| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01433731 | 521 WEST 28 STREET MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 09/29/2026 | Contractor POWERGEN DEVELOPMENT GROUP | FILING TO RELOCATE AN OPENING BETWEEN THE RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANG… |
| B01423495 ↗ | 151 NORTH 6 STREET BROOKLYN | Alteration | Permit Issued | 07/02/2026 | 09/11/2026 | Contractor BIG APPLE REMODELING CORP Filer RELATED COMPANIES | Temporary Construction Fence in two sections to maintain access to residential entrance. |
| M01438086 ↗ | 44 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 08/17/2026 | Contractor ALL CITY REMODELING, INC | FILING TO REMOVE 1ST FLOOR PARTITIONS AND EQUIPMENT AND FORMER RETAIL MILLWORK, WITH MINOR MODIFICATIONS TO 2nd FLOOR TREATMENT ROOMS AND SU… |
| B00797659 ↗ | 93 NORTH 9 STREET BROOKLYN | Alteration CO | Permit Issued | 09/06/2022 | 08/07/2026 | Owner NEW FICTION LLC Contractor F&S CONTRACTING GROUP INC Filer JM ZONING, LLC. | FILING HEREWITH FOR RENOVATIONS CHANGE OF USE AND OCCUPANCY FROM OFFICE AND VETERINARIAN CLINIC UG6 TO ART STUDIOS UG9A, AND PENTHOUSE ADDIT… |
| M01206087 ↗ | 211 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 03/12/2026 | 07/30/2026 | Contractor KILLOWEN CONSTRUCTION IN | FILING FOR STAIRCASE REMOVAL, REFRAMING, AND NEW STAIRCASE INSTALL AS PER PLANS SUBMITTED HEREWITH. |
| M01154678 ↗ | 140 WEST STREET MANHATTAN | Alteration | Signed-off | 12/18/2024 | 07/29/2026 | Owner MAGNUM REAL ESTATE GROUP Contractor FIRST STANDARD CONSTR INC Filer JM ZONING, LLC. | Sprinkler work at Penthouse Duplex at floors 31 & 31st Mezzanine. No change to use, egress or occupancy. |
| Person | Filings | Most recent |
|---|---|---|
| David McAlpine | 204 | 08/18/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| STEVEN PAUL HAMMER | 6 | 07/23/2026 |
| COLLECTIF ENGINEERING PLLC | 4 | 04/13/2026 |
| WSP | 4 | 03/23/2026 |
| MARTOS ENGINEERING | 2 | 04/13/2026 |
| ST ENGINEERING SERVICES LLP | 2 | 04/03/2025 |
| EP ENGINEERING LLC | 1 | 03/12/2026 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 08/18/2026 |
| MESZAROS ENGINEERING PLLC | 1 | 05/22/2026 |
| MG ENGINEERING D.P.C. | 1 | 08/30/2023 |
| PETRACCA DESIGN AND ENGINEERING, PC | 1 | 10/10/2025 |
| ROBERT DERECTOR ASSOCIATES | 1 | 11/08/2023 |
| THORNTON TOMASETTI | 1 | 08/30/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| POWERGEN DEVELOPMENT GROU | 14 | 07/23/2026 |
| BIG APPLE REMODELING CORP | 6 | 08/26/2026 |
| ARCHSTONE BUILDERS LLC | 5 | 06/15/2023 |
| RELATED CONSTRUCTION LLC | 5 | 04/26/2023 |
| A + SPRINKLER CORP | 4 | 04/17/2025 |
| A PLUS PLUMBING CORP | 4 | 04/17/2025 |
| CAM ENERGY HTG&MECH CORP | 4 | 04/03/2026 |
| D & K CONSTRUCTION GROUP | 4 | 02/11/2026 |
| ELYSIUM CONSTRUCTION INC | 4 | 05/08/2024 |
| F&S CONTRACTING GROUP INC | 4 | 07/23/2025 |
| HUDSON YARDS CONST II LLC | 4 | 03/18/2026 |
| PERENNIAL EMPIRE LLC | 4 | 04/03/2026 |
| 1215 CORP DBA KCM PLBG & | 3 | 04/03/2026 |
| DONATO, INC | 3 | 10/06/2020 |
| INTEGRATED PROJECT DELIVE | 3 | 06/05/2023 |
| JAG PLBG & MECH INC | 3 | 10/15/2020 |
| ORBIT PLBG & HTG INC | 3 | 02/11/2026 |
| REDCOM DESIGN & CONSTRUCT | 3 | 10/08/2018 |
| AQUEDUCT MECHANICAL CORP | 2 | 02/11/2026 |
| BUILDINGRITE LLC | 2 | 08/16/2023 |
| BUILDOPS INC | 2 | 04/03/2026 |
| CITY PLUMBING INC | 2 | 03/29/2026 |
| FIRST STANDARD CONSTR INC | 2 | 08/18/2026 |
| HUDSON YARDS CONSTRUCTION | 2 | 03/30/2022 |
| JAMES E FITZGERALD INC | 2 | 07/27/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RELATED MANAGEMENT COMPANY | 11 | 06/29/2026 |
| 85 TENTH AVENUE ASSOCIATES, LLC | 6 | 03/27/2025 |
| 515 WEST 18TH STREET CONDOMINIUM | 5 | 12/28/2023 |
| 22ND AND 11TH ASSOCIATES, LLC | 4 | 03/23/2026 |
| 28TH UNDER HIGH LINE ASSOCIATES LLC | 4 | 04/21/2026 |
| BRAM AUTO GROUP | 4 | 05/10/2023 |
| NEW FICTION LLC | 4 | 07/23/2025 |
| NEW YORK CITY HOUSING AUTHORITY | 4 | 04/03/2026 |
| RELATED | 4 | 04/19/2024 |
| 50 HYMC OWNER LLC | 3 | 10/30/2024 |
| CARNEGIE PARK ASSOCIATES, L.P. | 3 | 10/15/2020 |
| MAGNUM REAL ESTATE GROUP | 3 | 08/18/2026 |
| PINETREE GROUP, INC. | 3 | 02/11/2026 |
| 28TH HIGHLINE ASSOCIATES LLC | 2 | 07/23/2026 |
| ALMONTE REALTY, LLC | 2 | 10/03/2022 |
| CUBITTS INC | 2 | 12/30/2024 |
| DYNAMIC BUILDING CONSULTANTS, INC | 2 | 04/12/2024 |
| ERY TENANT LLC C/O THE RELATED | 2 | 04/03/2026 |
| LISA MANAGEMENT | 2 | 06/19/2022 |
| TRIBECA EQUITY PARTNERS LP | 2 | 04/29/2024 |
| WILLETS POINT PHASE I OWNER, LLC | 2 | 03/18/2026 |
| 101 North Ninth LLC | 1 | 07/17/2025 |
| 451 TENTH AVENUE LLC | 1 | 03/24/2022 |
| ACTA REALTY CORP. | 1 | 08/04/2025 |
| BEST REALTY 331-332 LLC | 1 | 05/17/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| RELATED COMPANIES | 42 | 08/26/2026 |
| GREEN LIGHT EXPEDITING LLC | 13 | 08/11/2026 |
| JM ZONING, LLC. | 10 | 08/18/2026 |
| JAM CONSULTANTS, INC. | 5 | 10/10/2025 |
| SEAY-YARBROUGH INC | 4 | 05/10/2023 |
| DYNAMIC BUILDING CONSULTANTS, INC | 2 | 04/12/2024 |
| GILLMAN CONSULTING INC | 2 | 10/30/2024 |
| PEROTTO CONSULTING MGT | 2 | 04/29/2024 |
| CONVERSANO ASSOCIATES, INC. | 1 | 11/01/2024 |
| DOMANI CONSULTING | 1 | 02/21/2024 |
| GANCI & LOGOZZO LLC | 1 | 07/19/2021 |
| MESZAROS ENGINEERING PLLC | 1 | 05/22/2026 |
| METROPOLIS GROUP INC | 1 | 08/04/2025 |
| RIZZO GROUP | 1 | 04/20/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01433731 | 521 WEST 28 STREET MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 09/29/2026 | Contractor POWERGEN DEVELOPMENT GROUP | FILING TO RELOCATE AN OPENING BETWEEN THE RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANG… |
| B01423495 ↗ | 151 NORTH 6 STREET BROOKLYN | Alteration | Permit Issued | 07/02/2026 | 09/11/2026 | Contractor BIG APPLE REMODELING CORP Filer RELATED COMPANIES | Temporary Construction Fence in two sections to maintain access to residential entrance. |
| M01438086 ↗ | 44 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 08/17/2026 | Contractor ALL CITY REMODELING, INC | FILING TO REMOVE 1ST FLOOR PARTITIONS AND EQUIPMENT AND FORMER RETAIL MILLWORK, WITH MINOR MODIFICATIONS TO 2nd FLOOR TREATMENT ROOMS AND SU… |
| B00797659 ↗ | 93 NORTH 9 STREET BROOKLYN | Alteration CO | Permit Issued | 09/06/2022 | 08/07/2026 | Owner NEW FICTION LLC Contractor F&S CONTRACTING GROUP INC Filer JM ZONING, LLC. | FILING HEREWITH FOR RENOVATIONS CHANGE OF USE AND OCCUPANCY FROM OFFICE AND VETERINARIAN CLINIC UG6 TO ART STUDIOS UG9A, AND PENTHOUSE ADDIT… |
| M01206087 ↗ | 211 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 03/12/2026 | 07/30/2026 | Contractor KILLOWEN CONSTRUCTION IN | FILING FOR STAIRCASE REMOVAL, REFRAMING, AND NEW STAIRCASE INSTALL AS PER PLANS SUBMITTED HEREWITH. |
| M01154678 ↗ | 140 WEST STREET MANHATTAN | Alteration | Signed-off | 12/18/2024 | 07/29/2026 | Owner MAGNUM REAL ESTATE GROUP Contractor FIRST STANDARD CONSTR INC Filer JM ZONING, LLC. | Sprinkler work at Penthouse Duplex at floors 31 & 31st Mezzanine. No change to use, egress or occupancy. |
| Q01370846 ↗ | 60-03 69 AVENUE QUEENS | Alteration | Permit Issued | 03/28/2026 | 07/27/2026 | Contractor CITY PLUMBING INC Filer RELATED COMPANIES | THE PROPOSED WORK IS INTERIOR RENOVATIONS TO AN EXISTING TWO-FAMILY RESIDENCE WITH NEW PARTITIONS AND RENOVATED KITCHENS AND BATHROOMS AS PE… |
| M01392956 ↗ | 520 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 06/29/2026 | 07/21/2026 | Contractor POWERGEN DEVELOPMENT GROUP | FLOOR LEVELING AND ADD HARDWARE AND CONTROLS TO PROVIDE MECHANICAL ASSIST FOR ADA / LL58 ACCESSIBILITY TO PRIMARY ENTRY DOORS. NO CHANGE IN … |
| M01354772 ↗ | 140 WEST STREET MANHATTAN | Alteration | Signed-off | 02/24/2026 | 06/10/2026 | Owner MAGNUM REAL ESTATE GROUP Contractor K & G GEKON INC Filer JM ZONING, LLC. | FILED IN CONJUNCTION WITH PAA DOC. 23 TO ALT1 JOB NO. 121830439 AND CHANGE OF USE ON CELLAR AND SUB CELLAR FROM MERCANTILE TO HEALTH & FITNE… |
| M01370298 ↗ | 527 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 04/05/2026 | 05/28/2026 | Contractor LINKED MECHANICAL LLC | MINOR INTERIOR RENOVATIONS INCLUDING NEW PARTITIONS. ALL EXISTING LIGHTING AND SWITCHING TO REMAIN. REPLACE TWO SINKS ON EXISTING ROUGHING… |
| M01392912 ↗ | 450 WEST 17 STREET MANHATTAN | Alteration | Permit Issued | 05/11/2026 | 05/19/2026 | Contractor POWERGEN DEVELOPMENT GROUP | PARTIAL INTERIOR REMOVALS INCLUDING PARTITIONS, SUSPENDED CEILINGS, CABINETRY AND FINISHES TO PREPARE SPACE FOR NEW TENANT. NO CHANGE TO US… |
| M01359674 ↗ | 170 AVENUE A MANHATTAN | Alteration | Signed-off | 02/19/2026 | 05/18/2026 | Contractor WATSON'S PLBG, HTG, & BDG | PLUMBING WORK FOR THE INTERIOR RENOVATIONS TO MODIFY LAYOUT FOR NEW TENANT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC… |
| M01384551 ↗ | 508 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 04/21/2026 | 05/13/2026 | Contractor POWERGEN DEVELOPMENT GROUP Filer RELATED COMPANIES | INSTALLATION OF DOORS AND INFILL PARTITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01369547 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 04/03/2026 | 04/13/2026 | Contractor BUILDOPS INC Filer RELATED COMPANIES | PLUMBING WORK FOR THE MINOR RENOVATION OF AN EXISTING BATHROOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01368236 ↗ | WILLETS POINT BLVD QUEENS | Alteration | Signed-off | 03/18/2026 | 04/01/2026 | Contractor HUDSON YARDS CONST II LLC Filer RELATED COMPANIES | THIS APPLICATION FILED ONLY TO DELIVER AND INSTALL PHOTOVOLTAIC ARRAYS AND SUPPORT EQUIPMENT ON ROOF. ALL ACTUAL CONSTRUCTION WORK PERFORMED… |
| Q01368239 ↗ | WILLETS POINT BLVD QUEENS | Alteration | Signed-off | 03/18/2026 | 04/01/2026 | Contractor HUDSON YARDS CONST II LLC Filer RELATED COMPANIES | THIS APPLICATION FILED ONLY TO DELIVER AND INSTALL PHOTOVOLTAIC ARRAYS AND SUPPORT EQUIPMENT ON ROOF. ALL ACTUAL CONSTRUCTION WORK PERFORMED… |
| B01342516 ↗ | 64 HURON STREET BROOKLYN | Alteration | Filed — no permit on record | 03/30/2026 | — | — | — |
| M01346115 ↗ | 555 WEST 22 STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 03/23/2026 | Contractor BUILDOPS INC Filer RELATED COMPANIES | PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY |
| M01143647 ↗ | 216 WEST 76 STREET MANHATTAN | Alteration | Signed-off | 12/05/2024 | 03/20/2026 | Contractor KILLOWEN CONSTRUCTION IN Filer JAM CONSULTANTS, INC. | PLUMBING AND SPRINKLER SCOPE ASSOCIATED WITH APARTMENT RENOVATION AS PER PLANS FILED HEREWITH. |
| M01263640 ↗ | 527 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 08/25/2025 | 01/12/2026 | Contractor POWERGEN DEVELOPMENT GROUP | Plumbing and sprinkler work for the minor interior renovation for new retail tenant as per plans filed herewith. No change in use, egress, o… |
| M01329358 ↗ | 140 WEST STREET MANHATTAN | Alteration | Permit Issued | 12/11/2025 | 01/07/2026 | Contractor K G GEKON | Interior renovation of retail space B |
| M01308479 ↗ | 117 NINTH AVENUE MANHATTAN | Alteration | Signed-off | 11/24/2025 | 12/17/2025 | Contractor PERENNIAL EMPIRE LLC Filer RELATED COMPANIES | PLUMBING WORK FOR THE INTERIOR RENOVATION TO COMBINE EXISTING UNITS 6B AND 6C INTO 6BC AS PER TPPN #3/97. PLEASE NOTE, THIS BUILDING IS NOT … |
| M01265410 ↗ | 430 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 08/14/2025 | 11/19/2025 | Contractor PERENNIAL EMPIRE LLC Filer RELATED COMPANIES | PLUMBING WORK FOR THE INTERIOR RENOVATION TO COMBINE EXISTING UNITS 25A AND 25B INTO 25AB AS PER TPPN #3/97. PLEASE NOTE, THIS BUILDING IS N… |
| M01265335 ↗ | 430 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 08/14/2025 | 11/17/2025 | Contractor PERENNIAL EMPIRE LLC Filer RELATED COMPANIES | PLUMBING WORK FOR THE INTERIOR RENOVATION TO COMBINE EXISTING UNITS 17H AND 17J INTO 17HJ AS PER TPPN #3/97. PLEASE NOTE, THIS BUILDING IS N… |
| M01265418 ↗ | 117 NINTH AVENUE MANHATTAN | Alteration | Permit Issued | 08/15/2025 | 11/17/2025 | Contractor CAM ENERGY HTG&MECH CORP Filer RELATED COMPANIES | PLUMBING WORK FOR THE INTERIOR RENOVATION TO COMBINE EXISTING UNITS 23G AND 23H INTO 23GH AS PER TPPN #3/97. PLEASE NOTE, THIS BUILDING IS N… |
| M01290757 ↗ | 635 WEST 42 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/27/2025 | — | — | — |
| Q00863124 ↗ | 21-32 79 STREET | Alteration | Permit Issued | 04/26/2023 | 10/24/2025 | Contractor MIKA CONTRACTING LLC | Interior Renovation including replacement of existing Kitchen and Bath, added Bath and Washer/Dryer, new Attic Stair |
| B01049462 ↗ | 37 GARNET STREET BROOKLYN | New Building | Permit Issued | 06/28/2024 | 10/22/2025 | Contractor GIRON CONTRACTING INC | FILING FOR CONSTRUCTION OF TWO FAMILY, FOUR STORY NEW BUILDING AS PER PLANS SUBMITTED HEREWITH. |
| Q00863120 ↗ | 21-32 79 STREET | Alteration | Permit Issued | 04/26/2023 | 10/22/2025 | Contractor CROSSFIELD PLBG.&HTG | Replace / Relocate Tub, Toilet, Lavatory, Sink & Gas Range. New Toilet, Lavatory, Shower in new Bath 2, new Washer in Bath 1 in Apartment 2… |
| M01233593 ↗ | 547 WEST 27 STREET MANHATTAN | Alteration | Signed-off | 08/04/2025 | 09/16/2025 | Owner PINETREE GROUP, INC. Contractor D & K CONSTRUCTION GROUP Filer RELATED COMPANIES | STOREFRONT RENOVATION OF AN EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01257422 ↗ | 34 WHITEHALL STREET MANHATTAN | Alteration | Signed-off | 08/04/2025 | 09/10/2025 | Owner ACTA REALTY CORP. Contractor ULTIMATE SAFETY ASS INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 8th (SUITE 801) FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| B01268605 ↗ | 76 FRANKLIN STREET BROOKLYN | Alteration | Signed-off | 08/10/2025 | 08/15/2025 | Owner PARTNERS PATH Contractor BIG APPLE REMODELING | INTERIOR RENOVATIONS FOR NEW BARBER SHOP AND APOTHECARY |
| B01004411 ↗ | 298 LAFAYETTE AVENUE BROOKLYN | Alteration | Permit Issued | 02/27/2024 | 07/31/2025 | Contractor CHATZI CONSTRUCTION INC | PARTIAL RENOVATION OF AN EXITING TOWNHOUSE INCLUDING NEW PLUMBING FIXTURES AND BRUNCH PIPIING. |
| M01181813 ↗ | 547 WEST 27 STREET MANHATTAN | Alteration | Signed-off | 03/20/2025 | 07/30/2025 | Owner PINETREE GROUP, INC. Contractor D & K CONSTRUCTION GROUP Filer RELATED COMPANIES | PLUMBING AND SPRINKLER WORK FOR THE INTERIOR RENOVATION OF THE EXISTING 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O… |
| M01191692 ↗ | 547 WEST 27 STREET MANHATTAN | Alteration | Signed-off | 04/16/2025 | 07/30/2025 | Owner PINETREE GROUP, INC. Contractor D & K CONSTRUCTION GROUP Filer RELATED COMPANIES | PLUMBING AND SPRINKLER WORK FOR THE INTERIOR RENOVATION OF THE EXISTING 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG… |
| B01221248 ↗ | 101 NORTH 9 STREET BROOKLYN | Alteration | Signed-off | 07/16/2025 | 07/28/2025 | Owner 101 North Ninth LLC Contractor TATRA RENOVATION INC Filer JM ZONING, LLC. | FILING HEREWITH STRUCTURAL WORK FOR BUILDING CONNECTION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01242917 ↗ | 455 MAIN ST MANHATTAN | Alteration | Filed — no permit on record | 07/23/2025 | — | — | |
| B08000845 ↗ | 93 NORTH 9 STREET BROOKLYN | Alteration | Signed-off | 11/21/2022 | 07/16/2025 | Owner NEW FICTION LLC Contractor F&S CONTRACTING GROUP INC Filer JM ZONING, LLC. | FILING HEREWITH FOR CURB CUT WORK ON THE EAST SIDE AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| M01023284 ↗ | 555 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 05/20/2025 | Contractor EXA USA,CORP Filer RELATED COMPANIES | PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE … |
| M01082141 ↗ | 427 10 AVENUE MANHATTAN | Alteration | Signed-off | 08/11/2024 | 04/15/2025 | Owner 50 HYMC OWNER LLC Contractor STRUCTURE TONE, LLC Filer GILLMAN CONSULTING INC | Filing herewith Mechanical modifications to the existing systems. No change to use, egress or occupancy. |
| M00844133 ↗ | 521 WEST 28 STREET MANHATTAN | Alteration | Permit Issued | 03/17/2023 | 04/11/2025 | Contractor JEM CONTRACTING CORP | INSTALLATION OF A SOLAR CANOPY (SOLAR ENERGY SYSTEM) ON AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP… |
| M01186588 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 03/27/2025 | 04/08/2025 | Contractor POWERGEN DEVELOPMENT GROUP Filer RELATED COMPANIES | INTERIOR RENOVATION OF AN EXISTING VESTIBULE IN AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01186838 ↗ | 508 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 02/26/2025 | 03/08/2025 | Contractor POWERGEN DEVELOPMENT GROUP Filer RELATED COMPANIES | INSTALLATION OF TEMPORARY PARTITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01143003 ↗ | 527 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 12/10/2024 | 02/19/2025 | Contractor POWERGEN DEVELOPMENT GROUP | Minor Interior partitions and finishes with new lighting for new retail tenant as per plans filed herewith. No change in use, egress, or occ… |
| X01157662 ↗ | 610 EXTERIOR STREET BRONX | Alteration | Signed-off | 12/18/2024 | 01/29/2025 | Contractor PROMETHEAN BUILDERS LLC | THIS APPLICATION IS FILED TO INSTALL TEMPORARY PARTITIONS AND CONSTRUCTIONFENCE TO SEPARATE THE ESCALATORS BEING REPLACED ON ALL FOUR FLOORS… |
| M01143072 ↗ | 527 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 12/10/2024 | 12/24/2024 | Contractor POWERGEN DEVELOPMENT GROUP | MECHANICAL WORK FOR AN INTERIOR RENOVATION TO AN EXISTING RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01150880 ↗ | 140 WEST STREET MANHATTAN | Alteration | Signed-off | 12/11/2024 | 12/12/2024 | Contractor FIRST STANDARD CONSTR INC | Soft demolition at the 31st & 32nd floor duplex units. Work to include removal and installation of non-load-bearing partitions & finishes. N… |
| M01002359 ↗ | 508 WEST 28 STREET MANHATTAN | Alteration CO | Permit Issued | 03/13/2024 | 11/13/2024 | Contractor KEYSTONE BUILDERS GROUP* Filer RELATED COMPANIES | RENOVATION OF AN EXISTING COMMERCIAL BUILDING AS PER PLANS FILED HEREWITH. |
| M01117939 ↗ | 72 WEST 88 STREET MANHATTAN | Alteration | Signed-off | 11/01/2024 | 11/07/2024 | Owner FINGER MANAGEMENT CORP Contractor CREATIVE HANDS RESTORERS | FILING HEREWITH GENERAL CONSTRUCTION MINOR PARTITONS AND RE-CONFIGURE THE TOILET AND INSTALL A CONNECTIING OPENING TO THE EXISTING ADJACENT … |
| M01073185 ↗ | 46 COOPER SQUARE MANHATTAN | Alteration | Signed-off | 07/15/2024 | 08/01/2024 | Contractor D & K CONSTRUCTION GROUP Filer JAM CONSULTANTS, INC. | Minor plumbing modifications as per plans filed herewith. No change in use, egress or occupancy. |
| M01085842 ↗ | 508 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 07/29/2024 | 08/01/2024 | Contractor KEYSTONE BUILDERS GROUP* | INTERIOR RENOVATIONS TO AN EXISTING SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01080578 ↗ | 335 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 07/25/2024 | 07/30/2024 | Owner CUBITTS INC Contractor BIG APPLE REMODELING | INTERIOR RENOVATIONS FOR RETAIL EYEWEAR STORE. AMEND M.101 TO REPLACE AC EQUIPMENT IN EXIST. LOCATIONS. |
| M01004219 ↗ | 10 EAST 102 STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 06/17/2024 | Contractor JUDY PAINTING CORP Filer RELATED COMPANIES | #8831 - Combination of apartments 34E and 34F. No change in egress, use, or occupancy. |
| M01004260 ↗ | 10 EAST 102 STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 06/17/2024 | Contractor JUDY PAINTING CORP | #8831 - Combination of apartments 35E and 35F, 36E and 36F, 37E and 37F. No change in egress, use, or occupancy. |
| M01030076 ↗ | 105 DUANE STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 06/12/2024 | Contractor PARAMOUNT PLBG & HTG CORP | 8824 - Plumbing modifications. No change in egress, use or occupancy. |
| M01004975 ↗ | 10 EAST 102 STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/30/2024 | Contractor JAG PLUMBING & MECHANICAL | #8831 - Cap and remove plumbing for combination of apartments 34E and 34F. No change in egress, use, or occupancy. |
| M01004994 ↗ | 10 EAST 102 STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/30/2024 | Contractor JAG PLUMBING & MECHANICAL Filer RELATED COMPANIES | #8831 - Cap and remove plumbing for combination of apartments 35E/F, 36 E/F, 37 E/F. No change in egress, use, or occupancy. |
| M01030051 ↗ | 105 DUANE STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 05/24/2024 | Contractor POWERGEN DEVELOPMENT GROUP Filer PEROTTO CONSULTING MGT | #8824 Modification of Retail space with installation of non-load bearing partitions and replacement of existing split HVAC system. No chang… |
| M01041194 ↗ | 250 EAST 53 STREET MANHATTAN | Alteration | Signed-off | 05/06/2024 | 05/24/2024 | Contractor ELYSIUM CONSTRUCTION INC | PLUMBING WORK ASSOCIATED WITH A RETAIL SPACE FIT OUT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00622763 ↗ | 34 HUDSON YARDS MANHATTAN | Alteration | Signed-off | 11/12/2021 | 05/01/2024 | Contractor LORICH CONSTRUCTION MANAGEMENT Filer JM ZONING, LLC. | FILING HEREWITH PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01034681 ↗ | 380 11 AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2024 | 04/25/2024 | Owner RELATED Contractor NEGLIACCIO.IMPROVEMENTS | THIS APPLICATION IS FILED TO PARTIALLY RENOVATE OFFICE SPACE ON THE 18TH FLOOR OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE… |
| M01008224 ↗ | 508 WEST 28 STREET MANHATTAN | No Work | Filed — no permit on record | 03/13/2024 | — | — | — |
| B00146507 ↗ | 158 BEARD STREET BROOKLYN | No Work | Filed — no permit on record | 03/01/2024 | — | — | — |
| M00942361 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 11/08/2023 | 02/29/2024 | Contractor KAJIMA BUILDING DESIGN Filer RELATED COMPANIES | SPRINKLER WORK FOR THE LANDLORD WORK FOR THE RENOVATION OF THE 8TH FLOOR IN AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M00982228 ↗ | 107 SPRING STREET MANHATTAN | Alteration | Signed-off | 01/18/2024 | 01/31/2024 | Owner CUBITTS INC Contractor BIG APPLE REMODELING | Interior renovations and finishes to the 103 Mercer Retail part of the 1st floor and Cellar. |
| M00937526 ↗ | 500 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 12/05/2023 | 01/02/2024 | Contractor POWERGEN DEVELOPMENT GROUP Filer RELATED COMPANIES | New Storefront and Interior renovation of Retail #4. No change to use occupancy or egress. |
| S00960805 ↗ | 2730 ARTHUR KILL ROAD STATEN ISLAND | Alteration | Signed-off | 11/29/2023 | 12/11/2023 | Contractor JCT DEVELOPMENT NY INC Filer DOMANI CONSULTING | THIS APPLICATION IS TO PERFORM INTERIOR RENOVATIONS INCLUDING A NEW ADA/GENDER NEUTRAL TOILET, ADDITIONAL LIGHTING AND REMOVAL OF FINISHES, … |
| M00913561 ↗ | 380 11 AVENUE MANHATTAN | Alteration | Signed-off | 08/16/2023 | 12/01/2023 | Owner RELATED Contractor BUILDINGRITE Filer RELATED COMPANIES | THIS APPLICATION IS FILED TO INSTALL MINOR PARTITIONS, FURNITURE AND FINISHES FOR SUPPORT SPACES FOR ENGINEERING AND MAINTENANCE STAFF ON TH… |
| M00908366 ↗ | 105 DUANE STREET MANHATTAN | Alteration | Signed-off | 08/11/2023 | 11/28/2023 | Contractor TORLINA CONSTRUCTION | #8692 - Modification of UG 6 space with installation of non-load bearing partitions. No change of Use occupancy or egress |
| M00949230 ↗ | 250 EAST 53 STREET MANHATTAN | Alteration | Signed-off | 10/30/2023 | 11/09/2023 | Contractor ELYSIUM CONSTRUCTION INC | REMOVAL OF FINISHES, TENANT PARTITIONS AND MILLWORK TO PREPARE SPACE FOR NEW TENANTS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS O… |
| M00937477 ↗ | 111 EAST 67 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/06/2023 | — | Owner BHS | — |
| X00880248 ↗ | 708 EAST TREMONT AVENUE BRONX | Alteration | Signed-off | 05/31/2023 | 09/06/2023 | Contractor MSS GOLDEN EAGLE CONSTRUC | Filing facade restoration as per plans. No change in use, egress, or occupancy under this application. |
| M00856369 ↗ | 10 AVENUE MANHATTAN | Alteration | Signed-off | 06/05/2023 | 08/30/2023 | Contractor INTEGRATED PROJECT DELIVE Filer RELATED COMPANIES | GENERAL CONSTRUCTION AND MECHANICAL WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHAN… |
| M00897717 ↗ | 380 11 AVENUE MANHATTAN | Alteration | Signed-off | 07/27/2023 | 08/29/2023 | Owner RELATED Contractor JAMES E FITZGERALD INC | THIS APPLICATION IS FILED TO PARTIALLY RENOVATE OFFICE SPACE ON THE 29TH FLOOR OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE… |
| B00697720 ↗ | 228 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 03/19/2022 | 08/23/2023 | Contractor TROY CONSTRUCTION OF NY I | INTERIOR RENOVATION OF EXISTING 2-FAMILY BUILDING WITH ASSOCIATED GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS SUBMITTED HEREWITH. … |
| M00891808 ↗ | 64 EAST 77 STREET MANHATTAN | Alteration | Signed-off | 07/24/2023 | 07/25/2023 | Owner CVW PROPERTY LLC Contractor EUROSTRUCT INC Filer JAM CONSULTANTS, INC. | INTERIOR RENOVATION AND REPLACEMENT OF FENCE AT REAR YARD PER PLANS FILED HEREWITH. PLUMBING FILED AS SUBSEQUENT. NO CHANGE TO USE, EGRESS N… |
| M00897244 ↗ | 508 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 07/06/2023 | 07/21/2023 | Contractor AVENTADOR CONSTRUCTION IN Filer RELATED COMPANIES | PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION TO EXISTING COMMERCIAL BUILDING. NO CHANGE TO OCCUPANCY, EGRESS, OR USE. |
| M00854549 ↗ | 427 10 AVENUE MANHATTAN | Alteration | Signed-off | 04/27/2023 | 07/14/2023 | Owner 50 HYMC OWNER LLC Contractor OCGP LLC Filer GILLMAN CONSULTING INC | Interior renovation. Installation of Partitions, furniture and finishes as per plans plans. No change to use, egress or occupancy. |
| M00890921 ↗ | 140 WEST STREET MANHATTAN | Alteration | Signed-off | 06/15/2023 | 06/30/2023 | Owner MAGNUM REAL ESTATE GROUP Contractor ARCHSTONE BUILDERS LLC Filer JM ZONING, LLC. | Soft demolition at the 31st & 32nd floor duplex units. Work to include removal and installation of non-load-bearing partitions & finishes. N… |
| M00856430 ↗ | 10 AVENUE MANHATTAN | Alteration | Signed-off | 06/05/2023 | 06/21/2023 | Contractor A PLUS PLUMBING CORP Filer RELATED COMPANIES | PLUMBING AND SPRINKLER WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG… |
| M00713254 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 05/10/2022 | 06/02/2023 | Contractor ARCHSTONE BUILDERS LLC Filer RELATED COMPANIES | RENOVATION OF AN EXISTING BUILDING SPACE TO CHANGE IT FROM AN ELEVATOR SHAFT TO A FIBER SHAFT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,… |
| M00875316 ↗ | 555 WEST 22 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/22/2023 | — | Filer RELATED COMPANIES | — |
| M00857252 ↗ | 235 WEST 154 STREET MANHATTAN | Alteration | Signed-off | 05/10/2023 | 05/19/2023 | Owner BRAM AUTO GROUP Contractor COBOT PLUMBING AND HEATIN Filer SEAY-YARBROUGH INC | REPLACE EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING AT BASEMENT - 8 PLUMBING FIXTURES |
| B00870235 ↗ | 93 NORTH 9 STREET BROOKLYN | Alteration | Signed-off | 05/05/2023 | 05/11/2023 | Owner NEW FICTION LLC Contractor F&S CONTRACTING GROUP INC Filer JM ZONING, LLC. | FILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| M00861614 ↗ | 1192 PARK AVENUE MANHATTAN | Alteration | Filed — no permit on record | 05/08/2023 | — | — | — |
| M00870501 ↗ | 1192 PARK AVENUE MANHATTAN | Alteration | Filed — no permit on record | 05/08/2023 | — | — | — |
| S00852825 ↗ | 1424 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 04/02/2023 | 05/02/2023 | Contractor HIGH QUALITY CONSTRUCTION Filer RELATED COMPANIES | THE WORK UNDER THIS APPLICATION IS FOR GENERAL CONSTRUCTION AND MECHANICAL WORK TO RENOVATE THE EXISTING COMMERICAL SPACE FOR USE AS MEDICAL… |
| S00852838 ↗ | 1424 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 04/02/2023 | 05/01/2023 | Contractor CITY PLUMBING INC Filer RELATED COMPANIES | THE WORK UNDER THIS APPLICATION IS FOR PLUMBING WORK TO RENOVATE THE EXISTING COMMERICAL SPACE FOR USE AS MEDICAL OFFICES. NO CHANGE TO OCCU… |
| B08004335 ↗ | 93 NORTH 9 STREET BROOKLYN | Alteration | Permit Issued | 11/21/2022 | 04/27/2023 | Owner NEW FICTION LLC Contractor F&S CONTRACTING GROUP INC Filer JM ZONING, LLC. | FILING HEREWITH FOR CURB CUT WORK ON THE WEST SIDE AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| M00702044 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 04/08/2022 | 04/26/2023 | Contractor ARCHSTONE BUILDERS LLC Filer RELATED COMPANIES | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT TO USE AN EXISTING BUILDING SPACE AS A TEMPORARY LOBBY AREA AS PER PLANS FILED HEREWITH… |
| M00860575 ↗ | 555 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 04/17/2023 | 04/19/2023 | Contractor RELATED CONSTRUCTION LLC | RENOVATION OF EXISTING APARTMENTS 2D AND 2E TO COMBINE THEM TO BECOME 2DE AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #1212043… |
| Q00722382 ↗ | 82-41 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 05/26/2022 | 04/13/2023 | Contractor SJS CONSTRUCTION CO., INC | FILING FOR INTERIOR RENOVATION OF BASEMENT LEVEL SPACE AS PER PLANS SUBMITTED HEREWITH. |
| B00481240 ↗ | 524 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 03/29/2021 | 04/05/2023 | Contractor T. NOBLE & CO., LLC Filer JAM CONSULTANTS, INC. | Interior renovations for the conversion from existing 2-family and commercial to single family residence. Complete renovation include remova… |
| M08036989 ↗ | 105 DUANE STREET MANHATTAN | Alteration | Signed-off | 02/16/2023 | 02/28/2023 | Contractor POWERGEN DEVELOPMENT GROUP Filer PEROTTO CONSULTING MGT | #8692 - Modification of UG 6 space with installation of non-load bearing partitions. No change of Use occupancy or egress |
| M00806957 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 01/11/2023 | 01/13/2023 | Contractor ARCHSTONE BUILDERS LLC | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT TO USE THE EXISTING BUILDING LOBBY AS A LOBBY AREA AS PER PLANS FILED HEREWITH PURSUANT… |
| M00697732 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 04/11/2022 | 01/09/2023 | Contractor ARCHSTONE BUILDERS LLC Filer RELATED COMPANIES | RENOVATION OF AN EXISTING BUILDING SPACE TO USE IT AS A TEMPORARY LOBBY AREA AS PER PLANS FILED HEREWITH. TUP TO BE FILED UNDER SEPARATE APP… |
| M08036802 ↗ | 105 DUANE STREET MANHATTAN | Alteration | Signed-off | 12/15/2022 | 01/03/2023 | Contractor POWERGEN DEVELOPMENT GROUP | #8692 DM - Modification of UG 6 space with Removal of non-load bearing partition. No change of Use occupancy or egress |
| B00656178 ↗ | 524 BERGEN STREET BROOKLYN | Alteration | Signed-off | 01/03/2022 | 12/28/2022 | Contractor T. NOBLE & CO., LLC | Interior demolition only of non load bearing partitions & finishes. No change in use , egress, or occupancy. |
| M08010277 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Signed-off | 10/25/2022 | 12/20/2022 | Contractor TRI-STAR CONSTRUCTION COR Filer RELATED COMPANIES | ARCHITECTURAL AND STRUCTURAL WORK RELATED TO THE RENOVATION OF EXISTING BUILDING SPACES TO CHANGE THEM TO A BUILDING MANAGEMENT OFFICE, A BI… |
| B00698242 ↗ | 228 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 03/17/2022 | 11/29/2022 | Contractor JVR PLBG AND HEATING INC | Plumbing work associated with renovation of existing 2-family building as per plans submitted herewith. No change to use, egress, or occupa… |