| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00587305 | 2953 BRIGHTON 6 STREET BROOKLYN | Alteration | Permit Issued | 09/28/2021 | 10/16/2026 | Design JFK&M CONSULTING ENGINEERS Filer JMV ASSOCIATES LLC | Subsequent boiler application. |
| B00697137 | 121 SARATOGA AVENUE BROOKLYN | Alteration | Permit Issued | 03/25/2022 | 10/13/2026 | Design H2M ARCHITECTS AND ENGINEERS | PS 137: Plumbing work in conjunction with new addition to school as per plans. No change in use egress or occupancy under this application. |
| X00875799 | 2750 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 05/22/2023 | 10/08/2026 | Design SYSTRA | Installation of (1) single drinking fountain and (1) dual drinking fountain. |
| X00902102 | 1449 SHAKESPEARE AVENUE BRONX | Alteration | Permit Issued | 07/31/2023 | 10/08/2026 | Design AKM ARCHITECTS LLP Filer CASO & ASSOCIATES,INC. | Remove select exhaust fans, ductwork, sire distribution and provide new. Remove select convectors, steam piping and accessories and provide … |
| X00980590 | 1449 SHAKESPEARE AVENUE BRONX | Alteration | Permit Issued | 12/21/2023 | 10/07/2026 | Design IAQ SYSTEMS INC Filer CASO & ASSOCIATES,INC. | Roof and window replacement. Raising low parapets. Exterior masonry repointing work, repair damaged masonry and corner face brick replacemen… |
| X01311975 | 560 BROOK AVENUE BRONX | Alteration | Permit Issued | 02/09/2026 | 10/07/2026 | Design COLLECTIF ENGINEERING PLLC Owner NYC-ACS | Replacement of (2) boilers at cellar level. |
| Name | Projects together | Most recent |
|---|---|---|
| Shenoy Engineering | 15 | 10/14/2026 |
| Loring Consulting Engineers | 8 | 10/02/2026 |
| Velocity Architectural Services | 7 | 09/14/2026 |
| Ysrael A. Seinuk | 6 | 09/21/2026 |
| A&J Consulting Engineering Services | 5 | 08/10/2026 |
| Silman | 5 | 10/02/2026 |
| Velocity Architectural Services PLL | 5 | 09/14/2026 |
| Maitra Associates | 4 | 08/10/2026 |
| Princeton Engineering Services | 4 | 12/10/2024 |
| Systra | 4 | 04/03/2026 |
| H2M Architects and Engineers | 3 | 02/24/2026 |
| Hartland Engineering | 3 | 06/16/2026 |
| Mount Vernon Group Architects | 3 | 04/17/2024 |
| NYC School Construction Authority | 3 | 10/14/2026 |
| Salam & Giacalone Architects | 3 | 12/17/2025 |
| Steven Paul Hammer | 3 | 12/17/2025 |
| STV | 3 | 08/10/2026 |
| Thornton Tomasetti | 3 | 12/09/2025 |
| Akm Architects | 2 | 12/19/2025 |
| AKRF | 2 | 03/10/2026 |
| Cosentini Associates | 2 | 01/16/2024 |
| Cta Architects | 2 | 09/12/2025 |
| DVL Consulting Engineers | 2 | 12/26/2023 |
| Iaq Systems | 2 | 12/26/2023 |
| JFK & M Consulting Engineers | 2 | 06/27/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ABC Construction Cont | 6 | 09/14/2026 |
| ACS System Associates | 6 | 09/30/2025 |
| Empire Control Abatement | 6 | 09/10/2026 |
| Ashnu International | 5 | 10/31/2024 |
| A & F Fire Protection Co | 4 | 09/02/2025 |
| Adam's European Contracting | 4 | 02/24/2026 |
| Awl Industries | 4 | 09/10/2026 |
| Eon Mechanical | 4 | 12/19/2025 |
| CVM Construction | 3 | 04/28/2026 |
| Darcon Construction | 3 | 10/14/2026 |
| Intricate Tech Solutions | 3 | 10/02/2026 |
| Ashlar Mechanical | 2 | 09/21/2026 |
| Central Mechanical System | 2 | 09/14/2026 |
| Champion Combustion | 2 | 09/14/2026 |
| Chapman & Evans | 2 | 12/09/2025 |
| Iannelli Construction Co | 2 | 05/11/2023 |
| Infinity Contracting Service | 2 | 09/21/2026 |
| Litehouse Builders | 2 | 07/27/2026 |
| Positive Electric Associates | 2 | 06/16/2026 |
| R.A.M.S. Mechanical | 2 | 08/10/2026 |
| Roma Scaffolding | 2 | 12/09/2025 |
| Tameer | 2 | 10/14/2026 |
| Tomco Mechanical | 2 | 10/14/2026 |
| A.T.J. Electrical Co | 1 | 10/14/2025 |
| Air-Tek Mechanical | 1 | 09/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC School Construction Authority | 15 | 09/14/2026 |
| NYC School Construction | 11 | 10/14/2026 |
| City University of New York | 2 | 09/21/2026 |
| Minetta Lane Owners | 2 | 03/14/2024 |
| Nello Development | 2 | 07/26/2021 |
| Rocklyn Asset | 2 | 06/17/2025 |
| 3518 X LLC | 1 | 01/05/2026 |
| 365 Bay | 1 | 11/16/2021 |
| 4818 Van Dam | 1 | 10/31/2024 |
| Boulevard Together Developer | 1 | 05/24/2022 |
| Enos Realty | 1 | 04/13/2023 |
| Esrt | 1 | 04/25/2023 |
| Gun Hill RD Apartments | 1 | 04/10/2023 |
| Infinity Queens | 1 | 08/24/2022 |
| Jemb Realty | 1 | 12/26/2023 |
| NYC Department of Design and Construction | 1 | 07/27/2026 |
| NYC Department of Environmental Protection | 1 | 06/28/2021 |
| NYC Educational Construction Fund | 1 | 01/16/2024 |
| NYC-ACS | 1 | 09/23/2026 |
| Platinum | 1 | 04/17/2024 |
| SDF9 Ocean Parkway Owner | 1 | 01/10/2020 |
| The Brodsky Organization | 1 | 05/07/2024 |
| The Trust for Governors Island | 1 | 09/02/2025 |
| Turtle Bay Music School | 1 | 11/14/2022 |
| Wilfred Realty | 1 | 09/21/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| JMV Associates | 13 | 08/10/2026 |
| Design 2147 | 6 | 10/02/2026 |
| Precision 3Sixty NYC | 5 | 12/17/2025 |
| Velocity Architecture & Engineering | 5 | 09/14/2026 |
| Caso & Associates | 4 | 07/14/2026 |
| Synergy Strategic Design Architects | 4 | 04/03/2026 |
| NYC School Construction Authority | 3 | 10/14/2026 |
| H2M Architects + Engineers | 2 | 02/24/2026 |
| Lizardos Engineering Associates | 2 | 09/21/2026 |
| Municipal Building Consultants | 2 | 09/12/2025 |
| SBLM | 2 | 06/16/2026 |
| Albert Aronov Architect | 1 | 12/03/2024 |
| Alloy Development | 1 | 01/16/2024 |
| City Wide Expediting | 1 | 09/30/2025 |
| Code | 1 | 07/27/2026 |
| DI Domenico + Partners | 1 | 11/16/2021 |
| Expedia Building Solution | 1 | 10/31/2024 |
| Greeley and Hansen | 1 | 06/28/2021 |
| HDR | 1 | 10/07/2025 |
| JMV Assosiates | 1 | 04/28/2026 |
| KM Associates of New York | 1 | 07/21/2026 |
| Loring Consulting Engineers | 1 | 08/28/2025 |
| Lothrop Associates | 1 | 07/17/2025 |
| MKM Landscape Architecture | 1 | 10/14/2026 |
| Neris | 1 | 07/19/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00587305 | 2953 BRIGHTON 6 STREET BROOKLYN | Alteration | Permit Issued | 09/28/2021 | 10/16/2026 | Design JFK&M CONSULTING ENGINEERS Filer JMV ASSOCIATES LLC | Subsequent boiler application. |
| B00697137 | 121 SARATOGA AVENUE BROOKLYN | Alteration | Permit Issued | 03/25/2022 | 10/13/2026 | Design H2M ARCHITECTS AND ENGINEERS | PS 137: Plumbing work in conjunction with new addition to school as per plans. No change in use egress or occupancy under this application. |
| X00875799 | 2750 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 05/22/2023 | 10/08/2026 | Design SYSTRA | Installation of (1) single drinking fountain and (1) dual drinking fountain. |
| X00902102 | 1449 SHAKESPEARE AVENUE BRONX | Alteration | Permit Issued | 07/31/2023 | 10/08/2026 | Design AKM ARCHITECTS LLP Filer CASO & ASSOCIATES,INC. | Remove select exhaust fans, ductwork, sire distribution and provide new. Remove select convectors, steam piping and accessories and provide … |
| X00980590 | 1449 SHAKESPEARE AVENUE BRONX | Alteration | Permit Issued | 12/21/2023 | 10/07/2026 | Design IAQ SYSTEMS INC Filer CASO & ASSOCIATES,INC. | Roof and window replacement. Raising low parapets. Exterior masonry repointing work, repair damaged masonry and corner face brick replacemen… |
| X01311975 | 560 BROOK AVENUE BRONX | Alteration | Permit Issued | 02/09/2026 | 10/07/2026 | Design COLLECTIF ENGINEERING PLLC Owner NYC-ACS | Replacement of (2) boilers at cellar level. |
| M01089047 | 695 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 08/15/2024 | 10/06/2026 | Design LIZARDOS ENGINEERING | Remove existing steel dunnage, catwalk and handrails. Install new steel dunnage, catwalk and handrails. New roof slab openings for ductwork… |
| B00863997 | 18 BEAVER STREET BROOKLYN | Alteration | Permit Issued | 04/26/2023 | 10/02/2026 | REMOVAL AND REPLACEMENT OF MASONRY, PARTITIONS, DOORS AND HARDWARE; INTERIOR FINISHES. REPLACEMENT OF ELEVATOR WITH NEW. | |
| Q00756382 | 231-02 67TH AVENUE QUEENS | Alteration | Permit Issued | 06/09/2022 | 10/02/2026 | Design SHENOY ENGINEERING, P.C. Owner NYC SCHOOL CONSTRUCTION Filer SBLM | FILING HEREWITH FOR THE STRUCTURAL WORK RELATED TO THE FLOOD ELIMINATION WORK FOR THIS SCHOOL. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY… |
| Q01197361 | 156-10 BAISLEY BOULEVARD QUEENS | Alteration | Permit Issued | 03/24/2025 | 10/02/2026 | Design KERI ENGINEERING, P.C. Owner NYC SCHOOL CONSTRUCTION | Replace existing drinking fountains in the corridors of path of travel with ADA compliant fixture and reconnect to existing plumbing distrib… |
| Q01155037 | 156-10 BAISLEY BOULEVARD QUEENS | Alteration | Permit Issued | 12/20/2024 | 09/29/2026 | Design SYSTRA Owner NYC SCHOOL CONSTRUCTION | Removing existing exhaust fans serving aeronautics lab and transportation shop with associated duct work. Providing new VRF heat pump unit w… |
| B08004157 | 6565 FLATLANDS AVENUE BROOKLYN | Alteration | Permit Issued | 09/19/2022 | 09/08/2026 | Design AECOM | PL: Remove Piping and Provide New with Plumbing Fixtures. No Change in Use, Occupancy, or Egress. |
| Q00730544 | 214-43 35TH AVENUE QUEENS | Alteration | Permit Issued | 06/21/2022 | 08/31/2026 | Design MAITRA ASSOCIATES Owner NYC SCHOOL CONSTRUCTION Filer JMV ASSOSIATES | REPURPOSING EXISTING SPACES, NECESSITATING ADA UPGRADES ON PATHS OF TRAVEL & AUDITORIUM, UPGRADE WATER SERVICES INSTALLATIONS, PROVIDE ASSIS… |
| B00448149 | 75 MESEROLE AVENUE BROOKLYN | Alteration | Permit Issued | 02/10/2021 | 08/21/2026 | REMOVAL OF MASONRY AND TOILET PARTITIONS; DOORS AND HARDWARE; TOILET FINISHES AND ACCESSORIES. INSTALLATION OF ELEVATOR, MASONRY, GYPSUM BOA… | |
| X08022673 | 383 EAST 139TH STREET BRONX | Alteration | Permit Issued | 11/03/2022 | 08/21/2026 | Filer HDR | PROVIDE NEW WXHAUST FANS AND TO ACCOMMODATE NEW AND UPGRADED TOILETS. PROVIDE HOIST VENT FOR NEW ELEVATOR. |
| X01091351 | 2055 MAPES AVENUE BRONX | Alteration | Permit Issued | 08/15/2024 | 08/12/2026 | Remove grille/install new fire damper grille, Remove/Install Fin tube covers, remove steam traps/pneumatic steam control valves, remove/inst… | |
| X01130339 | 2055 MAPES AVENUE BRONX | Alteration | Permit Issued | 10/31/2024 | 08/12/2026 | X129-Audio Visual Recording Studio - Room 433 - Disconnect, Remove, Capping/Plugging and Discard (1) Existing sink. | |
| X00709562 | 2080 CRUGER AVENUE BRONX | New Building | Permit Issued | 05/12/2022 | 08/11/2026 | Design STEVEN PAUL HAMMER | SUBSEQUENT FILING FOR PLUMBING WORK AS PER THE PLANS FILED HEREWITH. |
| M00688737 | 411 PEARL STREET MANHATTAN | Alteration | Permit Issued | 03/01/2022 | 08/06/2026 | Owner NYCSCA | Replacement of 275 gal. fuel oil tank. |
| B00710980 ↗ | 280 SENATOR STREET BROOKLYN | New Building | Permit Issued | 04/14/2022 | 07/30/2026 | Design STANTEC Filer STANTEC ARCHITECTURE | Sub-slab depressurization (soil venting) system and associated fan work for five story school with cellar |
| X00694656 ↗ | 680 NEWMAN AVENUE BRONX | Alteration | Permit Issued | 03/11/2022 | 07/09/2026 | Filer SEMMENS ASSOCIATE P.C. | Replace Electric water heater. Replace 13 water closets, 6 Lavs, 2 urinals, 1 shower, 1 mop sink, 2 drinking fountains. Replace 4 floor dra… |
| M00936068 | 800 DIVISION ROAD MANHATTAN | New Building | Permit Issued | 10/27/2023 | 07/01/2026 | M533 : Interior and Underground Plumbing for the 5 Story Educational Structure. No GAS Connection. | |
| Q00793388 | 129-33 155TH STREET QUEENS | New Building | Permit Issued | 10/03/2022 | 06/26/2026 | Owner NYC SCHOOL CONSTRUCTION | SSDS and GVB |
| Q01128905 | 214-43 35TH AVENUE QUEENS | Alteration | Permit Issued | 12/03/2024 | 06/24/2026 | Design SHENOY ENGINEERING, P.C. Owner NYC SCHOOL CONSTRUCTION Filer ALBERT ARONOV ARCHITECT | Q041- Roof, Parapet, & Exterior Masonry Replacement Structural Work |
| X00875055 ↗ | 3850 REVIEW PLACE BRONX | New Building | Permit Issued | 05/25/2023 | 06/24/2026 | Filer DESIGN 2147, LTD | Sub-Slab Depressurization System for New School Building |
| Q08025595 | 48-01 90TH STREET QUEENS | Alteration | Permit Issued | 10/25/2022 | 06/17/2026 | Owner NYC SCHOOL CONSTRUCTION Filer CASO & ASSOCIATES,INC. | Wing C - Roof drain replacement |
| M00839549 ↗ | 282 EAST 3RD STREET MANHATTAN | Alteration | Permit Issued | 05/23/2023 | 06/11/2026 | Design EP ENGINEERING LLC Filer CODE LLC | STRUCTURAL/FRAMING PLANS WITH RENOVATION, PARTIAL DEMOLITION AND ROOF DUNNAGE SUPPORT |
| B08023579 ↗ | 4012 FORT HAMILTON PARKWAY BROOKLYN | New Building | Permit Issued | 10/25/2022 | 06/03/2026 | Filer JMV ASSOCIATES LLC | P.S. 004-K: UNDERGROUND PLUMBING FOR A NEW SCHOOL BUILDING. |
| M01023321 | 4600 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/04/2024 | 06/02/2026 | Owner NYCSCA | SP: Remove and replace all sprinkler heads associated with the installation of new HVAC work. Note: this application is filed to separate th… |
| B00957552 | 500 19TH STREET BROOKLYN | Alteration | Permit Issued | 12/04/2023 | 05/20/2026 | Design SHENOY ENGINEERING, P.C. Filer CASO & ASSOCIATES,INC. | Structural openings for 3 floor renovations. PAA description in comments |
| B00787074 | 18 BEAVER STREET BROOKLYN | Alteration | Permit Issued | 10/04/2022 | 05/19/2026 | K120 : PLUMBING WORK : Replace 16 Roof Drains; 28 Vent Stacks Extensions and relocate 2 Vent Stacks on the Roofs. Remove 1 Gas Range, 1 2-… | |
| X00758859 ↗ | 680 NEWMAN AVENUE BRONX | Alteration | Permit Issued | 06/18/2022 | 04/30/2026 | REMOVAL AND DEMOLITION OF EXISTING ATHLETIC FIELD AND TENNIS COURTS. PROVIDE NEW ONSITE DETENTION PRACTICES AS PART OF THIS DEP GREEN INFR… | |
| Q00726673 ↗ | 35-18 LEAVITT STREET QUEENS | New Building | Permit Issued | 05/13/2022 | 04/23/2026 | Design A & T ENGINEERING, P.C. Owner 3518 X LLC | PROPOSED UNDERPINNING WORK TYPE FOR A 5 STORY MIXED-USE BUILDING, IN CONJUNCTION WITH NB APPLICATION NUMBER Q00726673-I1 |
| M01020891 | 4600 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/15/2024 | 04/13/2026 | Design H2M ARCHITECTS AND ENGINEERS Owner NYCSCA | Remove and replace roofing, parapets, and damaged masonry. Repair related interior finishes. |
| M01089098 | 920 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/19/2024 | 04/13/2026 | Design LIZARDOS ENGINEERING | Replace existing air handling unit and associated ductwork and piping in B4 and B3 levels. |
| Q00850708 | 48-01 90TH STREET QUEENS | Alteration | Permit Issued | 03/29/2023 | 04/09/2026 | Design MASSA MULTIMEDIA ARCHITECTS Owner NYC SCHOOL CONSTRUCTION | WATERPROOFING AT INTERIOR SIDE OF CELLAR FOUNDATION WALLS, PATCH/REPAIR OF FAILING/CRACKING CONCRETE SLABS, BEAM ENCASEMENTS, COLUMN ENCASEM… |
| M00594556 | 40 IRVING PLACE MANHATTAN | Alteration | Permit Issued | 09/16/2021 | 04/02/2026 | Design SHENOY ENGINEERING, P.C. Owner NYCSCA Filer SHENOY ENGINEERING, P.C. | Replace existing sump pump and provide new floor drains. |
| 201204115BIS | 1302 EDWARD L GRANT HIGHWAY BRONX | — | ISSUED | 04/26/2022 | 03/24/2026 | — | PL |
| 220484250BIS | 265 EAST 161ST STREET BRONX | — | ISSUED | 01/27/2017 | 03/17/2026 | — | MH, OT, PL, SP |
| 302583899BIS | 1801 AVENUE Y BROOKLYN | — | ISSUED | 09/20/2019 | 03/16/2026 | — | PL |
| 421104147BIS | 1-55 54TH AVENUE QUEENS | — | ISSUED | 12/04/2024 | 03/10/2026 | — | PL |
| 302583880BIS | 1801 AVENUE Y BROOKLYN | — | ISSUED | 11/27/2019 | 01/28/2026 | — | PL |
| Q01144466 | 14-30 BROADWAY QUEENS | Alteration | Permit Issued | 11/21/2024 | 01/26/2026 | Owner NYC SCHOOL CONSTRUCTION | Selective removals furniture, radiator covers, existing flooring, interior windows/doors, ceiling conduits, smartboard/tackboards/shelving/l… |
| X00807514 | 750 BAYCHESTER AVENUE BRONX | Alteration | Permit Issued | 01/06/2023 | 01/16/2026 | Design LOTHROP ASSOCIATES Filer LOTHROP ASSOCIATES | Remove and replace drinking fountains and add new drinking fountains. Remove and replace pumbing fixtures and add new. Install new floor d… |
| 421101453BIS | 58-20 UTOPIA PARKWAY QUEENS | — | ISSUED | 02/02/2023 | 01/12/2026 | — | PL |
| 421902418BIS | 156-10 BAISLEY BOULEVARD QUEENS | — | ISSUED | 07/19/2024 | 01/09/2026 | — | OT, PL |
| B00996506 | 5800 TILDEN AVENUE BROOKLYN | Alteration | Permit Issued | 02/29/2024 | 12/24/2025 | Removal One (1) Non Compliant drinking fountain along the Path Of Travel. Removal portion of Glazed Tile surrounding the existing drinking f… | |
| 104204451BIS | 345 EAST 15TH STREET MANHATTAN | — | ISSUED | 01/05/2023 | 12/23/2025 | — | MH, OT, PL, SP |
| 104213307BIS | 511 WEST 182ND STREET MANHATTAN | — | ISSUED | 01/19/2023 | 12/23/2025 | — | OT, PL |
| 103643960BIS | 4360 BROADWAY MANHATTAN | — | ISSUED | 01/09/2014 | 12/01/2025 | — | MH, OT, PL |
| 201190068BIS | 1514 OLMSTEAD AVENUE BRONX | — | ISSUED | 12/20/2013 | 12/01/2025 | — | MH, OT, PL |
| 201204393BIS | 1964 YATES AVENUE BRONX | — | ISSUED | 01/19/2022 | 12/01/2025 | — | PL |
| 322053781BIS | 8301 SHORE ROAD BROOKLYN | — | ISSUED | 05/12/2023 | 11/17/2025 | — | MH, OT, PL, SP |
| Q08023329 | 104-06 101ST AVENUE QUEENS | Alteration | Permit Issued | 10/25/2022 | 11/05/2025 | Design SHENOY ENGINEERING, P.C. Owner ROCKLYN ASSET CORP Filer JMV ASSOCIATES LLC | SCA PS 509Q. STRUCTURAL WORK ASSOCIATED WITH THE RENOVATION OF THE EXISTING SCHOOL BUILDING. |
| 201190059BIS | 1514 OLMSTEAD AVENUE BRONX | — | ISSUED | 12/31/2013 | 11/04/2025 | — | BL, MH, OT, PL |
| 421104067BIS | 174-25 59TH AVENUE QUEENS | — | ISSUED | 01/04/2019 | 11/04/2025 | — | PL |
| 322053228BIS | 39 MIDDAGH STREET BROOKLYN | — | ISSUED | 07/29/2021 | 10/07/2025 | — | MH, OT, PL |
| B00802438 | 800 GATES AVENUE BROOKLYN | Alteration | Permit Issued | 01/04/2023 | 09/15/2025 | REMOVE AND PROVIDE NEW THERMOSTATIC TRAPS AND CONTROL VALVES, DUCTWORK, VALVES, PIPING, SUPPORTS FOREXISTING SYSTEM, NEW SUPPLY AND RETURN G… | |
| 103652085BIS | 3 PARK AVENUE MANHATTAN | — | ISSUED | 10/22/2021 | 09/12/2025 | — | FS, MH, OT, PL, SD, SP |
| 201207737BIS | 1166 NEILL AVENUE BRONX | — | ISSUED | 09/07/2022 | 09/02/2025 | — | MH, OT, PL |
| 302586574BIS | 145 ST PENNSYLVANIA AVENUE BROOKLYN | — | ISSUED | 03/19/2020 | 09/02/2025 | — | OT, PL |
| 421103068BIS | 34-55 112TH STREET QUEENS | — | ISSUED | 03/06/2018 | 08/12/2025 | — | PL |
| 201207773BIS | 1166 NEILL AVENUE BRONX | — | ISSUED | 07/14/2022 | 07/21/2025 | — | MH, OT, PL |
| 201192431BIS | 275 HARLEM RIVER PARK BRIDGE BRONX | — | ISSUED | 07/14/2015 | 07/18/2025 | — | MH, OT, PL, SP |
| 201192636BIS | 275 HARLEM RIVER PARK BRIDGE BRONX | — | ISSUED | 07/19/2016 | 07/18/2025 | — | OT, PL |
| Q00548152 | 4301 BERRIAN BOULEVARD QUEENS | Alteration | Permit Issued | 06/28/2021 | 07/09/2025 | Design GREELEY AND HANSEN Filer GREELEY AND HANSEN | Remove and replace existing sump pumps located a various locations around Bowery Bay WRRF with duplex sump pumps. |
| 421899609BIS | 23-55 29TH STREET QUEENS | — | ISSUED | 03/29/2022 | 07/07/2025 | — | PL |
| 322050766BIS | 208 NORTH 5TH STREET BROOKLYN | — | ISSUED | 06/20/2024 | 06/24/2025 | — | MH, OT, PL |
| 302572197BIS | 25 BRIGHTON 4 ROAD BROOKLYN | — | ISSUED | 05/05/2015 | 06/23/2025 | — | BL, FB, MH, OT, PL |
| 421101319BIS | 221-15 58TH AVENUE QUEENS | — | ISSUED | 01/07/2020 | 06/17/2025 | — | PL |
| 201195786BIS | 3053 BRUCKNER BOULEVARD BRONX | — | ISSUED | 04/28/2017 | 06/13/2025 | — | PL |
| 201195795BIS | 3053 BRUCKNER BOULEVARD BRONX | — | ISSUED | 11/18/2016 | 06/13/2025 | — | PL |
| 402885428BIS | 50-51 98TH STREET QUEENS | — | ISSUED | 09/10/2015 | 06/10/2025 | — | PL |
| Q01166797 | 47-09 36TH STREET QUEENS | Alteration | Signed-off | 03/26/2025 | 05/06/2025 | Filer SBLM | PS503Q - FILING HEREWITH FOR THE PLUMBING WORK FOR THE SCHOOL. |
| X00838848 | 2750 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 03/07/2023 | 04/29/2025 | The conversion of existing classrooms into specialized education D75 classrooms at Rooms 103, 107 and 116. | |
| 302570705BIS | 71 SULLIVAN STREET BROOKLYN | — | ISSUED | 01/08/2015 | 04/25/2025 | — | BL, MH, OT, PL, SP |
| 421101916BIS | 46-35 OCEANIA STREET QUEENS | — | ISSUED | 07/16/2021 | 04/24/2025 | — | MH, OT, PL |
| 420557677BIS | 20-55 49TH STREET QUEENS | — | ISSUED | 04/09/2013 | 03/27/2025 | — | PL |
| B00984517 | 1077 REMSEN AVENUE BROOKLYN | Alteration | Signed-off | 01/03/2024 | 02/20/2025 | Design DMR ARCHITECTS | REPAIR EXISTING GREENHOUSE INTERIOR & INSTALL HYDROPONIC LAB EQUIPMENT |
| M00293203 | 75 BROAD STREET MANHATTAN | Alteration | Signed-off | 02/03/2020 | 12/02/2024 | Owner JEMB REALTY Filer CASO & ASSOCIATES,INC. | Plumbing installation for proposed school on 14 floor. PAA filed to change asbestos abatement compliance to V5 for permit- no plans |
| 421578732BIS | 222-15 56TH AVENUE QUEENS | — | ISSUED | 12/07/2018 | 11/05/2024 | — | PL, SD, SP |
| 302578805BIS | 317 HOYT STREET BROOKLYN | — | ISSUED | 02/05/2019 | 08/12/2024 | — | PL |
| 402898959BIS | 45-57 UNION STREET QUEENS | — | ISSUED | 02/09/2017 | 07/30/2024 | — | PL |
| 421107741BIS | 40-11 28TH STREET QUEENS | — | ISSUED | 11/16/2018 | 06/26/2024 | — | PL |
| 104213806BIS | 2581 ADAM CLAYTON POWELL JR BOULEVARD MANHATTAN | — | ISSUED | 06/09/2023 | 06/06/2024 | — | MH, OT, PL |
| 402894365BIS | 54-05 SKILLMAN AVENUE QUEENS | — | ISSUED | 04/06/2016 | 04/30/2024 | — | MH, OT, PL |
| 402895916BIS | 54-05 SKILLMAN AVENUE QUEENS | — | ISSUED | 06/05/2015 | 04/26/2024 | — | BL, MH, OT, PL |
| 220411793BIS | 265 EAST 161ST STREET BRONX | — | ISSUED | 05/17/2016 | 04/24/2024 | — | MH, OT, PL |
| M00701316 ↗ | 150 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 06/06/2022 | 04/19/2024 | Design O&S ASSOCIATES Filer JMV ASSOCIATES LLC | SPRINKLER AND STANDPIPE WORK FOR PROPOSED M514 3K CENTER FIT OUT. PROVIDE NEW BRANCH SPRINKLER PIPING AND SPRINKLER HEADS THROUGHOUT THE SP… |
| Q08034773 ↗ | 48-18 VAN DAM STREET QUEENS | Alteration | Signed-off | 11/04/2022 | 04/19/2024 | Owner 4818 VAN DAM LLC Filer DESIGN 2147, LTD | Q444 - Herewith filing 3K fitout |
| B00703399 ↗ | 1 CLINTON STREET BROOKLYN | Alteration | Signed-off | 05/24/2022 | 04/16/2024 | Design COSTA ARCH & ENG LLP Filer DESIGN 2147, LTD | HEREWITH FILING PLUMBING & SPRINKLER WORK AS PER PLANS FOR TENANT FIT OUT IN CONJUNCTION WITH NB APPLICATION #321197478. NO CHANGE IN USE, O… |
| M01010685 ↗ | 163 EAST 84TH STREET MANHATTAN | Alteration | Signed-off | 03/14/2024 | 03/20/2024 | Design O&S ASSOCIATES Owner MINETTA LANE OWNERS Filer JMV ASSOCIATES LLC | 3K-M512 _ The plumbing application work is to Swap locations of the Standing Accessible drinking fountain and the 3K wheelchair-accessible d… |
| 302572632BIS | 317 HOYT STREET BROOKLYN | — | ISSUED | 12/14/2017 | 11/08/2023 | — | PL |
| B00238667 ↗ | 485 STATE STREET BROOKLYN | Alteration | Signed-off | 09/01/2021 | 10/31/2023 | Design COSENTINI ASSOCIATES Filer ALLOY DEVELOPMENT | Plumbing work in conjunction w/ NB #321595449. |
| 201195697BIS | 279 EAST 196TH STREET BRONX | — | ISSUED | 09/07/2017 | 09/21/2023 | — | PL |
| 201199247BIS | 1434 LONGFELLOW AVENUE BRONX | — | ISSUED | 07/10/2020 | 09/20/2023 | — | OT, PL |
| Q00751804 ↗ | 36-31 38TH STREET QUEENS | Alteration | Signed-off | 07/13/2022 | 08/30/2023 | Design SETTY Owner PLATINUM Filer DESIGN 2147, LTD | 210213 -Herewith filing plumbing work type for 3K reno |
| B00579929 ↗ | 662 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 01/13/2022 | 08/16/2023 | Owner THE BRODSKY ORGANIZATION Filer DESIGN 2147, LTD | Filing herewith for plumbing portion of interior tenant fit out. No Change to use, egress or occupancy on this application. |
| Q00660931 | 47-09 36TH STREET QUEENS | Alteration | Signed-off | 05/16/2022 | 07/31/2023 | Filer JMV ASSOCIATES LLC | SP application for SCA Q503-3K. Installation of temporary sprinkler loop. |
| 302573846BIS | 317 HOYT STREET BROOKLYN | — | ISSUED | 10/03/2017 | 07/26/2023 | — | OT, PL |