| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01401022 ↗ | 114-34 167TH STREET QUEENS | Alteration CO | Permit Issued | 05/19/2026 | 10/08/2026 | Design JOHN JOSEPH GLAVIC, R.A. Owner NY DYNAMIC CONSTRUCTION | INSTALLATION OF CURB CUT -10'-0 WIDE WITH 2 1'-6 SPLAYS DISTANT 220' FROM THE INTERSECTION OF 167TH STREET AND 115TH AVE. FILED INCONJUNCT… |
| Q00594856 ↗ | 37-02 FRANCIS LEWIS BOULEVARD QUEENS | Alteration | Permit Issued | 09/22/2021 | 10/08/2026 | Design CNY ENGINEERING P.C Owner CONSTRUCTION ARTS WP LLC Filer CNY ENGINEERING PC | INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421672755. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| Q01465028 ↗ | 135-16 96TH STREET QUEENS | Alteration | Permit Issued | 10/05/2026 | 10/08/2026 | Interior renovation of the existing 1-family dwelling as per the submitted drawings. No change in use, egress and occupancy. | |
| B01432164 ↗ | 93 CONSELYEA STREET BROOKLYN | Alteration | Permit Issued | 07/22/2026 | 10/07/2026 | Design EAB ENGINEERING PC | LEGALIZE INSTALLATION OF ONE WASHING MACHINE AND ONE SLOP SINK IN CELLAR. |
| M01219640 ↗ | 900 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 11/12/2025 | 10/06/2026 | Design RCGA ARCHITECTS, P.C Owner THE PARK 900 CONDOMINIUM Filer RCGA ARCHITECTS, PC | Replacement of Plumbing fixtures in Apt. 12C & 12D to facilitate the renovation work filed separately under M01219640-I1. No changes in the… |
| S01016888 ↗ | 274 VICTORY BOULEVARD STATEN ISLAND | New Building | Permit Issued | 03/14/2024 | 10/06/2026 | THIS APPLICATION TO FILE FOR ALL NEW MECHANICAL SYSTEM FOR PROPOSED NEW BUILDING AS INDICATED ON PLANS. |
| Name | Projects together | Most recent |
|---|---|---|
| J.k.design | 43 | 09/28/2026 |
| Tabriz Design Group | 34 | 10/16/2026 |
| Gerald Caliendo Architects | 26 | 10/07/2026 |
| Pirooz Engineering | 23 | 03/14/2024 |
| Maz Design | 21 | 06/10/2026 |
| Marcelo Barujel Architect | 20 | 09/21/2022 |
| CL Engineering | 17 | 09/26/2024 |
| Askon Architects | 16 | 02/26/2025 |
| Advanced Engineering & Inspection PLL | 13 | 12/07/2023 |
| King David Architecture | 12 | 03/12/2026 |
| Alberto Roman | 11 | 06/06/2024 |
| Nasir J, Khanzada | 11 | 10/07/2026 |
| A&A Consulting Engineers | 9 | 10/15/2026 |
| AL Ffred Architecture | 9 | 05/18/2026 |
| Ashraf | 9 | 11/09/2025 |
| D&E Build Evergreen | 9 | 10/05/2026 |
| Zheng & Associates | 9 | 10/15/2026 |
| Citiscape Consulting | 8 | 01/08/2026 |
| CQ&J | 8 | 10/12/2026 |
| Grasso-Menziuso Architects | 8 | 01/21/2026 |
| H G Lee Architect | 8 | 04/08/2026 |
| Kojo Simpson Architect | 8 | 04/17/2023 |
| Opera Studio Architecture | 8 | 04/30/2024 |
| RJ Stahl Architect | 8 | 11/15/2021 |
| Sung Ho Shin Architect | 8 | 09/14/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NY Plumbing Pros | 928 | 10/16/2026 |
| Kishan Plumbing | 42 | 09/18/2026 |
| Horbridge Plumbing & Heating | 29 | 09/18/2026 |
| L&J PLG & Heating Co of NY | 23 | 10/09/2024 |
| All Pro Plumbing & Heating | 22 | 07/18/2025 |
| Infiniti Esc Plumbing | 21 | 01/28/2026 |
| JVR Plumbing and Heating | 17 | 08/13/2025 |
| Dynamic Plumbing & Sprinkler | 13 | 08/17/2026 |
| Rishon Homes | 12 | 10/05/2026 |
| Yafe Meod | 12 | 10/15/2026 |
| Amb Mechanical | 11 | 12/07/2023 |
| Morell Builders | 11 | 09/22/2026 |
| JYNY Construction | 9 | 10/15/2026 |
| Safe Assure Construction | 9 | 10/07/2026 |
| MTK Contracting | 6 | 01/29/2024 |
| Pepaj Construction | 6 | 07/30/2026 |
| Watermark Plumbing | 6 | 03/28/2024 |
| J&J Designs | 5 | 10/01/2026 |
| JBJ Concrete Renovations | 5 | 06/22/2026 |
| K & Y Plumbing and Heating | 5 | 02/25/2026 |
| Kaieteur Construction | 5 | 09/09/2026 |
| Dynamic Plumbing & Sprinkler | 4 | 09/13/2023 |
| Flavio Mechanical | 4 | 12/05/2025 |
| G.M.A. Plumbing & Heating | 4 | 03/11/2025 |
| Plumbing | 4 | 11/12/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Blackstone Real Group | 22 | 10/15/2026 |
| Royal T&E | 15 | 03/14/2024 |
| Empire Management | 8 | 09/21/2022 |
| Rochdale Village | 8 | 11/15/2021 |
| Brighton Terrace | 7 | 01/21/2026 |
| 'FC Foley Square Associates | 6 | 04/11/2022 |
| Citiscape Consulting | 6 | 01/08/2026 |
| D Handy | 6 | 04/05/2023 |
| Hiic Builders | 6 | 03/23/2026 |
| Myrtle Development | 6 | 08/03/2022 |
| 198 Shefa | 5 | 09/15/2026 |
| HSK Management | 5 | 05/18/2026 |
| NY Dynamic Construction | 5 | 09/29/2026 |
| Rahamu One | 5 | 07/10/2026 |
| Thegardenbond | 5 | 08/04/2022 |
| CDP General Contractors | 4 | 03/21/2022 |
| Construction Arts WP | 4 | 09/18/2026 |
| 190 Withers Group | 3 | 11/07/2024 |
| Black Steel Developers | 3 | 08/20/2026 |
| Colonial Properties | 3 | 01/31/2023 |
| M Build Builers | 3 | 08/03/2020 |
| NYC Parks | 3 | 06/28/2023 |
| R & J Acq | 3 | 10/16/2026 |
| RNY Development Group | 3 | 11/12/2024 |
| Varg Construction | 3 | 07/11/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Gerald J. Caliendo R.A | 16 | 10/07/2026 |
| Metro Design Consultants | 15 | 10/05/2026 |
| 4444 PPPP | 12 | 03/12/2026 |
| NYC Building Solutions | 10 | 06/08/2026 |
| Youber Design | 10 | 10/09/2024 |
| Advanced Builders Services | 8 | 11/25/2025 |
| P.wolfe Consultants | 8 | 11/15/2021 |
| WM Arch | 8 | 10/12/2026 |
| Empire Expediting | 7 | 08/20/2026 |
| Highrise Group | 7 | 06/17/2026 |
| Nasir J. Khanzada | 7 | 08/25/2026 |
| A & D Building Solutions | 6 | 10/15/2026 |
| BMB Building Consulting | 6 | 01/27/2026 |
| Lavb Design Consultants | 6 | 01/30/2025 |
| Atelier New York Architecture | 5 | 04/11/2022 |
| Express Filing | 5 | 07/11/2025 |
| Tabriz Group Enterprise | 5 | 07/10/2026 |
| Architectural Concept | 4 | 08/11/2026 |
| Citiscape Consulting | 4 | 01/08/2026 |
| CNY Engineering | 4 | 09/18/2026 |
| Jared & Associate Consulting | 4 | 10/08/2026 |
| Nexus Consulting NYC | 4 | 05/18/2023 |
| Quick Filing of NY | 4 | 09/30/2024 |
| Royal T&E | 4 | 08/03/2022 |
| Sunshine Plaza | 4 | 08/04/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01401022 ↗ | 114-34 167TH STREET QUEENS | Alteration CO | Permit Issued | 05/19/2026 | 10/08/2026 | Design JOHN JOSEPH GLAVIC, R.A. Owner NY DYNAMIC CONSTRUCTION | INSTALLATION OF CURB CUT -10'-0 WIDE WITH 2 1'-6 SPLAYS DISTANT 220' FROM THE INTERSECTION OF 167TH STREET AND 115TH AVE. FILED INCONJUNCT… |
| Q00594856 ↗ | 37-02 FRANCIS LEWIS BOULEVARD QUEENS | Alteration | Permit Issued | 09/22/2021 | 10/08/2026 | Design CNY ENGINEERING P.C Owner CONSTRUCTION ARTS WP LLC Filer CNY ENGINEERING PC | INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421672755. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| Q01465028 ↗ | 135-16 96TH STREET QUEENS | Alteration | Permit Issued | 10/05/2026 | 10/08/2026 | Interior renovation of the existing 1-family dwelling as per the submitted drawings. No change in use, egress and occupancy. | |
| B01432164 ↗ | 93 CONSELYEA STREET BROOKLYN | Alteration | Permit Issued | 07/22/2026 | 10/07/2026 | Design EAB ENGINEERING PC | LEGALIZE INSTALLATION OF ONE WASHING MACHINE AND ONE SLOP SINK IN CELLAR. |
| M01219640 ↗ | 900 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 11/12/2025 | 10/06/2026 | Design RCGA ARCHITECTS, P.C Owner THE PARK 900 CONDOMINIUM Filer RCGA ARCHITECTS, PC | Replacement of Plumbing fixtures in Apt. 12C & 12D to facilitate the renovation work filed separately under M01219640-I1. No changes in the… |
| S01016888 ↗ | 274 VICTORY BOULEVARD STATEN ISLAND | New Building | Permit Issued | 03/14/2024 | 10/06/2026 | THIS APPLICATION TO FILE FOR ALL NEW MECHANICAL SYSTEM FOR PROPOSED NEW BUILDING AS INDICATED ON PLANS. | |
| Q01243752 ↗ | 130-29 146TH STREET QUEENS | Alteration CO | Permit Issued | 06/19/2025 | 10/05/2026 | Design D&E BUILD EVERGREEN INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01243752-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF TH… |
| B01286214 ↗ | 1692 ROCKAWAY PARKWAY BROOKLYN | Alteration | Permit Issued | 10/12/2025 | 10/02/2026 | Design KING DAVID ARCHITECTURE PC Filer 4444 PPPP CORP | Propose to provide plumbing plans for existing 2 family 2 story with cellar |
| M00890093 ↗ | 236 WEST 16TH STREET MANHATTAN | Alteration | Signed-off | 06/15/2023 | 10/01/2026 | Design SIMPLE ARCHITECTURE PC Owner MAGNUM | COMBINATION AND RENOVATION OF APRTMENT 4B & 5B INCLUDING LAYOUT CHANGES, NEW CONVENIENCE STAIR, ELECTRICAL AND SUPPLEMENTAL SPLIT SYSTEM. NO… |
| Q01466614 ↗ | 134-39 224TH STREET QUEENS | Alteration | Permit Issued | 09/29/2026 | 09/30/2026 | Design ZHENG & ASSOCIATES LLC | INTERIOR RENOVATION FOR ONE FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY. |
| X01382532 ↗ | 1427 WHITE PLAINS ROAD BRONX | Alteration | Permit Issued | 04/03/2026 | 09/29/2026 | Design MAZ 247 CORP | REMOVE & CAPPED ILLEGAL BATHROOM AND KITCHEN FIXTURE'S FROM CELLAR INSTALL NEW LAUNDRY AREA &REMAIN 1 THREE FIXTURE'S BATHROOM IN CELLAR. AS… |
| B01168269 ↗ | 295 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 01/17/2025 | 09/23/2026 | Design BANGASH ASSOCIATES INC. Filer B&A INSPECTIONS INC. . | The purpose of this project is to refurbish existing Apartment at 2nd floor to relocate kitchen from rear to front of building. No change to… |
| B01148168 ↗ | 168 VERNON AVENUE BROOKLYN | Alteration | Permit Issued | 01/30/2025 | 09/23/2026 | Design EJZ ENGINEERING Filer R&I EXPEDITING SERVICES | NEW PLUMBING WORK TO INCLUDE BATHROOMS, KITCHEN, HWH, AND ROOF DRAINS. |
| Q00961220 ↗ | 3-12 BEACH 48TH STREET QUEENS | Alteration | Permit Issued | 12/01/2023 | 09/18/2026 | Design NASIR J, KHANZADA LLC | PLUMBING FILLING IN CONJUNCTION ALT-1 FILING FOR CONVERSION ONE FAMILY IN TO TWO FAMILY TO OBTAIN CERTIFICATE OF OCCUPANCY |
| B01446135 ↗ | 289 GATES AVENUE BROOKLYN | Alteration | Permit Issued | 08/17/2026 | 09/17/2026 | Design PETER CHO ARCHITECTS, PLLC Filer WM ARCH CORP | EXISTING TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR,BASEMENT,1ST,2ND AND 3RD FLOOR.JOB FILED TO RELATED TO ALT 2 APPLICATION #B01446135-I… |
| B01458026 ↗ | 540 CROWN STREET BROOKLYN | Alteration | Permit Issued | 09/10/2026 | 09/16/2026 | Design ADB ASSOCIATES | PROPOSED PLUMBING WORK AS PER PLAN |
| B01414780 ↗ | 336 MAPLE STREET BROOKLYN | Alteration | Permit Issued | 06/19/2026 | 09/15/2026 | Design J.K.DESIGN | Interior renovation of existing two family dwelling units. New drywall partitions and plumbing fixtures as per plans. New open patio at rear… |
| Q01386931 ↗ | 145-45 123RD AVENUE QUEENS | Alteration CO | Permit Issued | 04/23/2026 | 09/14/2026 | Design TABRIZ GROUP ENTERPRISES Owner Rahamu one corp Filer TABRIZ GROUP ENTERPRISE | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT , INTERIOR AND EXTERIOR RENOVATION AND CONVERSION TO TWO FAMILY |
| Q01457540 ↗ | 107-22 REMINGTON STREET QUEENS | Alteration | Permit Issued | 09/09/2026 | 09/14/2026 | Design ZHENG & ASSOCIATES LLC | Plumbing Work @ Cellar, 1st and 2nd Floor. No change in use, egress or occupancy |
| Q01412539 ↗ | 1-75 BEACH 101ST STREET QUEENS | Alteration | Permit Issued | 06/08/2026 | 09/11/2026 | Design FC CONSULTING ENGINEER, PLLC Owner MATEL | PLUMBING SYSTEM RENOVATION. NO CHANGE IN BUILDING USE OCCUPANCY AND EGRESS. |
| Q01451674 ↗ | 109-23 141ST STREET QUEENS | Alteration | Permit Issued | 08/26/2026 | 09/09/2026 | — | Propose to provide PLUMBING plans for cellar floor of 2 family 2 story house NO CHANGE IN USE EGRESS OR OR OCCUPANCY |
| Q01454461 ↗ | 449 BEACH 123RD STREET QUEENS | Alteration | Permit Issued | 09/02/2026 | 09/09/2026 | Design ZHENG & ASSOCIATES LLC | INTERIOR RENOVATION FOR TWO FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY. |
| Q01332813 ↗ | 145-16 232ND STREET QUEENS | New Building | Permit Issued | 01/14/2026 | 09/04/2026 | PROPOSED 260 LINEAR FEET OF CONSTRUCTION FENCE. STREET FRONTAGE IS 30 FEET. | |
| B01147007 ↗ | 395 WARWICK STREET BROOKLYN | New Building | Permit Issued | 01/09/2025 | 09/03/2026 | Design GERALD CALIENDO ARCHITECTS Owner NY DYNAMIC CONSTRUCTION | support of excavation design for Two & half story New Building with Basement |
| X01425491 ↗ | 1711 ZEREGA AVENUE BRONX | Alteration | Permit Issued | 07/08/2026 | 09/03/2026 | Design TECC SOLUTIONS | PLUMBING SYSTEM ALTERATION FOR HOT WATER HEATERS REPLACEMENT AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY. IN CONJUNCTION… |
| B01316762 ↗ | 77 MACON STREET BROOKLYN | Alteration | Permit Issued | 11/21/2025 | 09/02/2026 | Design CQ&J CORPORATION Filer WM ARCH CORP | PROPOSED REPLACING SLAB ON GRADE AND NEW CELLAR PLST AND NEW BASEMENT GIRDER.PROPOSED STRUCTURAL WORK IN CONJUNCTION WITH DOB NOW JOB#B01459… |
| Q01447073 ↗ | 134-26 FRANCIS LEWIS BOULEVARD QUEENS | Alteration | Permit Issued | 08/26/2026 | 09/02/2026 | Design ZHENG & ASSOCIATES LLC | INSTALL PLUMBING FIXTURES FOR ONE FAMILY DWELLING UNIT. NO CHANGE IN USE OF EGRESS & OCCUPANCY. |
| Q01453038 ↗ | 214-29 112TH ROAD QUEENS | Alteration | Permit Issued | 08/31/2026 | 09/01/2026 | Design ZHENG & ASSOCIATES LLC | INSTALL PLUMBING FIXTURES FOR ONE FAMILY DWELLING UNIT BUILDING. NO CHANGE IN USE OF EGRESS & OCCUPANCY. |
| B01440826 ↗ | 1514 44TH STREET BROOKLYN | Alteration | Permit Issued | 08/13/2026 | 09/01/2026 | Filer AVALON DESIGNS INC | Facade alteration |
| B01161142 ↗ | 207 HALE AVENUE BROOKLYN | New Building | Permit Issued | 01/20/2025 | 08/26/2026 | Design GERALD CALIENDO ARCHITECTS Owner NY DYNAMIC CONSTRUCTION | Plumbing work as per plans. Filed in conjunction with NB B01161142 |
| X01416601 ↗ | 2300 GUNTHER AVENUE BRONX | Alteration | Permit Issued | 06/24/2026 | 08/25/2026 | Design MAZ 247 CORP | Replace and Relocate Existing bathroom at 2nd floor level as per plan. No change use egress and occupancy . |
| Q01239737 ↗ | 90-23 181ST STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/25/2025 | 08/24/2026 | Design GERALD CALIENDO ARCHITECTS Owner NY DYNAMIC CONSTRUCTION | HEREWITH FILING ALTERATION SUBSEQUENT TO APPLICATION # Q01239737-I1 FOR PLUMBING WORK IN CELLAR, FIRST, SECOND FLOORS AS PER PLANS FILED. |
| B01060686 ↗ | 123 WILLOUGHBY AVENUE BROOKLYN | Alteration CO | Permit Issued | 06/04/2024 | 08/24/2026 | Design RMM DESIGN STUDIO Filer KC EXPEDITING INC | plumbing work in conjunction with Alt-CO conversion to 2-fam residence. New appliances, fixtures, and piping throughout |
| B00980728 ↗ | 42 CLIFTON PLACE BROOKLYN | Alteration CO | Permit Issued | 04/19/2024 | 08/21/2026 | Design PHLA Filer LAVB DESIGN CONSULTANTS | General Interior renovations, Kitchen and bathroom relocations, New windows and doors. Rear 2nd story addition. |
| Q01189326 ↗ | 131-10 142ND STREET QUEENS | Alteration CO | Permit Issued | 03/18/2025 | 08/20/2026 | Design D&E BUILD EVERGREEN INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01189326-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF TH… |
| X01387401 ↗ | 1889 LACOMBE AVENUE BRONX | Alteration | Permit Issued | 04/17/2026 | 08/19/2026 | Design MAZ DESIGN LLC | Interior renovation, horizontal and vertical enlargement of existing 2 family dewlling units |
| Q01346516 ↗ | 145-18 232ND STREET QUEENS | New Building | Permit Issued | 01/19/2026 | 08/18/2026 | PROPOSED 260 LINEAR FEET OF CONSTRUCTION FENCE. STREET FRONTAGE IS 30 FEET. | |
| B01249862 ↗ | 602 7TH AVENUE BROOKLYN | Alteration | Permit Issued | 12/01/2025 | 08/18/2026 | Design ALEXALLEN STUDIO ARCHITECTS | STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 1-FAMILY RESIDENCE AND CONSTRUCTION OF NEW REAR DECK. CREATE NEW R… |
| Q01114474 ↗ | 216-25 136TH ROAD QUEENS | Alteration | Permit Issued | 11/12/2024 | 08/14/2026 | Design FRED W. TORRICO ARCHITECT | CELLAR: REMOVE EXIST. BOI. & W. HTR., NEW 3 SEPARATE COMB. BOI./W. HTG. UNITS; 1ST FL.: REPLACE W.C., LAV. & TUB ON EXIST. ROUGHING & INSTAL… |
| B01413147 ↗ | 1509 PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 06/17/2026 | 08/12/2026 | Design ADB ASSOCIATES Filer HIGHRISE GROUP | PLUMBING REMOVALS ON CELLAR, 1ST, 2ND, 3RD AND 4TH FLOORS FOR AN INTERIOR RENOVATION OF EXISTING 4-STORY WITH CELLAR BUILDING.NO CHANGE TO U… |
| B01341920 ↗ | 523 GATES AVENUE BROOKLYN | Alteration | Permit Issued | 02/17/2026 | 08/07/2026 | Design TSL ARCHITECT,P.C. Owner TAQWA REALTY INVESTMENT | Rehabilitate Existing Duplex Basement and First Floor as One dwelling Unit. Refurbish,upgrade Interior walls, Stairs, and Obtain LOC for 3… |
| Q01222106 ↗ | 131-21 140TH STREET QUEENS | New Building | Permit Issued | 07/14/2025 | 08/07/2026 | Design D&E BUILD EVERGREEN INC. | PROPOSED NEW TWO (2) STORY, TWO (2) FAMILY BUILDING WITH CELLAR. OBTAIN A CERTIFICATE OF OCCUPANCY. |
| Q01347724 ↗ | 80-47 188TH STREET QUEENS | Alteration | Permit Issued | 01/20/2026 | 08/06/2026 | Design GERALD CALIENDO ARCHITECTS | HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION Q01347724-S2 IN CONJUNCTION WITH ALT-CO Q01347724-I1 FOR PLUMBING WORK IN CELLAR, FIRST, SEC… |
| Q01436971 ↗ | 147-11 SUTTER AVENUE QUEENS | Alteration | Permit Issued | 07/28/2026 | 08/05/2026 | Design CQ&J CORPORATION Filer WM ARCH CORP | REMOVED & REINSTALL PLUMBING SYSTEM THROUGHOUT EXISTING TWO(2) FAMILY,2-STORY WITH CELLAR AS PER PLAN SHOW. |
| Q01277587 ↗ | 135-16 134TH PLACE QUEENS | Alteration CO | Permit Issued | 09/24/2025 | 08/03/2026 | Design KENNY LEE ARCHITECT Filer KORMAN DESIGN & BUILD | RENOVATION OF HOUSE TO OBTAIN TWO DWELLING UNIT HOUSE FROM ONE UNIT |
| Q01160524 ↗ | 75-31 166TH STREET QUEENS | Alteration CO | Permit Issued | 03/31/2025 | 07/30/2026 | Design SUNG HO SHIN ARCHITECT, PC | PROPOSED NEW FIRST FLOOR HORIZONTAL ADDITION. PROPOSED NEW SECOND FLOOR VERTICAL ADDITION. PROPOSED NEW CONCRETE STAIR TO CELLAR. PROPOSED N… |
| Q01434782 ↗ | 163-20 21ST ROAD QUEENS | Alteration | Permit Issued | 07/27/2026 | 07/30/2026 | Design CQ&J CORPORATION Filer WM ARCH CORP | EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK AT CELLAR,1ST AND 2ND FLOOR.JOB FILED TO RELATED TO ALT 2 APPLICATION #Q01434782-I1.NO CHANGE … |
| B01409365 ↗ | 191 VAN BUREN STREET BROOKLYN | Alteration | Permit Issued | 06/02/2026 | 07/27/2026 | Design CQ&J CORPORATION Filer WM ARCH CORP | EXISTING 2 FAMILY HOUSE WITH PLUMBING WORK AT CELLAR,BASEMENT, 1 ST AND 2ND FLOOR. JOB FILED TO RELATED TO ALT2APPLICATION # B01409365-I1.… |
| Q01342046 ↗ | 111-10 153RD STREET QUEENS | Alteration CO | Permit Issued | 02/16/2026 | 07/16/2026 | Design MAZ 247 CORP Filer KORMAN DESIGN & BUILD | Remove Kitchen, install 3 Fixture bathroom, laundry area at Cellar, install new Kitchen in 1st Floor, Ex.Boiler/HWT Configure with Safety Va… |
| M01424639 ↗ | 158 8TH AVENUE MANHATTAN | Alteration | Permit Issued | 07/02/2026 | 07/14/2026 | Design LL ENGINEERING PC Owner AEP Properties Filer N AND N CONSULTANT CORP. | FILING HEREWITH APPLICATION FOR PL WORK TYPE FOR THE 1ST FLOOR, BASEMENT, AND CELLAR OF EXISTING RESTAURANT. NO CHANGE TO USE, EGRESS, OR OC… |
| X01389386 ↗ | 1966 POWELL AVENUE BRONX | Alteration CO | Permit Issued | 05/14/2026 | 07/13/2026 | Design MAZ 247 CORP Filer MAZ DESIGN LLC | INSTALL NEW KITCHEN AT 2ND FL AND ADDITIONAL BATHROOM AT BASEMENT AND 2ND FLOOR. NEW 1 BOILER & 1 HWT. NO CHANGE USE AND EGRESS.OBTAIN NEW C… |
| Q01159206 ↗ | 90-40 80TH STREET QUEENS | Alteration | Permit Issued | 12/25/2024 | 07/10/2026 | Design ASHRAF CORP Owner NETDT LLC Filer NETDT LLC | A. CELLAR1. CREATE STORAGE ROOM IN THE CELLAR AS PER PLAN.2. CREATE 2 PCS POWDER ROOM IN THE CELLAR.3. REMOVE EXISTING NON LOAD BEARING PART… |
| Q00625479 ↗ | 46-20 BURLING STREET QUEENS | Alteration | Permit Issued | 11/15/2021 | 07/08/2026 | Design BRIAN ILL DEVELOPMENT LLC | FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#Q00615977. |
| Q01124450 ↗ | 148-09 115TH AVENUE QUEENS | Alteration | Permit Issued | 10/10/2024 | 07/08/2026 | Design TABRIZ DESIGN GROUP | PLUMBING WORK IN CONJUNCTION WITH ALT # Q01098546 |
| B01155599 ↗ | 987 EAST 43RD STREET BROOKLYN | Alteration CO | Permit Issued | 03/23/2025 | 07/08/2026 | Design ST DESIGN & CONSULTING INC. Filer R & H DRUMMOND EXP INC | Application Filing to Convert Existing 2 1/2 Sty. Building from 1 DU to 2 DU With a Minor Interior Renovation as Required as Per Plan Submit… |
| B00282582 ↗ | 19 IRVING PLACE BROOKLYN | Alteration | Permit Issued | 07/20/2020 | 07/08/2026 | Design L & C ASSOCIATES | PROVIDE NEW FIRE SPRINKLER & PLUMBING SYSTEM THROUGHOUT FOUR STORY BUILDING |
| Q01247009 ↗ | 174-25 127TH AVENUE QUEENS | Alteration CO | Permit Issued | 07/01/2025 | 07/08/2026 | Design M.S. SAVANI ARCHITECT, PC | Plumbing work related to the new extension. |
| Q01416826 ↗ | 172-12 125TH AVENUE QUEENS | Alteration | Permit Issued | 07/01/2026 | 07/06/2026 | Design CQ&J CORPORATION Filer WM ARCH CORP | EXISTING 1 FAMILY HOUSE WITH PLUMBING WORK AT CELLAR,1ST AND 2ND FLOOR.JOB FILED TO RELATED TO ALT 2 APPLICATION #Q01416826-I1.NO CHANGE IN … |
| B01254338 ↗ | 259 MONROE STREET BROOKLYN | Alteration | Signed-off | 07/24/2025 | 06/30/2026 | Filer NYC BUILDING SOLUTIONS | HEREWITH TO PROPOSE PL SYSTEMS, INCONJUNCTION WITH DOB# B01254338-I1 |
| B01203840 ↗ | 1387 MADISON STREET BROOKLYN | Alteration CO | Permit Issued | 04/07/2025 | 06/29/2026 | Design NY BUILDING ASSOCIATES INC | NEW INSTALLATION OF HVAC AND EXHAUST FOR BATHROOM AND KITCHEN |
| M00844394 ↗ | 4320 BROADWAY MANHATTAN | Alteration | Signed-off | 06/13/2023 | 06/25/2026 | Design SUNG HO SHIN ARCHITECT, PC Owner Park It Management | RELOC. (1) W.C. AND (1) LAV. NEW HAND SINK. |
| Q00594865 ↗ | 37-12 FRANCIS LEWIS BOULEVARD QUEENS | Alteration | Permit Issued | 09/22/2021 | 06/24/2026 | Design CNY ENGINEERING P.C Owner CONSTRUCTION ARTS WP LLC Filer CNY ENGINEERING PC | INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681004. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| M00267409 ↗ | 77 EAST 3RD STREET MANHATTAN | Alteration | Permit Issued | 11/19/2019 | 06/24/2026 | Design GRASSO-MENZIUSO ARCHITECTS Owner BRIGHTON TERRACE LLC. | Rep & relocate 4 lavs, 4 Wc's, 4 sinks, cap and remove 2 tubs, 4 new showers |
| B01275640 ↗ | 138 FROST STREET BROOKLYN | Alteration | Signed-off | 08/21/2025 | 06/23/2026 | Design KACZOR PE | TOILET+SINK INSTALLATION |
| B00972334 ↗ | 390 WAVERLY AVENUE BROOKLYN | Alteration | Permit Issued | 01/24/2024 | 06/22/2026 | Design KING DAVID ARCHITECTURE PC Filer 4444 PPPP CORP | PROPOSE TO PROVIDE PLUMIBNG PLANS FOR EXISTING 3 FAMILY . partition gc plans provided on job# B00972333 no change in use egress or occupan… |
| B01403876 ↗ | 2303 AVENUE D BROOKLYN | Alteration | Permit Issued | 05/29/2026 | 06/18/2026 | Design IKRA CONSULTING LLC Filer AVALON DESIGNS INC | Plumbing work in conjunction with interior renovation |
| Q01303334 ↗ | 102-36 163RD ROAD QUEENS | Alteration | Permit Issued | 10/24/2025 | 06/17/2026 | Design ZHENG & ASSOCIATES LLC | PLUMBING AND GAS WORK FOR PROPOSED TWO FAMILY DWELLING UNITS. |
| B01310567 ↗ | 759 HOWARD AVENUE BROOKLYN | Alteration | Permit Issued | 10/29/2025 | 06/12/2026 | Design CQ&J CORPORATION | PLUMBING WORK AS PER PLAN, THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.CELLAR: REMOVE EX. BOILER & HWH, INSTALL (2) ELEC. HWH &REPLACE (3… |
| B01111543 ↗ | 61 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 10/30/2024 | 06/11/2026 | Design REBECCA BELTON, ARCHITECT | Remove 2nd floor kitchen as part of apartment combination as per plans filed herewith. No change to use, egress or occupancy |
| B01111547 ↗ | 61 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 10/30/2024 | 06/11/2026 | Design REBECCA BELTON, ARCHITECT | Remove 3rd floor kitchen as part of apartment combination as per plans filed herewith. No change to use, egress or occupancy |
| X01385937 ↗ | 2265 CHATTERTON AVENUE BRONX | Alteration | Signed-off | 04/18/2026 | 06/11/2026 | Design MS BUILDING DESIGN LLC | Interior renovation and add new bathroom at 1st floor and 2nd floor |
| B00817197 ↗ | 23 MICIELI PLACE BROOKLYN | Alteration | Signed-off | 01/26/2023 | 06/09/2026 | Design Ryan Soames Engineering DPC | Structural work in conjunction with renovation to one (1) duplex apartment in a (2) family home, see comments for more. |
| Q08022254 ↗ | 175-27 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 04/10/2023 | 06/09/2026 | MODIFY THE LAYOUT FOR THE EXISTING STEAM FISH MARKET. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION. | |
| B01110874 ↗ | 61 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 01/19/2025 | 06/09/2026 | Design REBECCA BELTON, ARCHITECT | Remove basement kitchen as part of apartment combination as per plans filed herewith. Filed in conjunction with no work Alt 1 322118882. No… |
| Q01314966 ↗ | 95-27 148TH STREET QUEENS | Alteration | Permit Issued | 11/09/2025 | 06/08/2026 | Design ASHRAF CORP Owner NETDT LLC Filer NETDT LLC | 1. REMOVE NON LOAD BEARING PARTITION WALL TO ELIMINATE ROOMS IN THE CELLAR.2. CREATE 2PCS BATHROOM & STORAGE ROOM IN THE CELLAR. |
| M01305809 ↗ | 645 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2025 | 06/05/2026 | Design TEHN DESIGN GROUP Owner EYECRAVE DESIGN | WORK FILED FOR COMBINATION OF UNITS 43A AND 43H AND MINOR RENOVATION OF UNIT. RELOCATION AND REPLACEMENT OF FIXTURES. NO CHANGE TO USE, EGRE… |
| Q01329751 ↗ | 172-49 127TH AVENUE QUEENS | New Building | Permit Issued | 12/11/2025 | 06/03/2026 | Design D&E BUILD EVERGREEN INC. | PROPOSED NEW TWO (2) STORY, TWO (2) FAMILY BUILDING WITH CELLAR. OBTAIN A CERTIFICATE OF OCCUPANCY. |
| Q01352616 ↗ | 10628 GUY BREWER BOULEVARD QUEENS | Alteration | Signed-off | 02/09/2026 | 06/03/2026 | FILING APPLICATION TO RESOLVE ECB VIOLATIONS 35198765X, 35198764Y AND 35235451N | |
| B01360051 ↗ | 432 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 02/18/2026 | 06/01/2026 | PLUMBING WORK IN EXISTING 4-STORY, 2-FAMILY RESIDENTIAL BUILDING,IN CONJUNCTION WITH ALT-2 APPLICATION # B01359901-I1. NO CHANGE INUSE, MEAN… | |
| B01231241 ↗ | 17 3RD STREET BROOKLYN | Alteration CO | Permit Issued | 06/20/2025 | 06/01/2026 | Design J.K.DESIGN Filer XPDITE GROUP LLC (104) | Installation of new gas fired equipment and plumbing fixtures in conjunction with ALT I application B01231241-I1 |
| Q01313887 ↗ | 146-25 229TH STREET QUEENS | Alteration CO | Permit Issued | 11/24/2025 | 05/26/2026 | Design NASIR J, KHANZADA LLC Owner SAFETECH ENTERPRISES CORP Filer NASIR J. KHANZADA LLC | PLUMBING FILLING IN CONJUNCTION WITH CONVERSION 1 TO 2 FAMILY DWELLING UNITS WITH FRONT AND REAR EXTENSION |
| Q00559681 ↗ | 117-27 132ND STREET QUEENS | Alteration | Permit Issued | 08/10/2021 | 05/22/2026 | Plumbing works filed for extension and conversion to 2-family dwelling as per submitted drawing. | |
| Q01185157 ↗ | 108-33 164TH STREET QUEENS | New Building | Permit Issued | 03/05/2025 | 05/20/2026 | Design D&E BUILD EVERGREEN INC. | PROPOSED NEW TWO (2) STORY, TWO (2) FAMILY BUILDING WITH CELLAR. OBTAIN A CERTIFICATE OF OCCUPANCY. |
| M00645815 ↗ | 436 WEST 20TH STREET MANHATTAN | Alteration CO | Permit Issued | 01/07/2022 | 05/18/2026 | Design SHARON ENGINEERING, P.C Owner MD NYC MANAGEMENT, LLC | Subsequent filing for Sprinkler work in conjunction with Alt-CO-GC # M00645815-I1 |
| Q01380214 ↗ | 41-09 60TH STREET QUEENS | Alteration | Permit Issued | 03/31/2026 | 05/13/2026 | Owner FLANAGAN CONSTRUCTION CO | Proposed plumbing work filed in conjunction with dob now application GC application # Q01380214-I1 |
| Q01350902 ↗ | 114-02 SUTTER AVENUE QUEENS | Alteration | Permit Issued | 01/30/2026 | 05/11/2026 | Design TABRIZ GROUP ENTERPRISES | PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q01330537. |
| B01126814 ↗ | 96 2ND PLACE BROOKLYN | Alteration CO | Permit Issued | 10/30/2024 | 05/07/2026 | Design J. MCKENZIE | SUBSEQUENT FILING FOR SPRINKLER WORK TYPE AS PER PLAN IN CONJUNCTION WITH ALT-CO # B01126814-I1. |
| Q01332262 ↗ | 134-42 225TH STREET QUEENS | Alteration CO | Permit Issued | 01/08/2026 | 05/07/2026 | Design D&E BUILD EVERGREEN INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01332262-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF TH… |
| B01350556 ↗ | 579 MACON STREET BROOKLYN | Alteration | Permit Issued | 01/27/2026 | 05/06/2026 | Design J.K.DESIGN | Interior renovation of existing two family dwelling units ,New drywall partitions and plumbing fixtures as per plans. Installation of new me… |
| Q01370769 ↗ | 109-09 RYE PLACE QUEENS | Alteration | Permit Issued | 03/19/2026 | 05/05/2026 | Design ZHENG & ASSOCIATES LLC | Plumbing work in conjunction with GC application Q01370769. |
| Q01312226 ↗ | 153-20 120TH AVENUE QUEENS | Alteration CO | Permit Issued | 12/20/2025 | 05/05/2026 | Design D&E BUILD EVERGREEN INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01312226-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE… |
| Q01371474 ↗ | 1701 GATES AVENUE QUEENS | Alteration | Signed-off | 03/13/2026 | 05/01/2026 | Design BRIAN ILL DEVELOPMENT LLC Owner 1701 GATES AVENUE LLC Filer AMERILAND BROOK LLC | INTERIOR RENOVATION OF EXISTING THREE STORY HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| B01189405 ↗ | 573 41ST STREET BROOKLYN | Alteration CO | Permit Issued | 04/16/2025 | 04/30/2026 | FILING HEREWITH FOR THE MODIFICATIONS TO EXISTING PLUMBING SYSTEMS, | |
| Q01063561 ↗ | 69-19 223RD STREET QUEENS | Alteration CO | Permit Issued | 06/18/2024 | 04/29/2026 | Design AMINOV DESIGN ENGINEER, PC Filer A & D BUILDING SOLUTIONS | PLUMBING WORK TYPE FILED SUBSEQUENT TO ALT-CO APPLICATION NUMBER Q01063561-i1. |
| M01349211 ↗ | 117 WEST 72ND STREET MANHATTAN | Alteration | Permit Issued | 01/29/2026 | 04/28/2026 | Design PSA Architects, LLC Owner UWS Jordan Pilates LLC Filer KC EXPEDITING INC | FILING FOR PLUMBING WORK AS PER PLANS |
| Q00718236 ↗ | 1518 VILLAGE LANE QUEENS | Alteration | Signed-off | 06/13/2022 | 04/27/2026 | Design GEODESIGN INC. PC Owner PHIPPS HOUSES Filer JM ZONING, LLC. | SOE work as per plans filed, in conjunction with NB #421134187. No change to use, egress, or occupancy. |
| X00261449 ↗ | 235 EAST 235TH STREET BRONX | Alteration | Signed-off | 11/09/2019 | 04/24/2026 | Owner 235 EAST 235 STREET LLC | FILING TO INSTALL NEW PLUMBING FIXTURES |
| Q01291920 ↗ | 67-28 185TH STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 09/26/2025 | 04/23/2026 | Design GERALD CALIENDO ARCHITECTS Owner HIIC BUILDERS LLC | HEREWITH FILING ALTERATION SUBSEQUENT TO APPLICATION # Q01291920-S2 FOR PLUMBING WORK IN CELLAR, FIRST, SECOND FLOOR & OSP AS PER PLANS FILE… |
| Q01334323 ↗ | 191-20 110TH ROAD QUEENS | Alteration | Permit Issued | 04/13/2026 | 04/22/2026 | Design ASHOKE CHAKRABORTY RA Owner KATARIA LLC Filer KATARIA BUILDERS L.L.C | FILING HEREWITH PLANS AND PLUMBING APPLICATION FOR A NEW SECOND STORY EXTENSION AND CONVERSION FROM ONE FAMILY DWELLING TO (TWO) -FAMILY DW… |
| M01342991 ↗ | 311 EAST 71ST STREET MANHATTAN | Alteration | Permit Issued | 02/06/2026 | 04/22/2026 | Design SIMPLE ARCHITECTURE PC Owner 31171 Owners Corp. | INTERIOR RENOVATION OF EXISTING NON ADA COMPLIANT APARTMENT 3F INCLUDING MINOR LAYOUT CHANGES. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY. |