| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01424165 ↗ | 47 9 AVENUE MANHATTAN | — | Permit Issued | — | 09/25/2026 | Contractor SKINNER PLUMBING & HEATING | Modification to Plumbing Systems as per plans filed herewith. |
| M01424151 ↗ | 47 9 AVENUE MANHATTAN | — | Permit Issued | — | 09/18/2026 | Contractor STEADFAST DEVELOPMENT AND | Structural Modification as per plans filed herewith. |
| M01424159 ↗ | 47 9 AVENUE MANHATTAN | Alteration | Permit Issued | 09/15/2026 | 09/18/2026 | Contractor STEADFAST DEVELOPMENT AND | Modification to Mechanical systems as per plans filed herewith. |
| M01358152 ↗ | 31 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 03/06/2026 | 09/17/2026 | Owner LITTLE EL FASSI LLC Contractor BULL CONSTRUCTION GROUP* | STORE RENOVATION (ZARA) WORK TO INCLUDE RELATED STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01433738 ↗ | 100 CHURCH STREET MANHATTAN | — | Permit Issued | — | 09/17/2026 | Owner SL GREEN REALTY CORP Contractor M&T PLBG AND HTG CO., INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 1st Floor retail space (Joe & the Juice) as per plans. No change to use, egress or occu… |
| B01241752 ↗ | 5120 AVENUE U BROOKLYN | Alteration | Permit Issued | 08/14/2025 | 09/14/2026 | Contractor BULL CONSTRUCTION GROUP* Filer ZARA USA, Inc. | TENANT FIT OUT - REMOVAL AND INSTALLATION OF NON-BEARING PARTITION, HUNG CEILING, & FLOORING. PARTIAL INTERIOR RENOVATION WITHIN AN EXISTING… |
| Person | Filings | Most recent |
|---|---|---|
| MARK HUFFNAGLE | 251 | 09/11/2026 |
| RANDOLPH PIERSALL | 26 | 06/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 4 | 08/11/2026 |
| ARCHYTECX DESIGN AND ARCHITECTURE | 3 | 08/26/2026 |
| ARTHUR BALOURDAS | 3 | 05/29/2024 |
| LEVERATTO ARCHITECTURE GROUP | 3 | 04/01/2026 |
| LEVIN ENGINEERING PLLC | 2 | 04/10/2025 |
| MG2 | 2 | 02/17/2025 |
| MICHAEL H LUTSCH JR. ARCHITECT | 2 | 10/09/2024 |
| ACTIVE DESIGN GROUP ENGINEERING | 1 | 08/14/2024 |
| ARMOUR UNSDERFER ENGINEERING INC, P | 1 | 01/29/2025 |
| BERGMEYER ARCHITECTURAL PC | 1 | 03/18/2025 |
| CALLISONRTKL ARCHITECTS, P.C. | 1 | 04/14/2025 |
| CTHREE ARCHITECTURE + DESIGN, PC | 1 | 04/15/2025 |
| DOKA ENGINEERING PC | 1 | 04/16/2024 |
| Domus Company LLC | 1 | 08/27/2026 |
| GENSLER | 1 | 07/11/2025 |
| JACK GREEN ASSOCIATES | 1 | 11/04/2025 |
| LINO PICINIC ARCHITECT | 1 | 08/27/2026 |
| MB ARCHITECTURE DESIGN | 1 | 02/14/2026 |
| MEYERS+ ENGINEERS | 1 | 08/15/2024 |
| MEYERS+ASSOCIATES ARCHITECTURE | 1 | 09/24/2025 |
| NADEL INC. | 1 | 08/14/2024 |
| O'NEIL LANGAN ARCHITECTS, PC | 1 | 04/19/2024 |
| PETER A. LEPTUCH P.E. | 1 | 08/15/2024 |
| R H SWEERS ARCHITECT | 1 | 11/14/2023 |
| RMJ | 1 | 02/14/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| STEADFAST DEVELOPMENT AND | 30 | 09/15/2026 |
| PAR PLUMBING CO., INC | 14 | 08/26/2026 |
| SCHIMENTI CONSTRUCTION CO | 14 | 03/31/2026 |
| SKINNER PLUMBING & HEATIN | 12 | 07/24/2026 |
| BEDROCK PLBG. & HTG., INC | 8 | 06/23/2026 |
| TOM RECTENWALD CONSTRUCTI | 8 | 02/14/2026 |
| JRM CONSTRUCTION MGMT LLC | 7 | 02/05/2025 |
| AARON PLBG AND MECH SYST | 5 | 08/20/2026 |
| ARMON MECHANICAL INC | 5 | 07/30/2025 |
| SIRINA FIRE PROT CORP | 5 | 04/10/2025 |
| CLUNE CONSTRUCTION CO LP | 4 | 02/05/2025 |
| DUO PLUMBING & HTG CORP. | 3 | 07/20/2026 |
| E. C. PROVINI CO., INC | 3 | 02/17/2025 |
| STANDARD FIRE PROTECT LLC | 3 | 08/15/2024 |
| VERICON CONSTRUCTION CO | 3 | 04/14/2025 |
| WARD PIPING COMPANY INC | 3 | 03/18/2025 |
| ALCHEMY DEVELOPMENT | 2 | 08/27/2026 |
| AMBASSADOR CONSTRUCTION C | 2 | 02/26/2024 |
| BULL CONSTRUCTION GROUP* | 2 | 08/26/2026 |
| COMMERCIAL CONSTRUCTION M | 2 | 08/02/2023 |
| CPM BUILDERS N.A. LLC | 2 | 09/30/2021 |
| FAST TRACK CONSTRUCTION S | 2 | 11/14/2023 |
| FLOW-RIGHT FIRE SUPP CORP | 2 | 04/01/2026 |
| FLOW-RIGHT PLBG & HTG COR | 2 | 08/24/2026 |
| FORTE EXPRESS P & H INC | 2 | 03/28/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| MACERICH | 13 | 08/20/2026 |
| VORNADO REALTY TRUST | 9 | 07/16/2026 |
| WINTER MANAGEMENT CORP. | 7 | 06/23/2026 |
| ACADIA REALTY TRUST | 5 | 06/27/2024 |
| KINGS PLAZA SHOPPING CENTER | 5 | 08/26/2026 |
| GFP REAL ESTATE LLC | 4 | 11/12/2024 |
| LASERAWAY | 4 | 05/29/2024 |
| SL GREEN REALTY CORP | 4 | 08/22/2023 |
| ACADIA REALTY | 3 | 10/02/2025 |
| AVALON BAY COMMUNITIES INC. | 3 | 07/07/2023 |
| BROADWALL MANAGEMENT | 3 | 04/09/2024 |
| GGP STATEN ISLAND MALL LLC | 3 | 03/21/2023 |
| GLYNTON HANDKERCHIEF COMPANY | 3 | 05/31/2024 |
| Hudson 1701-1706 LLC | 3 | 08/13/2025 |
| 315 HUDSON LLC | 2 | 12/02/2025 |
| ASG EQUITIES LLC | 2 | 12/18/2024 |
| BRILLIANT EARTH | 2 | 01/29/2025 |
| CUSHMAN & WAKEFIELD | 2 | 04/13/2026 |
| DIRECT PROPERTY MANAGEMENT, LLC | 2 | 09/16/2021 |
| EXTELL DEVELOPMENT | 2 | 06/09/2026 |
| FSF SOHO, LLC | 2 | 09/30/2021 |
| GLOBAL HOLDINGS | 2 | 01/30/2025 |
| GORDON PROPERTY | 2 | 06/17/2021 |
| HUBB NYC PROPERTIES LLC | 2 | 10/20/2022 |
| ISJ MANAGEMENT CORP. | 2 | 12/05/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 36 | 09/15/2026 |
| OUTSOURCE CONSULTANTS, INC. | 16 | 08/11/2026 |
| RIZZO GROUP | 16 | 07/11/2025 |
| MARY MCKEOWN | 15 | 06/23/2026 |
| GILLMAN CONSULTING INC | 14 | 01/30/2025 |
| JAM CONSULTANTS, INC. | 9 | 12/02/2025 |
| WILLIAM VITACCO ASSOCIATES | 9 | 04/19/2024 |
| MUNICIPAL BUILDING CONSULTANTS | 7 | 04/14/2025 |
| ARCHETYPE CONSULTANTS, INC. | 5 | 07/25/2024 |
| GREEN LIGHT EXPEDITING LLC | 4 | 04/01/2026 |
| BURNHAM NATIONWIDE INC | 3 | 08/02/2023 |
| CTHREE ARCHITECTURE + DESIGN, PC | 3 | 04/15/2025 |
| GEORGE E. BERGER & ASS. LLC | 3 | 06/29/2022 |
| DOMANI CONSULTING | 2 | 02/14/2026 |
| DVA Advisors | 2 | 03/31/2026 |
| MG2 | 2 | 06/17/2021 |
| MICHAEL ZENREICH ARCHITECT, PC | 2 | 08/24/2026 |
| MUNICIPAL EXPEDITING INC | 2 | 01/29/2025 |
| BRIDGE EXPEDITING INC. | 1 | 01/06/2026 |
| EA DESIGN GROUP, INC. | 1 | 10/09/2024 |
| JENNY FLORES EXPEDITING | 1 | 08/15/2024 |
| NEXUS CONSULTING NYC, INC | 1 | 03/31/2026 |
| PHS CONSULTING & SERVICE CORP | 1 | 11/04/2025 |
| Pura Vida Miami | 1 | 07/23/2025 |
| VINCENT J. LIOTTA P.E. | 1 | 05/03/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01424165 ↗ | 47 9 AVENUE MANHATTAN | — | Permit Issued | — | 09/25/2026 | Contractor SKINNER PLUMBING & HEATING | Modification to Plumbing Systems as per plans filed herewith. |
| M01424151 ↗ | 47 9 AVENUE MANHATTAN | — | Permit Issued | — | 09/18/2026 | Contractor STEADFAST DEVELOPMENT AND | Structural Modification as per plans filed herewith. |
| M01424159 ↗ | 47 9 AVENUE MANHATTAN | Alteration | Permit Issued | 09/15/2026 | 09/18/2026 | Contractor STEADFAST DEVELOPMENT AND | Modification to Mechanical systems as per plans filed herewith. |
| M01358152 ↗ | 31 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 03/06/2026 | 09/17/2026 | Owner LITTLE EL FASSI LLC Contractor BULL CONSTRUCTION GROUP* | STORE RENOVATION (ZARA) WORK TO INCLUDE RELATED STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01433738 ↗ | 100 CHURCH STREET MANHATTAN | — | Permit Issued | — | 09/17/2026 | Owner SL GREEN REALTY CORP Contractor M&T PLBG AND HTG CO., INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 1st Floor retail space (Joe & the Juice) as per plans. No change to use, egress or occu… |
| B01241752 ↗ | 5120 AVENUE U BROOKLYN | Alteration | Permit Issued | 08/14/2025 | 09/14/2026 | Contractor BULL CONSTRUCTION GROUP* Filer ZARA USA, Inc. | TENANT FIT OUT - REMOVAL AND INSTALLATION OF NON-BEARING PARTITION, HUNG CEILING, & FLOORING. PARTIAL INTERIOR RENOVATION WITHIN AN EXISTING… |
| B01449750 ↗ | 161 COURT STREET BROOKLYN | Alteration | Permit Issued | 08/24/2026 | 09/10/2026 | Owner prospect management Contractor ALCHEMY DEVELOPMENT | Interior renovation of existing tenant suite |
| M01391062 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 05/08/2026 | 08/20/2026 | Contractor JOSEPH CRUPI CONSTRUCT IN | STORE RENOVATION (ZARA KIDS) WORK TO INCLUDE PARTITION, CEILING AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OC… |
| M01431531 ↗ | 808 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 07/24/2026 | 08/14/2026 | Owner Lincoln Property Company Contractor SKINNER PLUMBING & HEATING | Modification to Plumbing systems as per plans filed herewith. |
| Q01351911 ↗ | 211-01 26TH AVENUE QUEENS | Alteration | Permit Issued | 02/03/2026 | 07/29/2026 | Contractor PAR PLUMBING CO., INC | Modification to Plumbing Systems as per plans filed here with. |
| S01428464 ↗ | 2655 RICHMOND AVENUE STATEN ISLAND | Alteration | Permit Issued | 07/16/2026 | 07/28/2026 | Owner BROOKFIELD PROPERTIES Contractor PAR PLUMBING CO., INC | Modification to Plumbing systems as per plans filed herewith. |
| M01427999 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/16/2026 | 07/24/2026 | Owner VORNADO REALTY TRUST Contractor PAR PLUMBING CO., INC | Modification to Plumbing systems as per plans filed herewith. |
| M01381803 ↗ | 300 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/15/2026 | 07/07/2026 | Contractor DUO PLUMBING & HTG CORP. | Modification to Plumbing systems as per plans filed herewith. |
| M01403747 ↗ | 150 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 06/09/2026 | 06/30/2026 | Contractor STEADFAST DEVELOPMENT AND | Structural modifications, Ceiling Soffit support as per plans filed herewith. |
| Q01382097 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 05/12/2026 | 06/04/2026 | Owner MACERICH Contractor AARON PLBG AND MECH SYST | Modification to Plumbing systems as per plans filed herewith. |
| M01362596 ↗ | 163 EAST 86 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/12/2026 | — | — | |
| M01324150 ↗ | 150 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 01/20/2026 | 04/24/2026 | Contractor SKINNER PLUMBING & HEATING | Existing tenant remodel. Floor fixture reset and minor plumbing work with a hand sink. Air devices to be cleaned. All plumbing will be compl… |
| M01369529 ↗ | 666 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 04/09/2026 | Contractor SCHIMENTI CONSTRUCTION CO Filer DVA Advisors | Plumbing work as shown on plans filed herewith. |
| M01330889 ↗ | 457 WEST 17 STREET MANHATTAN | Alteration | Permit Issued | 01/02/2026 | 03/20/2026 | Contractor ALCHEMY DEVELOPMENT Filer BRIDGE EXPEDITING INC. | ERECTION OF MINOR PARTITIONS, MILLWORK, NEW LIGHTING AND NEW FINISHES THROUGHOUT THE CELLAR AND 1ST FLOOR COMMERICAL SPACE |
| M01321564 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 02/06/2026 | 03/06/2026 | Owner WINTER MANAGEMENT CORP Contractor BEDROCK PLBG. & HTG., INC Filer MARY MCKEOWN | Plumbing work associated with new tenant build out for Lululemon per plans filed herewith. No change in egress, use or occupancy. |
| B01288144 ↗ | 5120 AVENUE U BROOKLYN | Alteration | Permit Issued | 12/03/2025 | 02/25/2026 | Contractor ARTUR HOME IMPROVEMENT Filer DOMANI CONSULTING | sprinkler filing in association with B01173356-I1 Coach Store Space 148 |
| M01321548 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 02/06/2026 | 02/25/2026 | Owner WINTER MANAGEMENT CORP Contractor MICHILLI INC Filer MARY MCKEOWN | Mechanical work in conjunction with new tenant layout for Lululemon as per plans filed herewith. No change in egress, use or occupancy |
| M01321570 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 01/16/2026 | 02/19/2026 | Owner WINTER MANAGEMENT CORP Contractor ALLSTATE SPRINKLER LLC Filer MARY MCKEOWN | LULELEMON - Sprinkler work associated with new tenant build out. No change in egress, use or occupancy. |
| M01253436 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Permit Issued | 07/30/2025 | 02/03/2026 | Owner Hudson 1701-1706 LLC Contractor ARMON MECHANICAL INC | modifications to existing plumbing system. no change in use occupancy or egress |
| M01338650 ↗ | 666 5 AVENUE MANHATTAN | Alteration | Permit Issued | 12/23/2025 | 01/14/2026 | Contractor SCHIMENTI CONSTRUCTION CO Filer DVA Advisors | STRUCTURAL MODIFICATIONS FOR SLAB INFILLS AND OPENINGS TO ACCOMMODATE NEW ELEVATOR AND MEPS RISERS AND CONVENIENCE STAIR. NO CHANGE TO USE,… |
| M01266283 ↗ | 78 VANDAM STREET MANHATTAN | Alteration | Permit Issued | 09/10/2025 | 12/11/2025 | Owner 315 HUDSON LLC Contractor RALPH W. LANDOLFI JR. Filer JAM CONSULTANTS, INC. | SPRINKLER WORK FOR THE 1ST FLOOR JUICE STORE |
| M01253423 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Permit Issued | 07/30/2025 | 10/01/2025 | Owner Hudson 1701-1706 LLC Contractor STEADFAST DEVELOPMENT AND | retail tenant alteration. no change in use egress of occupancy |
| M01253448 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Signed-off | 08/13/2025 | 09/30/2025 | Owner Hudson 1701-1706 LLC Contractor STEADFAST DEVELOPMENT AND | HVAC Support (Water Source Heat Pumps). No change in use occupancy egress. |
| B01161805 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 02/14/2025 | 09/29/2025 | Owner CUSHMAN & WAKEFIELD Contractor PAR PLUMBING CO., INC | MODIFICATIONS TO EXISTING PLUMBING SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M01266233 ↗ | 78 VANDAM STREET MANHATTAN | Alteration | Signed-off | 09/10/2025 | 09/12/2025 | Owner 315 HUDSON LLC Contractor RIDGE CONSTRUCTION CORP Filer JAM CONSULTANTS, INC. | MODIFICATION OF DUCTWORK AND INSTALLATION OF AC UNITS. |
| M01236655 ↗ | 750 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 07/09/2025 | 09/02/2025 | Contractor SKINNER PLUMBING & HEATIN | Modifications to existing plumbing system. no changes in use egress or occupancy |
| M01236659 ↗ | 750 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 07/09/2025 | 08/25/2025 | Contractor STEADFAST DEVELOPMENT AND | Reframing of Mechanical Platform. No change in use egress or occupancy. |
| M01043944 ↗ | 549 BROADWAY MANHATTAN | Alteration | Signed-off | 06/25/2024 | 08/22/2025 | Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Filing for Structural interior renovation as per the plans filed herewith. No change in use, egress or occupancy. |
| B01237105 ↗ | 19 KENT AVENUE BROOKLYN | Alteration | Signed-off | 06/17/2025 | 07/14/2025 | Contractor COOPER WORKS Filer Pura Vida Miami | Hereby filing to remove and install sprinkler heads with associated piping for restaurant expansion as shown on plans filed herewith. |
| B01214635 ↗ | 97 NORTH 6 STREET BROOKLYN | Alteration | Signed-off | 05/20/2025 | 07/10/2025 | Owner ACADIA REALTY Contractor SKINNER PLMNG & HTG CORP Filer MARY MCKEOWN | Lululemon Minor modification to existing sprinkler system to accommodate new layout for new tenant. No change in egress, use or occupancy. |
| B01214626 ↗ | 97 NORTH 6 STREET BROOKLYN | Alteration | Signed-off | 05/20/2025 | 05/23/2025 | Owner ACADIA REALTY Contractor STEADFAST DEVELOPMENT AND Filer MARY MCKEOWN | Lululemon Minor modification to existing exhaust and dampers to accommodate new layout out for new tenant. HVAC existing to remain. No ch… |
| B01211900 ↗ | 97 NORTH 6 STREET BROOKLYN | Alteration | Filed — no permit on record | 05/20/2025 | — | Owner ACADIA REALTY Filer MARY MCKEOWN | — |
| B01203820 ↗ | 210 JORALEMON STREET BROOKLYN | Alteration | Signed-off | 04/09/2025 | 04/28/2025 | Contractor ARMON MECHANICAL INC | Modifications to existing plumbing system. No change in use egress or occupancy |
| M01173620 ↗ | 557 BROADWAY MANHATTAN | Alteration | Signed-off | 03/05/2025 | 04/22/2025 | Owner JLL Contractor ARMON MECHANICAL INC | Modifications to existing plumbing system. No change in use egress or occupancy. |
| B01203806 ↗ | 210 JORALEMON STREET BROOKLYN | Alteration | Signed-off | 04/09/2025 | 04/11/2025 | Contractor STEADFAST DEVELOPMENT AND | Modifications to existing mechanical systems. No change in use egress or occupancy. |
| M00832838 ↗ | 547 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/05/2023 | 03/31/2025 | Contractor FLOW-RIGHT PLBG & HTG COR | Filing for the installation of plumbing fixtures in bathroom at first floor retail space (Abercrombie & Fitch) as per plans submitted, in as… |
| M00833145 ↗ | 547 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/05/2023 | 03/28/2025 | Owner TRUE SERVICE NY, INC. Contractor FLOW-RIGHT FIRE SUPP CORP | Installation of sprinkler heads in existing sprinkler system, at retail space as per plans submitted. |
| M01176380 ↗ | 9 AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2025 | 03/25/2025 | Contractor STEADFAST DEVELOPMENT AND | Structural work as shown on plans |
| Q01131396 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 11/26/2024 | 03/14/2025 | Owner MACERICH Contractor JAMES M. BARB CONSTR. INC | Replace plumbing fixtures in existing location. Connect new fixtures to existing sanitary and domestic piping as required. |
| B01173356 ↗ | 5120 AVENUE U BROOKLYN | Alteration | Signed-off | 02/07/2025 | 03/09/2025 | Contractor E. C. PROVINI CO., INC Filer DOMANI CONSULTING | Structural application in conjunction with application#B01173356,VICTORIA SECRET STORE SPACE#0116A. |
| M01173662 ↗ | 1841 BROADWAY MANHATTAN | Alteration | Signed-off | 01/30/2025 | 02/27/2025 | Owner GLOBAL HOLDINGS Contractor VERICON CONSTRUCTION CO Filer GILLMAN CONSULTING INC | MODIFICATIONS/ADDITIONS TO EXISTING HVAC SYSTEM AND DUCTWORK/PIPING FOR EXISTING TENANT (CAPITAL ONE) IN A NEWLY CONSTRUCTED MIXED-USE RESID… |
| M01100703 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 12/10/2024 | 02/18/2025 | Contractor SCHIMENTI CONSTRUCTION CO | STORE RENOVATION (ZARA STOCK ROOM) WORK TO INCLUDE PARTITION, CEILING AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS… |
| M01133358 ↗ | 70 10 AVENUE MANHATTAN | Alteration | Signed-off | 11/25/2024 | 12/20/2024 | Contractor VERICON CONSTRUCTION CO | THE SCOPE OF WORK INCLUDESCONSTRUCTION OF INTERIOR NON-BEARING WALLS, DOORS AND LIGHTING, NEW ELECTRICAL OUTLETS FOR NEWEQUIPMENT, NEW MECHA… |
| M01028112 ↗ | 119 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2024 | 12/09/2024 | Contractor SKINNER PLUMBING & HEATIN | Modifications to existing plumbing system. No change in use occupancy or egress |
| M01028135 ↗ | 119 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2024 | 12/04/2024 | Contractor STEADFAST DEVELOPMENT AND | New wheelchair lift added and staircase support. No change in use egress or occupancy |
| M01100689 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 09/23/2024 | 11/18/2024 | Contractor SCHIMENTI CONSTRUCTION CO | STORE RENOVATION (ZARA) WORK TO INCLUDE STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00936938 ↗ | 405 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 09/20/2023 | 09/23/2024 | Contractor JAMES AGRESTA CARPENTRY I Filer JENNY FLORES EXPEDITING | HEREBY STRUCTURAL APPLICATION FOR THE RENOVAITON OF EXISTING COMMERCIAL SPACE. INSTALLATION OF NEW STAIRCASE. CHANGE IN USE, EGRESS OR OCCUP… |
| M01071222 ↗ | 139 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/12/2024 | 09/13/2024 | Owner THOR EQUITIES, LLC Contractor INTERNOVA CONTRACTING Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR (ABERCROMBIE & FITCH) AS PER PLAN FILED HEREWITH. NO CHA… |
| M00934646 ↗ | 83 GREENE STREET MANHATTAN | Alteration | Signed-off | 10/05/2023 | 08/27/2024 | Owner CJ TAN SPRING LLC Contractor SACHSE CONSTRUCTION AND | REPLACEMENT OF EXISITNG RETAIL STORE STAIR WITH NEW IN THE SAME LOCATION. |
| M01076773 ↗ | 175 BROADWAY MANHATTAN | Alteration | Signed-off | 07/15/2024 | 08/13/2024 | Owner ASG EQUITIES LLC Contractor ARMON MECHANICAL INC | Modifications to existing plumbing system. No change in use occupancy or egress |
| M01076627 ↗ | 175 BROADWAY MANHATTAN | Alteration | Signed-off | 07/15/2024 | 08/07/2024 | Owner ASG EQUITIES LLC Contractor STEADFAST DEVELOPMENT AND | Modifications to existing HVAC systems. No change in use occupancy or egress |
| M01076774 ↗ | 175 BROADWAY MANHATTAN | Alteration | Signed-off | 07/16/2024 | 08/07/2024 | Contractor STEADFAST DEVELOPMENT AND | HVAC Support (RTU and AHU) and storefront/Vestibule support. No change in use, egress or occupancy |
| M01039015 ↗ | 255 ELIZABETH STREET MANHATTAN | Alteration | Permit Issued | 06/27/2024 | 07/17/2024 | Owner BRILLIANT EARTH Contractor RUSSCO ,INC Filer MUNICIPAL EXPEDITING INC | B.E. Snow 2.0: Structural work to accommodate the renovation in the existing building. No change to zoning, use, egress or occupancy. |
| B00979252 ↗ | 80 4 STREET BROOKLYN | Alteration CO | Permit Issued | 01/18/2024 | 06/26/2024 | Contractor MJM ASSOCIATES CONSTR LLC | Plumbing work on floors 001, Mez and Roof as indicated on plans |
| Q01011619 ↗ | 37-12 82 STREET QUEENS | Alteration | Signed-off | 03/28/2024 | 05/20/2024 | Contractor FORTE EXPRESS P & H INC | Modifications to plumbing systems as per plans filed herewith. No change of use, occupancy or egress. |
| M00979789 ↗ | 608 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2024 | 04/24/2024 | Owner OMNISPECTIVE Contractor MEGA PLBG CORP Filer GILLMAN CONSULTING INC | restrooms, breakroom, cafe space, and kitchen to support new store. Modifications to existing plumbing system as per plans. (Aritzia Phase 2… |
| M00979669 ↗ | 608 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2024 | 04/23/2024 | Owner OMNISPECTIVE Contractor JRM CONSTRUCTION MGMT LLC Filer GILLMAN CONSULTING INC | provide HVAC for store utilizing existing condenser water and steam systems (Aritzia Phase 2 Retail TI). modification to existing mechanical… |
| Q01011593 ↗ | 37-12 82 STREET QUEENS | Alteration | Signed-off | 04/05/2024 | 04/12/2024 | Contractor STEADFAST DEVELOPMENT AND | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| Q01011630 ↗ | 37-12 82 STREET QUEENS | Alteration | Signed-off | 03/26/2024 | 04/12/2024 | Contractor STEADFAST DEVELOPMENT AND | AHU support framing with new wood joists and Unistrut for roof plan. Floor infill with wood members for first floor plan. No change in use, … |
| M00991564 ↗ | 881 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/26/2024 | 04/04/2024 | Owner WINTER MANAGEMENT CORP. Contractor RJ BRUNO INC Filer GILLMAN CONSULTING INC | REMOVAL/MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (DEMO WORK RELATED TO REMOVAL OF MEZZA… |
| M00973999 ↗ | 1841 BROADWAY MANHATTAN | Alteration | Signed-off | 01/10/2024 | 04/02/2024 | Owner GLOBAL HOLDINGS Contractor VERICON CONSTRUCTION CO Filer GILLMAN CONSULTING INC | STRUCTURAL MODIFICATIONS TO SUPPORT NEW MECHANICAL UNITS, NEW RAISED FLOOR, NEW STAIR AND RAMPS, SUPPORT OF NEW VESTIBULES FOR INTERIOR TENA… |
| M00926247 ↗ | 2780 BROADWAY MANHATTAN | Alteration | Signed-off | 11/01/2023 | 03/27/2024 | Owner LASERAWAY Contractor VANGUARD CONSTRUCTION AND | MODIFICATION OF EXISTING SPRINKLER SYSTEM IN EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, OCCUPANCEY OR EGRESS |
| M00896483 ↗ | 560 BROADWAY MANHATTAN | Alteration | Signed-off | 09/05/2023 | 03/25/2024 | Owner GFP REAL ESTATE LLC Contractor JRM CONSTRUCTION MGMT LLC Filer GILLMAN CONSULTING INC | Structural alterations for new escalators and elevator, no change use, egress or occupancy. |
| M00945619 ↗ | 750 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/08/2023 | 03/06/2024 | Contractor FAST TRACK CONSTRUCTION S Filer JAM CONSULTANTS, INC. | ST. JOHN'S-- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH RETAIL RENOVATION. |
| M00991554 ↗ | 881 BROADWAY MANHATTAN | Alteration | Signed-off | 02/26/2024 | 03/05/2024 | Owner WINTER MANAGEMENT CORP. Contractor AMBASSADOR CONSTRUCTION C Filer GILLMAN CONSULTING INC | REMOVAL/MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (WORK RELATED TO REMOVAL OF MEZZANINE). |
| M00947123 ↗ | 615 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/11/2023 | 03/04/2024 | Contractor BRIGHTON INSTALLATION CO | FILING FOR MECHANICAL WORK FOR INSTALLATION OF AIR COOLED CONDENSING UNITS & AIR HANDLING UNITS AS PER PLANS FILED HEREWITH. NO CHANGE IN EG… |
| M00965990 ↗ | 881 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/20/2024 | 02/29/2024 | Owner WINTER MANAGEMENT CORP. Contractor AMBASSADOR CONSTRUCTION C Filer GILLMAN CONSULTING INC | Relocate existing electric heater. MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (MEP COORDINATI… |
| M00966007 ↗ | 881 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 02/20/2024 | — | Owner WINTER MANAGEMENT CORP. Filer GILLMAN CONSULTING INC | — |
| M00966028 ↗ | 881 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 02/20/2024 | — | — | — |
| B00964464 ↗ | 7 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 02/06/2024 | 02/16/2024 | Owner ACADIA REALTY TRUST Contractor SKINNER PLUMBING & HEATIN | Modifications to existing to plumbing systems. No change in use, egress or occupancy. |
| B00963451 ↗ | 7 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 02/07/2024 | 02/15/2024 | Owner ACADIA REALTY TRUST Contractor STEADFAST DEVELOPMENT AND | Hanging of mech. units from exist. tenant space steel beams. No change in use, occupancy or egress. |
| B00991579 ↗ | 80 4 STREET BROOKLYN | Alteration | Signed-off | 01/29/2024 | 02/15/2024 | Contractor MJM ASSOCIATES CONSTR LLC | INTERIOR WORK - MECHANICAL DEMOLITION ON FIRST FLOOR, MEZZANINE AND ROOF. |
| B00963471 ↗ | 7 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 02/06/2024 | 02/08/2024 | Owner ACADIA REALTY TRUST Contractor STEADFAST DEVELOPMENT AND | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| M00816214 ↗ | 126 WEST 126 STREET MANHATTAN | Alteration | Signed-off | 02/14/2023 | 02/08/2024 | Contractor STEADFAST DEVELOPMENT AND | STRUCTURAL PLANS FILED HEREWITH FOR INTERIOR TENANT FIT-OUT FOR SEPHORA AT FIRST FLOOR. |
| M00964485 ↗ | 560 BROADWAY MANHATTAN | Alteration | Signed-off | 01/10/2024 | 02/01/2024 | Owner GFP REAL ESTATE LLC Contractor A PLUS PLUMBING CORP Filer GILLMAN CONSULTING INC | MODIFICATION TO EXISTING PLUMBING FIXTURE/SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00991594 ↗ | 80 4 STREET BROOKLYN | Alteration | Filed — no permit on record | 01/29/2024 | — | — | |
| M00964484 ↗ | 560 BROADWAY MANHATTAN | Alteration | Signed-off | 01/10/2024 | 01/26/2024 | Owner GFP REAL ESTATE LLC Contractor JRM CONSTRUCTION MGMT LLC Filer GILLMAN CONSULTING INC | Provide HVAC for store utilizing existing condenser water and steam systems. Modification to exiting mechanical system as per plans. No chan… |
| M00945099 ↗ | 1165 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/08/2023 | 12/11/2023 | Owner NAFTALI GROUP Contractor MGI DESIGNED INTERIORS Filer MARY MCKEOWN | INSTALL NEW DIFFUSER TO ACCOMODOATE NEW LAY OUT FO RNEW TENANT MALIN+GOETZ. AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPA… |
| M00945105 ↗ | 1165 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/06/2023 | 12/08/2023 | Owner NAFTALI GROUP Contractor DARINKO PLUMBING CO Filer MARY MCKEOWN | Install new plumbing fixtures to accommodate new layout for new tenant MALIN+GOETZ. per attached plans. |
| M00907833 ↗ | 317 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 08/08/2023 | 10/05/2023 | Contractor VANGUARD CONSTRUCTION AND | NEW HVAC INSTALLATION FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANC… |
| M00749977 ↗ | 849 BROADWAY MANHATTAN | Alteration | Signed-off | 10/28/2022 | 09/29/2023 | Owner BROADWALL MANAGEMENT Contractor PAR PLUMBING CO., INC | Plumbing work as reflected in plans herewith. No change to use, egress, or occupancy. |
| M00772637 ↗ | 849 BROADWAY MANHATTAN | Alteration | Signed-off | 10/28/2022 | 09/29/2023 | Owner BROADWALL MANAGEMENT Contractor LAWRENCE J. LEVINE | Sprinkler work as reflected herewith. No change to use, egress, or occupancy. |
| B00926515 ↗ | 159 5 AVENUE BROOKLYN | Alteration | Signed-off | 09/07/2023 | 09/19/2023 | Contractor NEWGRANGE CONSTRUCTION CO | Framebridge--GROUND LEVEL FIRST FLOOR INTERIOR ALTERATION OF EXISTING (WHITE BOX) COMMERCIAL TENANT SPACE STORE L (LEFT SIDE), TO INCLUDE NE… |
| B00910878 ↗ | 159 5 AVENUE BROOKLYN | Alteration | Signed-off | 07/28/2023 | 09/12/2023 | Owner LASERAWAY Contractor HIRSCH CONSTRUCTION CORP | PLUMBING FIT OUT OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00749968 ↗ | 849 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/28/2022 | 09/07/2023 | Owner BROADWALL MANAGEMENT Contractor BUCH CONSTRUCTION, INC | Mechanical work as reflected on plans herewith. No change to use, egress, or occupancy. |
| Q00854223 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/20/2023 | 08/04/2023 | Owner MACERICH Contractor JRM CONSTRUCTION MGMT LLC | STRUCTURAL MODIFICATONS (ZARA STORE) AS INDICATED ON PLANS,. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00854189 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/03/2023 | 08/03/2023 | Owner MACERICH Contractor JRM CONSTRUCTION MGMT LLC | STRUCTURAL SUPPORT OF SUSPENDED AHU ON 1ST FL FRAME IN CELLAR (ZARA STORAGE ROOM) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN… |
| Q00854202 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/03/2023 | 08/03/2023 | Owner MACERICH Contractor CLUNE CONSTRUCTION CO LP | MECHANICAL MODIFICATIONS (ZARA STORAGE ROOM) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00854245 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/15/2023 | 08/03/2023 | Owner MACERICH Contractor JRM CONSTRUCTION MGMT LLC | MECHANICAL MODIFICATIONS (ZARA STORE) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00803471 ↗ | 62 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 03/01/2023 | 07/19/2023 | Contractor STANDARD FIRE SUPP CORP | REMOVAL AND INSTALLATION OF SPRINKLER HEADS ON EXISITNG SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. |
| B00802970 ↗ | 62 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 03/01/2023 | 07/18/2023 | Contractor PIECE MANAGEMENT INC | INSTALLATION OF HVAC UNITS AND REALTED DUCT WORK AS PER PLANS FILED HEREWTIH. FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION B08… |
| B00888049 ↗ | 62 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 06/15/2023 | 07/18/2023 | Contractor PIECE MANAGEMENT INC | INSTALLATION OF HVAC UNITS AND REALTED DUCT WORK AS PER PLANS FILED HEREWTIH. FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION B00… |
| Q00854197 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/03/2023 | 07/17/2023 | Owner MACERICH Contractor PAR PLUMBING CO., INC | PLUMBING MODIFICATIONS (ZARA STORAGE ROOM) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00896895 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2023 | 07/17/2023 | Owner MACERICH Contractor PAR PLUMBING CO., INC | PLUMBING MODIFICATIONS (ZARA STORE) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00851993 ↗ | 114 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/28/2023 | 07/14/2023 | Contractor DUO PLUMBING & HTG CORP. Filer RIZZO GROUP | Plumbing modifications to take place on the basement floor and first floor as per plans filed herewith. No change in use, egress, or occupan… |