| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01422366 ↗ | 38 KING STREET MANHATTAN | Alteration | Permit Issued | 07/09/2026 | 09/15/2026 | Owner BATON PRIVATE LLC | Replacement of a roof drain at the second floor terrace. |
| B00756109 ↗ | 296 WASHINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 01/18/2023 | 07/21/2026 | Design VINCENT J. LIOTTA P.E. Filer JAM CONSULTANTS, INC. | PLUMBING WORK ASSOCIATED WITH CONVERSION OF 2 FAMILY HOME FROM TWO DUPLEX UNITS TO TRIPLEX ANDSINGLE FLOOR APARTMENT. |
| M01383998 ↗ | 180 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 05/07/2026 | 07/02/2026 | Design SHADOW ARCHITECT PC Owner Orsid Realty Corp Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 8E ON THE 8TH FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. |
| M01261193 ↗ | 151 WEST 86TH STREET MANHATTAN | Alteration | Permit Issued | 08/13/2025 | 06/24/2026 | Design MOTOKO TISZA Filer RICHARD LEWIS ARCHITECT | Modify existing and install new plumbing fixtures in existing apartment as per plan. No change to use, egress or ocupancy under this applica… |
| M08000539 ↗ | 18 NORTH MOORE STREET MANHATTAN | Alteration | Signed-off | 09/28/2022 | 06/02/2026 | Owner DOUGLAS ELLIMAN PROPERTY MANAGEMENT | Plumbing modifications as indicated on the plans. |
| M01290650 ↗ | 316 EAST 84TH STREET MANHATTAN | Alteration | Permit Issued | 01/15/2026 | 05/19/2026 | Owner EBERHART BROTHERS, LLC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF UNITS 2R AND 4R AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY… |
| Name | Projects together | Most recent |
|---|---|---|
| Building Studio Architects | 25 | 05/27/2025 |
| Navi Structural Engineering | 10 | 06/27/2022 |
| Rise Architecture NJ | 10 | 06/08/2023 |
| Alberto Roman | 8 | 06/24/2022 |
| Rise Architecture | 8 | 06/02/2026 |
| Matthew Viederman Architect | 6 | 05/20/2026 |
| Alfred Karman, Architect | 5 | 10/08/2021 |
| Atelier NY Architecture | 5 | 04/26/2022 |
| Arc-HI-Tect Associate | 4 | 01/23/2024 |
| Gregory V. Perotto, P.E | 4 | 11/24/2021 |
| Project Tactical Solutions | 3 | 01/15/2026 |
| Andrew Wilkinson Architect | 2 | 02/07/2025 |
| Bazini Engineering | 2 | 02/07/2020 |
| Becker Engineering | 2 | 10/12/2020 |
| Craft Design Architecture | 2 | 05/30/2023 |
| Daniel Frisch | 2 | 10/04/2023 |
| Dilandro Andrews Engineering | 2 | 02/07/2025 |
| H. Randall Goya Architect | 2 | 10/11/2021 |
| Harris Architecture & Design | 2 | 11/13/2023 |
| Kems Engineering and Construction | 2 | 06/02/2025 |
| Meszaros Engineering | 2 | 10/30/2024 |
| Steven Michael Peterson Studios | 2 | 07/09/2026 |
| Vincent J. Liotta P.E | 2 | 10/14/2026 |
| ZS Design Architect | 2 | 08/16/2022 |
| Acheson Doyle Partners Architects | 1 | 06/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Wynne Plumbing & Heating | 155 | 10/14/2026 |
| NJF Contracting | 17 | 05/27/2025 |
| Valiant Design Builders | 6 | 01/15/2026 |
| Build ItÜ Innovative Crea | 4 | 06/02/2026 |
| Biko Renovations | 3 | 05/07/2026 |
| Zara Plumbing | 3 | 01/18/2024 |
| Atlas & Design Contractor | 2 | 11/20/2024 |
| Grindstone Contruction | 2 | 08/16/2022 |
| M.N.C. General Contracting | 2 | 02/07/2025 |
| Wynne Plumbing and Heating | 2 | 10/30/2024 |
| A.M. Sage PLG & Heating | 1 | 11/09/2022 |
| Andreu Remodeling | 1 | 08/15/2025 |
| Angelos's Home Improvemen | 1 | 01/02/2025 |
| Artworks Construction | 1 | 04/11/2025 |
| B-EZ Plumbing & Heating | 1 | 06/02/2025 |
| Bonaline Construction Co | 1 | 03/04/2026 |
| Boxwood Construction | 1 | 06/02/2025 |
| Brooklyn Builders Colecti | 1 | 12/09/2021 |
| DPH Plumbing & Heating | 1 | — |
| Exotic Design & Wire | 1 | 01/19/2024 |
| G & G Mechanical Group | 1 | 06/02/2025 |
| G.A.M.C.N.Y | 1 | 02/07/2025 |
| Kapnag Heating & Plumbing | 1 | 11/09/2022 |
| KJJZ | 1 | 02/18/2025 |
| KM Construction Group | 1 | 05/31/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| RCR Management Group | 43 | 05/27/2025 |
| 'FC Foley Square Associates | 9 | 04/26/2022 |
| CDP General Contractors | 4 | 06/27/2022 |
| 230 West Houston | 2 | 10/12/2020 |
| 81st Dwellers | 2 | 02/07/2025 |
| Douglas Elliman Property Management | 2 | 06/08/2023 |
| Dynamic Building Consultants | 2 | 05/20/2026 |
| Eberhart Brothers | 2 | 01/15/2026 |
| Harmil Realty | 2 | 08/16/2022 |
| Hoffman Management | 2 | 05/09/2022 |
| Lincoln Park Realty | 2 | 06/06/2021 |
| 1051 BCH 20st Associates | 1 | 11/30/2021 |
| 200 95th Street | 1 | 01/23/2024 |
| 232 Equities | 1 | 12/22/2022 |
| 261 W 22 Tenant Owners | 1 | 09/27/2019 |
| 38 East 14th Street Assocaites | 1 | 06/02/2025 |
| 810 River Partners | 1 | 10/28/2025 |
| Akam Associates | 1 | 12/09/2021 |
| Architectural Design Solutions | 1 | 08/16/2023 |
| Baton Private | 1 | 07/09/2026 |
| Eberhart Brothers | 1 | 11/09/2022 |
| First Service Residential | 1 | 08/15/2022 |
| Halstead Management | 1 | 03/17/2021 |
| Island House Tenants | 1 | 03/29/2022 |
| Leeds Associates | 1 | 11/29/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Jack Jaffa & Associates | 7 | 06/02/2026 |
| Willoughby Consulting | 6 | 02/18/2025 |
| Aca Associates | 5 | 06/27/2022 |
| Dynamic Building Consultants | 5 | 05/20/2026 |
| Dominion Expediting | 4 | 01/23/2024 |
| The Perotto Group | 4 | 11/24/2021 |
| Clarke Construction Consultants | 3 | 02/07/2025 |
| AC Building Consultants | 2 | 08/16/2022 |
| Atelier New York Architecture | 2 | 04/26/2022 |
| Building Violation Services | 2 | 03/20/2025 |
| Meszaros Engineering | 2 | 10/30/2024 |
| Project Tactical Solutions | 2 | 01/15/2026 |
| S&M Expediting | 2 | 10/11/2021 |
| Adam Maiser | 1 | 11/29/2023 |
| Aegis Building Consultants | 1 | 07/09/2026 |
| Agouti Construction Consulting | 1 | 10/04/2023 |
| Alfred Karman, Architect | 1 | 10/08/2021 |
| Azar Associates | 1 | 07/18/2022 |
| Dina Vedmed Architect | 1 | 01/10/2023 |
| Edi Consulting Group | 1 | 11/09/2022 |
| Green Light Expediting | 1 | 07/20/2023 |
| J. Callahan Consulting | 1 | 09/08/2026 |
| J.A. Expediting | 1 | 05/07/2026 |
| Jam Consultants | 1 | 10/14/2026 |
| JM Zoning | 1 | 02/24/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01422366 ↗ | 38 KING STREET MANHATTAN | Alteration | Permit Issued | 07/09/2026 | 09/15/2026 | Owner BATON PRIVATE LLC | Replacement of a roof drain at the second floor terrace. |
| B00756109 ↗ | 296 WASHINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 01/18/2023 | 07/21/2026 | Design VINCENT J. LIOTTA P.E. Filer JAM CONSULTANTS, INC. | PLUMBING WORK ASSOCIATED WITH CONVERSION OF 2 FAMILY HOME FROM TWO DUPLEX UNITS TO TRIPLEX ANDSINGLE FLOOR APARTMENT. |
| M01383998 ↗ | 180 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 05/07/2026 | 07/02/2026 | Design SHADOW ARCHITECT PC Owner Orsid Realty Corp Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 8E ON THE 8TH FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. |
| M01261193 ↗ | 151 WEST 86TH STREET MANHATTAN | Alteration | Permit Issued | 08/13/2025 | 06/24/2026 | Design MOTOKO TISZA Filer RICHARD LEWIS ARCHITECT | Modify existing and install new plumbing fixtures in existing apartment as per plan. No change to use, egress or ocupancy under this applica… |
| M08000539 ↗ | 18 NORTH MOORE STREET MANHATTAN | Alteration | Signed-off | 09/28/2022 | 06/02/2026 | Owner DOUGLAS ELLIMAN PROPERTY MANAGEMENT | Plumbing modifications as indicated on the plans. |
| M01290650 ↗ | 316 EAST 84TH STREET MANHATTAN | Alteration | Permit Issued | 01/15/2026 | 05/19/2026 | Owner EBERHART BROTHERS, LLC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF UNITS 2R AND 4R AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY… |
| M01196126 ↗ | 35 NORTH MOORE STREET MANHATTAN | Alteration | Permit Issued | 04/11/2025 | 05/07/2026 | Plumbing work as shown on plans for Apt 5A | |
| M01352707 ↗ | 16 WEST 16TH STREET MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 04/24/2026 | Design VERSAI LLC | REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES AT APARTMENT 1DS ON THE FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01275826 ↗ | 350 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 08/27/2025 | 02/10/2026 | Design RISE ARCHITECTURE Owner WEINREB MANAGEMENT LLC Filer JACK JAFFA & ASSOCIATES | -MINOR PLUMBING WORK AT PARTIAL 2ND FLOOR (APT # 2C) . WORK TO RESOLVE VIOLATION #39155802L & 039155584M |
| B01254354 ↗ | 70 REMSEN STREET BROOKLYN | Alteration | Signed-off | 07/24/2025 | 02/04/2026 | Owner DYNAMIC BUILDING CONSULTANTS, INC | Respectfully request to file Post Approval Amendment to remove gas range & replace with electric range. Cap line. No change in use, egress, … |
| M01342814 | 16 WEST 16TH STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 01/27/2026 | Design TWIG CONSULTING ENGINEERS PC | Plumbing modifications taking place on the 9th floor (9KN) as per plans filed herewith. No change in use, egress or occupancy. |
| M00928682 ↗ | 238 WEST 108TH STREET MANHATTAN | Alteration | Signed-off | 09/06/2023 | 10/17/2025 | Remove, relocate & add new fixtures as noted on plans. No change in use, egress, or occupancy. | |
| M01026774 ↗ | 168 WEST 86TH STREET MANHATTAN | Alteration | Permit Issued | 03/04/2025 | 09/04/2025 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APT 8C ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01178875 ↗ | 168 WEST 86TH STREET MANHATTAN | Alteration | Signed-off | 03/04/2025 | 09/04/2025 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | FILE PLUMBING WORK IN CONJUNCTION WITH WORK LIMITED TO REPLACING PLUMBING FIXTURES AND REPLACING KITCHEN CABINETS AND FINISHES IN APARTMENT … |
| B00425348 ↗ | 96 ELLERY STREET BROOKLYN | Alteration | Signed-off | 11/10/2020 | 07/18/2025 | Design BAOBAB ARCHITECTS P.C. Filer JAM CONSULTANTS, INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION TYPE TWO APPLICATION B00316001. NO CHANGE IN EGRESS, USE OR OCCU… |
| M01178987 ↗ | 168 WEST 86TH STREET MANHATTAN | Alteration | Permit Issued | 05/27/2025 | 07/17/2025 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF APT 2C ON THE SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01186561 ↗ | 168 WEST 86TH STREET MANHATTAN | Alteration | Permit Issued | 05/27/2025 | 07/17/2025 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH REMODEL APT 7A ON THE 7TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00970461 ↗ | 175 MAC DOUGAL STREET MANHATTAN | Alteration | Signed-off | 01/19/2024 | 06/16/2025 | Design TARLAN DESIGN BUILD, LLC Filer LANCIERS ASSOCIATES, LLC | New fixtures for New Toilet |
| M01078183 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 01/02/2025 | 05/01/2025 | Design BLACK BOX ENGINEERING Filer PWF | MODIFICATIONS TO EXISTING PLUMBING SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 220684695BIS | 782 PELHAM PARKWAY SOUTH BRONX | — | ISSUED | 09/22/2020 | 04/16/2025 | — | OT, PL |
| M00361058 ↗ | 168 WEST 86TH STREET MANHATTAN | Alteration | Signed-off | 06/24/2020 | 04/01/2025 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH ALT2 APPLICATION # 140915794. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 104020827BIS | 450 WEST 14TH STREET MANHATTAN | — | ISSUED | 06/23/2008 | 03/18/2025 | — | PL |
| X01153683 ↗ | 810 RIVER AVENUE BRONX | Alteration | Signed-off | 12/24/2024 | 03/17/2025 | Design EJZ ENGINEERING Owner 810 RIVER PARTNERS LLC Filer M.HASHAS,INC | Install mechanical and ventilation work in conjunction with the tenant fit out . |
| M01108077 ↗ | 60 WEST 68TH STREET MANHATTAN | Alteration | Signed-off | 09/20/2024 | 02/27/2025 | Design AMMOR ARCHITECTURE LLP Filer JM ZONING, LLC. | NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. INSTALL NEW GAS RANGE AND GAS METER ON EXISTING BUILDING SERVICE. NO CHANGE TO EXISTING PART… |
| M01124620 ↗ | 38 EAST 14TH STREET MANHATTAN | Alteration | Permit Issued | 11/14/2024 | 02/11/2025 | Filer LEWSAN CONSULTANTS | REPLACEMENT OF TWO (2) HVAC UNITS AND INSTALLATION OF ONE (1) NEW HVAC UNIT. |
| M00513164 ↗ | 44 EAST 67TH STREET MANHATTAN | Alteration | Signed-off | 01/19/2022 | 01/24/2025 | Design FGS DESIGN, LLC. | Plumbing Modifications to unit 11D as indicated on the plans. No change to use, egress or occupancy. |
| 122915765BIS | 98 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 11/14/2016 | 01/03/2025 | — | OT, PL |
| 103252098BIS | 168 WEST 86TH STREET MANHATTAN | — | ISSUED | 01/06/2003 | 12/26/2024 | — | PL |
| M00956651 ↗ | 44 EAST 67TH STREET MANHATTAN | Alteration | Permit Issued | 04/29/2024 | 12/20/2024 | Design RJD ENGINEERING LLC | Plumbing work proposed for an existing penthouse. No change to use, occupancy or egress. |
| M01114275 ↗ | 1 GRACIE TERRACE MANHATTAN | Alteration | Signed-off | 11/04/2024 | 12/02/2024 | Design EAB ENGINEERING PC | Minor non-load bearing partition change, remove kitchen in apartment 9E and cap lines. light interior renovation and combine apartments 9E a… |
| M01121785 ↗ | 300 EAST 59TH STREET MANHATTAN | Alteration | Signed-off | 10/25/2024 | 11/08/2024 | Design SSA+D | Replaced and Relocated Plumbing Fixtures / Fittings as per Plumbing Plan |
| M01118572 ↗ | 305 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 10/11/2024 | 11/07/2024 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH ACCESORY TENANTS LAUNDRY ROOM ON THE BASEMENT LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00949432 ↗ | 870 WEST 181ST STREET MANHATTAN | Alteration | Signed-off | 01/22/2024 | 09/20/2024 | Design MESZAROS ENGINEERING PLLC | INSTALLATION OF SPRINKLER SYSTEM FOR LAUNDRY ROOM ON FIRST FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M00949411 ↗ | 860 WEST 181ST STREET MANHATTAN | Alteration | Signed-off | 01/22/2024 | 09/11/2024 | Design MESZAROS ENGINEERING PLLC | INSTALLATION OF SPRINKLER SYSTEM FOR LAUNDRY ROOM ON FIRST FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M01062138 ↗ | 425 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 06/17/2024 | 09/11/2024 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK OIN CONJUNCTION WITH INTERIOR RENOVATION OF APT PH2/3 ON THE PENTHOUSE LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 321045463BIS | 75 LAFAYETTE AVENUE BROOKLYN | — | ISSUED | 01/09/2015 | 09/11/2024 | — | BL, PL |
| 102489870BIS | 168 WEST 86TH STREET MANHATTAN | — | ISSUED | 03/06/2001 | 09/05/2024 | — | OT, PL |
| 120482968BIS | 305 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 02/22/2011 | 08/14/2024 | — | PL |
| 121804379BIS | 200 WEST 90TH STREET MANHATTAN | — | ISSUED | 08/21/2014 | 08/14/2024 | — | PL |
| M00645818 ↗ | 155 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 12/13/2021 | 06/04/2024 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH REMODEL AND SPLIT APARTMENT 2C ON THE 2ND FLOOR CREATING APARTMENTS 2F AND 2G. REMODEL AND SPLIT APT 7E ON… |
| M00949653 ↗ | 498 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 10/30/2023 | 05/15/2024 | Owner LEEDS ASSOCIATES, LLC Filer ADAM MAISER | PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE ON THE GROUND FLOOR AND STOREFRONT MODIFICATION. NO CH… |
| M00985944 ↗ | 305 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 01/09/2024 | 04/02/2024 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | REFILE JOB # 120409432 TO RENOVATE APT 6A ON THE SIXTH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 120508860BIS | 425 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 10/25/2011 | 03/11/2024 | — | PL |
| M00567311 ↗ | 425 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 07/29/2021 | 03/01/2024 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH ALT 1 # 120508860. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 100286094BIS | 550 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 08/29/1991 | 02/20/2024 | — | PL |
| M00827850 ↗ | 200 WEST 95TH STREET MANHATTAN | Alteration | Signed-off | 04/11/2023 | 02/07/2024 | Design ARC-HI-TECT ASSOCIATE INC Owner 200 95TH STREET LLC Filer DOMINION EXPEDITING | RELOCATE GAS RANGE. RELOCATE EXISTING TUB, WATER CLOSET AND SINK. INSTALL NEW WATER CLOSET, SINK, WASHER AT APARTMENT 25.NO CHANGE IN USE, E… |
| M00990268 ↗ | 500 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 01/16/2024 | 02/01/2024 | Respectfully request to Remove, Relocate & Install New Plumbing Fixtures. No change in use, egress, or occupancy. | |
| M00234283 ↗ | 209 WEST 97TH STREET MANHATTAN | Alteration | Signed-off | 10/03/2019 | 01/25/2024 | Design RISE ARCHITECTURE Owner RCR MANAGEMENT GROUP LLC Filer JACK JAFFA & ASSOCIATES | install, relocate and replace plumbing fixture in apartment 3B |
| Q00895247 ↗ | 33-15 30TH AVENUE QUEENS | Alteration | Signed-off | 10/09/2023 | 01/16/2024 | Design HARRIS ARCHITECTURE & DESIGN | Interior demolition of existing non-bearing partitions, wall, floor, & ceiling finishes down to the existing substrates. The work is being… |
| M00280419 ↗ | 98 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 01/10/2020 | 01/05/2024 | Design BUILDING STUDIO ARCHITECTS Filer JACK JAFFA & ASSOCIATES | RENOVATION OF KITCHEN, ADDITION OF NEW SINK AND NEW DISHWASHER, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M87510139 | 98 RIVERSIDE DRIVE MANHATTAN | — | Signed-off | — | 01/04/2024 | — | RENOVATION OF KITCHEN, ADDITION OF NEW SINK AND NEW DISHWASHER, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00953878 ↗ | 895 BROADWAY BROOKLYN | Alteration | Signed-off | 11/10/2023 | 12/11/2023 | — | INSTALLATION OF ONE LOW PRESSURE STEAM BOILER CONNECTED TO EXISTING ONE-PIPE STEAM SYSTEM. |
| 103113854BIS | 315 WEST 99TH STREET MANHATTAN | — | ISSUED | 03/22/2002 | 12/06/2023 | — | OT, PL |
| 122929581BIS | 390 WEST END AVENUE MANHATTAN | — | ISSUED | 01/09/2017 | 11/20/2023 | — | OT, PL |
| 123754954BIS | 98 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 04/10/2019 | 11/20/2023 | — | OT, PL |
| M00786164 ↗ | 35 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 02/02/2023 | 10/30/2023 | Design ANDREW WILKINSON ARCHITECT Owner 81ST DWELLERS | STRUCTURAL WORK ASSOCIATED WITH THE COMBINATION OF 7ABEF. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00249301 ↗ | 98 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 01/13/2020 | 10/13/2023 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC Filer JACK JAFFA & ASSOCIATES | 3G&3H - REPLACE LAV, TOILET, & TUB ON EXISTING ROUGHING. NEW SHOWER & WASHER. REMOVE AND RELOCATE SINK & DISHWASHER. BATHROOM 2, REPLACE LA… |
| M69729166 | 98 RIVERSIDE DRIVE MANHATTAN | — | Signed-off | — | 10/10/2023 | — | 3G&3H - REPLACE LAV, TOILET, & TUB ON EXISTING ROUGHING. NEW SHOWER & WASHER. REMOVE AND RELOCATE SINK & DISHWASHER. BATHROOM 2, REPLACE LA… |
| M00889985 ↗ | 900 WEST END AVENUE MANHATTAN | Alteration CO | Permit Issued | 06/16/2023 | 08/22/2023 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | REMODEL AND SPLIT APT 14F ON THE 13TH FLOOR CREATING APTS 14I AND 14J. NEW CO WILL BE OBTAINED. |
| M00638580 ↗ | 35 SUTTON PLACE MANHATTAN | Alteration | Signed-off | 11/30/2021 | 08/21/2023 | FILING FOR APT. 19-A IN CONJUNCTION W. GEN. CONST, MECHANICAL & STRUCTURAL APPLICATION M00612744. WORK INCLUDES THE DIRECT REPLACEMENT OF K… | |
| 122477943BIS | 280 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 03/09/2016 | 08/21/2023 | — | PL |
| M00786154 ↗ | 35 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 02/02/2023 | 08/10/2023 | Owner 81ST DWELLERS | STRUCTURAL WORK ASSOCIATED WITH THE GC FILING.SCOPE OF WORK IS TO FRAME NEW OPENING AT NORTH FACADE FOR NEW WINDOW ATTHE 7TH FLR. AT DUPLEX … |
| M00787325 ↗ | 98 RIVERSIDE DRIVE MANHATTAN | Alteration CO | Permit Issued | 08/11/2022 | 08/08/2023 | Design RISE ARCHITECTURE Owner RCR MANAGEMENT GROUP LLC Filer JACK JAFFA & ASSOCIATES | PLUMBING WORK IN CONJUNCTION WITH ALTCO#M00787325-I1 |
| M00877281 ↗ | 359 FORT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 05/25/2023 | 08/04/2023 | Filing plumbing modification to 2nd floor apartment as per plans. No change in use, egress, or occupancy under this application. | |
| M00766302 ↗ | 27 WEST 96TH STREET MANHATTAN | Alteration | Signed-off | 06/30/2022 | 07/14/2023 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK ON THE 7TH FLOOR IN CONJUNCTION WITH JOB # 120508628 REMODEL AND SPLIT APT 7E IN TO APTS 7G AND 7H. NO CHANGE IN USE, EGRESS O… |
| B00674767 ↗ | 460 STATE STREET BROOKLYN | Alteration | Signed-off | 02/09/2022 | 07/07/2023 | Design IKRA CONSULTING LLC Filer DOMINION EXPEDITING | PLUMBING WORK INCLUDE NEW BATHROOM AT BASEMENT NEW POWDER BATHROOM AT FIRST AND SECOND FLOOR. AND RELOCATE BATHROOM FIXTURES AT THIRD FLOOR.… |
| 122750031BIS | 15 WEST 84TH STREET MANHATTAN | — | ISSUED | 12/01/2016 | 05/31/2023 | — | PL |
| M00739572 ↗ | 118 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 08/05/2022 | 04/13/2023 | Design DANIEL FRISCH | MODIFICATION OF PLUMBING SYSTEM IN EXISTING APARTMENT #6CD, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00264692 ↗ | 168 WEST 86TH STREET MANHATTAN | Alteration | Signed-off | 12/26/2019 | 04/11/2023 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK ON 1ST FLOOR IN CONJUNCTION WITH ALT 1 JOB # 122779706. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 110138342BIS | 62 EAST 131ST STREET MANHATTAN | — | ISSUED | 08/27/2008 | 03/22/2023 | — | EQ, PL |
| M00393670 ↗ | 4460 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/08/2020 | 03/14/2023 | Design ALFRED KARMAN, ARCHITECT Filer ALFRED KARMAN, ARCHITECT | Proposed new tenant laundry room. Work inc. installation of 3 cloth washers, 3 gas dryers, 1 slop sink, 1 floor drain, and 2 sprinkler heads… |
| B08046268 ↗ | 895 BROADWAY BROOKLYN | Alteration | Signed-off | 11/30/2022 | 02/28/2023 | Design SOHAIL HUMAYUN P E INC | APPLICATION FILED TO INSTALL NEW GAS COOKING EQUIPMENTS AND PLUMBING FIXTURES AT 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OC… |
| M00803525 ↗ | 425 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 01/18/2023 | 02/07/2023 | Design RISE ARCHITECTURE NJ LLC Owner RCR MANAGEMENT GROUP LLC Filer JACK JAFFA & ASSOCIATES | Installation, removal, replacement, and relocation of plumbing fixtures as shown on plans filed herewith. |
| M00455645 ↗ | 200 WEST 90TH STREET MANHATTAN | Alteration | Signed-off | 01/18/2021 | 01/24/2023 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH ALT 1, SPLIT APT 14F ON THE 14TH FLOOR CREATING APTS 14I AND 14J. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M08051075 ↗ | 232 EAST 6TH STREET MANHATTAN | Alteration | Signed-off | 12/22/2022 | 12/29/2022 | Design HARRIS ARCHITECTURE & DESIGN Owner 232 EQUITIES CORP. | Install required fire sprinkler system to provide coverage of tenants' laundry room clothes dryers, cap-off & conceal future laundry room ga… |
| M00693692 ↗ | 233 EAST 96TH STREET MANHATTAN | Alteration | Signed-off | 03/14/2022 | 12/21/2022 | Owner EBERHART BROTHERS LLC | INTERIOR RENOVATION TO APT. 5FE. WORK TO INCLUDE PLUMBING WORK: INSTALL, RELOCATE AND REPLACE PLUMBING FIXTURES AS PER PLANS. GC WORK FILED … |
| M08009584 ↗ | 320 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 12/13/2022 | 12/21/2022 | Owner EBERHART BROTHERS, LLC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APTS 6RW AND 6RC. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| X00721064 ↗ | 33 TIER STREET BRONX | Alteration | Signed-off | 04/20/2022 | 12/08/2022 | Design AM ARCHITECTURE PLLC | Remove and replace plumbing fixtures on 2nd floor of existing building |
| M00706644 ↗ | 27 NORTH MOORE STREET MANHATTAN | Alteration | Signed-off | 05/09/2022 | 12/07/2022 | Owner HOFFMAN MANAGEMENT | Respectfully request to file for replacement of plumbing fixtures & installation of new shower. |
| M00657087 ↗ | 143 AVENUE B MANHATTAN | Alteration | Signed-off | 02/11/2022 | 11/17/2022 | Owner DOUGLAS ELLIMAN PROPERTY MANAGEMENT | Respectfully request to replace, relocate & install new plumbing fixtures. No change in use, egress or occupancy. |
| Q08007859 ↗ | 210-02 42ND AVENUE QUEENS | Alteration | Signed-off | 09/28/2022 | 11/07/2022 | Design RISE ARCHITECTURE NJ LLC Owner RCR MANAGEMENT GROUP LLC Filer JACK JAFFA & ASSOCIATES | Replacement and removal of plumbing fixtures as shown on plans filed herewith. |
| M00764868 ↗ | 167 PERRY STREET MANHATTAN | Alteration | Signed-off | 06/30/2022 | 11/03/2022 | Filer zenesis group | Remove & replace kitchen appliances, replace bathroom fixtures, install new clothes washer standpipe. |
| M00771490 ↗ | 243 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 08/15/2022 | 10/21/2022 | Design GRUPO DESIGN Owner FIRST SERVICE RESIDENTIAL | Plumbing work related to Application number M00770383-I1 interior alteration. Remove and cap plumbing and gas fixtures |
| M08000176 ↗ | 98 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 09/08/2022 | 10/04/2022 | Design RISE ARCHITECTURE Owner RCR MANAGEMENT GROUP LLC Filer JACK JAFFA & ASSOCIATES | PLUMBING FILING IN CONJUNCTION WITH ALTCO #M00787325 |
| X00553112 ↗ | 6201A SPENCER TERRACE BRONX | Alteration | Signed-off | 07/26/2021 | 10/03/2022 | Filer XPDITE GROUP LLC (104) | Plumbing work in conjunction with DOB NOW Alteration 2 application # X00552872 |
| M00776858 ↗ | 280 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 07/19/2022 | 09/13/2022 | Design BUILDING STUDIO ARCHITECTS | PLUMBING WORK IN CONJUNCTION WITH ALT 1, REMODEL AND SPLIT APT 15H IN TO TWO APTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00446872 ↗ | 456 STATE STREET BROOKLYN | Alteration | Signed-off | 01/11/2021 | 09/07/2022 | Design AK CONSULTING SERVICES, INC Owner ARCHITECTURAL DESIGN SOLUTIONS Filer DOMINION EXPEDITING | Plumbing work as per plan no change use,egress and occupancy. |
| M00749682 ↗ | 156 WEST 86TH STREET MANHATTAN | Alteration | Signed-off | 06/03/2022 | 08/17/2022 | Design ZS DESIGN ARCHITECT, PLLC Owner HARMIL REALTY LLC | Replacement of bathroom fixtures.No change to use, egress or occupancy. |
| M00752448 ↗ | 156 WEST 86TH STREET MANHATTAN | Alteration | Permit Issued | 06/07/2022 | 08/17/2022 | Design ZS DESIGN ARCHITECT, PLLC Owner HARMIL REALTY LLC | Replacement of plumbing fixtures. No change to use, egress or occupancy. |
| M00772858 | 866 UNITED NATIONS PLAZA MANHATTAN | Alteration | Signed-off | 07/18/2022 | 08/10/2022 | Design TSS ENGINEERS Filer AZAR ASSOCIATES | Replace plumbing fixtures in Apt 16F, GC filed under M00772128 |
| M00296851 ↗ | 126 WEST 34TH STREET MANHATTAN | Alteration | Signed-off | 01/26/2021 | 07/21/2022 | Filer LEWSAN CONSULTANTS | Plumbing work to replace existing split HVAC unit. |
| M00757450 ↗ | 69 5TH AVENUE MANHATTAN | Alteration | Signed-off | 06/24/2022 | 07/13/2022 | Design CARSON ARCHITECTURE, PLLC | Interior alteration at apartment 9H. All as per plans filed herewith. No change to egress, zoning, occupancy, & use. |
| X00360721 ↗ | 2447 SOUTHERN BOULEVARD BRONX | Alteration | Signed-off | 11/19/2020 | 07/13/2022 | Design MAX DISLA ARCHITECT Filer DANSHA REALTY CORP | SP WORKTYPE IN CONJUNCTION W APPLICATION #220725598 |
| M00753643 ↗ | 2 5TH AVENUE MANHATTAN | Alteration | Signed-off | 06/17/2022 | 07/09/2022 | Reolcate gas stove & washing machine. Replacement of existing shower, toilet and faucets on existing roughs. New ice maker box & dishwasher… | |
| M00502043 ↗ | 182 GRAND STREET MANHATTAN | Alteration | Signed-off | 05/19/2021 | 07/08/2022 | Design VINCENT J. LIOTTA P.E. Filer S&M EXPEDITING | SPRINKLER WORK IN EXISTING APARTMENT ON 2ND & 3RD FLOORS AS SHWON ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. |
| M00290567 ↗ | 305 WEST 86TH STREET MANHATTAN | Alteration | Signed-off | 02/18/2020 | 06/15/2022 | Design ALICIA A. INMAN Filer M.W. EXPEDITING INC | Plumbing work being filed in conjunction with Alteration 2 application to renovate and combine units 4C and 4D on the 4th floor. No change … |
| M00744025 ↗ | 155 EAST 73RD STREET MANHATTAN | Alteration | Signed-off | 05/24/2022 | 06/14/2022 | Design JUSTIN GEORGES ARCHITECT | REMOVE EXITING FIXTURES AND INSTALL NEW BATHTUB, LAVATORIES ANDTOILET |
| 122475561BIS | 124 WEST 79TH STREET MANHATTAN | — | ISSUED | 03/08/2016 | 06/08/2022 | — | PL |
| M00513331 ↗ | 124 WEST 79TH STREET MANHATTAN | Alteration | Signed-off | 05/03/2021 | 05/25/2022 | Design BUILDING STUDIO ARCHITECTS Owner RCR MANAGEMENT GROUP LLC | PLUMBING WORK IN CONJUNCTION WITH ALT 1 # 122475561. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00719436 ↗ | 845 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 05/05/2022 | 05/20/2022 | Design DINA VEDMED ARCHITECT Filer DINA VEDMED ARCHITECT | PLUMBING WORK IN APARTMENT 9B IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER APPLICATION #M00718181. NO CHANGE IN USE,EGRES… |