31/2024 |
| Metro | 1 | 04/15/2025 |
| PM Mechanical Group | 1 | 12/06/2023 |
| Power Air Cond | 1 | 04/28/2021 |
| Proline Contracting Group | 1 | 06/30/2026 |
| Reliable Enterprises | 1 | 03/23/2026 |
| RRP Plumbing | 1 | 05/12/2026 |
| Super Power Construction | 1 | 05/12/2026 |
| Tri City Mechanical Group | 1 | 01/26/2026 |
| Trystate Mechanical | 1 | 12/07/2020 |
| Xpress Plumbing and Heating | 1 | 08/05/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Jaber Realty | 4 | 08/19/2026 |
| Paradise Restoration | 3 | 12/29/2025 |
| Highbridge CDC | 2 | 06/12/2024 |
| Krishna Hospitality | 2 | 05/12/2026 |
| 69 Clifton Place Brooklyn | 1 | 02/13/2023 |
| 70 Clifton Place Brooklyn | 1 | 09/20/2021 |
| Akam Associates | 1 | 07/19/2025 |
| Apicha CHC | 1 | 05/09/2022 |
| Asden Properties | 1 | 08/20/2025 |
| Athenium House | 1 | 04/26/2023 |
| Banled Associates | 1 | 07/09/2021 |
| Brooklyn Landmark Properties | 1 | 03/28/2023 |
| Bryce Taylor, Architect | 1 | 03/23/2022 |
| Building Equity Management | 1 | 06/28/2023 |
| First Service Residential | 1 | 06/04/2025 |
| FirstService Residential | 1 | 04/13/2025 |
| Halstead Management | 1 | 10/31/2024 |
| Harlem Squared Realty | 1 | 04/15/2025 |
| HMC Times Square Hotel | 1 | 12/07/2020 |
| Kings Group NY | 1 | 10/31/2024 |
| Manhattan Valley Development | 1 | 05/16/2025 |
| NY Presbyterian Hospital | 1 | 08/14/2023 |
| NYPD | 1 | 03/30/2026 |
| Paradise Constrction | 1 | 03/14/2026 |
| PCS Engineering | 1 | 06/27/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Zenesis Group | 8 | 04/15/2025 |
| Bricolage Designs | 4 | 08/19/2026 |
| KD Designs | 4 | 03/14/2026 |
| AK Consulting Services | 2 | 06/27/2025 |
| City Wide Expediting | 2 | 05/11/2026 |
| Hlzae | 2 | 04/10/2024 |
| JMV Associates | 2 | 08/14/2023 |
| Lloyd Noel Building Consultant | 2 | 03/23/2026 |
| MP Design and Construction | 2 | 11/17/2022 |
| Ace Consultants | 1 | 12/06/2023 |
| Advanced Builders Services | 1 | 12/06/2024 |
| AM/PM Design and Consulting | 1 | 05/12/2026 |
| Big Orange Expediting | 1 | 02/02/2023 |
| Blok Associates | 1 | 08/05/2026 |
| Burnham Nationwide | 1 | 07/31/2025 |
| D&D Expeditors | 1 | 08/05/2021 |
| Dao Studios | 1 | 03/26/2026 |
| Five Borough Filing & Expediting | 1 | 09/20/2021 |
| Jam Consultants | 1 | 11/04/2022 |
| Kma Designs | 1 | 10/31/2024 |
| LC Expediting Services | 1 | 12/02/2025 |
| M-Dis Design Group | 1 | 03/28/2022 |
| MMSR Consulting Group | 1 | 06/30/2026 |
| Northeast Expediting | 1 | 09/18/2024 |
| O&S Associates | 1 | 11/19/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01067910 ↗ | 255 HAVEMEYER STREET BROOKLYN | Alteration | Permit Issued | 09/10/2024 | 09/10/2026 | Design O&S ASSOCIATES Filer O&S ASSOCIATES | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR REPAIR WORKS AT 253 HAVEMEYER STREET, BROOKLYN, NY 11211 |
| M01094107 ↗ | 509 WEST 121ST STREET MANHATTAN | Alteration | Permit Issued | 08/22/2024 | 09/10/2026 | Design SULLIVAN ENGINEERING | FACADE RESTORATION |
| M01328928 ↗ | 275 PLEASANT AVENUE MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 07/23/2026 | Design JAMES H. FAHEY Owner SAHARA CONTRACTING CORP | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #… |
| B01215555 ↗ | 705 BRIGHTON BEACH AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/24/2025 | 07/20/2026 | Design MZ ARCHITECTURE PLLC Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | INSTALL CONCRETE FOOTINGS AS PER PLANS |
| B01253408 ↗ | 703 BRIGHTON BEACH AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2025 | 07/20/2026 | Design BGM ENGINEERING Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | Support of excavation drawings for the installation of the new foundation system for the rear extension |
| B01256094 ↗ | 705 BRIGHTON BEACH AVENUE BROOKLYN | Alteration | Signed-off | 07/17/2025 | 07/20/2026 | Design BGM ENGINEERING Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | RREMOVE EXISTING WALLS TO CREATE OPENINGS TO THE ADJACENT BUILDING |
| B00583456 ↗ | 306 LINCOLN PLACE BROOKLYN | Alteration CO | Permit Issued | 03/23/2022 | 07/13/2026 | Design BRYCE TAYLOR, ARCHITECT Owner BRYCE TAYLOR, ARCHITECT | RENOVATE AND ENLARGE EXISTING 2-FAMILY HOUSE. REMOVE/INSTALL INTERIOR PARTITIONS, FINISHES, AND FIXTURES. INSTALL NEW POWER AND LIGHTING. … |
| B08002030 ↗ | 34 MONTGOMERY PLACE BROOKLYN | Alteration CO | Permit Issued | 10/17/2022 | 07/01/2026 | Design DAVID HOTSON ARCHITECT Filer BURNHAM NATIONWIDE INC | ALT CO AND GENERAL CONSTRUCTION BEING FILED TO CONVERT AN EXSITING MULTI FAMILY BUILDING TO ITS ORIGINAL TWO FAMILY USE (R-3) AS PER DRAWING… |
| M01173580 ↗ | 480 BROOME STREET MANHATTAN | Alteration | Permit Issued | 02/10/2025 | 07/01/2026 | Design DAVID HOTSON ARCHITECT | RENOVATION OF EXISTING APARTMENT #2 ON THE 2ND FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M01344896 ↗ | 350 EAST 57TH STREET MANHATTAN | Alteration | Permit Issued | 02/27/2026 | 07/01/2026 | Filer DAO STUDIOS LLC | The application is filed for plumbing work of a 2,000 sf apartment. Minor general construction and mechanical work filed separately. No chan… |
| B01215394 ↗ | 703 BRIGHTON BEACH AVENUE BROOKLYN | Alteration | Signed-off | 04/24/2025 | 06/24/2026 | Design MZ ARCHITECTURE PLLC Owner JABER REALTY CORP. Filer BRICOLAGE DESIGNS | REMOVE EXISTING PLUMBING FIXTURES AS PER PLANS |
| M01329963 ↗ | 409 EAST 60TH STREET MANHATTAN | Alteration | Permit Issued | 12/29/2025 | 06/16/2026 | Design Mumtaz Enterprises Owner PARADISE RESTORATION CORP Filer KD DESIGNS | APPLICATION FILE TO EXTERIOR FACADE REPAIR AS MINOR BRICK REPLACEMENT, BRICK CRACK REPAIR AND BRICK POINTING AT REAR ELEVATION. NO CHANGE I… |
| X01191763 ↗ | 1085 ANDERSON AVENUE BRONX | Alteration | Permit Issued | 04/24/2025 | 06/16/2026 | Design PACE ENGINEERING P.C. | Waterproofing repairs. No change in use, egress or occupancy. |
| X01189414 ↗ | 2425 SEDGWICK AVENUE BRONX | Alteration | Permit Issued | 04/13/2025 | 05/07/2026 | Owner FirstService Residential | Providing temporary Structural Shoring of 2nd floor ceiling beam down to the foundations. No change in egress, use or occupancy. |
| B00986156 ↗ | 1028 ST JOHN'S PLACE BROOKLYN | Alteration CO | Permit Issued | 03/13/2024 | 04/15/2026 | Design CITISCAPE CONSULTING LTD Filer BLOK ASSOCIATES | Interior partial renovation of existing 1-Family house, Conversion to 2-Family and proposed Home Occupation in Cellar. No change in bulk or … |
| M01378089 | 1 POLICE PLAZA MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 04/07/2026 | Design KZ ENGINEERING, P.C Owner NYPD | Installation of suspended scaffold for facade inspection/repair. |
| Q00793333 ↗ | 266-07 69TH AVENUE QUEENS | New Building | Permit Issued | 09/08/2022 | 04/07/2026 | Owner KRISHNA HOSPITALITY, LLC | proposed structural work |
| X01370194 ↗ | 2391 GRAND CONCOURSE BRONX | Alteration | Signed-off | 03/11/2026 | 04/07/2026 | REAR EXTERIOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| X01370218 ↗ | 2395 GRAND CONCOURSE BRONX | Alteration | Signed-off | 03/11/2026 | 04/07/2026 | REAR EXTERIOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| X01368851 ↗ | 1085 ANDERSON AVENUE BRONX | Alteration | Permit Issued | 03/14/2026 | 03/23/2026 | Design Mumtaz Enterprises Owner PARADISE CONSTRCTION Filer KD DESIGNS | APPLICATION FILE TO 1NSTALLATION OF DEBRIS CHUTE AT FRONT ELEVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| 321532445BIS | 5614 3RD AVENUE BROOKLYN | — | ISSUED | 11/03/2017 | 12/04/2025 | — | EQ, PL |
| X01255643 ↗ | 3555 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 08/20/2025 | 11/20/2025 | Design WRG ENGINEERING, P.C. Owner ASDEN PROPERTIES Filer WRG ENGINEERING, P.C. | Garage restoration project |
| Q01132071 ↗ | 90-35 VAN WYCK EXPRESSWAY QUEENS | Alteration CO | Permit Issued | 11/17/2024 | 10/31/2025 | PLUMBING MODIFICATIONS TO BASEMENT LEVEL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY | |
| X01226196 ↗ | 2425 SEDGWICK AVENUE BRONX | Alteration | Permit Issued | 05/23/2025 | 10/30/2025 | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE REPAIR At 2425 SEDGEWICK AVE, BRONX. | |
| B08035714 ↗ | 211 MAC DONOUGH STREET BROOKLYN | Alteration | Permit Issued | 03/28/2023 | 10/29/2025 | Design XIAOPENG WANG DESIGN LLC | Exterior renovation project; storefront restoration, window replacement and minor facade repairs. |
| M01121132 ↗ | 21 EAST 96TH STREET MANHATTAN | Alteration | Permit Issued | 10/15/2024 | 10/17/2025 | Design RIMKUS NEW YORK PLLC Owner KINGS GROUP NY CORP Filer KMA DESIGNS LLC | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 21 EAST 96 STREET, MANHATTAN, NY 10128. |
| Q08020525 ↗ | 266-07GAR 69TH AVENUE QUEENS | New Building | Permit Issued | 10/27/2022 | 10/15/2025 | Design BFS ARCHITECT PC Owner KRISHNA HOSPITALITY, LLC Filer KNA CONSULTING INC | proposed one (1) car detached garage. |
| B01105905 ↗ | 110 NEPTUNE AVENUE BROOKLYN | Alteration | Signed-off | 09/18/2024 | 10/14/2025 | Design PVE ENGINEERING Filer NORTHEAST EXPEDITING LLC | PROPOSED EXTERIOR FACADE RESTORATION AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01186147 ↗ | 110 NEPTUNE AVENUE BROOKLYN | Alteration | Signed-off | 03/18/2025 | 09/23/2025 | Design Agile Design Engineering PC | concrete columns repair and celling concrete slab repair at 1st floor . no change in use or occupancy |
| M01256960 ↗ | 353 WEST 11TH STREET MANHATTAN | Alteration | Signed-off | 07/19/2025 | 08/18/2025 | Design BRYCE TAYLOR, ARCHITECT Owner AKAM ASSOCIATES, INC. | Install new ductless mini-split heat pump system |
| Q01248115 ↗ | 65-38 AUSTIN STREET QUEENS | Alteration | Permit Issued | 06/27/2025 | 07/01/2025 | Design SAHARA CONTRACTING CORP Owner PCS Engineering PLLC | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK AT 65-38 AUSTIN STREET, QUEENS. |
| M01232160 ↗ | 66 LEONARD STREET MANHATTAN | Alteration | Signed-off | 06/04/2025 | 06/30/2025 | Design BRYCE TAYLOR, ARCHITECT Owner FIRST SERVICE RESIDENTIAL | Renovate existing bathroom. Remove. / Install non-structural partitions |
| X01181653 ↗ | 1810 BATHGATE AVENUE BRONX | Alteration | Signed-off | 02/18/2025 | 06/30/2025 | INTERIOR RENOVATION OF CELLAR TO ENLARGE OFFICES, REMOVAL OF 1 BATHROOM, RENOVATION OF 1 BATHROOM. 1ST FLOOR REMOVAL OF 3 KITCHENETTES. NO… | |
| M01091507 ↗ | 73 WEST 108TH STREET MANHATTAN | Alteration | Permit Issued | 10/02/2024 | 06/20/2025 | Design INSITE DESIGN STUDIO | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION/INSPECTIONS |
| 122132101BIS | 275 PLEASANT AVENUE MANHATTAN | — | ISSUED | 11/13/2015 | 06/17/2025 | — | EQ, PL |
| X01147182 ↗ | 2395 GRAND CONCOURSE BRONX | Alteration | Signed-off | 11/25/2024 | 06/05/2025 | SCOPE OF WORK: REPLACEMENT OF EXISTING DAMAGED PLUMBING FIXTURES, SANITARY STACKS, WATER DISTRIBUTION LINES. NO CHANGE IN EGRESS OR OCCUPAN… | |
| M01200679 ↗ | 167 PERRY STREET MANHATTAN | Alteration | Signed-off | 03/29/2025 | 05/08/2025 | Owner ZENESIS ENGINEERING / ARCHITECTURE | PROPOSED PLUMBING ALTERATION TO EXISTING APARTMENT (UNIT 5A). NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| 321735912BIS | 1565 RALPH AVENUE BROOKLYN | — | ISSUED | 09/24/2019 | 04/03/2025 | — | PL |
| M00990301 | 2508 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 02/21/2024 | 03/26/2025 | Design EOC-NY Owner YESHIVA UNIVERSITY | FACADE RESTORATION AS PER PLANS |
| M01165832 ↗ | 5 WEST 31ST STREET MANHATTAN | Alteration | Permit Issued | 01/21/2025 | 02/10/2025 | Design AK CONSULTING SERVICES, INC Owner SAHARA CONTRACTING CORP | EXTERIOR FACADE REPAIR AS BRICK POINTING, BRICK REPLACEMENT AND WINDOW CAULKING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN… |
| Q01080461 ↗ | 163-03 89TH AVENUE QUEENS | Alteration | Signed-off | 07/15/2024 | 01/27/2025 | FACADE REPAIRS RELATED TO LOCAL LAW 11 CYCLE 9 INSPECTION REPORT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M00922467 ↗ | 17 EAST 97TH STREET MANHATTAN | Alteration | Permit Issued | 09/21/2023 | 12/04/2024 | Filer HLZAE | Roof replacement & Facade repairs. No change in use, egress or occupancy. |
| X01053966 ↗ | 1435 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 05/20/2024 | 12/04/2024 | Design SAHARA CONTRACTING CORP Owner HIGHBRIDGE CDC | SUSPENDED SCAFFOLD OUTRIGGER FOR FACADE RESTORATION. |
| X08021723 ↗ | 1435 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 11/17/2022 | 10/17/2024 | Design GACE DPC | Repairs to existing facade as per submitted drawings. No change of use, egress or occupancy. |
| Q00969212 ↗ | 148-39 GAR 87 AVENUE QUEENS | Alteration | Signed-off | 12/06/2023 | 10/09/2024 | Design SAHARA CONTRACTING CORP Filer ACE CONSULTANTS | Filing plans and applications for installations for wood fence. No change in egress/ occupancy or use under this application, Filed in conju… |
| Q01062917 ↗ | 27-16 41ST AVENUE QUEENS | Alteration | Signed-off | 06/07/2024 | 08/26/2024 | EXTERIOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| B01043464 ↗ | 185 YORK STREET BROOKLYN | Alteration | Signed-off | 05/31/2024 | 08/05/2024 | Design BACKFORTY ARCHITECTURE, LLC | EXTERIOR REPAIR TO INCLUDE EIFS & SUB-SHEATHING REPLACEMENT, INSULATION INSTALLATION, LOCALIZED STONE VENEER REPLACEMENT, WINDOW TEMPORARY R… |
| B00885337 ↗ | 50 TURNER PLACE BROOKLYN | Alteration | Permit Issued | 08/14/2023 | 07/29/2024 | Design TAREK M. ZEID, PE, PLLC Owner NY PRESBYTERIAN HOSPITAL Filer JMV ASSOCIATES LLC | FACADE REPAIR AND REPAIR DAMAGE STEPS AT THE ENTRANCE TO THE CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X08021718 ↗ | 1439 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 11/17/2022 | 07/23/2024 | Design GACE DPC | Repairs to existing facade as per submitted drawings. No change of use, egress or occupancy. |
| S01008702 ↗ | 119 WADSWORTH AVENUE STATEN ISLAND | Alteration | Signed-off | 03/05/2024 | 07/22/2024 | Design EDWARD C. HICKS RA | PROPOSED ALTERATION TYPE II FOR A VERTICAL ENLARGEMENT OF A ONE STORY PORTION OF AN EXISTING TWO STORY FRAME BUILDING. NO CHANGE IN OCCUPAN… |
| X01054062 ↗ | 1439 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 05/20/2024 | 06/26/2024 | Design SAHARA CONTRACTING CORP Owner HIGHBRIDGE CDC | SUSPENDED SCAFFOLD OUTRIGGER FOR FACADERESTORATION. |
| B00840997 ↗ | 76 NORTH 8TH STREET BROOKLYN | Alteration | Permit Issued | 03/30/2023 | 06/20/2024 | Design ASHRAF CORP | PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING… |
| M00429834 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 12/07/2020 | 06/20/2024 | Design JAROS BAUM & BOLLES Filer JAROS BAUM & BOLLES | Mechanical modifications to existing base building systems. No change to use, egress, or occupancy. |
| B00482305 ↗ | 660 BERGEN STREET BROOKLYN | Alteration | Permit Issued | 04/21/2021 | 05/07/2024 | Design BRYCE TAYLOR, ARCHITECT | WITHIN EXISTING CONDO APARTMENT, CONVERT LAUNDRY ROOM TO 3-FIXTURE BATHROOM ( TOILET, LAV, AND SHOWER ) WASHER AND DRYER. INSTALL NEW PIPING… |
| B00852263 ↗ | 5614 3RD AVENUE BROOKLYN | Alteration | Signed-off | 03/31/2023 | 04/18/2024 | Design ASR ENGINEERING PC Owner PARADISE RESTORATION CORP | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00852266 ↗ | 5614 3RD AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2023 | 04/12/2024 | Design ASHRAF CORP Owner PARADISE RESTORATION CORP Filer KD DESIGNS | PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING… |
| Q01018909 ↗ | 42-22 KETCHAM STREET QUEENS | Alteration | Permit Issued | 03/12/2024 | 03/22/2024 | — | EXTERIOR FACADE REPAIRS |
| M01019104 ↗ | 21 EAST 52ND STREET MANHATTAN | Alteration | Permit Issued | 03/12/2024 | 03/19/2024 | — | SUSPENDED SCAFFOLD OUTRIGGER FOR FACADERESTORATION. |
| B01019260 ↗ | 639 6TH AVENUE BROOKLYN | Alteration | Permit Issued | 03/13/2024 | 03/14/2024 | — | Renewal of SR23-2445 |
| 340739482BIS | 145 KENILWORTH PLACE BROOKLYN | — | ISSUED | 10/13/2021 | 02/22/2024 | — | OT |
| M00923716 ↗ | 21 EAST 52ND STREET MANHATTAN | Alteration | Signed-off | 09/15/2023 | 02/09/2024 | Design RICHARD KOENIGSBERG | EXTERIOR RESTORATION PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 321473703BIS | 1819 CROPSEY AVENUE BROOKLYN | — | ISSUED | 04/27/2017 | 11/09/2023 | — | EQ, MH, OT, PL |
| X00926585 ↗ | 2950 GRAND CONCOURSE BRONX | Alteration | Signed-off | 09/11/2023 | 11/08/2023 | Facade Repairs as per plans; no change to use, egress, or occupancy. | |
| B00473229 ↗ | 415 6TH AVENUE BROOKLYN | Alteration | Signed-off | 03/24/2021 | 11/01/2023 | Design JAMES KOSTER ARCHITECT, PLLC | GENERAL CONSTRUCTION WORK FOR NEW ROOF BULKHEAD AND ROOF TERRACE FOR AN EXISTING 2-FAMILY RESIDENCE. STRUCTURAL FRAMING AT ROOF FOR NEW ROOF… |
| X00832190 ↗ | 2391 GRAND CONCOURSE BRONX | Alteration | Signed-off | 06/13/2023 | 10/27/2023 | Filer zenesis group | Replace existing plumbing fixtures at existing locations, replace existing plumbing risers between floors 2-4. |
| M00827940 ↗ | 118 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 05/10/2023 | 10/26/2023 | RENOVATION OF EXISTING RESIDENTIAL UNIT 6B ON THE 6TH FLOOR OF AN EXISTING BUILDING. ARCHITECTURAL WORK TYPE. NO CHANGE IN USE, OCCUPANCY, O… | |
| 321675111BIS | 135 KENT AVENUE BROOKLYN | — | ISSUED | 02/28/2019 | 10/24/2023 | — | OT |
| M00893498 ↗ | 75 BANK STREET MANHATTAN | Alteration | Signed-off | 06/28/2023 | 10/11/2023 | Design KATZ ARCHITECTURE | REPAIR OF PAVED WALKWAY @ BUILDING ENTRANCE |
| X00502212 ↗ | 1101 WESTCHESTER AVENUE BRONX | Alteration CO | Permit Issued | 04/19/2021 | 09/13/2023 | PROPOSED ELEVATOR MACHINE ROOM, OFFICE SPACE AND INTERIOR ALTERATIONS IN CELLAR TO PROVIDE REQUIRED EGRESS. PROPOSED ELEVATOR SHAFT ON FLOOR… | |
| M00881225 ↗ | 300 WEST 122ND STREET MANHATTAN | Alteration | Signed-off | 07/06/2023 | 09/06/2023 | Owner HARLEM SQUARED REALTY Filer zenesis group | PLUMBING AND SPRINKLER WORK RELATED TO THE COMBINATION OF 2 CLASS 'A' UNITS (11A & 11B). NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00822171 ↗ | 44 BUTLER PLACE BROOKLYN | Alteration | Signed-off | 04/13/2023 | 08/21/2023 | Design BRYCE TAYLOR, ARCHITECT | Interior renovation of apartment#4A in an existing condo building. No change of use, egress or occupancy under this application. |
| M00857762 ↗ | 54 EAST 11TH STREET MANHATTAN | Alteration | Signed-off | 04/26/2023 | 08/09/2023 | Owner ATHENIUM HOUSE CORP Filer HLZAE | MISCELLANEOUS STONE, BRICK , AND STUCCO REPAIRS. RAILING MODIFICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00760415 | 1565 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 06/20/2022 | 08/07/2023 | Design ASHRAF CORP | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR STAIR BULKHEAD WORK AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDIN… |
| B00298031 | 1565 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 02/03/2020 | 08/04/2023 | Design ASHRAF CORP | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| X00800869 ↗ | 800 GRAND CONCOURSE BRONX | Alteration | Signed-off | 03/13/2023 | 04/27/2023 | Filer zenesis group | ALTERATION TYPE-2: PROPOSAL TO RENOVATE APARTMENT UNIT 5H-N. REMOVE AND RELOCATE INTERIOR NON-LOAD BEARING PARTITIONS WITHIN TO CREATE NEW L… |
| X00743933 ↗ | 3097 3RD AVENUE BRONX | Alteration | Signed-off | 11/04/2022 | 03/23/2023 | Owner PHIPPS HOUSES Filer JAM CONSULTANTS, INC. | FILING FOR FACADE RESTORATION AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANG IN USE, EGRESS OR OCCUPANCY. |
| Q00764418 ↗ | 27-16 41ST AVENUE QUEENS | Alteration | Signed-off | 06/30/2022 | 11/04/2022 | Filer zenesis group | REPLACE EXISTING ROOFING MEMBRANE, CANT STRIPS AND INSULATION ABOVE EXISTING ROOF DECKING. ROOF DECK SHALL NOT BE DISTURBED. WORK IS OUTSIDE… |
| B00581902 ↗ | 70 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 09/20/2021 | 07/18/2022 | Design SRS ARCHITECT, PC | FRONT STOOP REPAIRS AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO SIDEWALK SHED IS REQUIRED FOR THIS WORK. |
| B00723697 ↗ | 67 CLIFTON PLACE BROOKLYN | Alteration | Permit Issued | 04/26/2022 | 04/29/2022 | Design SYED ENGINEERING, P.C. Owner SAHARA CONTRACTING CORP | PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING… |
| M00667378 ↗ | 66 LEONARD STREET MANHATTAN | Alteration | Signed-off | 03/25/2022 | 04/25/2022 | Design MDG DESIGN GROUP Filer M-DIS DESIGN GROUP | HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3E. WORK INCLUDES REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PR… |
| M00445564 ↗ | 400 BROADWAY MANHATTAN | Alteration | Signed-off | 02/10/2021 | 03/30/2022 | Owner APICHA CHC Filer zenesis group | REPLACEMENT OF EXISTING & INSTALLATION OF NEW PLUMBING EQUIPMENT IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00621183 ↗ | 73-00 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 11/01/2021 | 03/30/2022 | Filer zenesis group | SCOPE OF WORK: DEMOLITION & RECONSTRUCTION OF HURRICANE IDA DAMAGED BASEMENT & CELLAR ROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 540182657BIS | 7085 HYLAN BOULEVARD STATEN ISLAND | — | ISSUED | 11/10/2020 | 02/24/2022 | — | OT |
| B00543751 ↗ | 67 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 08/25/2021 | 01/16/2022 | Design SRS ARCHITECT, PC | Exterior Facade restoration as per plans. No change in use egress or occupancy. Sidewalk shed to be filed separately. |
| B00543767 ↗ | 69 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 08/31/2021 | 01/16/2022 | Design SRS ARCHITECT, PC | Exterior Facade restoration as per plans. No change in use egress or occupancy. Sidewalk shed to be filed separately. |
| Q00641580 ↗ | 73-00 QUEENS BOULEVARD QUEENS | Alteration CO | Permit Issued | 12/29/2021 | 01/12/2022 | CREATION OF ACCESSORY RECREATION ROOMS, ACCESSORY OFFICES, MINOR PARTITION WORK IN CELLAR, 1ST, 2ND FLOOR | |
| 140875701BIS | 328 WEST 87TH STREET MANHATTAN | — | ISSUED | 12/22/2021 | 12/22/2021 | — | OT |
| B00441364 ↗ | 799 EAST 17TH STREET BROOKLYN | Alteration | Signed-off | 01/25/2021 | 11/10/2021 | Design DAVID SILBERMAN, P.E. | Proposed installation of Scaffold Support North side rear of the building as a temporary equipment only in conjunction with work filed under… |
| B00451083 ↗ | 799 EAST 17TH STREET BROOKLYN | Alteration | Signed-off | 01/26/2021 | 11/10/2021 | Design DAVID SILBERMAN, P.E. | Proposed installation of Scaffold Support South side front of the building as temporary equipment only in conjunction with work filed under … |
| B00454463 ↗ | 799 EAST 17TH STREET BROOKLYN | Alteration | Signed-off | 01/25/2021 | 11/05/2021 | Design DAVID SILBERMAN, P.E. Filer KD DESIGNS | PROPOSED FILING OF WORK TO REPAIR AND REBUILD ONE MASONRYCHIMNEY AND CLEAN AND RE-POINT SECOND MASONRY CHIMNEY, AS PER PLANS. NO CHANGE TO U… |
| X00511065 ↗ | 1101 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 04/28/2021 | 09/20/2021 | Filer zenesis group | PROPOSED INTERIOR ALTERATIONS NEW HVAC EQUIPMENT IN NEW PROPOSED CELLAR OFFICE. NO CHANGE IN USE, EGRESS OROCCUPANCY. |
| M00564880 ↗ | 49 WEST 72ND STREET MANHATTAN | Alteration | Signed-off | 08/05/2021 | 08/22/2021 | Design ENGINEERING SOLUTIONS Filer D&D EXPEDITORS, INC. | Create trench in the cellar for replacement of plumbing lines filed under M00528445. |
| Q00533717 ↗ | 163-03 HORACE HARDING EXPRESSWAY QUEENS | Alteration | Signed-off | 06/21/2021 | 07/28/2021 | Design TAREK M. ZEID, PE, PLLC Owner BANLED ASSOCIATES LLC Filer JMV ASSOCIATES LLC | REPAIRS OF MASONRY WALLS THAT ENCLOSED THE ELEVATOR SHAFT. |
| 340781158BIS | 497 PACIFIC STREET BROOKLYN | — | ISSUED | 03/22/2021 | 06/23/2021 | — | OT |
| X00487470 ↗ | 2331 GRAND CONCOURSE BRONX | Alteration | Signed-off | 03/17/2021 | 06/17/2021 | Filer zenesis group | RENNOVATION OF WEST WING 1ST TO 5TH FLOORS. REPLACEMENT OF EXISTING WOOD JOISTS WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| 220682786BIS | 2327 GRAND CONCOURSE BRONX | — | ISSUED | 03/03/2021 | 06/17/2021 | — | MH, OT |
| 220712343BIS | 2331 GRAND CONCOURSE BRONX | — | ISSUED | 01/15/2021 | 06/17/2021 | — | — |
| 220712352BIS | 2327 GRAND CONCOURSE BRONX | — | ISSUED | 01/14/2021 | 06/17/2021 | — | — |
| 140996126BIS | 1793 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 03/01/2021 | 03/01/2021 | — | OT |
| 240267064BIS | 850 EAST 140TH STREET BRONX | — | ISSUED | 08/18/2020 | 12/08/2020 | — | OT |